Synopsis ANCH.doc

DOC document 33 KB Posted

Attached to
RECOVERY - 2009 -2011 Transitional and Maintenance Dredging at the Port of Anchorage
Solicitation number
W911KB-09-R-0001
Issued by

About this file

Pre-Solicitation and Meeting Notice

View the file

Other files

File Type Posted
W911KB-09-R-0001 Amendment 0004.pdf PDF
W911KB-09-R-0001-0003.pdf PDF
3D-2009 Anch Bndy Model .pdf PDF
REGISTER.pdf PDF
QUESITONS AND ANSWERS.doc DOC document
W911KB-09-R-0001-0002 ANCH.pdf PDF
Trial Dredging Report Port of Anchorage Harbor Deeping.pdf PDF
Trial Dredging Report Port of Anchorage Harbor Deeping.pdf PDF
W911KB-09-R-0001 A00001.pdf PDF
FONSI.pdf PDF
Port of Anchorage- ANCEXP09.pdf PDF
Geotechnical Findings Report Anchorage Harbor Deepening June 2008.pdf PDF
C-103 sheet 4 of 6 newwork 2010 Model —
POA_Pre-Dredge 16 may 08 EXHIBITS 1-4 Sheet 4 —
POA_Pre-Dredge 16 may 08 EXHIBITS 1-4 Sheet 1 —
C-501 sheet 6 of 6 newwork 2010 Details Model —
C-102 sheet 3 of 6 newwork 2010 Model —
Trial Dredging Report Port of Anchorage Harbor Deeping.pdf PDF
Geotechnical Findings Report Anchorage Harbor Deepening June 2008.pdf PDF
POA_Pre-Dredge 16 may 08 EXHIBITS 1-4 Sheet 3 —
C-101 sheet 2 of 6 newwork 2010 Model —
POA_Pre-Dredge 16 may 08 EXHIBITS 1-4 Sheet 2 —
C-104 sheet 5 of 6 newwork 2010 Model —
FONSI.pdf PDF
SPECS PORT OF ANCHORAGE DREDGING.pdf PDF
G-001 sheet 1 of 6 newwork 2010 Cover Model —
W911KB-09-R-0001 PORT OF ANCHORAGE DREDGING.pdf PDF
Port of Anchorage Drawings.pdf PDF
Port of Anchorage Dredging Specifications.pdf PDF
Answered QAs Anchorage Harbor Dredging Preproposal Conference.doc DOC document
2009-2011 Transitional Dredging Port of Anchorage Questions and Answers.pdf PDF
POA_Pre-Dredge 16 may 08 EXHIBITS 1-4 Sheet 2 —
sheet 4 of 4 newwork 2010 DETAILS Model —
ANCHORAGE dtl-site North1 nad83 sheet 3 of 5 Model —
POA_Pre-Dredge 16 may 08 EXHIBITS 1-4 Sheet 3 —
sheet 2 of 4 newwork 2010 Model —
Agenda W911KB-09-R-0001 Anchorage Harbor Dredging 2009-2011.pdf PDF
ANCHORAGE dtl-site South1 nad83 sheet 2 o f 5 Model —
ANCHORAGE dtl-site DETAILS sheet 5 of 5 rev2 Model —
ANCHORAGE dtl-site South2 nad83 sheet 1 of 5 Model —
sheet 3 of 4 newwork 2010 Model —
POA_Pre-Dredge 16 may 08 EXHIBITS 1-4 Sheet 1 —
POA_Pre-Dredge 16 may 08 EXHIBITS 1-4 Sheet 4 —
ANCHORAGE dtl-site North2 nad83 sheet 4 of 5 Model —
W911KB-09-R-0001 Proposal Documents Anchorage Harbor Dredging 2009-2011.pdf PDF
ANCHORAGE Cover 08-09 Model —
sheet 1 of 4 newwork 2010 Model —
W911KB-09-R-0001 Drawings.pdf PDF
Geotechnical Findings Report Anchorage Harbor Deepening June 2008.pdf PDF
_Compiled Solicitation Packet.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Z -- 2009-2011 Transitional and Maintenance Dredging at Port of Anchorage, AK General Information

Document Type:

Presolicitation Notice Solicitation Number:

W911KB-09-R-0001

Posted Date:

Response Date:

30 Days

Classification Code:

Z -- Maintenance, Repair, or Alteration of Real Property Set Aside:

Full and Open Description

A Request for Proposal in electronic format only will be available for download on or about 5 Mar 2009 at www.fbo.gov. No disks shall be mailed. Any resulting contract will be firm-fixed priced. The North American Industrial Classification System code is 237990, which has a size standard of $18.5 million in average annual receipts. Joint ventures must also be registered in CCR as a joint venture. We advise contractors begin this process as soon as possible should they be selected for award. The solicitation shall be based on Best Value in accordance with FAR Part 15... The government shall not be responsible for proposal preparation costs. To receive award contractors must be registered in the CCR at www.ccr.gov and http://orca.bpn.gov. The requirement for the submission of both performance and payment bonds, in an amount equivalent to 100% of the award price and a bid guarantee for 20% of the bid price or $3,000,000, whichever is less shall be applicable. Therefore, the successful firm shall have the capability to acquire such bonding. The Davis-Bacon Act will apply. Joint Ventures must also be registered in CCR as a joint venture. We advise contractors to start process as soon as possible.

DESCRIPTION OF WORK: Perform surveying, dredging and disposal of approximately 1,700,000 cubic yards in 2009 of virgin materials plus an additional 1,000,000 cubic yards of fine-grained shoal materials from the Port of Anchorage north expansion area and dredge an estimated 2,000,000 cubic yards of material per year at the Port of Anchorage, Alaska. The Contractor is to furnish all labor, equipment, supplies, materials, supervision and other items and services necessary to accomplish the work. Type of contract is firm-fixed-price Best Value. The Estimated Magnitude of Construction is between $25,000,000 to $100,000,000.

A Sources Sought/VE Study Conference for this project will be held on 10-11 February at the Hilton Hotel downtown Anchorage, AK at 500 West 3rd Avenue. Their phone number is (907) 272-7411. The actual time of the conference will run from 0900-1700 each day.

File details come from the government source that posted it. Updated .