Technical Exhibit J - Building Air Barrier System.pdf
PDF 103 KB Posted
- Attached to
- Renovate BLDG 37011 Federal contract opportunity
- Solicitation number
- W9115124B0001
About this file
This document is a Unified Facilities Guide Specification (UFGS) for a Building Air Barrier System. It provides detailed requirements for the construction and quality control of the installation of an air barrier system as part of a building envelope. The specification covers Contractor responsibilities, quality control procedures, and maximum allowable leakage requirements for the completed air barrier system. It references other specifications that cover the air barrier materials, components, and testing. The specification is intended for use on new construction, additions, and major renovations involving upgrades to the building envelope. Key requirements include: continuous air barrier across all surfaces of the enclosed air barrier envelope, maximum allowable leakage rates for the overall envelope and individual components, qualifications for an Air Barrier Inspector, and a design review process. The specification provides detailed guidance for the design and detailing of the air barrier system within the building envelope.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USACE / NAVFAC / AFCEC UFGS- 07 27 10 ( August 2023)
Pr epar i ng Act i v i t y: USACE Super sedi ng UFGS- 07 27 10. 00 10 ( August 2019)
UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS
Ref er ences ar e i n agr eement wi t h UMRL dat ed Apr i l 2024
SECTI ON TABLE OF CONTENTS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
SECTI ON 07 27 10
BUI LDI NG AI R BARRI ER SYSTEM
08/ 23
PART 1 GENERAL
1. 1 SUMMARY
1. 2 REFERENCES
1. 3 DEFI NI TI ONS
1. 3. 1 Ai r Bar r i er Accessor y
1. 3. 2 Ai r Bar r i er Assembl y
1. 3. 3 Ai r Bar r i er Component
1. 3. 4 Ai r Bar r i er Envel ope
1. 3. 5 Ai r Bar r i er Mat er i al
1. 3. 6 Ai r Bar r i er Syst em
1. 3. 7 Ai r Leakage Rat e
1. 3. 8 Ai r Leakage
1. 3. 9 Ai r Per meance
1. 3. 10 Envi r onment al Separ at or
1. 3. 11 Vapor Per meance
1. 4 PREPARATORY PHASE OR PRECONSTRUCTI ON CONFERENCE
1. 5 SUBMI TTALS
1. 6 AI R BARRI ER ENVELOPE SURFACE AREA AND LEAKAGE REQUI REMENTS
1. 7 AI R BARRI ER I NSPECTOR
1. 8 DESI GN REVI EW
PART 2 PRODUCTS
2. 1 AI R BARRI ER
PART 3 EXECUTI ON
3. 1 QUALI TY CONTROL
3. 1. 1 Document at i on and Repor t i ng
3. 1. 2 Const r uct i on Mock- Up
3. 1. 3 Qual i t y Cont r ol Test i ng And I nspect i on
3. 2 REPAI R AND PROTECTI ON
SECTI ON 07 27 10 Page 1
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 07 27 10 Page 2
USACE / NAVFAC / AFCEC UFGS- 07 27 10 ( August 2023)
Pr epar i ng Act i v i t y: USACE Super sedi ng UFGS- 07 27 10. 00 10 ( August 2019)
UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS
Ref er ences ar e i n agr eement wi t h UMRL dat ed Apr i l 2024
SECTI ON 07 27 10
BUI LDI NG AI R BARRI ER SYSTEM
08/ 23
NOTE: Thi s gui de speci f i cat i on cover s Cont r act or r esponsi bi l i t i es, qual i t y cont r ol , and maxi mum l eakage r equi r ement s of t he const r uct ed ai r bar r i er syst em. Thi s speci f i cat i on must be accompani ed by pl ans showi ng and det ai l i ng t he ai r bar r i er ; i t i s not i nt ended t o st and al one i n any set of const r uct i on document s. Thi s speci f i cat i on i s i nt ended f or use on new const r uct i on and addi t i ons, and on r enovat i ons i nvol v i ng maj or upgr ade t o t he bui l di ng envel ope.
Adher e t o UFC 1- 300- 02 Uni f i ed Faci l i t i es Gui de Speci f i cat i ons ( UFGS) For mat St andar d when edi t i ng t hi s gui de speci f i cat i on or pr epar i ng new pr oj ect speci f i cat i on sect i ons. Edi t t hi s gui de speci f i cat i on f or pr oj ect speci f i c r equi r ement s by addi ng, del et i ng, or r evi s i ng t ext . For br acket ed i t ems, choose appl i cabl e i t em( s) or i nser t appr opr i at e i nf or mat i on.
Remove i nf or mat i on and r equi r ement s not r equi r ed i n r espect i ve pr oj ect , whet her or not br acket s ar e pr esent .
Comment s, suggest i ons and r ecommended changes f or t hi s gui de speci f i cat i on ar e wel come and shoul d be submi t t ed as a Cr i t er i a Change Request ( CCR) .
PART 1 GENERAL
NOTE: UFC 3- 101- 01 Ar chi t ect ur e gi ves ai r bar r i er syst em r equi r ement s f or new const r uct i on and r enovat i ons.
Test i ng of t he ai r bar r i er syst em i s cover ed i n t he compani on UFGS 01 91 19 BUI LDI NG ENCLOSURE COMMI SSI ONI NG. I f ai r bar r i er syst em t est i ng i s
SECTI ON 07 27 10 Page 3 r equi r ed by t he UFC, t he t est i ng speci f i cat i on must accompany t hi s speci f i cat i on i n t he const r uct i on document s.
Thi s speci f i cat i on i s appl i cabl e t o ai r bar r i er syst ems i nst al l ed i n new bui l di ng const r uct i on and i n maj or r enovat i ons i nvol v i ng upgr ades t o t he bui l di ng envel ope; i t i s not appl i cabl e t o uncondi t i oned bui l di ngs. Thi s speci f i cat i on i s i nt ended t o def i ne Cont r act or r esponsi bi l i t i es f or t he const r uct i on of t he ai r bar r i er syst em acr oss t he si x s i des of a bui l di ng t hat when i nst al l ed pr oper l y wi l l cont r ol t he i nf i l t r at i on or exf i l t r at i on of ai r t hr ough t he ai r bar r i er syst em.
A t i ght bui l di ng i s essent i al t o a pr oper l y f unct i oni ng HVAC syst em, t o r educe ener gy consumpt i on, and t o pr event pr obl ems ar i s i ng f r om excessi ve i nf i l t r at i on or exf i l t r at i on i nt o or out of t he envi r onment al l y condi t i oned spaces.
UFC 3- 101- 01 Ar chi t ect ur e i s r ecommended r eadi ng f or t he desi gner . Al so r ecommended i s " Ai r Bar r i er Syst ems i n Bui l di ngs" by Wagdy Ani s, FAI A; avai l abl e at ht t ps: / / www. wbdg. or g/ r esour ces/ ai r - bar r i er - syst ems- bui l di ngs .
Addi t i onal r esour ces i ncl ude:
EP 415- 1- 261 Vol 6 BUI LDI NG ENVELOPES f or const r uct i on r el at ed aspect s of t he ai r bar r i er syst em and ot her bui l di ng envel ope component s.
Annex 61 Deep Ener gy Ret r of i t Gui de Chapt er 10 and Appendi x G Ai r Ti ght ness f or Gui dance on Renovat i on and Ret r of i t Appl i cat i ons and St r at egi es.
AI R BARRI ER SYSTEM CONCEPTS AND DESI GNER NOTES:
1. Desi gn a cont i nuous ai r bar r i er syst em t o cont r ol ai r l eakage i nt o, or out of , t he condi t i oned space.
2. On dr awi ngs dedi cat ed t o t he ai r bar r i er syst em, i dent i f y t he sur f ace boundar y of t he bui l di ng ai r bar r i er syst em i n pl an and i n bui l di ng sect i on v i ews. Thi nk of t he ai r bar r i er syst em as a seal ed bal l oon.
3. Keep i n mi nd t hat wi ndow and door component s ar e par t of t he bui l di ng ai r bar r i er syst em. One must be abl e t o t r ace a cont i nuous pl ane of ai r - t i ght ness t hr oughout each ai r bar r i er syst em envel ope.
4. Of cour se, i nt ake, exhaust , and r el i ef damper s ar e par t of t he ai r bar r i er syst em. I f t hese damper s ar e not l ocat ed at or near t he bui l di ng wal l , t hen t he duct bet ween t he ai r bar r i er i n t he ext er i or wal l and t he damper i s al so par t of t he ai r bar r i er syst em and must be wel l seal ed.
SECTI ON 07 27 10 Page 4
5. Wal l s of vent i l at ed cr awl spaces l ogi cal l y cannot be t he boundar y of t he ai r bar r i er syst em. Nor can t he r oof above a vent i l at ed at t i c be par t of an ai r bar r i er syst em.
6. Def i ni ng t he ai r bar r i er syst em boundar y i s t he r esponsi bi l i t y of t he bui l di ng desi gner . Pl an vi ews shoul d show t he hor i zont al out l i ne ( by dashed l i nes) of t he ai r bar r i er syst em and any i ndi v i dual ai r bar r i er zones. Rooms wi t h per manent f i xed openi ngs t o t he out door envi r onment cannot be i ncl uded i n t he ai r bar r i er envel ope because such openi ngs woul d r epr esent a hol e i n t he ai r bar r i er envel ope ( t he bal l oon) .
7. Bui l di ng and wal l sect i ons shoul d show t he ver t i cal out l i ne ( by dashed l i nes) of t he ai r bar r i er syst em f r om f l oor t o r oof or cei l i ng.
8. Wal l and r oof sect i ons and det ai l s shoul d show t he l ocat i on of t he ai r bar r i er membr ane wi t hi n t he ext er i or bui l di ng envel ope.
9. For cavi t y wal l const r uct i on ut i l i z i ng i nsul at i on boar d i nsi de t he cavi t y, ai r bar r i er mat er i al s l ocat ed on t he out boar d s i de of t he wal l syst em and t he i nt er i or s i de of t he i nsul at i on at t ached t o a dur abl e subst r at e i s subj ect t o l ess expansi on and cont r act i on t han i f l ocat ed on t he out er s i de.
Addi t i onal l y, t hi s l ocat i on i s t he pr oper hygr ot her mal l ocat i on f or t he vapor pl ane of t he wal l assembl y f or st ud cavi t y or masonr y bl ock wal l s.
10. The concr et e mat er i al can act as t he ai r / wat er / vapor bar r i er on pr e- cast , cast - i n- pl ace concr et e, and I nsul at ed Concr et e For m ( I CF) wal l s.
11. Ai r bar r i er mat er i al s t hat al so ser ve as i nt er i or f i ni shes ar e di scour aged because such mat er i al s ar e subj ect t o damage, di f f i cul t t o seal , and of t en compr omi sed by occupant penet r at i ons.
12. An ai r bar r i er mat er i al l ocat ed on t he out boar d s i de of t he ext er i or wal l assembl y can of t en ser ve as t he ai r , vapor and wat er r esi st i ve l ayer of t he wal l syst em. Common st ud cavi t y or masonr y wal l t ypes must i ncor por at e an ai r / wat er / vapor cont r ol l ayer on t he out boar d s i de of t he wal l assembl y and when doi ng so, t hi s shoul d be a Cl ass 1 vapor bar r i er / r et ar der by mat er i al per meance. Appl y i ng an ai r bar r i er wi l l est abl i sh t he vapor pl ane of t he wal l syst em i n t he cor r ect l ocat i on and al l ow i nwar d and out war d dr yi ng pot ent i al f or t he assembl y f r om t hi s pl ane. Consi der t he vapor per meance of al l mat er i al s and t hei r r el at i ve posi t i on wi t hi n t he ext er i or envel ope t o assur e t he i ncr easi ng per meance of t he mat er i al s f r om t he vapor pl ane t o t he i nner , condi t i oned space sur f ace of t he wal l syst em.
Par t i cul ar at t ent i on shoul d be pai d t o t he c l i mat i c
SECTI ON 07 27 10 Page 5 condi t i ons t he wal l syst em wi l l be s i t uat ed i n and exper i ence over t he l i f et i me of t he assembl y. Ai r bar r i er mat er i al s may have l ow wat er vapor per meance and act as i nt ended, or i f l ocat ed i ncor r ect l y, uni nt ended vapor r et ar der s or bar r i er s. Ot her mat er i al s used wi t h t he envel ope may al so have l ow wat er vapor per meance. Car ef ul consi der at i on r egar di ng t he l ocat i on of such mat er i al s i s cr uci al t o avoi d vapor bar r i er t emper at ur e bel ow t he dew poi nt t emper at ur e of t he ai r on ei t her s i de, and t o avoi d doubl e vapor bar r i er s t hat pr event i nwar d dr yi ng t o t he condi t i oned space and can t r ap condensat i on wi t hi n t he t her mal envel ope. Such condi t i ons can cont r i but e t o mol d pr obl ems and mat er i al f ai l ur e pr obl ems. The t her mal r esi st ance, vapor per meance, and r el at i ve t her mal posi t i on of t he component mat er i al s must be sel ect ed such t hat at al l l ocat i ons wi t hi n t he envel ope, t he dew poi nt t emper at ur e i s l ess t han t he l ocal sur f ace t emper at ur e.
I f sof t war e such as WUFI hygr ot her mal model i ng i s avai l abl e, use i t t o ver i f y wal l syst em per f or mance or t o model uni que condi t i ons or bui l di ng appl i cat i ons t hat ar e at ypi cal f or a gi ven condi t i on or c l i mat e.
13. Keep i n mi nd t hat ai r bar r i er membr anes must wi t hst and f or ces due t o posi t i ve and negat i ve pr essur es caused by wi nd and St ack Ef f ect . As a poi nt of r ef er ence, many r oof s ar e desi gned f or a wi nd upl i f t pr essur e of 4. 3 kPa 90 l b/ sq. f t .
Bui l di ng wr aps ar e par t i cul ar l y suscept i bl e t o wi nd f or ces unl ess sandwi ched bet ween r i gi d wal l component s ( exampl e: sheat hi ng and boar d i nsul at i on) . Ot her wi se, wr aps may exper i ence excessi ve f l exi ng and st r essi ng and poi nt l oadi ng of t he secur i ng f ast ener s.
14. On t he dr awi ngs, i dent i f y each ai r bar r i er mat er i al , membr ane, coat i ng, wi ndow component , door component , damper s, and ot her component s t hat compose t he cont i nuous ai r bar r i er envel ope.
Mat er i al s t hat ar e par t of t he desi gnat ed cont i nuous ai r bar r i er syst em must be i dent i f i ed as such.
Al t hough many mat er i al s used i n ext er i or assembl i es ar e ai r t i ght , t hey may or may not ser ve as par t of t he desi gnat ed cont i nuous ai r bar r i er syst em.
15. I n a r oof assembl y, t ypi cal l y l ocat e t he ai r bar r i er mat er i al on t he i nsi de of t he i nsul at i on and at t ached t o a dur abl e subst r at e. Desi gn r oof assembl i es i n accor dance wi t h UFC 3- 110- 03 Roof i ng.
16. Det ai l t he connect i on of r oof and wal l ai r bar r i er mat er i al s. The r oof - wal l i nt er f ace has been t he sour ce of maj or ai r i nf i l t r at i on and exf i l t r at i on i n t he past due t o t he many i r r egul ar l y shaped decki ng and st r uct ur al suppor t member s
SECTI ON 07 27 10 Page 6 i nt er sect i ng at t hi s poi nt , and i nsuf f i c i ent at t ent i on t o det ai l t o t he ai r bar r i er syst em at t hi s l ocat i on. Al t hough sequenci ng t he connect i on of t he r oof - wal l ai r bar r i er s i s t he Cont r act or ' s r esponsi bi l i t y , dr awi ng not es suggest i ng a sequence of t he t r ades may ser ve as hel pf ul r emi nder s t o t he i nst al l er .
17. Det ai l t he connect i on of wal l and f l oor ai r bar r i er mat er i al s.
18. Det ai l t he connect i on of t he wal l ai r bar r i er mat er i al s t o wi ndow and door component s.
19. Det ai l t he penet r at i ons of t he ai r bar r i er envel ope by pi pe, duct s, and condui t showi ng t he met hod of seal i ng t he penet r at i on. Mi ni mi ze ai r bar r i er penet r at i ons t o t he gr eat est ext ent possi bl e.
20. Det ai l t he ai r bar r i er mat er i al t o be cont i nuous under or ar ound el ect r i cal boxes and panel s, pl umbi ng f i xt ur e boxes, and ot her i t ems af f ect i ng ai r bar r i er syst em cont i nui t y. Do not penet r at e t he ai r bar r i er envel ope wi t h l i ght i ng f i x t ur es.
Cont i nui t y and ai r t i ght ness i s easi er t o achi eve when ai r bar r i er s mat er i al s ar e l ocat ed out boar d of t he cavi t i es t hat cont ai n wi r i ng, condui t , and pl umbi ng.
21. I n ot her speci f i cat i on sect i ons, speci f y t he ai r bar r i er mat er i al s used i n t he syst em. As def i ned by t he Ai r Bar r i er Associ at i on of Amer i ca ( ABAA) al l ai r bar r i er mat er i al s must have an ai r per meance l ess t han 0. 02 L/ s- m2 0. 004 CFM/ sq- f t at 75 Pa when t est ed i n accor dance wi t h ASTM E2178.
22. I dent i f y t he al l owabl e l eakage r at es of wi ndows, ext er i or door s, cur t ai n wal l assembl i es, skyl i ght s, damper s, and al l ot her such ai r bar r i er component s i n t he speci f i cat i on sect i ons cover i ng t hese component s.
23. Not e t hat t he Ener gy St ar pr ogr am has no ai r l eakage r equi r ement f or wi ndows and door s. However , ASHRAE 90. 1 cont ai ns maxi mum l eakage val ues f or f enest r at i on and door s det er mi ned i n accor dance wi t h NFRC 400. These ar e mi ni mal r equi r ement s and do not r epr esent st at e of t he ar t . The I ECC st andar d cont ai ns l eakage l i mi t s f or door s and wi ndows t hat may be usef ul as a gui del i ne. Be sur e t he speci f i cat i ons f or f enest r at i on and door s i ncl ude maxi mum ai r l eakage val ues.
24. Leakage r at es f or sect i onal t ype over head door s ar e publ i shed by manuf act ur er s, however , t her e i s no known manuf act ur er who publ i shes t est ed l eakage per f or mance f or r ol l - up t ype over head door assembl i es. For r ol l - up t ype door s, speci f y t he best weat her st r i ppi ng avai l abl e i n t he speci f i cat i on
SECTI ON 07 27 10 Page 7 sect i on cover i ng over head door s and speci f y a maxi mum l eakage when such r at i ngs ar e avai l abl e.
25. Wher e l ouver ed smoke vent i l at i on openi ngs ar e used at t he t op of el evat or shaf t s, pr ovi de a mot or i zed damper whi ch i s spr ung nor mal l y open and hel d c l osed by t he damper act uat or . Connect t he act uat or t o t he f i r e al ar m syst em t o open t he damper upon a bui l di ng al ar m. Ref er t o I BC Chapt er 30 El evat or s and Conveyi ng Syst ems.
26. Pr ovi de t i ght seal i ng damper s and cont r ol s t o c l ose al l vent i l at i on or make- up ai r i nt akes and exhaust s dur i ng i nact i ve or unoccupi ed per i ods. I n t he HVAC and bui l di ng cont r ol s speci f i cat i on sect i ons, speci f y al l i nt ake, r el i ef , and exhaust damper s t o be AMCA 511 l eakage Cl ass 1A ( 15. 2 L/ s/ squar e met er @250 Pa( 3 CFM/ sq. f t . @ 1 i n. w. c) .
27. Of t en, t her e i s but one ai r bar r i er envel ope i n a bui l di ng and t hi s s i ngl e envel ope may encl ose t he ent i r e vol ume of t he bui l di ng or a por t i on of t he bui l di ng.
28. However , some bui l di ngs cal l f or mul t i pl e ai r bar r i er envel opes. An exampl e i s i n a vehi c l e mai nt enance f aci l i t y ; t he ai r condi t i oned admi ni st r at i ve of f i ce ar ea must have an ai r bar r i er envel ope syst em compl et e and separ at e f r om t he ai r bar r i er envel ope ser vi ng t he mai nt enance ar ea so t hat t he admi n ar ea ai r bar r i er syst em i s not nul l i f i ed dur i ng war m weat her when t he vehi c l e mai nt enance bay door s ar e open. The common wal l bet ween t he t wo ar eas i s a par t of t he ai r bar r i er envel ope f or bot h ar eas. Ther ef or e, t he common wal l must be t i ght l y const r uct ed and i ncl ude an ai r bar r i er mat er i al . Not e t hat , i n t hi s case, t he common wal l i s i ncl uded i n t he cal cul at i on of t he ai r bar r i er sur f ace ar ea.
29. Somet i mes t he ent i r e ai r bar r i er envel ope cannot be t est ed at once. An exampl e i s a bui l di ng wi t h mul t i pl e l i v i ng quar t er s separ at ed by f ul l hei ght par t i t i ons and wi t hout an i nt er i or cor r i dor . I f t her e i s no di scer nabl e ai r pat h connect i ng t he r ooms ( such as i nt er i or door ways or common cei l i ng pl enums) , t est i ng t he ent i r e bui l di ng ai r bar r i er envel ope i s pr ecl uded.
30. I n t hi s case, por t i ons of t he ai r bar r i er envel ope shoul d be t est ed. Sel ect ed r ooms must be ai r pr essur e t est ed t o det er mi ne t he l eakage t hr ough t he por t i on of t he ai r bar r i er envel ope shar ed by t he sel ect ed r ooms. On t he dr awi ngs, i dent i f y r epr esent at i ve r ooms at t he ext er i or cor ner s and r ooms not at bui l di ng cor ner s t o be t est ed, and i n t hi s speci f i cat i on, gi ve t he r oom number ai r bar r i er envel ope ar ea and l eakage r equi r ement s f or each r oom t o be t est ed. Not e t he ai r bar r i er envel ope sur f ace
SECTI ON 07 27 10 Page 8 ar ea i s onl y t hat por t i on of ai r bar r i er per i met er envel ope shar ed by t he r oom, i t i s not t he ent i r e r oom sur f ace ar ea. Test i ng i n t hi s s i t uat i on r equi r es pr essur i z i ng adj acent r ooms so t hat t her e i s no r oom- t o- r oom ai r l eakage. For a descr i pt i on of t he t est pr ocess, Ref er t o UFGS 01 91 19 BUI LDI NG ENCLOSURE COMMI SSI ONI NG par agr aph Pr essur e Test i ng a Mul t i pl e I sol at ed Zoned Bui l di ng. Wher e a number of r ooms have t he same di mensi ons, t he dr awi ngs shoul d i ndi cat e t hat t he t est r oom wi l l ei t her be t he r oom i ndi cat ed or a r oom of t he same si ze sel ect ed by t he Cont r act i ng Of f i cer .
31. On t he dr awi ngs, t he desi gner must i dent i f y t he envel opes t o be t est ed, usual l y by number . Ref er t o par agr aph AI R BARRI ER ENVELOPE SURFACE AREA AND
LEAKAGE REQUI REMENTS.
32. Cal cul at e t he ai r bar r i er envel ope sur f ace ar ea ( sq. m( sq. f t . ) f or each envel ope t o be t est ed. Thi s i s t he sur f ace ar ea of t he vol ume encl osed by each ai r bar r i er envel ope t o be t est ed ( i ncl udes f l oor s, wal l s, f enest r at i on, door s, and r oof ) . On t he dr awi ngs or i n t hi s speci f i cat i on, i ndi cat e t he sur f ace ar ea f or each ai r bar r i er envel ope t o be t est ed.
33. Two t est s can be per f or med f or t he bui l di ng envel ope; an " Ar chi t ect ur al Onl y Test " , and an " Ar chi t ect ur al Pl us HVAC Syst em Test " . The Ar chi t ect ur al Onl y Test cal cul at es t he l eaki ng t hr ough t he ar chi t ect ur al por t i ons of t he envel ope and al l ows some expedi ent seal i ng of many HVAC component s t o excl ude any l eakage t hr ough t hese i t ems f r om t est r esul t s.
The Ar chi t ect ur al Pl us HVAC Syst em cal cul at es t he l eakage f r om t he ent i r e bui l di ng i n a condi t i on i n whi ch t he HVAC syst em i s of f and al l ows no t empor ar y maski ng or seal i ng of mechani cal or HVAC component s such as damper s, f l ues and vent s. The Ar chi t ect ur al pl us HVAC Syst em t est shoul d be i ncl uded i n t he speci f i cat i ons of a Cont r act when t he bui l di ng i s desi gned such t hat t he HVAC syst em may oper at e i nt er mi t t ent l y and when damper s wi l l be used t o pr event ai r l eakage out of t he condi t i oned space t hr ough t he HVAC syst em. The Ar chi t ect ur al Pl us HVAC Syst em t est may be appl i ed t o r esi dent i al pr oj ect s wi t h i nt er mi t t ent HVAC syst em oper at i on or a pr oj ect i n whi ch t her e i s a need t o ver i f y mechani cal damper s i n t he HVAC syst em f or l eakage per f or mance.
34. I ndi cat e t he al l owabl e l eakage r at e of each ai r bar r i er envel ope ( ___ L/ s- m2( ___CFM/ sq. f t . @ 75 Pa) . Ref er t o UFC 3- 101- 01. Use t he UFC maxi mum al l owed val ues or l ess f or t he Ar chi t ect ur al Onl y Test .
SECTI ON 07 27 10 Page 9
35. To t he Ar chi t ect ur al Onl y Test maxi mum l eakage r at e, add an al l owance f or t he HVAC syst em l eakage r at e. An ar bi t r ar y al l owance of 0. 25 L/ s- m2 0. 05 CFM/ sq. f t . i s suggest ed. Thi s hi gher l eakage r at e i s t he Ar chi t ect ur al Pl us HVAC Syst em Test maxi mum l eakage r at e. I n ot her wor ds, i f t he Ar chi t ect ur al Onl y Test al l owabl e l eakage r at e i s X, t he Ar chi t ect ur al Pl us HVAC Syst em Test al l owabl e l eakage r at e i s X + 0. 25 L/ s- m2 0. 05 CFM/ sq. f t .
Exampl e:
- Ar chi t ect ur al Onl y Test : 1. 27 L/ s- sq m 0. 25 CFM/ sq. f t . @ 75 Pa.
- Ar chi t ect ur al Pl us HVAC Syst em Test : 1. 5 L/ s- m2
0. 30 CFM/ sq. f t . @ 75 Pa.
36. Next , cal cul at e and i ndi cat e t he maxi mum t est l eakage i n L/ s ( CFM) f or each ai r bar r i er envel ope and f or each t ype t est .
37. Renovat i ons: Ref er t o UFC 3- 101- 01 f or r equi r ement s. Thi s speci f i cat i on i s used on r enovat i ons i f a maj or upgr ade t o t he bui l di ng envel ope i s i nvol ved. However , t he UFC of f er s gui dance on pr i or i t i z i ng t he seal i ng of exi st i ng bui l di ng envel opes based on f undi ng.
38. Addi t i ons: Wher e a new addi t i on shar es a wal l wi t h an exi st i ng bui l di ng, t he desi gner has t wo opt i ons:
a) put an ai r bar r i er assembl y i n t he common wal l and t r eat t he new addi t i on as a separ at e t est zone, or
b) i ndi cat e t hat door s and ot her openi ngs i n t he common wal l wi l l be t empor ar i l y seal ed dur i ng t he t est , and i dent i f y a por t i on of t he exi st i ng bui l di ng t hat can be cl osed and pr essur i zed wi t h separ at e pr essur i zat i on equi pment so t hat t her e i s no di f f er ent i al pr essur e acr oss t he common wal l dur i ng t he t est .
39. Speci al Desi gn Condi t i ons:
Humi di f i ed Rooms: A humi di f i ed space wi t hi n an unhumi di f i ed bui l di ng ( exampl e: comput er equi pment r oom) shoul d be l ocat ed as an i nt er i or r oom and not l ocat ed on t he bui l di ng per i met er envel ope.
Ot her wi se pay cl ose at t ent i on t o t he pot ent i al f or condensat i on wi t hi n t he per i met er envel ope dur i ng t i mes of col d weat her .
Removabl e Wal l or Roof Panel s f or Equi pment I nst al l at i on: Removabl e wal l and r oof panel s must mai nt ai n t he same weat her and ai r bar r i er qual i t i es as t he sur r oundi ng bui l di ng mat er i al s. Removabl e sect i ons must be det ai l ed i n a manner t o be abl e t o be r eseal ed t o t he same l evel as or i gi nal l y i nst al l ed.
SECTI ON 07 27 10 Page 10
Secur e Rooms and Shi el ded Faci l i t i es: Coor di nat e compat i bi l i t y of Secur e Room and Shi el di ng det ai l s wi t h t he ai r bar r i er det ai l s. I t i s r ecommended t o l ocat e such f aci l i t i es at i nt er i or bui l di ng l ocat i ons away f r om ext er i or wal l s or pr ovi de a separ at i on space bet ween t he pr ot ect ed f aci l i t y and t he ext er i or wal l . When usi ng t he Secur e Room or shi el ded wal l at ext er i or l ocat i ons, car e must be t aken t o mai nt ai n consi st ent wal l / cei l i ng t emper at ur e and pr oper vent i l at i on t o avoi d condensat i on and mol d pr obl ems. Shi el di ng mat er i al s must avoi d use of or gani c adhesi ves, seal ant s, or ot her mat er i al s whi ch pr omot e mol d gr owt h. When usi ng shi el ded assembl i es as par t of t he ext er i or bui l di ng shel l assembl y, i t i s r ecommended t o use WUFI anal ysi s t o det er mi ne pr oper assembl y of mat er i al s.
40. Copy and compl et e t he checkl i st bel ow and i ncl ude i t i n t he Ar chi t ect ur al Desi gn Anal ysi s.
AI R BARRI ER SYSTEM DESI GNER CHECKLI ST
Dr awi ngs:
___ 1. Ai r bar r i er syst em dr awi ngs ar e i ncl uded i n t he pl ans. ( Mor e t han one dr awi ng may be r equi r ed.
I t may be necessar y t o pr ovi de a pl an f or each f l oor . )
___ 2. A r educed si ze pl an and el evat i on v i ews of t he bui l di ng i ndi cat i ng t he desi r ed per i met er boundar y of each ai r bar r i er envel ope i s i ncl uded.
___ 3. The ai r bar r i er envel opes t o be t est ed ar e shown and gi ven a uni que number f or r ef er ence as appl i cabl e.
___ 4. Det ai l s showi ng how t he wal l ai r bar r i er assembl y i s j oi ned t o t he r oof ai r bar r i er assembl y ar e pr ovi ded.
___ 5. Det ai l s showi ng how t he wal l ai r bar r i er mat er i al i s j oi ned t o t he f l oor / f oundat i on ar e pr ovi ded.
___ 6. Det ai l s showi ng how t he wal l ai r bar r i er mat er i al i s j oi ned t o t he wi ndow component s ar e pr ovi ded.
___ 7. Det ai l s showi ng how t he wal l ai r bar r i er mat er i al i s j oi ned t o t he door component s ar e pr ovi ded.
___ 8. Det ai l s ar e pr ovi ded showi ng t he ai r bar r i er syst em at expansi on and i sol at i on j oi nt s as appl i cabl e.
___ 9. Det ai l s ar e pr ovi ded showi ng t he met hod of
SECTI ON 07 27 10 Page 11 seal i ng penet r at i ons of t he ai r bar r i er envel ope at t he wal l , r oof , or f l oor by condui t , pi pi ng, and cabl es.
___ 10. Det ai l s showi ng how t he ai r bar r i er mat er i al s ar e r out ed ar ound wal l and r oof di scont i nui t i es ar e pr ovi ded ( such as sof f i t s, over hangs, of f set s, vest i bul es, gabl es, r i dges, and eaves) .
___ 11. I n t he wal l and r oof sect i ons, mat er i al s and accessor i es t hat const i t ut e t he ai r bar r i er syst em ar e c l ear l y i dent i f i ed. Exampl es: boar d mat er i al s, l i qui d appl i ed coat i ngs, spr ay appl i ed f oams, t ape, cal ks, seal ant s.
___ 12. I n t he wal l and r oof sect i ons, component s and assembl i es t hat const i t ut e t he ai r bar r i er syst em ar e c l ear l y i dent i f i ed. Exampl es:
wi ndows, door s, skyl i ght s.
Not e: The f ol l owi ng ar e exampl es f or ai r bar r i er mat er i al s:
- Cast - i n- pl ace concr et e
- Gl ass
- Met al
- Spr ay pol yur et hane f oam
- Spr ay pol yet hyl ene f oam
- Ext r uded pol yst yr ene
- Low per meance bui l di ng wr ap pr oduct s.
- Li qui d appl i ed one- and t wo- component mat er i al s
Not e: The f ol l owi ng cannot ser ve as ai r bar r i er mat er i al s:
- Concr et e bl ock
- Expanded pol yst yr ene f oam
- Bui l di ng paper / f el t s
- Open cel l f oam
- Hi gh per meance house wr aps
- Per l i t e boar d
- Fi ber boar d
- Un- t r eat ed sheat hi ng
- Gl ass f i ber r i gi d boar d
- Cel l ul ose i nsul at i on
- Met al r oof decki ng
- St andi ng seam r oof
Speci f i cat i ons:
___ 13. Ai r bar r i er membr anes and t hei r ai r per meance and wat er vapor per meance ar e speci f i ed i n ot her speci f i cat i on sect i ons. Exampl es:
Mechani cal l y f ast ened sheet f i l ms, f l ui d- appl i ed membr anes, sel f - adher i ng membr anes, spr ay- appl i ed f oams.
SECTI ON 07 27 10 Page 12
Ai r bar r i er mat er i al s have a maxi mum ai r per meance of 0. 02 L/ s- m2 0. 004 CFM/ sq. f t . of sur f ace ar ea at a pr essur e di f f er ence of 75 Pa. Fi l ms, membr anes, and coat i ngs i nt ended as ai r bar r i er component s must meet t hi s r at i ng when t est ed i n accor dance wi t h
ASTM E 2178.
___ 14. The al l owabl e l eakage r equi r ement s of wi ndow, cur t ai n wal l , and door component s i s speci f i ed i n ot her speci f i cat i on sect i ons.
___ 15. The al l owabl e l eakage r equi r ement s of HVAC i nt ake and exhaust damper s i s speci f i ed i n ot her speci f i cat i on sect i ons.
Cal cul at i ons:
___ 16. The sur f ace ar ea ( sq. m( sq. f t . ) of each ai r bar r i er envel ope t o be t est ed has been cal cul at ed.
___ 17. The maxi mum al l owabl e l eakage ( L/ s( CFM) f or bot h t he Ar chi t ect ur al Onl y Test and t he Ar chi t ect ur al Pl us HVAC Syst em Test has been cal cul at ed and shown f or each ai r bar r i er envel ope t o be t est ed.
___ 18. Moi st ur e mi gr at i on and dewpoi nt cal cul at i ons have been per f or med. WUFI sof t war e avai l abl e f r om Oak Ri dge Nat i onal Labor at or y or s i mi l ar moi st ur e mi gr at i on anal ysi s sof t war e i s r ecommended.
Not e: Ai r bar r i er mat er i al s wi l l have l ow ai r per meance by def i ni t i on. However , bewar e of t he vapor per meance of ai r bar r i er membr anes. For exampl e, i f t he ai r bar r i er mat er i al has a l ow vapor per meance, i t may act as an ef f ect i ve vapor r et ar der . Wi t h t hi s i n mi nd, t he l ocat i on of t he membr ane wi t hi n t he wal l or r oof r el at i ve t o t he t her mal i nsul at i on becomes i mpor t ant . Be sur e t hat t he vapor per meance and l ocat i on has been consi der ed by t he desi gn. Per f or m vapor t r ansmi ssi on cal cul at i ons or dew poi nt cal cul at i ons as r equi r ed t o assur e t hat moi st ur e condensat i on wi t hi n t he bui l di ng envel ope wi l l not occur .
HVAC Not e: The HVAC desi gner shoul d coor di nat e wi t h t he ar chi t ect ur al desi gner r egar di ng t he i ndoor t emper at ur e and humi di t y condi t i ons and t he si mul t aneousl y occur r i ng out door ai r condi t i ons.
Wi t h t hi s i nf or mat i on t he ar chi t ect ur al desi gner can det er mi ne t he envel ope component conf i gur at i on conduci ve t o mai nt ai ni ng a dr y t her mal envel ope.
( End Desi gner Checkl i st )
1. 1 SUMMARY
Thi s Sect i on speci f i es t he const r uct i on and qual i t y cont r ol of t he
SECTI ON 07 27 10 Page 13 i nst al l at i on of an ai r bar r i er syst em. Const r uct t he ai r bar r i er syst em i ndi cat ed, t aki ng r esponsi bi l i t y f or t he means, met hods, and wor kmanshi p of t he i nst al l at i on of t he ai r bar r i er syst em. The ai r bar r i er must be cont i guous and connect ed acr oss al l sur f aces of t he encl osed ai r bar r i er envel ope i ndi cat ed. The maxi mum l eakage r equi r ement s of i ndi v i dual ai r bar r i er component s and mat er i al s ar e speci f i ed i n t he ot her speci f i cat i on sect i ons cover i ng t hese i t ems. [
NOTE: Ref er t o UFC 3- 101- 01 t o det er mi ne when t est i ng i s r equi r ed. I f t est i ng i s r equi r ed, r et ai n t he br acket ed par agr aph bel ow and i ncl ude t he r ef er enced t est i ng speci f i cat i on sect i on i n t he const r uct i on document s.
Thi s sect i on al so def i nes t he maxi mum al l owabl e l eakage of t he f i nal ai r bar r i er syst em. The wor kmanshi p must be adequat e t o meet t he maxi mum al l owabl e l eakage r equi r ement s of t hi s speci f i cat i on. Test t he assembl ed ai r bar r i er syst em t o demonst r at e t hat t he bui l di ng envel ope i s pr oper l y seal ed and i nsul at ed. Passi ng t he ai r bar r i er syst em l eakage t est and t her mogr aphy t est wi l l r esul t i n syst em accept ance. Conf or m ai r bar r i er syst em l eakage and t her mogr aphy t est i ng and r epor t i ng t o t he r equi r ement s of Sect i on 01 91 19 BUI LDI NG ENCLOSURE COMMI SSI ONI NG. ]
1. 2 REFERENCES
NOTE: Thi s par agr aph i s used t o l i s t t he publ i cat i ons c i t ed i n t he t ext of t he gui de speci f i cat i on. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by basi c desi gnat i on onl y and l i s t ed i n t hi s par agr aph by or gani zat i on, desi gnat i on, dat e, and t i t l e.
Use t he Ref er ence Wi zar d' s Check Ref er ence f eat ur e when you add a Ref er ence I dent i f i er ( RI D) out si de of t he Sect i on' s Ref er ence Ar t i c l e t o aut omat i cal l y pl ace t he r ef er ence i n t he Ref er ence Ar t i c l e. Al so use t he Ref er ence Wi zar d' s Check Ref er ence f eat ur e t o updat e t he i ssue dat es.
Ref er ences not used i n t he t ext wi l l aut omat i cal l y be del et ed f r om t hi s sect i on of t he pr oj ect speci f i cat i on when you choose t o r econci l e r ef er ences i n t he publ i sh pr i nt pr ocess.
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er enced wi t hi n t he t ext by t he basi c desi gnat i on onl y.
ASTM I NTERNATI ONAL ( ASTM)
ASTM D4541 ( 2022) St andar d Test Met hod f or Pul l - Of f St r engt h of Coat i ngs Usi ng Por t abl e Adhesi on Test er s
ASTM E96/ E96M ( 2024) St andar d Test Met hods f or
SECTI ON 07 27 10 Page 14
Gr avi met r i c Det er mi nat i on of Wat er Vapor Tr ansmi ssi on Rat e of Mat er i al s
ASTM E2178 ( 2021a) St andar d Test Met hod f or Det er mi ni ng Ai r Leakage Rat e and Cal cul at i on of Ai r Per meance of Bui l di ng Mat er i al s
ASTM E2357 ( 2018) St andar d Test Met hod f or Det er mi ni ng Ai r Leakage Rat e of Ai r Bar r i er Assembl i es
NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)
NFPA 285 ( 2023) St andar d Fi r e Test Met hod f or Eval uat i on of Fi r e Pr opagat i on Char act er i st i cs of Ext er i or Wal l Assembl i es Cont ai ni ng Combust i bl e Component s
1. 3 DEFI NI TI ONS
The f ol l owi ng t er ms as t hey appl y t o t hi s sect i on:
1. 3. 1 Ai r Bar r i er Accessor y
Pr oduct s desi gnat ed t o mai nt ai n ai r t i ght ness bet ween ai r bar r i er mat er i al s, ai r bar r i er assembl i es and ai r bar r i er component s, t o f ast en t hem t o t he st r uct ur e of t he bui l di ng, or bot h ( e. g. , seal ant s, t apes, backer r ods, t r ansi t i on membr anes, f ast ener s, st r appi ng, pr i mer s) .
1. 3. 2 Ai r Bar r i er Assembl y
The combi nat i on of ai r bar r i er mat er i al s and ai r bar r i er accessor i es t hat ar e desi gnat ed and desi gned wi t hi n t he envi r onment al separ at or t o act as a cont i nuous bar r i er t o t he movement of ai r t hr ough t he envi r onment al separ at or .
1. 3. 3 Ai r Bar r i er Component
Pr e- manuf act ur ed el ement s such as wi ndows, door s, damper s and ser vi ce el ement s t hat ar e i nst al l ed i n t he envi r onment al separ at or .
1. 3. 4 Ai r Bar r i er Envel ope
The combi nat i on of ai r bar r i er assembl i es and ai r bar r i er component s, connect ed by ai r bar r i er accessor i es t hat ar e desi gned t o pr ovi de a cont i nuous bar r i er t o t he movement of ai r t hr ough an envi r onment al separ at or . Ther e may be mor e t han one ai r bar r i er envel ope i n a s i ngl e bui l di ng. Al so known as Ai r Bar r i er Syst em.
1. 3. 5 Ai r Bar r i er Mat er i al
A bui l di ng mat er i al t hat i s desi gned, t est ed or pr oduced t o pr ovi de t he pr i mar y r esi st ance t o ai r f l ow t hr ough an ai r bar r i er assembl y of a bui l di ng encl osur e.
SECTI ON 07 27 10 Page 15
1. 3. 6 Ai r Bar r i er Syst em
Same as AI R BARRI ER ENVELOPE.
1. 3. 7 Ai r Leakage Rat e
The r at e of ai r f l ow ( L/ sCFM) dr i ven t hr ough a uni t sur f ace ar ea ( sq. m
sq. f t . ) of an assembl y or syst em by a uni t st at i c pr essur e di f f er ence ( Pa) acr oss t he assembl y. ( exampl e: 1. 27 L/ s- m20. 25 CFM/ sq. f t . @ 75 Pa)
1. 3. 8 Ai r Leakage
The t ot al ai r f l ow ( L/ sCFM) dr i ven t hr ough t he ai r bar r i er syst em by a uni t st at i c pr essur e di f f er ence ( Pa) acr oss t he ai r bar r i er envel ope. ( exampl e:
3070 L/ s 6500 CFM @ 75 Pa)
1. 3. 9 Ai r Per meance
The t est ed r at e of ai r f l ow ( L/ sCFM) t hr ough a uni t ar ea ( sq. msq. f t . ) of a mat er i al dr i ven by uni t st at i c pr essur e di f f er ence ( Pa) acr oss t he mat er i al ( exampl e: 0. 02 L/ s- m2 0. 004 CFM/ sq. f t . @ 75 Pa) as est abl i shed by
ASTM E2178.
1. 3. 10 Envi r onment al Separ at or
The par t s of a bui l di ng t hat separ at e t he cont r ol l ed i nt er i or envi r onment f r om t he uncont r ol l ed ext er i or envi r onment , or t hat separ at e spaces wi t hi n a bui l di ng t hat have di ssi mi l ar envi r onment s. Al so known as t he Cont r ol Layer .
1. 3. 11 Vapor Per meance
Vapor per meance i s separ at ed i nt o t hr ee cl asses based on t he wat er vapor per meance of a mat er i al as t est ed vi a ASTM E96/ E96M
Cl ass I Vapor Bar r i er / Ret ar der 0. 1 per m or l ess
Cl ass I I Vapor Bar r i er / Ret ar der 0. 1 per m t o 1. 0 per m
Cl ass I I I Vapor Bar r i er / Ret ar der 1. 0 per m t o 10 per m
1. 4 PREPARATORY PHASE OR PRECONSTRUCTI ON CONFERENCE
Or gani ze pr e- const r uct i on conf er ences bet ween t he ai r bar r i er i nspect or and t he sub- cont r act or s i nvol ved i n t he const r uct i on of , or penet r at i on of , t he ai r bar r i er syst em t o di scuss wher e t he wor k of each sub- cont r act or begi ns and ends, t he sequence of i nst al l at i on, and each sub- cont r act or ' s r esponsi bi l i t y t o ensur e ai r t i ght j oi nt s, j unct ur es, penet r at i ons and t r ansi t i ons bet ween mat er i al s. Di scuss t he pr oduct s, and assembl i es of pr oduct s speci f i ed i n t he di f f er ent sect i ons t o be i nst al l ed by t he di f f er ent sub- cont r act or s.
1. 5 SUBMI TTALS
NOTE: Revi ew submi t t al descr i pt i on ( SD) def i ni t i ons i n Sect i on 01 33 00 SUBMI TTAL PROCEDURES and edi t t he f ol l owi ng l i s t , and cor r espondi ng submi t t al
SECTI ON 07 27 10 Page 16 i t ems i n t he t ext , t o r ef l ect onl y t he submi t t al s r equi r ed f or t he pr oj ect . The Gui de Speci f i cat i on t echni cal edi t or s have cl assi f i ed t hose i t ems t hat r equi r e Gover nment appr oval , due t o t hei r compl exi t y or cr i t i cal i t y, wi t h a " G. " Gener al l y, ot her submi t t al i t ems can be r evi ewed by t he Cont r act or ' s Qual i t y Cont r ol Syst em. Onl y add a “ G” t o an i t em, i f t he submi t t al i s suf f i c i ent l y i mpor t ant or compl ex i n cont ext of t he pr oj ect .
For Ar my pr oj ect s, f i l l i n t he empt y br acket s f ol l owi ng t he " G" c l assi f i cat i on, wi t h a code of up t o t hr ee char act er s t o i ndi cat e t he appr ovi ng aut hor i t y. Codes f or Ar my pr oj ect s usi ng t he Resi dent Management Syst em ( RMS) ar e: " AE" f or Ar chi t ect - Engi neer ; " DO" f or Di st r i ct Of f i ce ( Engi neer i ng Di v i s i on or ot her or gani zat i on i n t he Di st r i ct Of f i ce) ; " AO" f or Ar ea Of f i ce; " RO" f or Resi dent Of f i ce; and " PO" f or Pr oj ect Of f i ce. Codes f ol l owi ng t he " G" t ypi cal l y ar e not used f or Navy and Ai r For ce pr oj ect s.
The " S" c l assi f i cat i on i ndi cat es submi t t al s r equi r ed as pr oof of compl i ance f or sust ai nabi l i t y Gui di ng Pr i nci pl es Val i dat i on or Thi r d Par t y Cer t i f i cat i on and as descr i bed i n Sect i on 01 33 00 SUBMI TTAL
PROCEDURES.
Choose t he f i r st br acket ed i t em f or Navy and Ai r For ce pr oj ect s, or choose t he second br acket ed i t em f or Ar my pr oj ect s.
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e [ f or Cont r act or Qual i t y Cont r ol appr oval . ] [ f or i nf or mat i on onl y. When used, a code f ol l owi ng t he " G" c l assi f i cat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . ] Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 02 Shop Dr awi ngs
Ai r Bar r i er Syst em Shop Dr awi ngs; G[ , [ _____] ] , Manuf act ur er pr oduced war r ant ed ai r bar r i er syst em
SD- 03 Pr oduct Dat a
Ai r Bar r i er Syst em Pr oduct Dat a; G[ , [ _____] ]
SD- 04 Sampl es
NOTE: Ref er t o UFC 3- 101- 01 f or gui dance on i mpl ement i ng mock- ups.
Mock- Up; G[ , [ _____] ]
SECTI ON 07 27 10 Page 17
Mat er i al Sampl es For Ai r Bar r i er Syst em; G[ , [ _____] ]
SD- 05 Desi gn Dat a
Desi gn Dat a And Cal cul at i ons For The Ai r Bar r i er Syst em; G[ , SD- 06 Test Repor t s
Desi gn Revi ew Repor t ; G[ , [ _____] ]
Test i ng and I nspect i on; G[ , [ _____] ]
SD- 07 Cer t i f i cat es
NOTE: I ncl ude submi t t al s f or Ai r Bar r i er I nspect or Qual i f i cat i ons and f or a Desi gn Revi ew Repor t whenever UFC 3- 101- 01 r equi r es t he ai r bar r i er syst em t o be t est ed.
Ai r Bar r i er I nspect or ; G, RO
[ 1. 6 AI R BARRI ER ENVELOPE SURFACE AREA AND LEAKAGE REQUI REMENTS
NOTE: I ncl ude t hi s par agr aph def i ni ng t he ai r bar r i er l eakage r equi r ement s whenever UFC 3- 101- 01 r equi r es t he ai r bar r i er t o be t est ed. I f pr essur e t est i ng of t he ai r bar r i er syst em i s not r equi r ed, del et e t hi s par agr aph. I f pr essur e t est i ng i s r equi r ed, on t he dr awi ngs, i dent i f y t he ai r bar r i er envel opes t o be t est ed. Pr ovi de t he ar ea and l eakage i nf or mat i on f or each si x- s i ded ai r bar r i er envel ope t o be t est ed bel ow. Opt i onal l y, i ncl ude a t abl e on t he dr awi ngs summar i z i ng t he envel ope i nf or mat i on. I f t hat i s t he appr oach, s i mpl y r ef er t o t he dr awi ngs at t hi s poi nt i n t he speci f i cat i on and del et e t he envel ope ar ea and l eakage i nf or mat i on bel ow.
I f onl y a por t i on of t he ai r bar r i er envel ope i s bei ng t est ed as i n t he case of t he bar r acks bui l di ng descr i bed i n t he openi ng not es above, i ndi cat e t he t est r ooms; f or exampl e, change " Ai r Bar r i er Envel ope 1" , t o " Room 214" . For a descr i pt i on of t he t est pr ocess, Ref er t o UFGS 01 91 19 BUI LDI NG ENCLOSURE COMMI SSI ONI NG par agr aph Pr essur e Test i ng a Mul t i pl e I sol at ed Zoned Bui l di ng. I f an Ai r Bar r i er Envel ope i s an i sol at ed zone wi t hi n t he l ar ger bui l di ng ( e. g. , s i ngl e r oom i n a bar r acks) , and i f i t i s i mpossi bl e t o t est t hat i sol at ed zone wi t hout seal i ng t he HVAC duct s t hat i nt er connect adj acent r ooms, per f or m t he Ar chi t ect ur al Onl y t est and del et e t he Ar chi t ect ur al Pl us HVAC Syst em t est f or t hat par t i cul ar Ai r Bar r i er Envel ope.
The bui l di ng ai r bar r i er syst ems must meet t he f ol l owi ng l eakage
SECTI ON 07 27 10 Page 18 r equi r ement s. The al l owabl e l eakage r at e and t he maxi mum l eakage ar e at a di f f er ent i al t est pr essur e of 75 Pa.
NOTE: Add or del et e ai r bar r i er envel opes t o be t est ed as r equi r ed.
NOTE: Edi t t he Al l owabl e ai r l eakage r at es as r equi r ed by UFC 3- 101- 01 Ar chi t ect ur e. A l eakage val ue l ess t han 0. 25 CFM/ SQFT f or DoD f aci l i t i es i s r ecommended on pr oj ect s wher e desi gn and const r uct i on t eams have exper i ence i n at t ai ni ng l ower r at es of l eakage t o i ncr ease ener gy r educt i on, on pr oj ect s wi t h speci f i c mi ssi on/ f unct i onal r equi r ement s, or on bui l di ng const r uct i on t ypes ( e. g. , pr e- cast concr et e panel s and i nsul at ed concr et e f or ms) wher e l ow al l owabl e l eakage val ues ar e easi l y at t ai ned. Addi t i onal l y, t he l eakage r at e can be set t o any l eakage val ue l ess t han 0. 25 CFM/ SQFT f or DoD f aci l i t i es i f r equi r ed t o meet pr oj ect speci f i c ener gy t ar get s. Thi s shoul d be cor r el at ed back t o t he ener gy model f or val i dat i on.
Ai r Bar r i er Envel ope 1
Sur f ace Ar ea [ _____] squar e met er squar e f eet
Ar chi t ect ur al Onl y Test :
Al l owabl e l eakage r at e [ 1. 27] [ _____] L/ s per squar e met er [ 0. 25] [ _____] CFM/ sq. f t
Maxi mum l eakage [ _____] t ot al L/ s CFM
[ Ar chi t ect ur al Pl us HVAC Syst em Test : ]
[ Al l owabl e l eakage r at e] [ [ 1. 52] [ _____] L/ s per squar e met er [ 0. 30] [ _____] CFM/ sq. f t ]
[ Maxi mum l eakage] [ [ _____] t ot al L/ s CFM]
Ai r Bar r i er Envel ope 2
Sur f ace Ar ea [ _____] squar e met er squar e f eet
Ar chi t ect ur al Onl y Test :
Al l owabl e l eakage r at e [ 1. 27] [ _____] L/ s per squar e met er [ 0. 25] [ _____] CFM/ sq. f t
Maxi mum l eakage [ _____] t ot al L/ s CFM
SECTI ON 07 27 10 Page 19
[ Ar chi t ect ur al Pl us HVAC Syst em Test : ]
[ Al l owabl e l eakage r at e] [ [ 1. 52] [ _____] L/ s per squar e met er [ 0. 30] [ _____] CFM/ sq. f t ]
[ Maxi mum l eakage] [ [ _____] t ot al L/ s CFM]
Ai r Bar r i er Envel ope 3
Sur f ace Ar ea [ _____] squar e met er squar e f eet
Ar chi t ect ur al Onl y Test :
Al l owabl e l eakage r at e [ 1. 27] [ _____] L/ s per squar e met er [ 0. 25] [ _____] CFM/ sq. f t
Maxi mum l eakage [ _____] t ot al L/ s CFM
[ Ar chi t ect ur al Pl us HVAC Syst em Test : ]
[ Al l owabl e l eakage r at e] [ [ 1. 52] [ _____] L/ s per squar e met er [ 0. 30] [ _____] CFM/ sq. f t ]
[ Maxi mum l eakage] [ [ _____] t ot al L/ s CFM]
] [ 1. 7 AI R BARRI ER I NSPECTOR
NOTE: I ncl ude t he r equi r ement f or an AI R BARRI ER I NSPECTOR whenever UFC 3- 101- 01 r equi r es t he ai r bar r i er t o be t est ed.
Empl oy a desi gnat ed Ai r Bar r i er I nspect or on t hi s pr oj ect . The Ai r Bar r i er I nspect or per f or ms a Desi gn Revi ew, over sees qual i t y cont r ol t est i ng speci f i ed i n t hese speci f i cat i ons, per f or ms qual i t y cont r ol ai r bar r i er i nspect i on as speci f i ed, i nt er f aces wi t h t he desi gner and pr oduct manuf act ur er ' s r epr esent at i ves t o assur e i nst al l at i on r equi r ement s ar e met , and ver i f i es t hat t he const r uct ed wor k i s i n accor dance wi t h bot h t he manuf act ur er ' s r ecommendat i ons f or pr oduct s used, t he cont ent of t hi s speci f i cat i on and ot her Cont r act dr awi ngs or document s. Qual i f i cat i ons f or t he Ai r Bar r i er I nspect or ar e as f ol l ows:
a. Tr ai ni ng and cer t i f i cat i on as an Ai r Bar r i er Audi t or f r om t he Ai r Bar r i er Associ at i on of Amer i ca ( ABAA) or ot her t hi r d- par t y ai r bar r i er associ at i on.
b. Or , pr ovi de document at i on i n r esume f or mat t hat demonst r at es t hat t he i ndi v i dual pr oposed has t he exper i ence, knowl edge, ski l l s and abi l i t i es t o f ul f i l l t he above st at ed dut i es as t he ai r bar r i er i nspect or .
c. I t i s accept abl e t hat t hi s i ndi v i dual be empl oyed by t he f i r m per f or mi ng t he bui l di ng pr essur i zat i on t est or anot her i ndependent t hi r d- par t y ent i t y, pr ovi ded t hey meet t he above r equi r ement s but must not be a member of t he i nst al l i ng Cont r act or or f i r m.
SECTI ON 07 27 10 Page 20
Pr ovi de copi es of Ai r Bar r i er I nspect or qual i f i cat i ons 30 days af t er Not i ce t o Pr oceed.
] [ 1. 8 DESI GN REVI EW
NOTE: I ncl ude t he r equi r ement f or a DESI GN REVI EW whenever UFC 3- 101- 01 r equi r es t he ai r bar r i er t o be t est ed.
Thi s Desi gn Revi ew i s concept ual l y s i mi l ar t o t he Desi gn Revi ew Repor t r equi r ed by t he TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC speci f i cat i on wher e t he TAB speci al i st r evi ews t he pl ans and specs and submi t s a r epor t ei t her i ndi cat i ng t hat t he syst em can be bal anced or descr i bi ng def i c i enci es t hat pr ecl ude t he TAB t eam f r om accompl i shi ng t hei r wor k and descr i bi ng necessar y changes. Si mi l ar l y, wi t h t he ai r bar r i er syst em Desi gn Revi ew, t he Cont r act or i s asked t o r evi ew t he desi gn and poi nt out any def i c i enci es t hat pr event a successf ul ai r bar r i er syst em i nst al l at i on.
Revi ew t he Cont r act Pl ans and Speci f i cat i ons and advi se t he Cont r act i ng Of f i cer of any def i c i enci es t hat woul d pr event t he const r uct i on of an ef f ect i ve ai r bar r i er syst em. Pr ovi de a Desi gn Revi ew Repor t i ndi v i dual l y l i s t i ng each def i c i ency and t he cor r espondi ng pr oposed cor r ect i ve act i on necessar y f or a pr oper ai r bar r i er syst em. Pr ovi de copi es of t he Desi gn Revi ew Repor t not l at er t han [ 14] [ _____] days af t er appr oval of t he Ai r Bar r i er I nspect or Qual i f i cat i ons. Submi t desi gn dat a and cal cul at i ons f or t he Ai r Bar r i er Syst em f or a manuf act ur er pr oduced and war r ant ed ai r bar r i er syst em.
] PART 2 PRODUCTS
NOTE: Ai r bar r i er membr anes and t hei r ai r per meance and wat er vapor per meance ar e speci f i ed i n ot her speci f i cat i on sect i ons. Add speci f i cat i on sect i ons as r equi r ed. Exampl es: Sel f - adher ed sheet s, f l ui d- appl i ed membr anes, spr ay f oams, boar dst ock ai r bar r i er mat er i al s, mechani cal l y at t ached f l exi bl e sheet mat er i al s. The ABAA websi t e i s one sour ce of ai r bar r i er mat er i al speci f i cat i ons. I ndi cat e al l per t i nent mat er i al pr oper t i es i ncl udi ng ai r per meance, wat er vapor per meance, adhesi on r equi r ement s, and f l ame and smoke spr ead r equi r ement s. Al so, i ndi cat e t hat t he manuf act ur er ' s i nst r uct i ons f or t he st or age, i nst al l at i on, and appl i cat i on of ai r bar r i er pr oduct s must be f ol l owed.
Ai r bar r i er mat er i al s have a maxi mum ai r per meance of
0. 02 L/ s- m2 0. 004 CFM/ sq. f t . of sur f ace ar ea at a pr essur e di f f er ence of 75 Pa. Fi l ms, membr anes, and coat i ngs i nt ended as ai r bar r i er component s must meet t hi s r at i ng when t est ed i n accor dance wi t h…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .