This document is a Request for Information (RFI) containing the government's responses to questions related to Solicitation Number W9115124B0001 for the renovation of Building 37011 at Fort Cavazos.
The key details are:
- The building was previously renovated in 2011, and the government has provided assumptions about the presence of asbestos-containing materials. A lead survey was also referenced.
- The government clarified various design and specification details, such as insulation requirements, window dimensions, exterior masonry cleaning, roofing, gutters, and other building components.
- The government provided responses related to engineering requirements, testing, commissioning, and other project management elements.
- The government indicated it will provide updated pricing from certain utility providers prior to bid opening.
- This RFI does not directly address the specific products or services required under the solicitation, but rather provides clarification and additional details in response to the contractor's questions.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9115124B0001 Renovate BLDG 37011
Government Response 05/16/2024
1. The Asbestos survey was done in 1997. Is there another that is more current?
It doesn’t look to be accurate.
ANS: The building was renovated in 2011; the 12 x 12 floor was replaced, stair treads on the stage steps were demolished, all water lines and sanitary lines were replaced. Assume the following ACM: cementitious siding; perimeter soffit (1-G), Building caulking and putties; at doors, windows (not to include new windows installed in 2011) and gutter connections (1-H), and roof penetrations mastics (R-B).
2. At the site visit there looked like there might be foundation difference. Is there a crawl space?
ANS: There is no crawl space hatch or breather vents on the outside, assume there is no crawl space.
3. C-102, key note #7 states to remove all paint from railing and paint “black”.
Does this mean that it needs to be removed to bare metal or remove loose paint?
ANS: Remove to bare metal.
4. Is there a lead survey for the building?
ANS: See Technical Exhibit E.
5. A-201 Key note #6 states to see structural drawings for fixed ladder but it is not available. Also the key note on the drawings is pointing at an exterior light.
ANS: See revised drawings.
6. A-201 Key note #7 asks for aluminum sign holders on the south elevation of the building but there are no dimensions.
ANS: See revised drawings.
7. A-401 CN-1 states that cabinets should be “horewood” ? Is this a typo or a type of material?
ANS: this is a typo, it is supposed to be “hardwood”.
8. 1. Reference Sheet A - 501, Partition System B3 indicates an insulation thickness of 2.5” (R16). However, exterior walls cross section details indicate R19. Typically, R19 in closed cell spray foam has a thickness of 2.9”-3.0”. This appears to be a conflict in requirements. Please provide clarification of spray foam insulation R values or thicknesses required in all exterior walls. Note:
2024 IBC recommends R19 in exterior facing walls.
ANS: Walls indicated as B3 shall have 2.5” insulation, the rest of the exterior walls shall be R19.
9. Reference Sheet A - 101, Proposed Floor Plan reflects a Partition wall section F6, however, there doesn’t appear to be wall cross section detail provided in the drawings. Please clarify what spray foam insulation R value or thickness required in the partition wall section labeled F6.
ANS: See revised drawings.
10. Will a intumescent coating applied over Spray Polyurethane Foam (SPF) be required ANS: Only where specifications, codes and regulations require.
11. Where SPF is installed on an exterior wall above an acoustical ceiling tile?
ANS: See note 15 on sheet A-501.
12. What color solid surface will be used for windowsills?
ANS: White
13. What depth are new window frames?
ANS: The governments intention is to have the windows flush with the outside of the exterior walls.
14. A302 sections 2 and 3 show solid surface sills with trim. Does the trim need to be a separate piece or can the sills be made like 41003 with attached edge band?
ANS: See revised drawings, just solid surface sills no trim and seal underneath.
15. On wall hung bathroom countertops can laminated end braces be used for support on open finished ends where needed?
ANS: No
16. On sheet D-101 under Architectural Key Notes, there is no reference to A4 on the actual demo Plan.
ANS: See revised drawings.
17. Sheet D-101 GN-20 what type of concrete is required.
ANS: 4000 psi non-shrink grout is acceptable.
18. D-201 some areas say tooth in others say infill with brick. Which is it?
ANS: The governments intention is to have the brick tooth in.
19. Sheet C-001 suggest that there will need to be work coordinated with private utility contractors, if so will their cost be provided before the project bids.
ANS: Yes, privatized utility pricing will be provided prior to bid opening.
20. Are the downspouts to be demoed or remain?
ANS: See Note GN-2 on sheet D-201.
21. Will door 104A be black or aluminum?
ANS: Black
22. Will doors 104A & door 107A be required to received blinds with them already being obscured?
ANS: No blinds
23. Is there existing ductwork to be relocated above the structural roof truss bottom cord?
ANS: All ductwork is new, new duct work is to be routed through new reinforced openings through the joists.
24. Is there asbestos in the flooring, floor mastic or elsewhere in the building?
ANS: See RFI #1.
25. How much existing furniture is there to move?
ANS: The contractor is responsible for disposing of any left furniture.
26. Is there mold remediation?
ANS: No mold was observed, mold remediation is not required.
27. Does the roof truss steel need to be galvanized for an interior application?
Adds cost and toxic fumes while welding.
ANS: Prime and paint with red oxide.
28. Where is the Mini-split pad?
ANS: See revised drawings.
29. Does the interior side of the exterior perimeter wall demo?
ANS: Yes, all fur-outs shall be demolished.
30. There are no wall sections for D4 or F6.
ANS: See revised drawings.
31. There is no specification for a rain screen system. EIFS was incorrectly supplied.
ANS: The product called out is not EIFS, Nichiha is called out for the exterior. The contractor shall follow the manufacturer’s recommendations.
32. Does the entire exterior masonry get cleaned or just the patch areas?
ANS: The entire exterior masonry gets cleaned.
33. We would like to verify (roof plan) in as-builts are correct, due to multiple buildings references within.
ANS: All buildings listed should have similar roof plans.
34. Regarding (roof plan) in as-builts, are we to assume Bldg. 37001 is the same building as 37011?
ANS: Assume BLDG 37011 and BLDG 37001 are similar.
35. Regarding, the roof, they request the R-30. We believe it will save the GOVT money if it was R-25. This has been approved before for similar jobs on Fort Cavazos.
ANS: Proceed per contract.
36. Pg A-104 (Roof Plan) #7 of New Drawings, states, “Install Seamless Gutter
System”. From previous Pre-Bid Site Visits, it has been stated they are going to start going back to 24ga pre-finished segmented box gutters. These are not Seamless gutters. Please ask for clarification of the gutter Metal/ Size/ Installation methods.
ANS: Install 24 ga commercial gutters and downspouts “Black”, see revised drawings.
37. Pg A-104 (Roof Plan) #10 of New Drawings states, “Install 2-Way Breather Vents”. I believe they mean to install ONE-WAY Vents. Please Clarify.
ANS: Proceed per contract.
38. Pg A-201 (Proposed Elevations) #GN-5 of New Drawings states, new K-style 6”
Seamless Gutters. From previous Pre-Bid Site Visits, it has been stated they are going to start going back to 24ga pre-finished segmented box gutters. These are not Seamless gutters. Please ask for clarification of the gutter Metal/ Size/ Installation methods.
ANS: See RFI #36, 6” wide gutters and 4” x 4” square downspouts.
39. Will we need a construction sign?
ANS: Yes.
40. Are contractors to include Dominion (Energy and Gas) and American Water cost for this project?
ANS: Yes, the government will provide an updated price from Dominion and
American Water prior to bid opening.
41. If so, can contractors get any associated cost for Dominion (Energy and Gas) and American Water for this project.
ANS: See RFI #40.
42. Is the contractor expected to have any concrete foundations engineered?
ANS: Only where specifications and drawings require.
43. Is the contractor expected to have anchor rods engineered?
44. Will 3rd party testing be required?
ANS: Only where specifications and drawings require.
45. Is the contractor expected to have concrete steel reinforcement engineered?
ANS: Only where specifications and drawings require.
46. Is the contractor expected to have the steel interior framing engineered?
ANS: Only where specifications and drawings require.
47. Is the contractor expected to have any exterior cold formed steel engineered?
ANS: Only where specifications and drawings require.
48. Is the contractor expected to have anchors used to fasten the bottom plate engineered?
ANS: Only where specifications and drawings require.
49. Is the contractor expected to have the roof engineered?
ANS: Only where specifications and drawings require.
50. Is the contractor expected to have any of the HVAC engineered?
ANS: Only where specifications and drawings require.
51. Will the government issue a time extension based on the substantial lead times for HVAC or electrical equipment?
ANS: Government will consider valid, excusable delays and address as they arise.
52. Is the contractor expected to have any of the electrical engineered?
ANS: Only where specifications and drawings require.
53. Is the contractor expected to have any of the plumbing engineered?
ANS: Only where specifications and drawings require.
54. Is whole building commissioning required?
ANS: Yes
55. Is only the HVAC commissioning required?
ANS: HVAC commissioning is required.
56. Will Dalt Testing be required?
ANS: Yes
57. Is Building envelope testing required?
ANS: Yes
58. Per 01 35 13 p.1.4.2a, in Specs, it calls out for a project schedule to be submitted with bid, will that be required?
ANS: No, project schedule not required to be submitted with bid.
59. Is the contractor expected to have shoring engineered for the demo phase.
60. Do we need a dedicated Quality Control Manager (QCM)?
ANS: Yes, follow specifications.
61. Does the QCM need ACI certification?
ANS: Follow specifications.
62. Typically foam would carry up the block wall from the top plate of the framing to the beam above to make a continuous layer. The drawings show otherwise.
Are they correct?
ANS: Shall be a continuous layer from top plate of the framing to deck.
63. In the specs, 01 57 20.00 10 there is a pest management, are we supposed to spray for bugs? If so, what bugs are we spraying for?
ANS: See drawings A-201 note GN-7.
64. Do we need to provide an Environmental manager?
ANS: See RFI # 66.
65. If we do have to provide an Environmental manager dedicated to the job site?
ANS: See RFI # 66.
66. If we do have to provide an environmental manager, can the QCM or
Superintendent fill this roll?
ANS: Superintendent, other duties as assigned.
67. The specs call out a needed TCP, since we are not working on the roads, do we have to provide this?
ANS: No
68. The specs call out a SWPPP, since we are not disturbing an acre, do we have to provide this?
ANS: A SWPPP is only required if the project site is over 1 acre.
69. Is cathodic protection required?
ANS: No
70. Is the intent to have the old windows infilled with CMU and Brick for the new smaller windows or to be framed once for the infill and again for the interior finish? I would assume CMU but would like clarification if you can get it.
ANS: The old windows will be infilled (toothed in) with CMU and Brick.
71. This is just the 3 locations on the front, there is a total of 5 locations like this
(2 more on the rear of the building, directly behind these).
ANS: See RFI #70.
72. Can you provide light fixture schedule?
ANS: See revised drawings.
73. Is basket tray needed for data/ communication cabling? If so what areas?
ANS: Only where specifications and drawings require.
74. What type of door blinds do you want? There are no specs on the blinds.
ANS: Coodless, Vinyl, Blinds, “Black”
75. E-601 states all HVAC circuits are existing to remain. However, the mechanical drawings indicate they are new.
ANS: All HVAC circuits shall be new, see revised drawings.
76. For lighting, is there a fixture schedule?
ANS: See RFI# 72.
77. E101 shows HDMI outlets. These are not shown on the symbols and notes.
What are they looking for? An actual HDMI outlet or pipe work at those locations?
ANS: The government’s intent is to have HDMI run to each location and provide a female connection at each location.
78. Can we get a lighting fixture schedule/spec for this project.
ANS: See RFI# 72.
79. There is a duplication of Circuit PA-17. I would think that PA-17 feeding quad recpts in RM 121 should be PB-17.
Switch at door 150 should be a single pole switch, instead of a three way switch.
Switch at door 121 should be a three way switch, instead of a single pole switch.
80. Can we get specs for the HDMI boxes/devices in Rooms 108, and 121.
ANS: 2 port HDMI – MFR. Model: 7332, Product #: 14J384 1 port HDMI – MFR. Model: 7330, Product #: 14J380 Install per manufacturer’s recommendations.
81. What is the list of power requirements and layouts for the NIPR room?
ANS: See sheet E-603.
82. What are the power requirements for the fire protection devices and panels?
ANS: See revised drawings.
NOTE:
The standard size for EXTERIOR BLDG ID is 2’ 6” w x 8”h
• Is this a typo?
o 30”w?
• Is this a hard requirement?
ANS: Proceed per contract drawings.
83. Detail 2/A302 – What is the wall covering above the curtainwall / window?
ANS: See revised drawings, exterior is Fiber Cement Rainscreen System Nichiha Tuffblock “Steel EPF644F”.
84. Spec Section 075500 – Membrane Roofing
a. The specs indicate 15yr warranty and the plans indicate 20yr Warranty.
ANS: Proceed per contract.
b. The specs indicate only ½” Fanfold insulation and the plans indicate R-30 and ½” Gypsum Coverboard.
ANS: Proceed per contract.
c. The specs indicate 40mil membrane and the plans indicate 60mil membrane.
ANS: Proceed per contract.
d. There is no mention of the system installation. Is the new roof system to be Fully Adhered, Mechanically Attached, or Rhinobond systems?
ANS: Mechanically attached, install per manufacturer’s recommendations.
e. How is the insulation to be attached or adhered?
ANS: See sheet A-104 GN4.
85. Are the gutters to be fabricated in 10’ sections or are they to be a continuous gutter system?
ANS: See RFI# 36.
Scope Questions:
86. Since the roofing is to be removed including the metal decking, do you want the roofing contractor to remove just the roofing or the roofing and the metal decking?
ANS: See sheet A-104 note GN1.
87. Metal Decking – Would you want us, the roofing contractor, to demo and install the new metal decking?
ANS: Follow contract drawings, means and methods.
a. What type of attachment would be required? Welding or would mechanical fasteners be acceptable?
ANS: See RFI# 84d.
88. Who is to supply and install the new cast iron downspout boots?
ANS: Means and methods.
a. Are they spill onto grade or connected below grade?
ANS: Connected below grade.
89. Who is to furnish and install the Hard plank Soffits and sub framing?
ANS: Means and methods.