Technical Exhibit G - Dominion Energy RFP.pdf
PDF 179 KB Posted
- Attached to
- Renovate BLDG 37011 Federal contract opportunity
- Solicitation number
- W9115124B0001
About this file
This document appears to be a Technical Exhibit G related to a Request for Proposal (RFP) for the Renovate BLDG 37011 project at Fort Cavazos. The RFP is for a firm-fixed price contract to convert an existing structure into a Brigade level headquarters.
Dominion Privatization Holdings, Inc. has provided a price quote of $81,254.98 to provide the required materials, equipment, and labor to install fuses, upgrade transformers and wiring, and install a watt node. The quote is valid for 90 days and work will be performed during normal business hours. The proposal indicates the work will be conducted in coordination with a third-party contractor. Upon completion, the fixed monthly service charge for the contract SP0600-16-C-8312 will be adjusted by $243.67. The distribution facilities charge is split between R&R and O&M at $158.14/month and $85.53/month respectively.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dominion Privatization Holdings, Inc 49011 Santa Fe Ave, Fort Cavazos, TX 76544
∗ The above pricing is valid for 90 days from the date of this quote.
∗ All services will be provided during Dominion's normal work hours.
∗ Contract authorization and installation of equipment for service cable termination at the customer facility are required prior to releasing and scheduling this project for construction.
RFP 510 – B37011 BN HQ Renovation
February 26, 2024
NOTIFICATION OF PROJECT COST
Contract No. SP-0600-16-C-8312 Fort Cavazos, Texas – Electric
RFP 510 – B37011 BN HQ Renovation
Fort Cavazos DPW:
In response to RFP 510, Dominion Privatization Holdings, Inc (DOM) has determined the Firm- Fixed Price proposal for the project requirements to be: $81,254.98.
This proposal is for DOM to provide material, equipment, and labor for the Scope of Work as described: Install fuses at the tap, upgrade existing transformers, upgrade underground secondary wire, upgrade pole, and install watt node.
Work for this proposal will be conducted in coordination with the third party contracted for this project. Third party payment to DOM has been authorized by the UP contract COR.
Authorization for an adjustment to the Operations and Maintenance fixed monthly service charge to be modified into Contract SP0600-16-C-8312, in the amount of $243.67 will be provided upon notification of project completion. Additional Facilities Charge is split between R&R and O&M as follows:
Distribution Facilities Charge R&R = $158.14/Month Distribution Facilities Charge O&M = $85.53/Month
Questions regarding this proposal should be addressed to the Dominion Energy Team at FortCavazosConstruction@dominionenergy.com. Contractual questions should be addressed to the Utilities Privatization COR, Dominic Miles at dominic.q.miles.civ@army.mil.
mailto:FortCavazosConstruction@dominionenergy.com mailto:dominic.q.miles.civ@army.mil
Dominion Privatization Holdings, Inc 49011 Santa Fe Ave, Fort Cavazos, TX 76544
∗ The above pricing is valid for 90 days from the date of this quote.
∗ All services will be provided during Dominion's normal work hours.
∗ Contract authorization and installation of equipment for service cable termination at the customer facility are required prior to releasing and scheduling this project for construction.
RFP 510 – B37011 BN HQ Renovation
Change in Inventory:
Component Size Quantity Unit Install Year
Overhead Transformer 50KVA 3 Each
Underground Service Wire 4/0AL 40 Feet
Crossarm 10’ 3 Each
Pole 1 Each
Watt Node 1 Each
Overhead Fuses 3 Each
Overhead Transformer 25KVA 3 Each
Pole 1 Each
Underground Wire 40 Each
Crossarm 5 Each
File details come from the government source that posted it. Updated .