About this file

This document is a Unified Facilities Guide Specification (UFGS) for Building Enclosure Commissioning (BECx). It provides requirements for verifying and testing the performance of the building envelope, including pressure testing the air barrier for air leaks. Key details include:

The BECx process involves validating the design and verifying the installation of the continuous air barrier, inspecting fenestration and doors, inspecting opaque roof/walls/floors, and conducting additional building envelope testing as needed. The specification outlines requirements for the BECx provider's qualifications, the building envelope inspection checklists, the building envelope air barrier pressure testing procedures, and the reporting and documentation requirements. It also specifies the test equipment, climate conditions suitable for pressure testing, and the coordination required between the contractor, government, and commissioning team. The goal is to ensure the building envelope meets the Owner's Project Requirements and the contract documents.

View the file

Other files for this federal contract opportunity

Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USACE / NAVFAC / AFCEC UFGS- 01 91 19 ( May 2023)

Pr epar i ng Act i v i t y: USACE Super sedi ng UFGS- 07 05 23 ( August 2019)

UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS

Ref er ences ar e i n agr eement wi t h UMRL dat ed Apr i l 2024

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 91 19

BUI LDI NG ENCLOSURE COMMI SSI ONI NG

05/ 2023

PART 1 GENERAL

1. 1 SUMMARY

1. 2 REFERENCES

1. 3 DEFI NI TI ONS

1. 3. 1 Ai r Bar r i er Envel ope

1. 3. 2 Ai r Leakage Rat e

1. 3. 3 Basi s of Desi gn ( BoD)

1. 3. 4 Bi as Pr essur e

1. 3. 5 Bl ower Door

1. 3. 6 Bui l di ng Encl osur e ( or envel ope)

1. 3. 7 Bui l di ng Encl osur e Commi ssi oni ng ( BECx)

1. 3. 8 Bui l di ng Encl osur e Commi ssi oni ng Pr ovi der ( BECxP)

1. 3. 9 Const r uct i on Phase

1. 3. 10 Desi gn Phase

1. 3. 11 Envi r onment al Separ at or

1. 3. 12 Funct i onal Per f or mance Test ( FPT)

1. 3. 13 Owner ' s Pr oj ect Requi r ement s ( OPR)

1. 3. 14 Pr essur e Test

1. 3. 15 Negat i ve Pr essur e Test ( Depr essur i zat i on Test )

1. 3. 16 Posi t i ve Pr essur e Test ( Pr essur i zat i on Test )

1. 3. 17 Ver i f i cat i on & Test i ng ( V&T) Pr ovi der

1. 4 COMMUNI CATI ON WI TH THE GOVERNMENT COMMI SSI ONI NG PROVI DER

1. 5 COMMUNI CATI ON WI TH GOVERNMENT ACCCEPTANCE TESTI NG REPRESENTATI VES

1. 6 ENCLOSURE COMPONENTS TO BE COMMI SSI ONED

1. 6. 1 Ver i f i cat i on of t he Desi gn and I nst al l at i on of t he Cont i nuous

Ai r Bar r i er

1. 6. 2 I nspect i on of Fenest r at i on and Door s

1. 6. 3 I nspect i on of Opaque Roof , Wal l s, and Fl oor s

1. 6. 4 Fenest r at i on I nspect i ons

1. 6. 5 Loadi ng Dock Weat her seal I nspect i ons

1. 6. 6 Addi t i onal Bui l di ng Encl osur e Test s

1. 7 SUBMI TTALS

1. 8 BUI LDI NG ENCLOSURE TESTI NG WORK PLAN

SECTI ON 01 91 19 Page 1

1. 9 ACCESSI BI LI TY REQUI REMENTS

1. 10 SCHEDULI NG

1. 11 COORDI NATI ON

1. 12 QUALI TY CONTROL

1. 12. 1 Modi f i cat i on of Ref er ences

1. 12. 2 Qual i f i cat i ons

1. 12. 2. 1 Bui l di ng Encl osur e Commi ssi oni ng Speci al i st Qual i f i cat i ons

1. 12. 2. 2 Pr essur e Test Agency

1. 12. 2. 3 Ther mogr apher Qual i f i cat i ons

1. 12. 3 Test Repor t s

1. 13 CLI MATE CONDI TI ONS SUI TABLE FOR A PRESSURE TEST

1. 13. 1 Rai n

1. 13. 2 Wi nd

1. 14 CERTI FI CATE OF READI NESS

PART 2 PRODUCTS

2. 1 TEST EQUI PMENT

2. 2 PRESSURE TEST EQUI PMENT

2. 2. 1 Bl ower Door Fans and Tr ai l er Mount ed Fans

2. 2. 2 Di gi t al Gages as Test I nst r ument s

2. 3 THERMAL I MAGI NG CAMERA REQUI REMENTS

PART 3 EXECUTI ON

3. 1 MEETI NGS

3. 2 DESI GN PHASE COORDI NATI ON MEETI NG

3. 3 PRELI MI NARY BECx PLAN

3. 4 DESI GN REVI EW

3. 5 FI NAL BECx PLAN

3. 6 CONSTRUCTI ON SUBMI TTAL REVI EWS

3. 7 TEMPLATE BUI LDI NG ENVELOPE I NSPECTI ON CHECKLI STS

3. 8 BUI LDI NG ENVELOPE I NSPECTI ON AND TESTI NG

3. 8. 1 Addi t i onal Bui l di ng Encl osur e Test i ng

3. 9 BUI LDI NG ENCLOSURE AI R BARRI ER PRESSURE TESTI NG

3. 9. 1 Pr essur e Test Agency

3. 9. 1. 1 Fi el d Wor k

3. 9. 1. 2 Repor t i ng Wor k

3. 9. 2 Envel ope Sur f ace Ar ea Cal cul at i on

3. 9. 3 Pr epar i ng The Bui l di ng Envel ope For The Pr essur e Test

3. 9. 3. 1 Test i ng Dur i ng Const r uct i on

3. 9. 3. 2 Seal i ng t he Ai r Bar r i er Envel ope

3. 9. 3. 3 Seal i ng Pl umbi ng

3. 9. 3. 4 Cl ose and Lock Door s

3. 9. 3. 5 Hol d Excl uded Bui l di ng Ar eas at t he Out door Pr essur e Level

3. 9. 3. 6 Mai nt ai n an Even Pr essur e wi t hi n t he Envel ope

3. 9. 3. 7 Mai nt ai n Access t o Mechani cal and El ect r i cal Rooms

3. 9. 3. 8 Mi ni mi ze Pot ent i al f or Bl owi ng Dust and Debr i s

3. 9. 3. 9 De- ener gi ze Ai r Movi ng Devi ces

3. 9. 3. 10 I nst al l i ng Bl ower Door Equi pment i n a Door Openi ng

3. 9. 4 Bui l di ng Envel ope Ai r Ti ght ness Requi r ement

3. 9. 4. 1 Ar chi t ect ur al Onl y Test

3. 9. 4. 1. 1 Test Goal

3. 9. 4. 1. 2 Pr epar i ng t he Envel ope f or t he Pr essur e Test - Seal

Al l Openi ngs t hr ough t he Ai r Bar r i er

3. 9. 4. 2 Ar chi t ect ur al Pl us HVAC Syst em Test

3. 9. 4. 2. 1 Test Goal

3. 9. 4. 2. 2 Pr epar i ng t he Bui l di ng f or t he Pr essur e Test

3. 9. 5 Conduct i ng The Pr essur e Test

SECTI ON 01 91 19 Page 2

3. 9. 5. 1 Ext end Pneumat i c Tubes and Est abl i sh a Ref er ence Di f f er ent i al Pr essur e

3. 9. 5. 2 Bi as Pr essur e Readi ngs

3. 9. 5. 3 Test i ng i n Bot h Posi t i ve and Negat i ve Di r ect i ons

3. 9. 5. 4 Si ngl e Di r ect i on Test i ng

3. 9. 5. 5 Usi ng a Bui l di ng' s Own Ai r Handl i ng Syst em t o Pr essur e

Test an Envel ope

3. 9. 5. 5. 1 Test Set up

3. 9. 5. 5. 2 Measur i ng Ai r f l ows

3. 9. 5. 5. 3 Out door Ai r Fl ow Measur i ng St at i ons

3. 9. 5. 6 Pr essur e Test i ng - Speci al Cases

3. 9. 5. 6. 1 Pr essur e Test i ng a Tal l or Lar ge Bui l di ng Envel ope

3. 9. 5. 6. 2 Pr essur e Test i ng a Mul t i pl e I sol at ed Zoned Bui l di ng

3. 9. 5. 6. 3 Pr essur e Test i ng a Bui l di ng Addi t i on

3. 9. 5. 7 Fai l ed Pr essur e Test

3. 9. 5. 8 Ai r Leakage Test Repor t

3. 9. 6 Locat i ng Leaks By Di agnost i c Test i ng

3. 9. 6. 1 Seal i ng and Re- Test i ng

3. 9. 6. 2 Fi nd Test

3. 9. 6. 3 Feel Test

3. 9. 6. 4 I nf r ar ed Ther mogr aphy Test

3. 9. 6. 4. 1 Ther mogr aphy Test Met hods

3. 9. 6. 4. 1. 1 Ther mogr aphy Test i ng of t he Ai r Bar r i er

3. 9. 6. 4. 2 Ther mogr aphy Test Resul t s

3. 9. 6. 5 Fog Test

3. 9. 6. 6 Di agnost i c Test Repor t

3. 9. 6. 6. 1 Ther mogr aphi c I nvest i gat i on Repor t

3. 9. 6. 6. 2 Fog Test Repor t

3. 9. 7 Cal cul at i on Pr ogr am

3. 9. 8 Af t er Compl et i on Of The Pr essur e And Di agnost i c Test

3. 9. 9 Repai r And Pr ot ect i on

3. 10 TRAI NI NG

3. 11 FI NAL BECx REPORT

3. 12 APPENDI CES

ATTACHMENTS:

Pr essur e Test Dat a Anal ysi s

Appendi x A - Ai r Leakage Test For m

Appendi x B - Ai r Leakage Test Resul t s For m

Appendi x C - Test Agency Qual i f i cat i ons Sheet

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 91 19 Page 3

USACE / NAVFAC / AFCEC UFGS- 01 91 19 ( May 2023)

Pr epar i ng Act i v i t y: USACE Super sedi ng UFGS- 07 05 23 ( August 2019)

UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS

Ref er ences ar e i n agr eement wi t h UMRL dat ed Apr i l 2024

SECTI ON 01 91 19

BUI LDI NG ENCLOSURE COMMI SSI ONI NG

05/ 2023

NOTE: Thi s gui de speci f i cat i on cover s bui l di ng encl osur e/ envel ope commi ssi oni ng, i ncl udi ng r equi r ement s f or pr essur e t est i ng a bui l di ng' s ai r bar r i er f or ai r l eaks. Mi ni mi zi ng ai r l eakage t hr ough an ai r bar r i er hel ps r educe ener gy cost s.

Thi s speci f i cat i on i s appl i cabl e t o new bui l di ng const r uct i on and maj or r enovat i ons i nvol v i ng upgr ades t o t he bui l di ng envel ope.

Adher e t o UFC 1- 300- 02 Uni f i ed Faci l i t i es Gui de Speci f i cat i ons ( UFGS) For mat St andar d when edi t i ng t hi s gui de speci f i cat i on or pr epar i ng new pr oj ect speci f i cat i on sect i ons. Edi t t hi s gui de speci f i cat i on f or pr oj ect speci f i c r equi r ement s by addi ng, del et i ng, or r evi s i ng t ext . For br acket ed i t ems, choose appl i cabl e i t em( s) or i nser t appr opr i at e i nf or mat i on.

Remove i nf or mat i on and r equi r ement s not r equi r ed i n r espect i ve pr oj ect , whet her or not br acket s ar e pr esent .

Comment s, suggest i ons and r ecommended changes f or t hi s gui de speci f i cat i on ar e wel come and shoul d be submi t t ed as a Cr i t er i a Change Request ( CCR) .

NOTE: TO DOWNLOAD UFGS GRAPHI CS AND APPENDI CES

Go t o ht t p: / / www. wbdg. or g/ f f c/ dod/ uni f i ed- f aci l i t i es- gui de- speci f i cat i ons- uf gs/ f or ms- gr aphi cs- t abl es

PART 1 GENERAL

NOTE: Thi s UFGS Sect i on cont ai ns t ai l or i ng opt i ons f or Cont r act or ( KTR) HI RED COMMI SSI ONI NG PROVI DER, GOVT HI RED COMMI SSI ONI NG PROVI DER, DESI GN- BUI LD, ARMY, and NAVY.

SECTI ON 01 91 19 Page 4

Sel ect KTR HI RED COMMI SSI ONI NG PROVI DER t ai l or i ng f or pr oj ect s t hat r equi r e t he Commi ssi oni ng Pr ovi der t o be pr ovi ded by t he Const r uct i on Cont r act or .

Sel ect GOVT HI RED COMMI SSI ONI NG PROVI DER t ai l or i ng f or pr oj ect s wher e t he Commi ssi oni ng Pr ovi der i s r et ai ned under a separ at e Cont r act wi t h t he Gover nment .

Sel ect DESI GN- BUI LD t ai l or i ng f or Desi gn- Bui l d pr oj ect execut i on.

Sel ect ARMY t ai l or i ng f or pr oj ect s t hat wi l l r epor t t he r eal pr oper t y asset f or Ai r For ce or Ar my.

Sel ect NAVY t ai l or i ng f or pr oj ect s t hat wi l l r epor t t he r eal pr oper t y asset f or Navy or Mar i ne Cor ps.

Ver i f i cat i on of t he ener gy per f or mance of t he bui l di ng envel ope i s r equi r ed f or al l pr oj ect s t hat r equi r e commi ssi oni ng and ver i f i cat i on i n accor dance wi t h UFC 1- 200- 02; f aci l i t i es t hat r equi r e ai r bar r i er i nspect i on and t est i ng ar e def i ned wi t hi n UFC 3- 101- 01. As di r ect ed i n UFC 1- 200- 02, t he Commi ssi oni ng r equi r ement s i n t hi s Sect i on ar e based on ASHRAE 90. 1 as r equi r ed f or commer ci al and mul t i - f ami l y hi gh- r i se bui l di ngs; f or pr oj ect s i nvol v i ng l ow- r i se r esi dent i al bui l di ngs t hi s Sect i on wi l l need t o be edi t ed t o meet t he Commi ssi oni ng r equi r ement s of I ECC. For commi ssi oni ng r equi r ement s of Medi cal Tr eat ment Faci l i t i es, r ef er t o UFC 4- 510- 01 and edi t t hi s Sect i on accor di ngl y. When a pr oj ect r equi r es t hi s Sect i on, edi t and i ncl ude UFGS Sect i on 07 27 10 BUI LDI NG AI R BARRI ER SYSTEM f or addi t i onal per f or mance t est i ng and ver i f i cat i on r equi r ement s.

For pr oj ect s wher e mor e over si ght i s needed beyond t he mi ni mum bui l di ng envel ope r equi r ement s of ASHRAE

90. 1 and t he r equi r ement s of Sect i on 07 27 10 BUI LDI NG AI R BARRI ER SYSTEM, r evi se t hi s speci f i cat i on accor di ngl y. ( Exampl es i ncl ude f aci l i t i es wi t h pr essur i zat i on or humi di t y cont r ol r equi r ement s such as ar mor i es, el ect r oni c equi pment f aci l i t i es, hospi t al s, and l abor at or i es. )

Coor di nat e t hi s Sect i on wi t h t he commi ssi oni ng r equi r ement s of ASHRAE 90. 1, as r equi r ed by UFC 1- 200- 02, " Hi gh Per f or mance and Sust ai nabl e Bui l di ng Requi r ement s" par agr aph " Commi ssi oni ng. "

NOTE: The basi s f or t he ai r l eakage t est i ng wi t hi n t hi s speci f i cat i on i s UFC 3- 101- 01 and t he U. S. Ar my Cor ps of Engi neer s Ai r Leakage Test Pr ot ocol f or Measur i ng Ai r Leakage i n Bui l di ngs. Thi s pr ot ocol can be f ound at t he f ol l owi ng web si t e:

ht t ps: / / www. wbdg. or g/ FFC/ ARMYCOE/ usace_ai r l eakaget est pr ot ocol . pdf .

SECTI ON 01 91 19 Page 5

Thi s speci f i cat i on i ncl udes addi t i onal r ecommendat i ons not f ound i n t he af or ement i oned pr ot ocol . These r ecommendat i ons ar e based on per sonal pr essur e t est exper i ence and di scussi ons wi t h i ndust r y exper t s.

An Excel spr eadsheet t i t l ed Pr essur e Test Dat a Anal ysi s, avai l abl e f or downl oad at ht t p: / / www. wbdg. or g/ f f c/ dod/ uni f i ed- f aci l i t i es- gui de- speci f i cat i ons- uf gs/ f or ms- gr aphi cs- t abl es i s an i nt egr al par t of t he bui l di ng' s ai r bar r i er pr essur e t est . Dat a obt ai ned dur i ng t he t est may be i nput i nt o t he spr eadsheet t o det er mi ne t he ai r bar r i er ' s l eakage r at e.

Thi s speci f i cat i on descr i bes t he r esponsi bi l i t i es of t he Cont r act or and t he Cont r act or ' s pr essur e t est agency. The bui l di ng desi gner i s r esponsi bl e f or cr eat i ng, def i ni ng and det ai l i ng t he ai r bar r i er envel ope. The Cont r act or ' s pr essur e t est agency i s r esponsi bl e f or pr epar i ng t he bui l di ng envel ope f or t he pr essur e t est , per f or mi ng t he t est , r ecor di ng t est r esul t s, and r et ur ni ng t he bui l di ng t o pr e- t est condi t i ons. The t est agency i s al so r esponsi bl e f or per f or mi ng t he cal cul at i ons t o det er mi ne i f t he envel ope passed t he pr essur e t est . Di agnost i c t est i ng i s al so t he r esponsi bi l i t y of t he t est agency.

Thi s speci f i cat i on does not cover duct and HVAC syst em pr essur e t est i ng and i s l i mi t ed t o t he envel ope penet r at i ng damper s as deemed appl i cabl e f or l eakage t est i ng. Duct and HVAC syst em pr essur e t est i ng r ef er ences can be obt ai ned f r om ASHRAE Handbook of Fundament al s, HVAC Desi gn Sect i on and Chapt er s and ASHRAE St andar d 215, Met hod of Test t o Det er mi ne Leakage of Oper at i on HVAC Ai r Di st r i but i on Syst ems, shoul d duct and HVAC syst em pr essur e t est i ng be r equi r ed by ot her speci f i cat i ons. See Sect i on 23 05 93, TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC f or duct t est i ng r equi r ement s.

1. 1 SUMMARY

Use t hi s Sect i on i n conj unct i on wi t h UFGS 01 91 00. 15 BUI LDI NG COMMI SSI ONI NG. Bui l di ng Encl osur e Commi ssi oni ng ( BECx) i s an essent i al par t of over al l Bui l di ng Commi ssi oni ng. The f i nal BECx r epor t i s par t of t he Fi nal Commi ssi oni ng Repor t as def i ned i n 01 91 00. 15 BUI LDI NG COMMI SSI ONI NG. Thi s Sect i on cover s Bui l di ng Encl osur e Commi ssi oni ng f or al l s i x sur f aces ( 4 wal l s, r oof , and f l oor , f or a r ect angul ar shaped zone) of a bui l di ng. Addi t i onal Qual i t y Cont r ol and t est i ng r equi r ement s f or speci f i c component s of t he bui l di ng encl osur e ar e descr i bed i n t he Di v i s i on 03 t hr u 08 UFGS Sect i ons of t he pr oj ect speci f i cat i ons.

1. 2 REFERENCES

NOTE: Thi s par agr aph i s used t o l i s t t he publ i cat i ons c i t ed i n t he t ext of t he gui de

SECTI ON 01 91 19 Page 6 speci f i cat i on. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by basi c desi gnat i on onl y and l i s t ed i n t hi s par agr aph by or gani zat i on, desi gnat i on, dat e, and t i t l e.

Use t he Ref er ence Wi zar d' s Check Ref er ence f eat ur e when you add a Ref er ence I dent i f i er ( RI D) out si de of t he Sect i on' s Ref er ence Ar t i c l e t o aut omat i cal l y pl ace t he r ef er ence i n t he Ref er ence Ar t i c l e. Al so use t he Ref er ence Wi zar d' s Check Ref er ence f eat ur e t o updat e t he i ssue dat es.

Ref er ences not used i n t he t ext wi l l aut omat i cal l y be del et ed f r om t hi s sect i on of t he pr oj ect speci f i cat i on when you choose t o r econci l e r ef er ences i n t he publ i sh pr i nt pr ocess.

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er enced wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AMERI CAN ARCHI TECTURAL MANUFACTURERS ASSOCI ATI ON ( AAMA)

AAMA 501. 2 ( 2015) Qual i t y Assur ance and Di agnost i c Wat er Leakage Fi el d Check of I nst al l ed St or ef r ont s, Cur t ai n Wal l s and Sl oped Gl azi ng Syst ems

AMERI CAN SOCI ETY FOR NONDESTRUCTI VE TESTI NG ( ASNT)

ANSI / ASNT CP- 105 ( 2020) ASNT St andar d Topi cal Out l i nes f or Qual i f i cat i on of Nondest r uct i ve Test i ng Per sonnel

ANSI / ASNT CP- 189 ( 2020) ASNT St andar d f or Qual i f i cat i on and Cer t i f i cat i on of Nondest r uct i ve Test i ng Per sonnel

ASNT SNT- TC- 1A ( 2020) Recommended Pr act i ce f or Per sonnel Qual i f i cat i on and Cer t i f i cat i on i n Nondest r uct i ve Test i ng

AMERI CAN SOCI ETY OF HEATI NG, REFRI GERATI NG AND AI R- CONDI TI ONI NG

ENGI NEERS ( ASHRAE)

ASHRAE 90. 1 - I P ( 2019) Ener gy St andar d f or Bui l di ngs Except Low- Ri se Resi dent i al Bui l di ngs

ASHRAE 202 ( 2018) Commi ssi oni ng Pr ocess f or Bui l di ngs and Syst ems

ASHRAE RP- 935 ( 1998) Pr ot ocol f or Fi el d Test i ng of Tal l Bui l di ngs t o Det er mi ne Envel ope Ai r Leakage Rat e

ASTM I NTERNATI ONAL ( ASTM)

ASTM C1193 ( 2016) St andar d Gui de f or Use of Joi nt

SECTI ON 01 91 19 Page 7

Seal ant s

ASTM D3464 ( 1996; R 2014) St andar d Test Met hod f or Aver age Vel oci t y i n a Duct Usi ng a Ther mal Anemomet er

ASTM D4541 ( 2022) St andar d Test Met hod f or Pul l - Of f St r engt h of Coat i ngs Usi ng Por t abl e Adhesi on Test er s

ASTM E779 ( 2019) St andar d Test Met hod f or Det er mi ni ng Ai r Leakage Rat e by Fan Pr essur i zat i on

ASTM E783 ( 2002; R 2018) St andar d Test Met hod f or Fi el d Measur ement of Ai r Leakage Thr ough I nst al l ed Ext er i or Wi ndows and Door s

ASTM E1105 ( 2015; R 2023) St andar d Test Met hod f or Fi el d Det er mi nat i on of Wat er Penet r at i on of I nst al l ed Ext er i or Wi ndows, Skyl i ght s, Door s, and Cur t ai n Wal l s, by Uni f or m or Cycl i c St at i c Ai r Pr essur e Di f f er ence

ASTM E1186 ( 2022) St andar d Pr act i ces f or Ai r Leakage Si t e Det ect i on i n Bui l di ng Envel opes and Ai r Bar r i er Syst ems

ASTM E1258 ( 1988; R 2018) St andar d Test Met hod f or Ai r f l ow Cal i br at i on of Fan Pr essur i zat i on Devi ces

ASTM E1827 ( 2022) St andar d Test Met hods f or Det er mi ni ng Ai r t i ght ness of Bui l di ngs Usi ng an Or i f i ce Bl ower Door

ASTM E2029 ( 2011) St andar d Test Met hod f or Vol umet r i c and Mass Fl ow Rat e Measur ement i n a Duct Usi ng Tr acer Gas Di l ut i on

ASTM E2813 ( 2018) St andar d Pr act i ce f or Bui l di ng Encl osur e Commi ssi oni ng

ASTM E2947 ( 2021) St andar d Gui de f or Bui l di ng Encl osur e Commi ssi oni ng

I NTERNATI ONAL ORGANI ZATI ON FOR STANDARDI ZATI ON ( I SO)

I SO 6781 ( 1983) Ther mal I nsul at i on - Qual i t at i ve Det ect i on of Ther mal I r r egul ar i t i es i n Bui l di ng Envel opes - I nf r ar ed Met hod

I SO 6781- 2 ( 2010) Per f or mance of Bui l di ngs - Det ect i on of Heat , Ai r , and Moi st ur e I r r egul ar i t i es i n Bui l di ngs by I nf r ar ed Met hods - Par t 2: Equi pment Requi r ement s

I SO 6781- 3 ( 2015) Per f or mance of Bui l di ngs - Det ect i on of Heat , Ai r , and Moi st ur e

SECTI ON 01 91 19 Page 8

I r r egul ar i t i es i n Bui l di ngs by I nf r ar ed Met hods - Par t 3: Qual i f i cat i ons of Equi pment Oper at or s, Dat a Anal yst s, and Repor t Wr i t er s

1. 3 DEFI NI TI ONS

The def i ni t i ons i ncl uded her e ar e speci f i c t o t hi s Sect i on. Ref er t o UFGS 01 91 00. 15 f or def i ni t i ons t hat appl y t o bot h Sect i ons. The f ol l owi ng t er ms as t hey appl y t o t hi s sect i on:

1. 3. 1 Ai r Bar r i er Envel ope

The sur f ace t hat separ at es t he i nsi de ai r f r om t he out si de ai r . The combi nat i on of ai r bar r i er assembl i es and ai r bar r i er component s, connect ed by ai r bar r i er accessor i es ar e desi gned t o pr ovi de a cont i nuous bar r i er t o t he movement of ai r t hr ough an envi r onment al separ at or . A s i ngl e bui l di ng may have mor e t han one ai r bar r i er envel ope. The ai r bar r i er sur f ace i ncl udes t he t op, bot t om, and si des of t he envel ope. The t er m " ai r bar r i er envel ope" i s al so known as " ai r bar r i er syst em" or s i mpl y " ai r bar r i er " .

1. 3. 2 Ai r Leakage Rat e

A measur ement of ai r i nf i l t r at i on or exf i l t r at i on t hr ough t he bui l di ng envel ope over t i me. The ai r l eakage r at e i s t he r at e of ai r f l ow acr oss t he ai r bar r i er per uni t sur f ace ar ea of t he envel ope at a def i ned di f f er ent i al pr essur e.

1. 3. 3 Basi s of Desi gn ( BoD)

A document devel oped by t he desi gn t eam whi ch i ncl udes t echni cal concept s, assumpt i ons, cal cul at i ons, deci s i ons, and pr oduct sel ect i ons t o suppor t t he Owner ' s Pr oj ect Requi r ement s ( OPR) .

1. 3. 4 Bi as Pr essur e

Al so known as zer o f l ow pr essur e, basel i ne pr essur e, of f set pr essur e or backgr ound pr essur e. Wi t h t he envel ope not ar t i f i c i al l y pr essur i zed, bi as i s t he di f f er ent i al pr essur e t hat al ways exi st s bet ween t he envel ope t hat has been pr epar ed ( seal ed) f or t he pr essur e t est and t he out door s. Bi as pr essur e i s made up of t wo component s, f i xed st at i c of f set ( usual l y due t o st ack ef f ect or t he HVAC syst em) and f l uct uat i ng pr essur e ( usual l y due t o wi nd or a movi ng el evat or ) . Because of pr essur e f l uct uat i ons many bi as pr essur e r eadi ngs ar e r ecor ded and aver aged f or use i n t he cal cul at i ons.

1. 3. 5 Bl ower Door

Commonl y used t er m f or an appar at us used t o pr essur i ze and depr essur i ze t he space wi t hi n t he bui l di ng envel ope and quant i f y ai r l eakage t hr ough t he envel ope. The bl ower door t ypi cal l y i ncl udes a door f an and an ai r r esi st ant f abr i c or a ser i es of har d panel s t hat ext ends t o cover and seal t he door openi ng bet ween t he f an shr oud and door f r ame. The door f an i s a cal i br at ed f an capabl e of measur i ng ai r f l ow and i s usual l y pl aced i n t he openi ng of an ext er i or door . Wi t h t he ai r bar r i er ot her wi se seal ed, ai r pr oduced by t he door f an pr essur i zes or de- pr essur i zes t he envel ope, dependi ng on t he f an' s or i ent at i on.

SECTI ON 01 91 19 Page 9

1. 3. 6 Bui l di ng Encl osur e ( or envel ope)

The mat er i al s, component s, syst ems, and assembl i es i nt ended t o pr ovi de an envi r onment al separ at or bet ween t he i nt er i or and ext er i or or bet ween i nt er i or spaces wi t h di f f er ent envi r onment r equi r ement s. " Encl osur e" i s used i nt er changeabl y wi t h " envel ope" .

1. 3. 7 Bui l di ng Encl osur e Commi ssi oni ng ( BECx)

Techni cal ser vi ce pr ovi ded on behal f of t he Gover nment t o pr ovi de a qual i t y- f ocused pr ocess f or enhanci ng t he per f or mance of t he bui l di ng encl osur e by val i dat i ng t he desi gn phase and ver i f y i ng dur i ng t he const r uct i on phase t hat t he per f or mance of t he bui l di ng encl osur e mat er i al s component s, assembl i es, and syst ems ar e desi gned and i nst al l ed t o meet t he Owner ' s Pr oj ect Requi r ement s ( OPR) .

1. 3. 8 Bui l di ng Encl osur e Commi ssi oni ng Pr ovi der ( BECxP)

An ent i t y t hat f unct i ons as par t of t he over al l Commi ssi oni ng Team and i s r esponsi bl e f or val i dat i ng t he desi gn phase and ver i f y i ng dur i ng t he const r uct i on phase t hat t he per f or mance of t he bui l di ng encl osur e mat er i al s, component s, assembl i es, and syst ems ar e desi gned and i nst al l ed t o meet t he Owner ' s Pr oj ect Requi r ement s ( OPR) .

1. 3. 9 Const r uct i on Phase

The per i od of a pr oj ect f ol l owi ng t he awar d of const r uct i on Cont r act t o pr oj ect compl et i on.

1. 3. 10 Desi gn Phase

The per i od of t he pr oj ect del i ver y pr ocess when a desi gn suppor t i ng t he Owner ' s Pr oj ect Requi r ement s i s devel oped and t r ansl at ed i nt o Cont r act Document s.

1. 3. 11 Envi r onment al Separ at or

The par t s of a bui l di ng t hat separ at e t he cont r ol l ed i nt er i or envi r onment f r om t he uncont r ol l ed ext er i or envi r onment , or t hat separ at e spaces wi t hi n a bui l di ng t hat have di ssi mi l ar envi r onment s. The t er m " envi r onment al separ at or " i s al so known as t he " cont r ol l ayer " .

1. 3. 12 Funct i onal Per f or mance Test ( FPT)

A syst emat i c pr ocess t o ver i f y t hat cont r ol s and ot her el ement s of t he bui l di ng pr oj ect ar e capabl e of and conf i gur ed t o oper at e or per f or m as r equi r ed.

[ 1. 3. 13 Owner ' s Pr oj ect Requi r ement s ( OPR)

NOTE: The Owner ' s Pr oj ect Requi r ement s ( OPR) document may be i ncl uded as deemed appr opr i at e by t he pr oj ect t eam or as r equi r ed by some Thi r d Par t y Cer t i f i cat i on ( TPC) syst ems ( such as LEED and Gr een Gl obes) . The pr el i mi nar y desi gn del i ver abl es and pr el i mi nar y desi gn aut hor i t y ( PDA) document at i on ( such as 1391, Basi s of Desi gn, and UFCs) const i t ut e t he Owner ' s Pr oj ect Requi r ement s ( OPR) and may be

SECTI ON 01 91 19 Page 10 used i n l i eu of a st and- al one OPR. I f used, t he OPR i s r ef er enced by t he CxC dur i ng desi gn r evi ew when t he speci f i cat i on i s t ai l or ed f or KTR HI RED

COMMI SSI ONI NG PROVI DER.

NOTE: The Owner ' s Pr oj ect Requi r ement s ( OPR) document may be i ncl uded as deemed appr opr i at e by t he pr oj ect t eam or as r equi r ed by some Thi r d Par t y Cer t i f i cat i on ( TPC) syst ems ( such as LEED and Gr een Gl obes) . When not ot her wi se r equi r ed f or TPC, i ncl usi on of t he OPR f or CxC r evi ew may be benef i c i al f or ensur i ng l ar ge or compl ex pr oj ect s conf or m t o t he Owner ' s needs. Thi s may be unnecessar y f or mor e t ypi cal const r uct i on pr oj ect s.

I f used, t he OPR i s r ef er enced by t he CxC dur i ng desi gn r evi ew and dur i ng submi t t al r evi ew, i nspect i ons, and t est i ng.

NOTE: I f used, i nser t t he OPR as Appendi x A t o Sect i on 01 91 00. 15 BUI LDI NG COMMI SSI ONI NG. I ncl ude a st at ement on t he OPR cover st at i ng t hat t he document i s pr ovi ded f or commi ssi oni ng r evi ew pur poses onl y and i s not a Cont r act r equi r ement .

Ret ai n t he br acket ed r ef er ences t o Owner ' s Pr oj ect Requi r ement s ( OPR) t hr oughout t he speci f i cat i on when one i s i ncl uded. Del et e t he br acket ed OPR r ef er ences when t he OPR i s not i ncl uded.

A document t hat det ai l s t he st akehol der s ' r equi r ement s f or t he pr oj ect and t he expect at i ons f or how i t wi l l be used and oper at ed. The OPR i s pr ovi ded f or commi ssi oni ng r evi ew pur poses onl y and i s not a Cont r act r equi r ement .

] 1. 3. 14 Pr essur e Test

A gener i c t er m f or a t est i n whi ch t he envel ope i s ei t her pr essur i zed or de- pr essur i zed wi t h r espect t o t he out door s.

1. 3. 15 Negat i ve Pr essur e Test ( Depr essur i zat i on Test )

A t est wher ei n ai r i nsi de t he envel ope i s dr awn t o t he out door s. Thi s pl aces t he envel ope at a l ower ( negat i ve) pr essur e wi t h r espect t o t he out door s.

1. 3. 16 Posi t i ve Pr essur e Test ( Pr essur i zat i on Test )

A t est wher ei n out door ai r i s pushed i nt o t he envel ope. Thi s ai r movement pl aces t he envel ope at a hi gher ( posi t i ve) pr essur e wi t h r espect t o t he out door s.

1. 3. 17 Ver i f i cat i on & Test i ng ( V&T) Pr ovi der

An ent i t y who compl et es t he act i v i t i es needed t o i mpl ement t he bui l di ng f unct i onal per f or mance t est i ng ( FPT) act i v i t i es or ver i f y t hat el ement s of t he bui l di ng pr oj ect meet st at ed r equi r ement s.

SECTI ON 01 91 19 Page 11

1. 4 COMMUNI CATI ON WI TH THE GOVERNMENT COMMI SSI ONI NG PROVI DER

For communi cat i on r esponsi bi l i t i es, see Sect i on 01 91 00. 15 BUI LDI NG

COMMI SSI ONI NG.

1. 5 COMMUNI CATI ON WI TH GOVERNMENT ACCCEPTANCE TESTI NG REPRESENTATI VES

NOTE: The f ol l owi ng par agr aph i s t ai l or ed f or use on NAVY pr oj ect s onl y.

The QC Manager must communi cat e di r ect l y wi t h t he Gover nment Accept ance Test i ng Repr esent at i ves and Cont r act i ng Of f i cer ' s Repr esent at i ve r egar di ng Gover nment accept ance t est i ng act i v i t i es. I nf or m t he Cont r act i ng Of f i cer ' s Repr esent at i ve when syst ems ar e r eady f or t est i ng t o be wi t nessed by Gover nment Accept ance Test i ng Repr esent at i ves, and al l ow access t o t he const r uct i on s i t e and syst em( s) t o be t est ed

1. 6 ENCLOSURE COMPONENTS TO BE COMMI SSI ONED

NOTE: The f ol l owi ng component s ar e r equi r ed t o be commi ssi oned per ASHRAE 90. 1. Sel ect al l syst ems t hat ar e par t of t he scope. Add ot her syst ems as r equi r ed by t he scope of t he pr oj ect or r equi r ed by t he appl i ed sust ai nabl e t hi r d- par t y cer t i f i cat i on pr ogr am.

Whol e bui l di ng ai r t i ght ness t est i ng i s r equi r ed f or al l pr oj ect s as out l i ned i n t he Edi t or ' s Not e f or t he Par t 3 sect i on BUI LDI NG ENVELOPE AI R TI GHTNESS REQUI REMENT; however , t hi s t est i s per f or med near t he end of t he pr oj ect . Once t he bui l di ng encl osur e i s f ul l y const r uct ed, i nst al l at i on cor r ect i ons needed t o compl y wi t h t he t est r equi r ement s may r equi r e subst ant i al di sassembl y and r e- wor k. Smal l er scal e t est s per f or med on mock- ups or at t he i ni t i al i nst al l at i on of bui l di ng component s ar e r ecommended t o val i dat e t he desi gn and i nst al l at i on of bui l di ng encl osur e el ement s and syst ems. These t est s may i ncl ude:

Adhesi on t est s on l i qui d- appl i ed or adher ed wat er pr oof i ng and ai r / weat her bar r i er such as ASTM D4541, Test Met hod f or Pul l - of f St r engt h Coat i ngs Usi ng Por t abl e Adhesi on Test er s.

Ai r l eakage t est i ng of f enest r at i on or opaque wal l s usi ng a s i t e- bui l t t est chamber t o pr ovi de di f f er ent pr essur es such as ASTM E783, Test Met hod f or Fi el d Measur ement of Ai r Leakage t hr ough I nst al l ed Ext er i or Wi ndows and Door s.

Smal l scal e t est s of wat er pr oof i ng or ai r weat her bar r i er s such as t he bubbl e t est descr i bed i n ASTM E1186, Pr act i ces f or Ai r Leakage Si t e Det ect i on i n Bui l di ng Envel opes and Ai r Bar r i er Syst ems.

Wat er penet r at i on t est s of f enest r at i on wi t h a s i t e- bui l t t est chamber ( same chamber as ASTM E783) per ASTM E1105, Test Met hod f or Fi el d Det er mi nat i on

SECTI ON 01 91 19 Page 12 of Wat er Penet r at i on of I nst al l ed Ext er i or Wi ndows, Skyl i ght s, Door s, and Cur t ai n Wal l s by Uni f or m or Cycl i c St at i c Ai r Pr essur e Di f f er ence.

Wat er penet r at i on t est i ng usi ng a hose wi t h a cal i br at ed nozzl e such as AAMA 501. 2, Qual i t y Assur ance and Di agnost i c Wat er Leakage Fi el d Check of I nst al l ed St or ef r ont s, Cur t ai nwal l , and Sl oped Gl azi ng Syst ems.

Adhesi on and cohesi on t est i ng of seal ant s accor di ng t o ASTM C1193, Gui de f or Use of Joi nt Seal ant s: Fi el d- Appl i ed Seal ant Joi nt Hand Pul l Tab.

Dependi ng on t he pr oj ect compl exi t y, budget , and i nt er i or envi r onment al r equi r ement s, consi der i ncl udi ng t he smal l - scal e t est i ng l i s t ed above on mock- ups or ear l y i n t he i nst al l at i on of t hat const r uct i on component . Addi t i onal t est s not l i s t ed may be sel ect ed i n consul t at i on wi t h t he BECxP and Desi gn Team. See ASTM E2813 f or addi t i onal t est opt i ons. Sel ect and i ncl ude addi t i onal bui l di ng encl osur e t est s r equi r ed t o ver i f y envel ope per f or mance as appr opr i at e t o t he pr oj ect compl exi t y, OPR, envi r onment al r equi r ement s and geogr aphi c l ocat i on.

1. 6. 1 Ver i f i cat i on of t he Desi gn and I nst al l at i on of t he Cont i nuous Ai r Bar r i er

a. Conduct per i odi c f i el d i nspect i on of t he cont i nuous ai r bar r i er mat er i al s and assembl i es, i ncl udi ng al l penet r at i ons t hr ough t he si x s i des of t he ai r bar r i er , dur i ng const r uct i on whi l e t he cont i nuous ai r bar r i er i s st i l l accessi bl e f or i nspect i on and r epai r ( af t er i nst al l at i on of al l penet r at i ons and wal l c l addi ng anchor i ng devi ces and bef or e t he i nst al l at i on of i nt er i or f i ni shes) t o ver i f y and document compl i ance wi t h t he r equi r ement s. Conduct i nspect i ons at i ni t i al i nst al l at i on of each bui l di ng envel ope component and at i n- pr ogr ess const r uct i on i nt er val s as st at ed i n Par t 3 sect i on t i t l ed

BUI LDI NG ENVELOPE I NSPECTI ON AND TESTI NG.

[ b. Conduct Per f or mance Ver i f i cat i on Test i ng of t he ent i r e bui l di ng envel ope ( syst ems, component s, and assembl i es) f or ai r t i ght ness i n accor dance wi t h Par t 3 sect i on t i t l ed BUI LDI NG ENVELOPE AI R TI GHTNESS

REQUI REMENT. ]

1. 6. 2 I nspect i on of Fenest r at i on and Door s

a. Fenest r at i on and Door s must be l abel ed and i nspect ed t o ver i f y compl i ance wi t h Bui l di ng Envel ope ener gy r equi r ement s, i ncl udi ng appl i cabl e U- f act or s, Sol ar Heat Gai n Coef f i c i ent ( SHGC) , Vi s i bl e Tr ansmi t t ance ( VT) , and ai r l eakage r at es.

b. I nspect door s and wi ndows f or coor di nat i on wi t h t he i nsul at i ng pl ane of t he wal l , cont i nui t y wi t h t he ai r / weat her bar r i er , and f l ashi ng.

c. I nspect oper at i on of door s, c l oser s, and oper at i ng mechani sms f or conf or mance wi t h manuf act ur er ' s i nst r uct i ons.

d. I nspect seal s and gasket s f or f enest r at i on and door s ( i ncl udi ng

SECTI ON 01 91 19 Page 13 l oadi ng dock, sect i onal , and coi l i ng door s) f or pr oper i nst al l at i on and t o ver i f y t hat seal s ar e i n good condi t i on.

1. 6. 3 I nspect i on of Opaque Roof , Wal l s, and Fl oor s

Opaque r oof , above- gr ade and bel ow- gr ade wal l s, and f l oor s, must be subj ect t o t he f ol l owi ng i nspect i ons dur i ng const r uct i on:

a. Use of ASHRAE 90. 1 - I P- compl i ant mat er i al s and assembl i es.

b. I nsul at i on mat er i al meet s desi gn speci f i cat i ons and i s cont i nuous.

1. 6. 4 Fenest r at i on I nspect i ons

Conduct i nspect i ons of t he f ol l owi ng f enest r at i on- r el at ed i t ems dur i ng const r uct i on:

a. Skyl i ght s s i ze and l ocat i on i n r el at i on t o t he desi gned pr i mar y s i del i ght ed ar ea and secondar y s i del i ght ed ar ea bel ow.

b. Roof moni t or s i ze and l ocat i on i n r el at i on t o t he desi gned pr i mar y s i del i ght ed ar ea and secondar y s i del i ght ed ar ea bel ow.

c. Dynami c gl azi ng compl i ance wi t h SHGC and U- f act or s, and t est i ng of t he oper at i on f or conf or mance wi t h t he manuf act ur er ' s i nst r uct i ons.

d. Per manent f enest r at i on pr oj ect i ons i nst al l at i on and per f or mance i n accor dance wi t h ASHRAE 90. 1 - I P r equi r ement s and t he Cont r act document s.

[ 1. 6. 5 Loadi ng Dock Weat her seal I nspect i ons

NOTE: I ncl ude t hi s par agr aph wher e l oadi ng dock weat her seal s ar e a par t of t he pr oj ect .

I nspect l oadi ng dock weat her seal s f or pr oper i nst al l at i on and t o ver i f y t he seal s ar e i n good condi t i on.

] [ 1. 6. 6 Addi t i onal Bui l di ng Encl osur e Test s

NOTE: I ncl ude any addi t i onal t est i ng needed t o ver i f y per f or mance of t he bui l di ng encl osur e el ement s i n t hi s par agr aph, wi t h exampl es i n t he pr i or Edi t or ' s Not e.

Conduct t he f ol l owi ng bui l di ng encl osur e t est s on mock- ups or ear l y i n t he i nst al l at i on of t he r el at ed bui l di ng component s:

] 1. 7 SUBMI TTALS

NOTE: Revi ew submi t t al descr i pt i on ( SD) def i ni t i ons

SECTI ON 01 91 19 Page 14 i n Sect i on 01 33 00 SUBMI TTAL PROCEDURES and edi t t he f ol l owi ng l i s t , and cor r espondi ng submi t t al i t ems i n t he t ext , t o r ef l ect onl y t he submi t t al s r equi r ed f or t he pr oj ect . The Gui de Speci f i cat i on t echni cal edi t or s have cl assi f i ed t hose i t ems t hat r equi r e Gover nment appr oval , due t o t hei r compl exi t y or cr i t i cal i t y, wi t h a " G. " Gener al l y, ot her submi t t al i t ems can be r evi ewed by t he Cont r act or ' s Qual i t y Cont r ol Syst em. Onl y add a “ G” t o an i t em, i f t he submi t t al i s suf f i c i ent l y i mpor t ant or compl ex i n cont ext of t he pr oj ect .

For Ar my pr oj ect s, f i l l i n t he empt y br acket s f ol l owi ng t he " G" c l assi f i cat i on, wi t h a code of up t o t hr ee char act er s t o i ndi cat e t he appr ovi ng aut hor i t y. Codes f or Ar my pr oj ect s usi ng t he Resi dent Management Syst em ( RMS) ar e: " AE" f or Ar chi t ect - Engi neer ; " DO" f or Di st r i ct Of f i ce ( Engi neer i ng Di v i s i on or ot her or gani zat i on i n t he Di st r i ct Of f i ce) ; " AO" f or Ar ea Of f i ce; " RO" f or Resi dent Of f i ce; and " PO" f or Pr oj ect Of f i ce. Codes f ol l owi ng t he " G" t ypi cal l y ar e not used f or Navy and Ai r For ce pr oj ect s.

The " S" c l assi f i cat i on i ndi cat es submi t t al s r equi r ed as pr oof of compl i ance f or sust ai nabi l i t y Gui di ng Pr i nci pl es Val i dat i on or Thi r d- Par t y Cer t i f i cat i on and as descr i bed i n Sect i on 01 33 00 SUBMI TTAL

PROCEDURES.

Choose t he f i r st br acket ed i t em f or Navy and Ai r For ce pr oj ect s, or choose t he second br acket ed i t em f or Ar my pr oj ect s.

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e [ f or Cont r act or Qual i t y Cont r ol appr oval . ] [ f or i nf or mat i on onl y. When used, a code f ol l owi ng t he " G" c l assi f i cat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . ] Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Bui l di ng Encl osur e Commi ssi oni ng Speci al i st Qual i f i cat i ons; G [ , Bui l di ng Encl osur e Test i ng Wor k Pl an; G [ , [ _____] ]

SD- 03 Pr oduct Dat a

Ther mal I magi ng Camer a; G[ , [ _____] ]

Test Equi pment ; G[ , [ _____] ]

SD- 05 Desi gn Dat a

Envel ope Sur f ace Ar ea Cal cul at i ons; G[ , [ _____] ]

SECTI ON 01 91 19 Page 15

SD- 06 Test Repor t s

Compl et ed Bui l di ng Envel ope I nspect i on Checkl i st s; G[ , [ _____] ]

Pr essur e Test Pr ocedur es; G[ , [ _____] ]

Ai r Leakage Test Repor t ; G[ , [ _____] ]

Di agnost i c Test Repor t ; G[ , [ _____] ]

SD- 07 Cer t i f i cat es

Pr essur e Test Agency

Ther mogr apher Qual i f i cat i ons

Cer t i f i cat e of Readi ness

SD- 10 Oper at i on and Mai nt enance Dat a

Tr ai ni ng; G[ , [ _____] ]

1. 8 BUI LDI NG ENCLOSURE TESTI NG WORK PLAN

For each bui l di ng encl osur e t est t o be per f or med, submi t t he f ol l owi ng not l at er t han [ 120] [ _____] cal endar days [ af t er Cont r act awar d, but ] bef or e st ar t of t est i ng wor k, st eps t o be t aken by t he l ead t est t echni c i an t o accompl i sh t he r equi r ed t est i ng.

a. Memor andum of t est pr ocedur e.

( 1) Pr oposed dat es f or conduct i ng t he t est s.

( 2) Submi t det ai l ed t est pr ocedur es pr i or t o t he t est . Pr ovi de a pl an vi ew showi ng pr oposed l ocat i ons ( per sonnel door s or ot her s i mi l ar openi ngs) t o i nst al l equi pment ( such as bl ower door s or f l exi bl e duct s f or t r ai l er - mount ed f ans, i f used) .

b. Test equi pment t o be used.

c. Scaf f ol di ng, sci ssor l i f t s , power , el ect r i cal ext ensi on cor ds, duct t ape, pl ast i c sheet i ng and ot her Cont r act or ' s suppor t equi pment r equi r ed t o per f or m al l t est s.

d. Ot her Cont r act or ' s suppor t per sonnel who wi l l be on si t e f or t est i ng.

1. 9 ACCESSI BI LI TY REQUI REMENTS

Ai r bar r i er component s, i nsul at i on, f enest r at i on, and door s f or commi ssi oned syst ems must be made accessi bl e f or i nspect i ons. Cont r act or must make necessar y modi f i cat i ons at Cont r act or ' s own expense i f syst ems and encl osur es ar e not accessi bl e f or i nspect i ons and t est i ng. Assi st commi ssi oni ng t eam i n t est i ng and i nspect i ons by r emovi ng equi pment cover s, openi ng access panel s, and ot her r equi r ed act i v i t i es t hat assi st wi t h v i sual over si ght . Fur ni sh l adder s, f l ashl i ght s, met er s, gauges, or ot her i nspect i on equi pment as necessar y.

SECTI ON 01 91 19 Page 16

1. 10 SCHEDULI NG

NOTE: The f ol l owi ng par agr aph i s t ai l or ed f or NAVY. For Navy pr oj ect s, r oof syst ems ar e consi der ed cr i t i cal syst ems per NAVFACI NST 3960. 1.

Qual i t y Assur ance f unct i ons by NAVFAC i s done on t he r oof i ng syst ems t o ensur e Cont r act or ' s const r uct i on qual i t y cont r ol ( CQC) pr ogr am and commi ssi oni ng del i ver a hi gh qual i t y and pr oper l y f unct i oni ng cr i t i cal syst em.

Not i f y t he Cont r act i ng Of f i cer a mi ni mum [ 14] [ ] cal endar days i n advance of s i t e v i s i t s and i nspect i ons by t he r oof syst em manuf act ur er t echni cal r epr esent at i ve f or coor di nat i on wi t h t he Gover nment Accept ance Test i ng Repr esent at i ve.

1. 11 COORDI NATI ON

Ref er t o Sect i on 01 91 00. 15 BUI LDI NG COMMI SSI ONI NG f or r equi r ement s per t ai ni ng t o coor di nat i on dur i ng t he commi ssi oni ng pr ocess. Coor di nat e wi t h t he Commi ssi oni ng Pr ovi der i n accor dance wi t h Sect i on 01 91 00. 15 and i n accor dance wi t h t he Commi ssi oni ng Pl an t o schedul e i nspect i ons as r equi r ed t o suppor t t he commi ssi oni ng pr ocess. Fur ni sh addi t i onal i nf or mat i on r equest ed by t he Commi ssi oni ng Pr ovi der .

Coor di nat e schedul i ng of ai r bar r i er i nspect i ons and ai r bar r i er pr essur e t est i ng wi t h t he commi ssi oni ng t eam. Upl oad pl ans, r epor t s, not es, and ot her document at i on t o t he Commi ssi oni ng Pr ovi der ' s web- based commi ssi oni ng sof t war e, or as speci f i ed i n t he commi ssi oni ng pl an, as i t i s compl et ed.

1. 12 QUALI TY CONTROL

1. 12. 1 Modi f i cat i on of Ref er ences

Per f or m al l pr essur e and di agnost i c t est s accor di ng t o t he r ef er enced publ i cat i ons l i s t ed i n par agr aph REFERENCES and as modi f i ed by t hi s sect i on. Consi der t he advi sor y or r ecommended pr ovi s i ons, of t he r ef er r ed r ef er ences, as mandat or y.

1. 12. 2 Qual i f i cat i ons

1. 12. 2. 1 Bui l di ng Encl osur e Commi ssi oni ng Speci al i st Qual i f i cat i ons

See UFGS 01 91 00. 15 BUI LDI NG COMMI SSI ONI NG f or t he qual i f i cat i on r equi r ement s of t he Bui l di ng Encl osur e Commi ssi oni ng Speci al i st .

1. 12. 2. 2 Pr essur e Test Agency

Submi t , no l at er t han [ 15] [ _____] cal endar days af t er Cont r act awar d, i nf or mat i on cer t i f y i ng t hat t he pr essur e t est agency i s not af f i l i at ed wi t h any ot her company par t i c i pat i ng i n wor k on t hi s Cont r act . The wor k of t he t est agency i s l i mi t ed t o pr essur e t est i ng t he bui l di ng envel ope, per f or mi ng a t her mogr aphy t est and f og t est , and i nvest i gat i ng, t hr ough var i ous met hods, t he l ocat i on of ai r l eaks t hr ough t he ai r bar r i er . See Par t 3 par agr aph PRESSURE TEST AGENCY f or addi t i onal r equi r ement s. For

SECTI ON 01 91 19 Page 17 t her mogr apher qual i f i cat i ons, see par agr aph THERMOGRAPHER QUALI FI CATI ONS.

Use t he sampl e TEST AGENCY QUALI FI CATI ONS SHEET f or m ( Appendi x C) , t o submi t t he f ol l owi ng i nf or mat i on.

a. Ver i f i cat i on of [ 2] [ _____] year s of exper i ence as an agency i n pr essur e t est i ng commer ci al or i ndust r i al bui l di ngs.

b. Li st of at l east t en commer ci al / i ndust r i al f aci l i t i es wi t h bui l di ng envel opes t hat t he agency has t est ed wi t hi n t he past 2 year s. I ncl ude bui l di ng name, addr ess, and name of pr i me const r uct i on Cont r act or and Cont r act or ' s poi nt - of - cont act i nf or mat i on.

c. Conf i r mat i on of 2 year s of commer ci al and or i ndust r i al bui l di ng pr essur e t est exper i ence f or t he l ead pr essur e t est t echni c i an and t he t her mogr apher i n usi ng t he speci f i ed ASTM E779 or ASTM E1827 t est i ng st andar d. Ref er ences f r om f i ve Cont r act i ng Of f i cer s f or f aci l i t i es wher e t he l ead t est t echni c i an has super vi sed commer ci al and or i ndust r i al bui l di ng pr essur e t est s i n t he l ast 2 year s.

d. Ver i f i cat i on t hat t he l ead pr essur e t est t echni c i an has been empl oyed by a bui l di ng pr essur e t est i ng agency i n t he capaci t y of a l ead pr essur e t est t echni c i an f or not l ess t han 1 year .

1. 12. 2. 3 Ther mogr apher Qual i f i cat i ons

To per f or m an i nf r ar ed di agnost i c eval uat i on, use a l ead t her mogr apher who has at l east an act i ve Level I I Cer t i f i cat i on t hat i s based on t he r equi r ement s i n ANSI / ASNT CP- 105 or ANSI / ASNT CP- 189 and i s i n accor dance wi t h ASNT SNT- TC- 1A. The cour se of st udy i s t o be speci f i cal l y f ocused on i nf r ar ed t her mogr aphy f or bui l di ng sci ence. The t her mogr apher must have at l east t wo year s of bui l di ng sci ence t her mogr aphy exper i ence i n I R t est i ng commer ci al or i ndust r i al bui l di ngs. The t her mogr apher must al so have exper i ence i n bui l di ng envel opes and bui l di ng sci ence i n or der t o make ef f ect i ve r ecommendat i ons t o t he Cont r act or shoul d t he envel ope r equi r e addi t i onal seal i ng. Ther mogr aphi c equi pment oper at or s, dat a anal yst s and r epor t wr i t er s must compl y wi t h t he r equi r ement s of I SO 6781- 3.

Submi t t he t her mogr apher ' s cer t i f i cat e f or appr oval . Submi t a l i s t of at l east t en commer ci al / i ndust r i al bui l di ngs on whi ch t he t her mogr apher has per f or med I R t her mogr aphy i n t he past t wo year s. The t her mogr apher i s t o have a cur r ent act i ve cer t i f i cat i on. Submi t cer t i f i cat i on at l east 60 days pr i or t o t her mogr aphy t est i ng.

1. 12. 3 Test Repor t s

No l at er t han 14 days af t er compl et i on of t he pr essur e t est , submi t el ect r oni c copi es of an or gani zed r epor t [ and [ _____] bound paper copi es i n a dur abl e 3- r i ng bi nder ] . The r epor t i s t o cont ai n a t abl e of cont ent s, an execut i ve summar y, an i nt r oduct i on, a r esul t s sect i on and a di scussi on of t he r esul t s. Submi t t he ai r l eakage t est r epor t as descr i bed i n par agr aph AI R LEAKAGE TEST REPORT. Submi t a di agnost i c t est r epor t as descr i bed i n par agr aph LOCATI NG LEAKS BY DI AGNOSTI C TESTI NG.

The di agnost i c t est r epor t i s t o i ncl ude t he Ther mogr aphi c I nvest i gat i on Repor t and t he Fog Test Repor t ( i f per f or med) .

Submi t f i el d dat a and compl et ed r epor t f or ms f ound i n t he appendi ces. Use t he sampl e f or ms, Test Agency Qual i f i cat i on Sheet , Ai r Leakage Test For m and Ai r Leakage Test Resul t s For m t o summar i ze t he t est s f or t he appr opr i at e bui l di ng envel ope. Submi t bot h el ect r oni cal l y popul at ed and

SECTI ON 01 91 19 Page 18 f i el d hand f i l l ed- i n f or ms.

Repor t Dat a. I ncl ude i n t he r epor t t he f ol l owi ng i nf or mat i on f or al l t est s:

a. Dat e of i ssue

b. Pr oj ect t i t l e and number

c. Name, addr ess, and t el ephone number of t est i ng agency

d. Dat es and l ocat i ons of sampl es and t est s or i nspect i ons

e. Names of i ndi v i dual s maki ng t he i nspect i on or t est f . Desi gnat i on of t he wor k and t est met hod

g. I dent i f i cat i on of pr oduct and speci f i cat i on sect i on

h. Compl et e i nspect i on or t est dat a i . Test r esul t s and an i nt er pr et at i on of t est r esul t s j . Comment s or pr of essi onal opi ni on on whet her i nspect ed or t est ed wor k compl i es wi t h Cont r act document r equi r ement s

k. Recommendat i ons on r et est i ng

1. 13 CLI MATE CONDI TI ONS SUI TABLE FOR A PRESSURE TEST

As t he t est dat e appr oaches, moni t or t he weat her f or ecast f or t he t est s i t e. Avoi d t est i ng on days f or ecast t o exper i ence hi gh wi nds, r ai n, or snow. Moni t or weat her f or ecast s pr i or t o shi ppi ng pr essur e t est equi pment t o t he s i t e. Based on cur r ent and f or ecast weat her condi t i ons, t he Cont r act i ng Of f i cer ' s r epr esent at i ve i s t o gr ant f i nal appr oval f or t est i ng t o occur .

1. 13. 1 Rai n

NOTE: Leakage t hr ough some f l oor , r oof , and wal l assembl i es can be af f ect ed by heavy r ai n when mi nut e cr acks and hol es become t empor ar i l y seal ed. Rai n may cl ose pot ent i al l eaks, maki ng t he envel ope appear t i ght er t han i t woul d be i n dr i er condi t i ons. Rai nwat er can al so bl ock pneumat i c t ubes used i n pr essur e t est i ng t her eby al t er i ng di f f er ent i al pr essur e r eadi ngs.

For saf et y r easons, avoi d t est i ng dur i ng r ai n or i f r ai n i s ant i c i pat ed dur i ng t est i ng. I f pneumat i c hoses ar e i nst al l ed and exposed t o r ai n i nspect t he hose t o ensur e r ai nwat er has not mi gr at ed i nt o t he hose ends.

Or i ent al l exposed hose ends t o keep t hem out of wat er puddl es. Success i n t empor ar i l y seal i ng out door vent i l at i on component s such as l ouver s and exhaust f ans may al so be compr omi sed by r ai n. Don' t seal r oof - mount ed vent i l at i on component s dur i ng t i mes of pot ent i al l i ght ni ng.

SECTI ON 01 91 19 Page 19

1. 13. 2 Wi nd

Because wi nd can skew pr essur e t est r esul t s, t est onl y on days and at t i mes when wi nds ar e ant i c i pat ed t o be t he cal mest . Avoi d pr essur e t est i ng dur i ng gust y or hi gh wi nd condi t i ons. Avoi d i nst al l i ng t est f ans on t he wi ndwar d si de of t he bui l di ng i f wi nd gust s dur i ng t he t est ar e ant i c i pat ed t o be gr eat er t han 16. 1 k i l omet er s/ hour 10 mi l es per hour .

1. 14 CERTI FI CATE OF READI NESS

NOTE: Thi s par agr aph cont ai ns t ai l or i ng opt i ons f or ARMY and NAVY. Sel ect or i nser t t he number of cal endar days f or desi r ed not i f i cat i on pr i or t o syst em commi ssi oni ng t est s. I ncl ude t he l ast br acket ed sent ence when t he pr oj ect r equi r es ai r t i ght ness t est i ng; whol e bui l di ng envel ope ai r t i ght ness t est i ng i s r equi r ed f or pr oj ect s as out l i ned i n t he Edi t or ' s Not e f or t he Par t 3 sect i on

BUI LDI NG ENVELOPE AI R TI GHTNESS REQUI REMENT.

Pr i or t o schedul i ng t he Commi ssi oni ng Test s as r equi r ed by t hi s Sect i on, submi t Cer t i f i cat e of Readi ness document at i on i n accor dance wi t h Sect i on 01 91 00.