This document provides cost information for a natural gas installation project in support of a solicitation to renovate Building 41003 at Fort Hood, Texas. The scope of work involves installing a new natural gas service line, meter, and regulator to serve the building. The privatized utility owner, Dominion Privatization Texas LLC, estimates the firm-fixed-price for the gas installation work to be $12,923.24. Upon project completion, the utility will also assess an additional monthly facilities charge of $51.48 to the existing gas service contract with the Army, broken down as $35.15 for renewal and replacement and $16.33 for operations and maintenance. Completion of the gas work is required within 30 days of contract award to avoid potential late fees. Questions should be directed to the specified Dominion and Army contacts.

View the file

Other files

File Type Posted
Award W9115122C0031 22 September 2022 Signed.pdf PDF
C.04. Abstract of Offers, W91151-22-B-0010, 14 September 2022.pdf PDF
Sign-In Sheet W91151-22-B-0010 14 September 2022.jpeg JPEG file
A.03. BUILDING 41003 AS-BUILTS.pdf PDF
W9115122B0010 Amendment 09 September 2022.pdf PDF
AD209630P - Technical Exhibit A - Drawings r02 07 September 2022.pdf PDF
AD209630P Technical Exhibit B - Specifications 07 September 2022.pdf PDF
AD209630P - DPW RFI Responses 07 September 2022.docx DOCX document
AD209630P - DPW RFI Response 31 Aug 2022.docx DOCX document
AD209630P - Tech Exhibit D - Water and Sewer Cost Notification Updated as of 31 Aug 2022.pdf PDF
AD209630P - Tech Exhibit A - Drawings r01 Updated 31 Aug 2022.pdf PDF
AD209630P - Tech Exhibit C - Electrical Service Cost Notification Updated as of 31 Aug 2022.pdf PDF
Sign-in Sheet Pg 1.jpg JPG image
Sign-in Sheet Pg 2.jpg JPG image
A.03. B41003_95, DesignAnalysis_20220302.pdf PDF
A.03. Exhibit B, W91151-22-B-0010, Renovate Building 41003_20220302.pdf PDF
A.03. Exhibit C, W91151-22-B-0010, B41003 (Updated) Drawings_20220722.pdf PDF
A. 02. SOW -B41003, FH, 5 July 2022.pdf PDF
W9115122B0010.pdf PDF
1A202761P - Attachment 1-Appendix A.pdf PDF
1A202761P - Technical Exhibit A - Drawings.pdf PDF
1A202751P - Technical Exhibit B - Specifications.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DPW Vertical Design & Construction

Technical Exhibit E

NATURAL GAS COST NOTIFICATION

Project #:AD209630P

Solicitation: W91151-22-B-0010

August 30, 2022

ENCLOSED ARE THE SCOPE AND COST FOR PROJECT UTILITY SERVICE

REQUIREMENTS.

IT IS THE CONTRACTOR’S RESPONSIBILITY TO COORDINATE AND

SUBMIT FULL PAYMENT DIRECTLY TO UTILITY OWNER WITHIN THE

FIRST 30 DAYS OF THE CONTRACT PERIOD OF PERFORMANCE.

PAYMENTS MADE AFTER 30 DAYS MAY BE SUBJECTED TO ADDITIONAL

FEES BY PRIVATIZED UTILITY OWNER AND SHALL BE MADE PAYABLE IN

FULL BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE

GOVERNMENT.

DPW VERTICAL DESIGN & CONSTRUCTION BRANCH

FORT HOOD, TEXAS

Dominion Privatization Texas, LLC 49011 Santa Fe Ave, Fort Hood, TX 76544

RFP #224: Renovate Bldg 43001

August 30, 2022

NOTIFICATION OF PROJECT COST

Contract No. SP‐0600‐16‐C‐8312 Fort Hood, Texas – Natural Gas

RFP # 224: Renovate Bldg 41003

Fort Hood DPW:

In response to RFP 224, Dominion Privatization Texas, LLC provides the following:

Scope of Work:

Install natural gas service line, natural gas meter and properly sized regulator at BLDG 41003.

Costs to Government:

Dominion Privatization Texas, LLC has determined the Firm‐Fixed Price proposal for the project requirements to be: $12,923.24

Installation of new facilities = $12,923.24

Adjustments to Monthly Service Charge:

Additional requirements of the Government, its tenants, or contractors consistent with RFP Paragraph H.13 and G.3. Additional Facilities Charge is calculated as 0.440% / Month of the estimated New Installed Cost of additional distribution and substation facilities. Facilities Charge Credit is calculated as 0.445% / Month of the estimated Replacement Cost New of removed facilities adjusted for inflation. Adjustments to Monthly Service Charge are effective beginning the first performance period after project completion.

Additional Facilities Charge = 0.440% X $11,699.27 = $51.48 / Month

An adjustment of $51.48/ Month for this Additional Facilities Charge needs to be included in the modification of Contract SP0600‐16‐C‐8312 authorizing Dominion Privatization Texas, LLC to perform work as described above in Scope of Work. Additional Facilities Charge is split between R&R and O&M as follows:

Distribution Facilities Charge R&R = $35.15 / Month Distribution Facilities Charge O&M = $16.33 / Month

Work for this proposal will be conducted independently from any third party projects. Construction will proceed upon written notification from the government to Dominion Privatization Texas, LLC of the acceptance and funding allocations for this proposal.

Questions regarding this proposal should be addressed to the Natural Gas Superintendent, Bryan Pethtel at bryan.r.pethtel@dominionenergy.com. Contractual questions should be addressed to Utilities Privatization COR, Sean Goodwin at sean.d.goodwin2@mail.mil.

AD209630P - Technical Exhibit E - Natural Gas Cost Notification
RFP 224 - Cost Notification - 30Aug22 - Renovate Bldg 41003

File details come from the government source that posted it. Updated .