This technical exhibit provides cost details for electrical service upgrades required to support the renovation of Building 41003 at Fort Hood, Texas. Dominion Privatization Texas, LLC will remove an existing 500 KVA transformer and associated gear, install a new 150 KVA pad-mounted transformer, and replace 100 feet of conductor for a firm fixed price of $44,783.14. The work includes coordinating between the third party contractor renovating the building. Upon project completion, Dominion will adjust the monthly service charge by $62.38 as authorized in their existing contract with the Army.

View the file

Other files

File Type Posted
Award W9115122C0031 22 September 2022 Signed.pdf PDF
C.04. Abstract of Offers, W91151-22-B-0010, 14 September 2022.pdf PDF
Sign-In Sheet W91151-22-B-0010 14 September 2022.jpeg JPEG file
A.03. BUILDING 41003 AS-BUILTS.pdf PDF
W9115122B0010 Amendment 09 September 2022.pdf PDF
AD209630P - Technical Exhibit A - Drawings r02 07 September 2022.pdf PDF
AD209630P Technical Exhibit B - Specifications 07 September 2022.pdf PDF
AD209630P - DPW RFI Responses 07 September 2022.docx DOCX document
AD209630P - DPW RFI Response 31 Aug 2022.docx DOCX document
AD209630P - Tech Exhibit D - Water and Sewer Cost Notification Updated as of 31 Aug 2022.pdf PDF
AD209630P - Tech Exhibit A - Drawings r01 Updated 31 Aug 2022.pdf PDF
AD209630P - Tech Exhibit E - Natural Gas Cost Notification Updated as of 31 Aug 2022.pdf PDF
Sign-in Sheet Pg 1.jpg JPG image
Sign-in Sheet Pg 2.jpg JPG image
A.03. B41003_95, DesignAnalysis_20220302.pdf PDF
A.03. Exhibit B, W91151-22-B-0010, Renovate Building 41003_20220302.pdf PDF
A.03. Exhibit C, W91151-22-B-0010, B41003 (Updated) Drawings_20220722.pdf PDF
A. 02. SOW -B41003, FH, 5 July 2022.pdf PDF
W9115122B0010.pdf PDF
1A202761P - Attachment 1-Appendix A.pdf PDF
1A202761P - Technical Exhibit A - Drawings.pdf PDF
1A202751P - Technical Exhibit B - Specifications.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DPW Vertical Design & Construction

Technical Exhibit C

ELECTRICAL SERVICE COST NOTIFICATION

Project #:AD209630P

Solicitation: W91151-22-B-0010

August 30, 2022

ENCLOSED ARE THE SCOPE AND COST FOR PROJECT UTILITY SERVICE

REQUIREMENTS.

IT IS THE CONTRACTOR’S RESPONSIBILITY TO COORDINATE AND

SUBMIT FULL PAYMENT DIRECTLY TO UTILITY OWNER WITHIN THE

FIRST 30 DAYS OF THE CONTRACT PERIOD OF PERFORMANCE.

PAYMENTS MADE AFTER 30 DAYS MAY BE SUBJECTED TO ADDITIONAL

FEES BY PRIVATIZED UTILITY OWNER AND SHALL BE MADE PAYABLE IN

FULL BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE

GOVERNMENT.

DPW VERTICAL DESIGN & CONSTRUCTION BRANCH

FORT HOOD, TEXAS

Dominion Privatization Texas, LLC 49011 Santa Fe Ave, Fort Hood, TX 76544

The above pricing is valid for 90 days from the date of this quote.

All services will be provided during Dominion's normal work hours.

Contract authorization and installation of equipment for service cable termination at the customer facility are required prior to releasing and scheduling this project for construction.

RFP 356 – Demo Electric to Bldgs 2028, 2029, 2030, 2031, 2032, and 2033

June 30, 2022

NOTIFICATION OF PROJECT COST

Contract No. SP‐0600‐16‐C‐8312 Fort Hood, Texas – Electric

RFP 223 ‐ BUILDING 41003 RENO

Fort Hood DPW:

In response to RFP 223, Dominion Privatization Texas, LLC (DOM) has determined the Firm‐ Fixed Price proposal for the project requirements to be: $44,783.14

This proposal is for DOM to provide material, equipment, and labor for the Scope of Work as described: REMOVE EXISTING 500 KVA TX AND ASSOCIATED GEAR. INSTALL NEW 3‐PHASE

277/480 PAD‐MOUNT TX IN SUPPORT OF THE BUILDING RENOVATION.

Work for this proposal will be conducted in coordination with the third party contracted for this project. Third party payment to DOM has been authorized by the UP contract COR.

Authorization for an adjustment to the Operations and Maintenance fixed monthly service charge to be modified into Contract SP0600‐16‐C‐8312, in the amount of $62.38 will be provided upon notification of project completion. Additional Facilities Charge is split between R&R and O&M as follows:

Distribution Facilities Charge R&R = $40.48/ Month Distribution Facilities Charge O&M = $21.90/Month

Questions regarding this proposal should be addressed to the Dominion Energy Team at FortHoodConstruction@dominionenergy.com. Contractual questions should be addressed to the Utilities Privatization COR, Sean Goodwin at sean.d.goodwin2.civ@army.mil.

Change in Inventory:

QN27

1 - 150 ABC

QN09

1 -500 ABC

627 S61

PO82

665 S5

PN68

627 T 665

PO92

ABC - N.O.

627 F17

QN38

ABC - N.O.

3 - UNK UNK ABC

627 F6

QO01

3 - 50 N ABC

WL 1

X0408 QO11

45' Class 3 - JU

INSTALL:

X10FG

CO27LINE1 (3)

F6221003

X10FG

LAF3

AR10OHMOVP (3)

TM310J3

RSP4

U310J3OP

KHROCKDRL6 (100)

KTUNNEL6 (100)

CND6HDPECOIL (100)

KCND6TUNNEL (100)

KCBLCND3 (100)

ABANDON:

CND6S4 (200)

#RODS:

#OHMS:

WL 2

X0408 QN09

INSTALL:

KDTRUCKST (8)

KCONCRETER (30)

TD1215048R

GROD4CUUG

GRODCUUGF

LT340 (100)

KLOCCND

KHROCKDRL4

KTUNNEL4 (100)

CND3HDPECOIL (100)

CND3S490D24 (2)

KCND3TUNNEL (100)

KCBLCND2 (100)

SCRAP:

TL1250048R

TL1250048R

#RODS:

#OHMS:

41003

41018

/// US 4/0 (100') /// ///

U

1/

0 (

0')

ADC Map #Volts Amps Phase Voltage Drop Flicker Fault Current Est. Demand

Co. Grid #

Miss U # Circuit # Substation

Easement # Tax District

Scale

WR Name

Location

POC

Designer

Phone #

Work Request # Date Phone #

TRS #

6/30/2022

WALT119

13600

REMOVE EXISTING 500 KVA TX AND ASSOCIATED GEAR. INSTALL NEW

3-PHASE 277/480 PAD-MOUNT TX IN SUPPORT OF THE BUILDING

RENOVATION.

RFP 223 - BUILDING 41003 RENO

10548607

Walter J Ezell

X0408

N/A

51627 S61N/A 1437325

N/A1.28

ABC250277/480

FT Hood Clarke Rd627

41003 W OLD IRONSIDES AVE FORT HOOD TX

1 inch = 64 feet

757-585-1407

N Cl ea r C ree k R d

Old Ironsides Ave

Existing 500 KVA TX's are dead. Remove both, break up and haul away concrete pads. Convert QO11 to 3 phase terminal pole, install 100' of 1/0 3 phase primary in conduit. Install new pad and 150 KVA TX plus 100' of 4/0 conductor in conduit to building.

POC: Walter Ezell 757-585-1407

AD209630P - Technical Exhibit C - Electrical Service Cost Notification
RFP 223 - Cost Notification - 30June22 - 10548607 - Renovate Bldg 41003
RFP 223 - Construction Sketch - 30June22 - 10548607 - Renovate Bldg 41003

File details come from the government source that posted it. Updated .