1A202761P - Technical Exhibit A - Drawings.pdf
PDF 32 MB Posted
- Attached to
- Convert Building 41003 into Battalion Headquarters Federal contract opportunity
- Solicitation number
- w9115122B0010
About this file
This document includes a solicitation for a federal contract opportunity to convert Building 41003 at Fort Hood, Texas into a Battalion Headquarters. The Directorate of Public Works at Fort Hood is seeking to renovate the building and has issued solicitation number W9115122B0010 for the project. Interested parties should review the attached solicitation and documents for details on the renovation requirements. The solicitation is seeking contractors to convert the existing building into headquarters facilities for a Battalion, which will involve renovations to the interior spaces as well as any necessary upgrades or modifications to existing building systems. The solicitation was issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Hood.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NFH ADMIN REPLACE 2 RLBs B56485-B56486
FY21 PN: 498658
NOT FOR CONSTRUCTION
DATED: APRIL 2022
SIGNATURES AFFIXED BELOW INDICATE
OFFICIAL RECOMMENDATION AND APPROVAL OF
ALL DRAWINGS IN THIS SET AS INDEXED ON THIS SHEET.
APPROVAL RECOMMENDED BY:
DATE
N
FH
AD
M
IN
R
EPLAC
E 2 R
LBs B56485-B56486 FY21 PN : 498658
N
FH
A D
M
IN
R
EP
LA
C
E
R
LB
s B5
-B
FY
P
N : 4
FO
R T
H O
O D
, T
EX
AS
NOT FOR C
ONSTRUCTIO
N
SHEET
NUMBER
D ra w n by
D es ig ne d by
Su bm itt ed b y:
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
C he ck ed b y:
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
FILE PATH:
4/12/2022 3:43:09 PM
FO
R
T H
O O
D , T
EX
AS
AD
M
IN
R
EP
LA
C E
B5
-5
PN
AP
R
IL
G-002
IN
D
EX
O
F D
R
AW
IN
G
S
Project Name
ELECTRICAL
E-001 ELECTRICAL LEGENDS
ED101 EXTERIOR TELECOMMUNICATION DEMOLITION PLAN
ES101 EXTERIOR TELECOMMUNICATION PLAN
ES501 EXTERIOR COMMUNICATION DETAILS
EG101 LIGHTNING PROTECTION SYSTEM
EG501 LIGHTNING PROTECTION DETAILS
EG601 GROUNDING RISER DIAGRAM
EL101 LIGHTING PLAN
EL501 LIGHTING FIXTURE DETAILS 1
EL502 LIGHTING FIXTURE DETAILS 2
EL601 LIGHTING FIXTURE SCHEDULE & LIGHT CONTROL MATRIX
EP101 POWER PLAN
EP102 ENLARGED POWER PLAN - RM 101
EP601 ONE LINE DIAGRAM
EP602 EQUIPMENT CONNECTION SCHEDULE
EP701 PANELBOARD SCHEDULES 1
EP702 PANELBOARD SCHEDULES 2
ET101 TELECOMMUNICATION PLAN -NIPRNET, SIPRNET & XNET
ET501 TELECOMMUNICATIONS DETAILS 1
ET502 TELECOMMUNICATIONS DETAILS 2
ET503 TELECOMMUNICATIONS DETAILS 3
ET601 NON-SECURE TELECOMMUNICATION RISER DIAGRAM-RM 103
ET602 SECURE TELECOMMUNICATION - SIPRNET & XNET RISER DIAGRAMPLUMBING
P-001 PLUMBING LEGEND
P-101 OVERALL PLUMBING PLAN
PL101 SANITARY WASTE AND VENT PLAN
PP101 DOMESTIC HOT AND COLD WATER PLAN
P-401 RESTROOM PLUMBING SECTION VIEWS
P-501 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
P-901 SANITARY WASTE AND VENT ISOMETRIC
P-902 DOMESTIC HOT AND COLD ISOMETRIC
INDEX OF DRAWINGS
ARCHITECTURE
A-001 ABBREVIATIONS AND GENERAL NOTES
A-101 OVERALL FLOOR PLAN
A-131 REFLECTED CEILING PLAN
A-151 ROOF PLAN
A-201 EXTERIOR ELEVATIONS
A-301 BUILDING SECTIONS
A-311 WALL SECTIONS
A-401 ENLARGED TOILET PLANS
A-402 INTERIOR ELEVATIONS
A-403 INTERIOR ELEVATIONS
A-501 DETAILS I
A-503 DETAILS II
A-504 DETAILS III
A-511 PLAN DETAILS III
A-512 INTERIOR WALL PENETRATION DETAILS
A-551 CEILING DETAILS
A-552 MISC. DETAILS I
A-601 DOOR AND WINDOW SCHEDULES
A-621 PARTITION TYPES
A-641 EXTERIOR SIGNAGE PLANCIVIL
C-001 GENERAL NOTES AND LEGEND
CD101 DEMOLITION PLAN
CS101 OVERALL SITE PLAN
CS102 SITE PLAN POINT LOCATIONS
CG101 STORM DRAINAGE AND GRADING
CU101 UTILITY PLAN
C-501 MISCELLANEOUS DETAILS
C-502 FENCING DETAILS
C-503 GATE DETAILS
INTERIORS
I-101 FURNITURE, FIXTURES, & EQUIPMENT PLAN
I-501 INTERIOR DETAILS
I-601 INTERIOR FINISH SCHEDULE
I-611 INTERIOR SIGNAGE SCHEDULE
STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES I
S-002 GENERAL STRUCTURAL NOTES II
S-101 FOUNDATION PLAN
S-111 FRAMING PLAN
S-201 ELEVATIONS
S-301 FOUNDATION SECTIONS
S-311 FRAMING SECTIONS
S-312 FRAMING SECTIONS II
S-501 FOUNDATION DETAILS
S-512 FRAMING DETAILS I
S-521 STRUCTURAL DETAILS I
S-522 STRUCUTRAL DETAILS II
S-601 SCHEDULES
GENERAL
G-001 COVER SHEET
G-002 INDEX OF DRAWINGS
G-101 PROJECT LOCATION PLAN
G-102 PROJECT SITE AND LAYDOWN PLAN
SURVEY
V-101 EXISTING SITE CONDITIONS
V-102 SURVEY CONTROL POINTS
LIFE SAFETY
LS001 CODE COMPLIANCE PLAN
LS101 LIFE SAFETY PLAN
MECHANICAL
M-001 MECHANICAL LEGEND
M-101 OVERALL MECHANICAL PLAN
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-901 HVAC ISOMETRIC
MI001 CONTROLS LEGEND
MI002 POINTS LIST INSTRUCTIONS
MI301 TYPICAL AHU CONTROL SCHEMATIC
MI302 AHU POINTS SCHEDULE
MI303 DEDICATED SPLIT SYSTEM CONTROLS
MI304 EXHAUST FAN CONTROLS SCHEMATIC
FIRE ALARM
FA001 FIRE ALARM LEGENDS
FA101 FIRE ALARM PLAN
FA501 FIRE ALARM/MASS NOTIFICATION INPUT/OUTPUT MATRIX
FA502 FIRE ALARM/MASS NOTIFICATION RISER DIAGRAM
GEOTECHNICAL
B-101 BORING LOCATIONS
B-201 LOGS OF BORINGS - 1 OF 3 GENERAL PURPOSE WAREHOUSE SITE
B-202 LOGS OF BORINGS - 2 OF 3 GENERAL PURPOSE WAREHOUSE SITE
B-203 LOGS OF BORINGS - 3 OF 3 GENERAL PURPOSE WAREHOUSE SITE
N
16TH ST
A V
E N
U E
A V
E N
V
E N
V
E N
B
V
E N
C
V
E N
F
V
E N
V
H
P A
R K
E N
U E
C E
N T
R
L
E
C E
N T
R
E
AV
EN
U E
T
S
S T
T
H
S t
24TH St
24TH St
15TH St
16TH St
17TH St
18TH St
21ST St
18TH St
T
H
S t
15TH S
t
TH
St
T
H
S t
T
H
S t
T
H
S t
T
H
S t
T
H
S t
T
H
S t
T
H
S t
T
H
S t19
T H
S t
T
H
S t
T
H
S t
T
H
S t
T
H
S t
T
H
S t
T
H
S t
T
H
S t
T
H
S t
6T
H
S t
R
D
S t
N D
S t
N D
S t
1S
T
S t
R
D
S t
21ST St
21ST St
23RD St 23RD St
18TH ST
18TH ST
P A
E
P A
E
1S
T
S T
23RD ST
16TH ST
A V
E N
G
V
E N
V
E N
V E
N
V
E N
D
V
E N
V
E N
V
E N
V
E N
V
E N
C E
N T
R
E N
U E
H
EAD
Q U
AR
T
ER
S
AV
EN
U E
C E
N T
R
E
C E
N T
R
E
C E
N T
R
E
C E
N T
R
E N
U E
P A
E N
U E
P A
E N
U E
P A
E N
U E
P A
E N
U E
H
EAD
Q U
AR
T
ER
S
AV
EN
U E
H
EAD
Q U
AR
T
ER
S
T
H
S T
T
H
S T
T
H
S T
T
H
S T
P
P B
P B
P B
P B
3P B
P B
P B
H E
A L T
H
C L
IN
IC
T E
M
Q
IP
C
P a v ilio n
P B
P B
P B
P B
SHEET
NUMBER
D ra w n b y
D e s ig n e d b y
S u b m it te d b y
S h e e t
S iz e
A N
S I
D
D a te
C o n tr a c t
N o
S o li c it a ti o n N o
C h e c k e d b y
A
R e v
M a rk
D e s c ri p ti o n
T ra c k in g N o
A c ti o n
D a te
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
FILE PATH:
4/1/2022 7:27:33 AM
N:\Fort_Hood\Design\FY21-498658-NFH Admin Replace 2 RLBs B56485-B56486\02_CAD_BIM\01_General\GENERAL SHEETS\NFH-B56485-B56486-G-101.dgn
M A
R C
H
A
D M
IN
R
E P
L A
C E
B
B
F O
R T
H O
O D
T
E X
A S
P R
O
JE
C T
L O
C A
T
IO
N P
L A
N
G-101
ACCESS CONTROL POINT: MAIN GATE
PROJECT SITE
TEXAS
DALLAS
HOUSTON
AUSTIN
SAN ANTONIO
VICINITY MAP
N.T.S.
VICINITY MAP
N.T.S.
PROJECT SITE
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
PROJECT SITE: NORTH FORT HOOD
1000'0 500'
NN
E N F
IE
L D R
D
TH
S
T
TH
S
T
T E
X A S H
IG
H W
A Y
T E
X A S H
IG
H W
A Y
GENERAL NOTES:
LEGEND.
1. REFER TO SHEET C-001 FOR GENERAL NOTES AND
TH
S
T
E N F
IE
L D R
D
TH
N
B56408
1 STORY BLOCK B56475
1 STORY METAL
B56476
1 STORY METAL
B56477
1 STORY METAL
B56483
1 STORY METAL
B56484
1 STORY METAL
GAZEBO
B56408AR
ARMORY
B
S
T O
R Y B
L O
C K
B
S
T O
R Y M
E T
A L
1 STORY METAL
B56479
1 STORY METAL
B56478
SHEET
NUMBER
D ra w n b y
D e s ig n e d b y
S u b m it te d b y
S h e e t
S iz e
A N
S I
D
D a te
C o n tr a c t
N o
S o li c it a ti o n N o
C h e c k e d b y
A
R e v
M a rk
D e s c ri p ti o n
T ra c k in g
N o
A c ti o n
D a te
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
FILE PATH:
3/9/2022 10:24:25 AM
N:\Fort_Hood\Design\FY21-498658-NFH Admin Replace 2 RLBs B56485-B56486\02_CAD_BIM\01_General\GENERAL SHEETS\NFH-B56485-B56486-G-102.dgn
M A
R C
H
A
D M
IN
R
E P
L A
C E
B
B
F O
R T
H O
O D
T
E X
A S
P R
O
JE
C T
S
IT
E A
N D
L A
Y D
O W
N P
L A
N
G-102
B56478
1 STORY METAL
B56479
1 STORY METAL
E3121766.61
N10469372.24
E3121808.43
N10469314.47
E3121811.90
N10469292.99
E3121878.41
N10469241.30
E3121954.43
N10469323.23
E3121865.51
N10469445.04
E3122011.95
N10469365.06
E3122024.69
N10469347.55 E3121904.86
N10469260.43
E3121910.88
N10469291.56
E3121887.36
N10469323.92
E3121840.30
N10469289.70
E3121920.11
N10469347.71
E3121899.51
N10469376.03
E3121819.71
N10469318.01
40'0 20'
NN
15TH ST
LAYDOWN AREA
T E
X A
S H
IG
H W
A Y
GENERAL NOTES:
WITH COR.
CONTRACTOR SHALL COORDINATE FINAL LOCATION
LAYDOWN AREA LOCATION IS APPROXIMATE AND2.
1. REFER TO C-001 FOR GENERAL NOTES AND LEGEND.
CONSTRUCTION LIMITS ONLY BEYOND THIS LINE
CONTRACTORS' WORK TRUCKS/POVS
N
750 750
GENERAL NOTES:
SEE SHEET V-102 FOR CONTROL POINT INFORMATION.4.
SURVEY IS BASED UPON NAVD88, GEOID 2018.
(4203), NAD 88(2011). THE VERTICAL DATUM OF THE
STATE PLAN COORDINATE SYSTEM, CENTRAL ZONE
DATUM OF SURVEY IS BASED UPON THE TEXAS
FILE COORDINATE SYSTEM IS GRID. HORIZONTAL3.
THE PROJECT AREA PRIOR TO CONSTRUCTION.
BLDG 56486 AND COMMUNICATION LINES WITHIN
DPW TO COORDINATE REMOVAL OF BLDG 56485, 2.
LEGEND.
1. REFER TO SHEET C-001 FOR GENERAL NOTES AND
FOOT BRIDGE
PAS SPEAKER
CONC.
CONC.
GRAVEL
ASPHALT
A S
P H
A L T
A S
P H
A L T
ASPHALT
C
G
C
G
C O
N C . S /W
CONC. S/W
C O
N C . S /W
C O
N C . S /W
C O
N C . S /W
C O
N C . S /W
CONC. S/W CONC. S/W
C O
N C . S /W
C O
N C . S /W
GRAVEL
GRAVEL
STO
P
C O
N C . S /W
AC
VAULT
B56408
1 STORY BLOCK B56475
1 STORY METAL
B56476
1 STORY METAL
B56477
1 STORY METAL
B56483
1 STORY METAL
B56484
1 STORY METAL
GAZEBO
B56408AR
ARMORY
B
S
T O
R Y B
L O
C K
B
S
T O
R Y M
E T
A L
B
S
T O
R Y M
E T
A L
B
S
T O
R Y M
E T
A L
1 STORY METAL
B56479
1 STORY METAL
B56478
P
V C
6"S
P
V C
'X ' B
C
2-4'X2' BC
E
W
RCP @0.36%
30.59' - 24"
RCP @0.27%
30.43' - 24"
RCP @0.62%
48.77' - 24"
RCP @0.69%
48.53' - 24"
P E
R G
IS
P E
R G
IS
P E
R G
IS
PER GIS
PER GIS
PER GIS
SHEET
NUMBER
D ra w n b y
D e s ig n e d b y
S u b m it te d b y
S h e e t
S iz e
A N
S I
D
D a te
C o n tr a c t
N o
S o li c it a ti o n N o
C h e c k e d b y
A
R e v
M a rk
D e s c ri p ti o n
T ra c k in g
N o
A c ti o n
D a te
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
FILE PATH:
3/9/2022 4:20:38 PM
N:\Fort_Hood\Design\FY21-498658-NFH Admin Replace 2 RLBs B56485-B56486\02_CAD_BIM\05_Civil\_Sheets\498658-NFH Admin Replace 2 RLBs B56485-B56486_V-101.dgn
M A
R C
H
A
D M
IN
R
E P
L A
C E
B
B
F O
R T
H O
O D
T
E X
A S
CO
CO
C O
S
S
G
CO
CO
E X
IS
T
IN
G
S
IT
E C
O N
D
IT
IO
N
S
V-101
6-INCH NATURAL GAS LINE
10-INCH WATER LINE
12-INCH SANITARY SEWER LINE
OVERHEAD ELECTRICAL LINE
6-INCH PVC WATER MAIN LINE
(SEE NOTES)
COMMUNICATION LINE
E N
F
IE
L D R
D
15TH ST
16-INCH WATER MAIN LINE
CONCRETE HEADWALL
LIMITS OF CONCRETE
LIMITS OF GRAVEL AREA
NN
40'0 20'
W
V TO
P=748.86'
TO
P N
U T=745.74'
W
V TO
P=748.71'
TO
P N
T=746.15'
N
GENERAL NOTES:
SURVEY IS BASED UPON NAVD88, GEOID 2018.
(4203), NAD 88(2011). THE VERTICAL DATUM OF THE
STATE PLAN COORDINATE SYSTEM, CENTRAL ZONE
DATUM OF SURVEY IS BASED UPON THE TEXAS
FILE COORDINATE SYSTEM IS GRID. HORIZONTAL2.
LEGEND.
1. REFER TO SHEET C-001 FOR GENERAL NOTES AND
PROJECT SITE
SHEET
NUMBER
D ra w n b y
D e s ig n e d b y
S u b m it te d b y
S h e e t
S iz e
A N
S I
D
D a te
C o n tr a c t
N o
S o li c it a ti o n N o
C h e c k e d b y
A
R e v
M a rk
D e s c ri p ti o n
T ra c k in g
N o
A c ti o n
D a te
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
FILE PATH:
4/1/2022 7:48:18 AM
N:\Fort_Hood\Design\FY21-498658-NFH Admin Replace 2 RLBs B56485-B56486\02_CAD_BIM\05_Civil\_Sheets\498658-NFH Admin Replace 2 RLBs B56485-B56486_V-102.dgn
M A
R C
H
A
D M
IN
R
E P
L A
C E
B
B
F O
R T
H O
O D
T
E X
A S
P a v ilio n
C E
N T
R
E
T e x a s w y
TH
St
T
H
S t
T
H
S t
T
H
S t
T
H
S t
16TH ST
H
EAD
Q U
AR
T
ER
S
AV
EN
U E
H
EAD
Q U
AR
T
ER
S
AV
EN
U E
T
H
S T
S U
R V
E Y
C O
N T
R O
L P
O
IN
T S
V-102
CP1 MAG NAIL
N: 10,469,276.29
E: 3,120,209.87
Z: 759.82
CP2 IRON ROD
N: 10,469,608.54
E: 3,121,450.34
Z: 755.51
NN
160'0 80'
N
SHEET
NUMBER
D r a w n b y
D e s i g n e d b y
S h e e t
S i z e
A N
S I
D
D a t e
C o n t r a c t
N o
S o l i c i t a t i o n
N o
C h e c k e d b y
A
R e v
M a r k
D e s c r i p t i o n
T r a c k i n g
N o
A c t i o n
D a t e
2 3 4 5 6
7 8 9 10
B
C
D
E
F
G
B-101
S I T
E
L
A Y
O U
T
P
L A
N S u b m i t t e d b y
N O
R T
H
F
O R
T
H
O O
D
T
E X
A S
B
AP
R
IL
N
NUMBER
D r a w n b y
D e s i g n e d b y
S h e e t
S i z e
A N
S I
D
D a t e
C o n t r a c t
N o
S o l i c i t a t i o n
N o
C h e c k e d b y
A
R e v
M a r k
D e s c r i p t i o n
T r a c k i n g
N o
A c t i o n
D a t e
2 3 4 5 6
7 8 9 10
B
C
D
E
F
G
B-102
B O
R I N
G
L
O C
A T
I O
N
P L
A N
S u b m i t t e d b y
N O
R T
H
F
O R
T
H
O O
D
T
E X
A S
B
AP
R
IL
NUMBER
D r a w n b y
D e s i g n e d b y
S h e e t
S i z e
A N
S I
D
D a t e
C o n t r a c t
N o
S o l i c i t a t i o n
N o
C h e c k e d b y
A
R e v
M a r k
D e s c r i p t i o n
T r a c k i n g
N o
A c t i o n
D a t e
2 3 4 5 6
7 8 9 10
B
C
D
E
F
G
B-201
B O
R I N
G
L
O G
S S u b m i t t e d b y
-AP
R
IL
N O
R T
H
F
O R
T
H
O O
D
T
E X
A S
B
NUMBER
D r a w n b y
D e s i g n e d b y
S h e e t
S i z e
A N
S I
D
D a t e
C o n t r a c t
N o
S o l i c i t a t i o n
N o
C h e c k e d b y
A
R e v
M a r k
D e s c r i p t i o n
T r a c k i n g
N o
A c t i o n
D a t e
2 3 4 5 6
7 8 9 10
B
C
D
E
F
G
B-202
B O
R I N
G
L
O G
S S u b m i t t e d b y
-AP
R
IL
N O
R T
H
F
O R
T
H
O O
D
T
E X
A S
B
N
C-001
G E
N E
R A
L N
O T
E S
A N
D L
E G
E N
D
GRADING & EARTHWORK NOTES:
ALL WASTE SOIL/EARTH SHALL BE DEPOSITED OFF POST AT CONTRACTOR'S EXPENSE.2.
SHALL BE OBTAINED OFF POST AT THE CONTRACTOR'S EXPENSE.
1. THERE ARE NO SOURCES OF BORROW ON GOVERMENT PROPERTY. ALL BORROW
POINT OF DEMARCATION INDICATED ON PLANS.
INFRASTRUCTURE, DEMOLITION, AND CONSTRUCTION FROM EXISTING CONNECTION POINT TO THE
17. AMERICAN WATER IS RESPONSIBLE FOR DOMESTIC WATER AND SANITARY SEWER
PAD.
CONSTRUCTION FROM EXISTING CONNECTION POINT TO THE NEW GAS LINE AT THE MECHANICAL
16. DOMINION ENERGY IS RESPONSIBLE FOR NATURAL GAS INFRASTRUCTURE DEMOLITION AND
SUBMITTED TO THE COR FOR APPROVAL 1 MONTH PRIOR.
15. ALL FULL OR PARTIAL ROAD CLOSURE REQUIRE A TRAFFIC CONTROL PLAN AND MUST BE
14. CONSTRUCTION WORK HOURS ARE FROM 7:30AM TO 5:00PM UNLESS APPROVED BY THE COR.
AVAILABLE AT THAT LOCATION.
THE NORTH FORT HOOD MAIN GATE. A SPECIAL STATION FOR BACKGROUND CHECKS WILL BE
13. DELIVERY TRUCKS AND CONSTRUCTION VEHICLES MUST ACCESS NORTH FORT HOOD THROUGH
12. CONTRACTOR TO FIELD LOCATE ALL UNDERGROUND UTILITIES PRIOR TO INSTALLATION.
ISSUES WITH THE PRIVATE UTILITY PROVIDERS.
THE BULIDING AND WITHIN THE BUILDING. CONTRACTORS MUST COORDINATE WITH COR ON ANY FOR THE CONNECTION TO AND CONSTRUCTION OF UTILITIES FROM THE DEMARCATION LIMIT TO IDENTIFIED IN THE PLANS UP TO THE DEMARCATION LIMITS. CONTRACTOR MUST BE RESPONSIBLE
MAKE FINAL CONNECTIONS BETWEEN THE NEW SYSTEMS AND EXISTING SYSTEMS ON ALL WORK
DEMOLISH EXISTING UTILITIES AND INSTALL NEW PRIMARY UTILITIES. THE OWNERS MUST ALSO EXISTING UTILITIES, AND STAKEOUT OF NEW UTILITIES. THE UTILITY SYSTEM OWNERS MUST UTILITY REQUIREMENTS WITH THE OWNERS OF THE PRIVATIZED UTILITY SYSTEMS, REMOVAL OF AND AMERICAN WATER RESPECTIVELY. THIS SCOPE OF WORK INCLUDES COORDINATING PROJECT
11. THE NATURAL GAS AND DOMESTIC WATER UTILITIES ARE PRIVATELY OWNED BY DOMINION ENERGY
BE POST MOUNTED.
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. ALL SIGNS, UNLESS OTHERWISE NOTED, MUST
10. SIGNS, PAVEMENT MARKINGS AND THEIR INSTALLATION MUST MEET THE REQUIREMENT OF THE
CENTERLINE UNLESS OTHERWISE NOTED.
9. ALL NORTHING (N) AND EASTING (E) ARE PLACED AT BACK OF CURB, EDGE OF PAVEMENT OR
EXPENSE.
FROM DAMAGE. ANY DAMAGE TO EXISTING UTILITIES MUST BE REPAIRED AT THE CONTRACTOR'S
8. ALL EXISTING UTILITIES TO REMAIN MUST BE VERIFIED PRIOR TO CONSTRUCTION AND PROTECTED
THE FIELD TO ALLOW SUFFICIENT TIME FOR REVIEW, AS MAY BE REQUIRED.
THE CONTRACTING OFFICER'S REPRESENTATIVE IMMEDIATELY OF ANY CONFLICT DISCOVERED IN
7. EXISTING UTILITIES MUST BE REMOVED OR RELOCATED AS INDICATED. CONTRACTOR MUST NOTIFY
COMPANIES AND CONDUCT ALL NECESSARY FIELD INVESTIGATIONS PRIOR TO ANY EXCAVATION.
SUBSTRUCTURES AND PROTECT THEM FROM DAMAGE. CONTRACTOR MUST CONTACT ALL UTILITY
TO VERIFY THE LOCATION, DEPTH, AND CONDITION OF ALL EXISTING UTILITIES AND
6. IT IS THE RESPONSIBILITY OF THE CONTRACTOR, WHETHER INDICATED ON THESE PLANS OR NOT, MUST RELOCATE BENCHMARK AND PROVIDE NEW DATA ON AS-BUILTS.
5. IF BENCH MARK AND CONTROL POINT MUST BE DEMOLISHED FOR CONSTRUCTION, CONTRACTOR
DEMOLITION/CONSTRUCTION.
REGISTERED SURVEYOR AND SUBMIT REPORT TO COR BEFORE STARTING ANY
4. CONTRACTOR MUST LOCATE/VERIFY DATA FOR ALL BENCHMARKS AND CONTROL POINTS BY
CONTRACTOR'S REPRESENTATIVES.
COORDINATION WITH THE CONTRACTING OFFICER REPRESENTATIVE (COR) AND EXISTING
RESPONSIBILITY & MAINTENANCE OF THOSE DEVICES IN LIEU OF INSTALLING NEW DEVICES UPON
EROSION CONTROL DEVICES ARE SHOWN IN THE PLANS, CONTRACTOR MAY ASSUME
3. WHEN EXISTING EROSION CONTROL DEVICES ARE PRESENT IN LOCATIONS WHERE PROPOSED
LOCAL, STATE AND FEDERAL LAWS AND REGULATIONS.
REQUIRED STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IN ACCORDANCE WITH ALL
2. IT IS THE RESPONSIBILTY OF THE CONTRACTOR TO PREPARE AND OBTAIN APPROVAL OF THE
UPON NAVD88, GEOID 2018.
SYSTEM, CENTRAL ZONE (4203), NAD 88(2011). THE VERTICAL DATUM OF THE SURVEY IS BASED THE HORIZONTAL DATUM OF THE SURVEY IS BASED UPON THE TEXAS STATE PLANE COORDINATE
1. FILE COORDINATE SYSTEM IS GRID.
GENERAL NOTES
STORM DRAINAGE HEADWALL
SWING GATE
CONSTRUCTION LIMITS
CONTOURS 1050
664.21
FL 664.21FLOW LINE SPOT ELEVATIONS
SPOT ELEVATIONS
CONC
ASPH
CONC
ASPH
CONC. S/WCONC. S/W
CONCRETE
ASPHALT
CONCRETE SIDEWALK
TREE
EELECTRICAL JUNCTION BOX
GNATURAL GAS METER
GRADING LIMITS
G
CO COSINGLE SANITARY SEWER CLEANOUT
SANITARY SEWER LINE
WATER LINE
GAS LINE
UNDERGROUND ELECTRICAL LINE
FIRE HYDRANT
SANITARY SEWER MANHOLE
UTILITY POLE
OVERHEAD ELECTRICAL LINE
STORM WATER DRAINAGE DITCH
CULVERT
COMMUNICATION CABLE
NATURAL GAS VALVE
WATER VALVE
FENCE
ITEM EXISTING NEW
HAUL ROUTE
ABBREVIATIONS & SYMBOLS
TRANSFORMERXFMR
UNDERGROUND ELECTRICUGE
TYPICALTYP
STORM DRAINSD
SIDEWALKSW
SANITARY SEWERSS
SQUARE FEETSQ. FT.
SANITARYSAN
REINFORCED CONCRETE PIPERCP
RADIUSR
PORTLAND CEMENT CONCRETEP.C.C.
POLYVINYL CHLORIDEPVC
ON CENTERO.C.
NOT TO SCALEN.T.S.
NATURAL GASNG
MANHOLEMH
MINIMUMMIN
MAXIMUMMAX
LINEAR FEETL.F.
INCHESIN
FEETFT
FLOWLINEFL
FIRE HYDRANTFH
FINISH GRADEFG
FINISH FLOORFF
CONTRACTING OFFICERCOR
CONCRETECONC
CLEANOUTCO
BUILDINGBLDG.
ACCESS CONTROL POINTACP
SHEET
NUMBER
D ra w n b y
D e s ig n e d b y
S u b m it te d b y
S h e e t
S iz e
A N
S I
D
D a te
C o n tr a c t
N o
S o li c it a ti o n N o
C h e c k e d b y
A
R e v
M a rk
D e s c ri p ti o n
T ra c k in g N o
A c ti o n
D a te
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
FILE PATH:
3/9/2022 2:52:51 PM
N:\Fort_Hood\Design\FY21-498658-NFH Admin Replace 2 RLBs B56485-B56486\02_CAD_BIM\05_Civil\_Sheets\498658-NFH Admin Replace 2 RLBs B56485-B56486_C-001.dgn
M A
R C
H
A
D M
IN
R
E P
L A
C E
B
B
F O
R T
H O
O D
T
E X
A
N(BY OTHERS, SEE NOTES)
UTILITY POLE, AND EQUIPMENT
REMOVE/RELOCATE ELECTRICAL LINES,
(BY OTHERS, SEE NOTES)
REMOVE COMMUNICATION LINE
E
SHEET
NUMBER
D ra w n b y
D e s ig n e d b y
S u b m it te d b y
S h e e t
S iz e
A N
S I
D
D a te
C o n tr a c t
N o
S o li c it a ti o n
N o
C h e c k e d b y
A
R e v
M a rk
D e s c ri p ti o n
T ra c k in g N o
A c ti o n
D a te
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
FILE PATH:
3/31/2022 8:29:02 AM
N:\Fort_Hood\Design\FY21-498658-NFH Admin Replace 2 RLBs B56485-B56486\02_CAD_BIM\05_Civil\_Sheets\498658-NFH Admin Replace 2 RLBs B56485-B56486_CD101.dgn
M A
R C
H
A
D M
IN
R
E P
L A
C E
B
B
F O
R T
H O
O D
T
E X
A S
B
S
T O
R Y M
E T
A L
B
S
T O
R Y M
E T
A L
B
S
T O
R Y M
E T
A L
PRIOR TO CONSTRUCTION (BY OTHERS, SEE NOTES)
EXISTING RELOCATABLE BUILDINGS WILL BE DEMOLISHED
REMOVE 14-FT X 5-FT SIDEWALK SECTION
GENERAL NOTES:
CONTRACT.
PRIOR TO CONSTRUCTION UNDER SEPARATE
BUILDINGS 56485 AND 56486 WILL BE COMPLETED
DEMOLITION/REMOVAL OF COMMUNICATION LINES,3.
PRIOR TO CONSTRUCTION.
DONE AS PART OF BUILDING DEMOLITION PROJECT
DEMOLITION/REMOVAL OF UTILITY POLE WILL BE 2.
LEGEND.
REFER TO SHEET C-001 FOR GENERAL NOTES AND 1.
D E
M O
L
IT
IO
N
P L
A N
CD101
20'0 10'
N
SHEET
NUMBER
D ra w n b y
D e s ig n e d b y
S u b m it te d b y
S h e e t
S iz e
A N
S I
D
D a te
C o n tr a c t
N o
S o li c it a ti o n N o
C h e c k e d b y
A
R e v
M a rk
D e s c ri p ti o n
T ra c k in g
N o
A c ti o n
D a te
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
FILE PATH:
3/9/2022 11:29:55 AM
N:\Fort_Hood\Design\FY21-498658-NFH Admin Replace 2 RLBs B56485-B56486\02_CAD_BIM\05_Civil\_Sheets\498658-NFH Admin Replace 2 RLBs B56485-B56486_CS101.dgn
M A
R C
H
A
D M
IN
R
E P
L A
C E
B
B
F O
R T
H O
O D
T
E X
A S
GENERAL NOTES:
EQUIPMENT PADS.
REFER TO STRUCTURAL DETAIL FOR MECHANICAL 4.
SURROUNDING MECHANICAL PAD.
CONSTRUCT GRAVEL AREA WITHIN FENCED AREA 3.
FOR FENCE AND GATE DETAILS.
EQUIPMENT PAD. REFER TO SHEET C-502 AND C-503
9-FT DOUBLE SWING GATES FOR MECHANICAL
CONSTRUCT FENCE ENCLOSURE WITH2.
LEGEND.
1. REFER TO SHEET C-001 FOR GENERAL NOTES AND
CONCRETE WHEEL STOP (A/C-501)
LEGEND
)BUCHLOE DACTYLOIDES(
BUFFALOGRASS SOD
GRAVEL AREA (B/C-501)
CONCRETE SIDEWALK (D/C-501)
CONSTRUCT NEW SIDEWALK
(SEE DETAIL C/C-501)
CONSTRUCT MOW STRIPS
NEW GRAVEL AREA
9-FT CENTER ON CENTER
INSTALL 13 WHEEL STOPS
(SEE NOTES)
GRAVEL AREA, AND FENCE ENCLOSURE
EQUIPMENT CONCRETE PAD WITH SURROUNDING
CONSTRUCT 15-FT x 5-FT MECHANICAL
SODDED AREA
(BUCHLOE DACTYLOIDES)
NEW BUFFALOGRASS
B
S
T O
R Y M
E T
A L
SODDED AREA
)BUCHLOE DACTYLOIDES(
NEW BUFFALOGRASS
R
BUILDING
NEW ADMINISTRATION
CONSTRUCT NEW ABA SIDEWALK
INTO EXISTING SIDEWALK
TIE NEW CONCRETE SIDEWALK
INTO EXISTING SIDEWALK
TIE NEW CONCRETE SIDEWALK
(SEE DETAIL E/C-501)
SIDEWALK DRAIN, TYP.
(SEE DETAIL E/C-501)
SIDEWALK DRAIN, TYP.
(SEE DETAIL E/C-501)
SIDEWALK DRAIN, TYP.
1.5'
.5
.5
4'
4'
117.4'
2' 1
.9
6'
5'
2'
EQUIPMENT PADS (SEE NOTES)
CONSTRUCT 4-FT X 2-FT MECHANICAL
2'
C O
N C . S /W
C O
N C . S /W
CONC. S/W CONC. S/W
VAULT
O V
E R
A L
L S
IT
E
P L
A N
CS101
N
SHEET
NUMBER
D ra w n b y
D e s ig n e d b y
S u b m it te d b y
S h e e t
S iz e
A N
S I
D
D a te
C o n tr a c t
N o
S o li c it a ti o n N o
C h e c k e d b y
A
R e v
M a rk
D e s c ri p ti o n
T ra c k in g
N o
A c ti o n
D a te
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
FILE PATH:
3/9/2022 12:26:22 PM
N:\Fort_Hood\Design\FY21-498658-NFH Admin Replace 2 RLBs B56485-B56486\02_CAD_BIM\05_Civil\_Sheets\498658-NFH Admin Replace 2 RLBs B56485-B56486_CS102.dgn
M A
R C
H
A
D M
IN
R
E P
L A
C E
B
B
F O
R T
H O
O D
T
E X
A S
GENERAL NOTES:
EQUIPMENT PAD.
REFER TO STRUCTURAL DETAIL FOR MECHANICAL 4.
MECHANICAL EQUIPMENT PAD.
CONSTRUCT GRAVEL AREA BETWEEN FENCING AND 3.
DOUBLE SWING GATES FOR MECHANICAL EQUIPMENT PAD.
CONSTRUCT 18-FT X 8-FT FENCE ENCLOSURE WITH2.
LEGEND.
1. REFER TO SHEET C-001 FOR GENERAL NOTES AND
PROJECT AREA POINT DATA
10469377.92
10469392.42
10469381.50
10469393.58
10469358.20
10469406.52
3121867.82
3121857.15
3121870.15
3121861.26
3121882.34
3121846.77
NUMBER
IDENTIFICATION
POINT
NORTHING EASTING
10469346.45
10469285.60
10469296.88
10469288.58
3121931.21
3121847.68
3121839.39
3121828.11
20 21
8 9
3121899.93
3121830.42
3121867.45
10469364.94
10469313.79
10469414.92
10469298.80
10469366.32
3121822.41
3121914.27
10469360.19
10469363.41
10469398.00
10469397.24
10469373.46
10469416.76
10469400.22
10469421.59
10469405.06
10469410.98
10469402.96
10469399.41
10469407.43
10469306.49
10469298.69
10469368.62
3121883.35
3121880.98
3121860.49
3121856.09
3121911.50
3121880.08
3121857.61
3121876.52
3121854.06
3121827.61
3121833.51
3121828.68
3121822.77
3121820.52
3121820.05
3121915.03
R
B
S
T O
R Y M
E T
A L
BUILDING
NEW ADMINISTRATION
C O
N C . S /W
C O
N C . S /W
CONC. S/W CONC. S/W
VAULT
S
IT
E P
L A
N P
O
IN
T L
O C
A T
IO
N
S
CS102
N
FF=752.4
752.28
752.28
752.18
748.10
FL 748.81
FL 748.89
FL 748.99750.37
749.30
FL 749.10
749.30
FL 750.51
FL 750.62
750.60
750.90 751.20
751.30
751.46
751.70 751.70
750.43
751.70
751.70
751.70
FL 748.06
751.20
751.54
SHEET
NUMBER
D ra w n b y
D e s ig n e d b y
S u b m it te d b y
S h e e t
S iz e
A N
S I
D
D a te
C o n tr a c t
N o
S o li c it a ti o n N o
C h e c k e d b y
A
R e v
M a rk
D e s c ri p ti o n
T ra c k in g
N o
A c ti o n
D a te
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
FILE PATH:
3/9/2022 12:49:39 PM
N:\Fort_Hood\Design\FY21-498658-NFH Admin Replace 2 RLBs B56485-B56486\02_CAD_BIM\05_Civil\_Sheets\498658-NFH Admin Replace 2 RLBs B56485-B56486_CG101.dgn
M A
R C
H
A
D M
IN
R
E P
L A
C E
B
B
F O
R T
H O
O D
T
E X
A S
B
S
T O
R Y M
E T
A L
GRADING LIMITS
BUILDING
NEW ADMINISTRATION
PAS SPEAKER
C O
N C . S /W
C O
N C . S /W
CONC. S/W CONC. S/W
VAULT
750 750
SIDEWALK DRAIN 1
SIDEWALK DRAIN 2SIDEWALK DRAIN 3
GENERAL NOTES:
LEGEND.
REFER TO SHEET C-001 FOR GENERAL NOTES AND 1.
S T
O R
M D
R A
IN
A
G E
A N
D G
R A
D
IN
G
CG101
N
BUILDING
NEW ADMINISTRATION
PADS, SEE SHEET CS101
NEW MECHANICAL EQUIPMENT
PAD, SEE SHEET CS101
NEW MECHANICAL EQUIPMENT
C O
N C . S /W
C O
N C . S /W
CONC. S/W CONC. S/W
VAULT
B
S
T O
R Y M
E T
A L
GENERAL NOTES:
PRIVATIZED UTILITY DEMARCATION INFORMATION.
REFER TO SPECIFICATION 01 35 10.00 44 FOR 4.
CONSTRUCTED BY DOMINION ENERGY.
NEW NATURAL GAS LINE SHALL BE DESIGNED AND 3.
WATER.
SHALL BE DESIGNED AND CONSTRUCTED BY AMERICAN
NEW SANITARY SEWER, WATER MAIN, AND FIRE HYDRANT2.
LEGEND.
REFER TO SHEET C-001 FOR GENERAL NOTES AND 1.
E3121873.32
N10469378.88
749.4' INVERT ELEVATION
POD 5' FROM EDGE OF BUILDING
2-INCH WATER LINE,
E3121870.08
N10469391.39
POD DOWNSTREAM SIDE OF NATURAL GAS METER
1-INCH NATURAL GAS LINE,
E3121858.33
N10469395.16
749.4' INVERT ELEVATION
POD DOWNSTREAM SIDE OF CLEANOUT DEVICE
3-INCH SANITARY SEWER LINE,
SHEET
NUMBER
D ra w n b y
D e s ig n e d b y
S u b m it te d b y
S h e e t
S iz e
A N
S I
D
D a te
C o n tr a c t
N o
S o li c it a ti o n N o
C h e c k e d b y
A
R e v
M a rk
D e s c ri p ti o n
T ra c k in g
N o
A c ti o n
D a te
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
FILE PATH:
3/9/2022 1:26:48 PM
N:\Fort_Hood\Design\FY21-498658-NFH Admin Replace 2 RLBs B56485-B56486\02_CAD_BIM\05_Civil\_Sheets\498658-NFH Admin Replace 2 RLBs B56485-B56486_CU101.dgn
M A
R C
H
A
D M
IN
R
E P
L A
C E
B
B
F O
R T
H O
O D
T
E X
A S
CO
U T
IL
IT
Y P
L A
N
CU101
G
NN
FF=752.4
N
M
IS
C E
L L
A N
E O
U S
D E
T A
IL
S
C-501
CONCRETE EDGING DETAIL
N.T.S.
C
6"
2" GRAVEL BED
@ CENTER
#3 BAR CONTINIOUS
1/4" R TYPICAL
(ASTM D 1557)
90 PERCENT OF LABORATORY MAXIMUM DENSITY
6" RAW SUBGRADE COMPACTED TO AT LEAST
(ASTM D 1557)
95 PERCENT OF LABORATORY MAXIMUM DENSITY
4" AGGREGATE BASE COURSE COMPACTED TO AT LEAST
GRAVEL SECTION (TYP)
N.T.S.
B ƒ
1'-2"1'-2"
1'-2" 1'-2"
3"
6'-0"
3'-8"
11ƒ" ƒ
1'-4"
PLAN
ELEVATION
STOP MAY BE USED
MANUFACTURED WHEEL
APPROVED STANDARD
NOTE:
END VIEW
ANCHOR ROD
2 - #3 BARS " x 1'-6" ANCHOR RODS8
" I.D. SLEEVES FOR4
#3 BARS @ 14" O.C.
" I.D. SLEEVES4
ANCHOR ROD
" DIAM.8
CONT.
#3 BARS
WHEEL STOP DETAILS
N.T.S.
A
LABORATORY MAXIMUM DENSITY (ASTM D 1557)
4) 6" RAW SUBGRADE COMPACTED TO AT LEAST 90 PERCENT OF
STEEPER THAN 2%.
3) All SIDEWALKS SHALL NOT HAVE CROSS SLOPES
40'-0" ON CENTER WHERE WALK DOES NOT ABUT CURB.
2) PROVIDE EXPANSION JOINTS AT INTERVALS NOT EXCEEDING
EXCEED 6'-0".
SPACING OF CENTERLINE CONTRACTION JOINTS SHALL NOT
CONTRACTION JOINTS IN SIDEWALKS WIDER THAN 8'-0".
INTERVALS NOT TO EXCEED 5'-0" O.C. PROVIDE CENTERLINE
1) CONTRACTOR SHALL PROVIDE CONTRACTION JOINTS AT
NOTE:
SECTION
EXPANSION JOINTCONTRACTION JOINT
WELDED WIRE MESH
6" x 6" - W2.9 x W2.9
1/8" 1/2" 1 /4
1/ 8" R
R
AS REQUIRED
3"
3" ƒ"
„" 1…"
CONCRETE PAD
1 1
SECTION
6"
2"
DETAIL "C"
SEE DETAIL "C" PATTERN PLATE
¼" RAISED
EXPANSION JOINT (TYP.)
WELDED WIRE MESH
6" X 6" W2.9 X W2.9
(TYP.)
SIDEWALK
4" MIN.
VARIES
EXPANSION JOINT (TYP.)
BAR
¼" X¾" ¼" SCREW AT 12"
¼" CHECKERED PLATE
2" X 2" X¼"
@ 18" O.C.
TO ANGLE
#3 BARS WELDED
1'-0"
16" WIDE
14 3/4" WIDE
PLAN
8'
SIDEWALK DRAIN DETAILS
N.T.S.
E
SIDEWALK DETAILS
N.T.S.
D
SHEET
NUMBER
D ra w n b y
D e s ig n e d b y
S u b m it te d b y
S h e e t S iz e
A N
S I D
D a te
C o n tr a c t
N o
S o lic it a ti o n N o
C h e c k e d b y
A
R e v
M a rk
D e s c ri p ti o n T ra c k in g N o
A c ti o n D a te
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
FILE PATH:
3/3/2022 9:44:20 AM
N:\Fort_Hood\Design\FY21-498658-NFH Admin Replace 2 RLBs B56485-B56486\02_CAD_BIM\05_Civil\_Sheets\498658-NFH Admin Replace 2 RLBs B56485-B56486_C-501.dgn
M A
R C
H
A D
M
IN
R E
P L A
C E
B
B
F O
R T
H O
O D
T
E X
N
F E
N C
IN
G
D E
T A
IL
S
C-502
SHEET
NUMBER
D ra w n b y
D e s ig n e d b y
S u b m it te d b y
S h e e t
S iz e
A N
S I
D
D a te
C o n tr a c t
N o
S o li c it a ti o n N o
C h e c k e d b y
A
R e v
M a rk
D e s c ri p ti o n
T ra c k in g N o
A c ti o n
D a te
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
FILE PATH:
1/11/2022 9:56:28 AM
N:\Fort_Hood\Design\FY21-498658-NFH Admin Replace 2 RLBs B56485-B56486\02_CAD_BIM\05_Civil\_Sheets\498658-NFH Admin Replace 2 RLBs B56485-B56486_C-502.dgn
M A
R C
H
A D
M
IN
R E
P L
A C
E
B
B
F O
R T
H O
O D
T
E X
A S
NO SCALE
16" MIN. DIA.
M
IN
M
IN
10'-0" MAXIMUM
LINE POSTS TO BE EQUALLY SPACED
10" MIN. DIA.
NO SCALE
FASTENING DETAILS
TRUSS ROD AND BAND
ROUND POST
BRACE RAIL CLAMP DETAILS
H-BEAM
TENSION BAND DETAIL
END OR GATE POST DETAIL
T Y
P
2.25" x 1.70"
2.25" x 1.70"
2.375" O.D. 2.875" O.D.
2.25" x 1.70"
1.90" O.D.
2.25" x 1.70"
1.875" x 1.625"
3.50" x 3.50"
2.00" SQ.
2.375" O.D. 2.875" O.D.
2.50" SQ.
3.50" x 3.50"
3.00" SQ.
4.00" O.D.
1.66" O.D.
1.50" O.D.
1.625" x 1.50"
1.625" x 1.25"C-SECTION (ROLL-FORMED)
H-SECTION
TUBULAR - SQUARE
TUBULAR - ROUND
TOP, BOTTOM & BRACE RAILS
C-SECTION (ROLL-FORMED)
TUBULAR - ROUND
LINE POSTS
C-SECTION (ROLL-FORMED)
TUBULAR - SQUARE
TUBULAR - ROUND
CORNER, END & PULL POSTS
USE AND SECTION
FABRIC LESS THAN 72"
MINIMUM OUTSIDE DIMENSIONS (NOMINAL)
STEEL POST SCHEDULE
FABRIC 72" TO 96" FABRIC OVER 96"
NOTES:
FENCE LEGEND:
H-BEAM ROUND POST
LINE POST ATTACHMENTS
TOP OR BRACE RAIL ATTACHMENT
GROUNDING DETAIL
NO SCALE
NO SCALE
BRACE PANEL DETAIL
10'-0" MAX. 10'-0" MAX.
NOTE:
STRAIGHT RUNS EXCEED 500 FEET.
PROVIDE BRACE PANEL WHENEVER
10'-0" MAXIMUM
X X X X X X
XX
X XXXXXXXXXXX
X
X X X X X X
X X X X XXXXX
X X X X X X X
XXXXXX
X X X X X X
X X X X
XXXX
X X X X X X X
XXX
X X X
X X X X X
XXXXX
X X X X X
X
X
X
X
X
X X
X X
X X
X
XXX
X
X
X
NO SCALE
EXTENSION ARM DETAILS
LINE POST CORNER POST
1'-0"
45 DEGREES
1' -6 " 6"
T Y P
1' -1 0" 7.
5" (T
YP.
35 DEGREES
X X X X X
XXXXX
X X X X X
X X X X
X
XX
XXX
X X
X X X X
XXXX
X X X X
X X X X
XXXX
X X X X
X
X
X X
X
X
H-SECTION
FE6 CHAIN-LINK SECURITY FENCE DETAIL
LINE POST
TOP RAIL OR TENSION WIRE
BRACE RAIL
(TYP.)
TIE WIRES
(3/8" MIN. DIA.)
TRUSS ROD
CONCRETE BASE
OR PULL POST
CORNER, END,
TIE WIRES (TYP.)
LINE POST
GRADE
WIRE
TENSIONOF FABRIC
BOTTOM
(9 GAGE, 2" MESH)
CHAIN-LINK FABRIC
BASE
CONCRETE
(3/8" MIN. DIA.)
TRUSS ROD
BAND
TENSION
(3/8" MIN. DIA.)
TRUSS ROD
WIRE
TENSION
CARRIAGE BOLT
TENSION BAR
EACH FABRIC LINK
TENSION BAR TO ENGAGE
FABRIC
TOP AND BOTTOM OF FABRIC)
(15" O.C. MAX. AND WITHIN 4" FROM
TENSION BAND
FABRIC
(2'-0" O.C. MAX.)
9-GAGE TIE WIRES
OF FABRIC)
TOP AND BOTTOM
WITHIN 4" FROM
(15" O.C. MAX AND
TIE WIRE
OF FABRIC)
TOP AND BOTTOM
WITHIN 4" FROM
(15" O.C. MAX AND
TIE WIRE
STEEL GROUND ROD
3/4" DIA. COPPER-CLAD
OF COPPER
CLAMP-TYPE FITTING
WELD OR APPROVED
MOLDED EXOTHERMIC
COPPER WIRE
#8 AWG SOLID
FENCE POST
TRUSS ROD TRUSS ROD
LINE POSTLINE POST BRACE RAILS
RAILS
BRACE
PULL POST
TENSION WIRE
TOP RAIL OR
(TYP.)
TIE WIRES
ON EXTENSION ARMS
BARBED-WIRE APRON
RIVETED FLUSH (TYP.)
" PLAIN PIN8
RIVETED FLUSH (TYP.)
3/8" PLAIN PIN
LOCK PIN (TYP.)
WIRE (TYP.)
BARBED
F A
B R
IC
W
ID
T
H
FINAL NUMBER IS FABRIC WIDTH IN INCHES
TBR - FENCE WITH TOP AND BOTTOM RAILS
TYPE FE6 - CHAIN-LINK FENCE W/BARBED-WIRE ON SINGLE OUTRIGGER
TO THE TOP OF THE FOUNDATION.
INSIDE THE POST IS COMPLETELY FILLED WITH CONCRETE UP
4. C-SECTION POSTS SHALL BE INSTALLED SO THAT THE VOID
3. NOT USED.
SECURE AREA.
FABRIC SHALL BE PLACED ON THE OPPOSITE SIDE OF THE
ON THE SECURE SIDE OF THE FENCE ALIGNMENT. CHAIN-LINK
2. WIRE TIES, RAILS, POSTS, AND BRACES SHALL BE CONSTRUCTED
MANUFACTURER.
NOT INTENDED TO LIMIT METHOD OF INSTALLATION TO ONE
1. DETAILS SHOWN ARE TO CLARIFY REQUIREMENTS AND ARE
N
G A
T E
D E
T A
IL
S
C-503
SHEET
NUMBER
D ra w n b y
D e s ig n e d b y
S u b m it te d b y
S h e e t
S iz e
A N
S I
D
D a te
C o n tr a c t
N o
S o li c it a ti o n N o
C h e c k e d b y
A
R e v
M a rk
D e s c ri p ti o n
T ra c k in g N o
A c ti o n
D a te
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
FILE PATH:
3/9/2022 1:41:40 PM
N:\Fort_Hood\Design\FY21-498658-NFH Admin Replace 2 RLBs B56485-B56486\02_CAD_BIM\05_Civil\_Sheets\498658-NFH Admin Replace 2 RLBs B56485-B56486_C-503.dgn
M A
R C
H
A D
M
IN
R E
P L
A C
E
B
B
F O
R T
H O
O D
T
E X
A S
GATE OPENING
5'-0"
M
IN
M
A X
6" D
IA
10"
6" DIA. P.C. CONC.
NO SCALE
PERSONNEL GATE
TYPE FE6 FENCE
OFFSET HINGE STANDARD HINGE
LATCH ASSEMBLY
DROP ROD ASSEMBLY
GATE POST SCHEDULE
6' OR LESS
MORE THAN 13' TO 18'
MORE THAN 6' TO 13'
MORE THAN 18'
(NOMINAL)
GATE LEAF WIDTH
(NOMINAL)
OUTSIDE DIMENSION
2.875" O.D.
2.5" SQ.
4.0" O.D.
6.625" O.D.
8.625" O.D.
NOTES:
NO SCALE
SWING GATE DETAILS
GATE KEEPER
(TO HOLD GATE OPEN)
PLAN
A
SECTION A
DROP ROD FOUNDATION
SECTION
GATE POST DETAIL
AT CURB AND GUTTER
GATE LEAF
M
IN
M
A X
NO SCALE
DOUBLE SWING GATE (TYPE FE6 FENCE)
ELEVATION
2'-10" FOR POSTS 4" O.D. & LESS
" O.D.8
53'-4" FOR POSTS 6
" O.D.8
53'-10" FOR POSTS 8
4" O.D. & LESS
16" DIA. MIN. FOR GATE POSTS
OVER 4" O.D.
24" DIA. MIN. FOR GATE POSTS
X X
XX
X X X X X X X X X
XXXXXXX
X X X X X X X X X X X X X X
XXXXXXX
X X X X X X X
X X X X X X X
XXXXXXX
X X X X X X X
X X X X X X X
XXXXXXX
X X X X X X X
X X X X
XXXX
X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
XX
X
X X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X X
X
X X
X
X X
X
X X
X X
X X X X X
XXXXX
X X X X X
PLAN
DIRECTION OF GATE SWING (TYP.)
X X
XX
X X X X X X X
XXXXX
X X X X X
GATE OPENING
FE5-48-SO-HD-6
EXAMPLES: FE6-84-DO-RA-24
OPENING - FEET (CLEAR OPENING BETWEEN GATE POSTS)
- HO (OFFSET)
HINGE - RA (STANDARD)
- DO (DOUBLE)
TYPE OPENING - SO (SINGLE)
FENCE HEIGHT - INCHES
FENCE TYPE - FE5, FE6, ETC.
4. GATES SHALL BE DESIGNATED AS FOLLOWS:
CONSTRUCTION OF ALL GATES SUPPLIED.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER RIGID
USED IN LIEU OF TRUSS RODS TO BRACE ALL WELDED GATE FRAMES.
AT CONSTRACTOR'S OPTION, A WELDED HORIZONTAL BRACE MAY BE
CONSTRUCTION OR SHALL BE ASSEMBLED USING HEAVY FITTINGS.
OR 2.00" NOMINAL (SQUARE). GATE FRAMES SHALL BE WELDED
3. ALL GATE FRAMES SHALL BE A MINIMUM OF 1.90" NOMINAL (ROUND)
LATCH ASSEMBLY AND GATE KEEPERS EXCEPT AS NOTED.
2. SWING GATES SHALL BE CONSTRUCTED WITH DROP RODS, PADLOCKS,
INTENDED TO LIMIT METHOD OF INSTALLATION TO ONE MANUFACTURER.
1. DETAILS SHOWN ARE TO CLARIFY REQUIREMENTS AND ARE NOT
LINE POST
ASSEMBLY
LATCH
GATE FRAME
DROP ROD
" TRUSS RODS8
FABRIC
CHAIN-LINK
RAIL AS SPECIFIED
TOP TENSION WIRE OR
HINGE
OR RAIL AS SPECIFIED
BOTTOM TENSION WIRE
RAIL (TYP.)
BRACE
LINE POST
(TYP.)
TRUSS ROD
(TYP.)
BRACE RAIL
LINE
GRADE
HINGE
POST
GATE
HINGE
RAIL AS SPECIFIED
TOP TENSION WIRE OR
BRACE RAIL (TYP.)
GRADE LINE
OR RAIL AS SPECIFIED
BOTTOM TENSION WIRE
TRUSS ROD (TYP.)
LATCH
AND GUTTER
EXIST. CURB
FULL DEPTH
SAWCUT CURB
GATE
3" MIN.
GUTTER
SAWCUT
SAND/GRAVEL
1" I.D. STEEL PIPE
PAVEMENT
BITUMINOUS
SURFACE
PAVED
PAVEMENT
P.C. CONC.
" DIA. DROP ROD2
AND GUTTER
NEW CURB
JOINT
" EXP.2
NEW GATE
WASHER
POST FOUND.
NEW GATE
EXIST. CURB
HINGE
STANDARD
POST
GATE
" EXP. JOINT2
BARBED WIRE
3 STRANDS OF
BARBED-WIRE
3-STRANDS OF
BARBED WIRE
3-STRANDS OF
BARBED WIRE
3-STRANDS OF
GATE FRAME
CHAIN-LINK FABRIC OF BARBED-WIRE
3 VERTICAL STRANDS
F E
N C
E F
A B
R
IC
F E
N C
E F
A B
R
IC
N
1. ACI 301, SPECIFICATIONS FOR STRUCTURAL CONCRETE
2. ACI 318/318R-19, BUILDING CODE REQUIREMENTS FOR
STRUCTURAL CONCRETE
3. ACI MNL-66 (20), ACI DETAILING MANUAL
4. AISC STEEL CONSTRUCTION MANUAL, 15TH EDITION
5. ASCE 7-16, MINIMUM DESIGN LOADS FOR BUILDINGS AND
OTHER STRUCTURES
6. AWS D1.1 STRUCTURAL WELDING CODE, STEEL, 24TH
EDITION.
7. INTERNATIONAL BUILDING CODE, IBC 2018
10. UFC 1-200-01, 08 OCTOBER 2019, DoD BUILDING CODE
(GENERAL BUILDING REQUIREMENTS)
11. UFC 3-301-01, 01 OCTOBER 2019, STRUCTURAL
ENGINEERING
NOTE: THIS LIST OF CODES IS NOT ALL-INCLUSIVE. REFER TO
OTHER DESIGN DISCIPLINE DRAWING SHEETS AND PROJECT
SPECIFICATIONS FOR ADDITIONAL APPLICABLE CODES AND
CRITERIA.
APPLICABLE CODES:
1. RISK CATEGORY = II
2. DEAD LOAD (SELF WEIGHT)
COLLATERAL......................................10 PSF
3. LIVE LOAD
MECHANICAL.....................................125 PSF
or ACTUAL EQUIP. WEIGHT (THE GREATER OF)
TELECOM...........................................150 PSF
ALL OTHER FIRST FLOOR AREAS...100 PSF
ROOF.................................................. 20 PSF
4. SNOW LOADS
GROUND SNOW ............................... 5 PSF
MINIMUM ROOF SNOW LOAD.......... 5 PSF
IMPORTANCE FACTOR..................... 1.0
THERMAL FACTOR............................1.0
EXPOSURE FACTOR......................... 1.0
5. WIND LOAD
BASIC WIND SPEED.......................... 106 MPH
EXPOSURE CATEGORY....................C
GCpi.................................................... +/- 0.18 Kzt...................................................... 1.0 Kd....................................................... 0.85
6. SEISMIC LOAD
IMPORTANCE FACTOR..................... 1.0
SITE CLASS........................................C
Ss........................................................ 0.059 S1........................................................0.039 Sds...................................................... 0.063 Sd1..................................................... 0.063
SEISMIC DESIGN CATEGORY..........A
RESPONSE MODIFICATION
COEFFICIENT
(STEEL SYSTEMS NOT SPECIFICALLY
DETAILED FOR SEISMIC RESISTANCE)
7. ANTI-TERRORISM/FORCE PROTECTION GLAZING AND
DOORS, AND FRAMING AROUND GLAZING AND DOORS,
SHALL MEET THE BLAST RESISTANCE REQUIREMENTS
OF UFC 4-010-01,DoD MINIMUM ANTITERRORISM
STANDARDS FOR BUILDINGS.
DESIGN LOADS:
1FL FIRST FLOOR
2FL SECOND FLOOR
ALT ALTERNATE
ACI AMERICAN CONCRETE INSTITUTE
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
AISI AMERICAN IRON AND STEEL INSTITUTE
ASCE AMERICAN SOCIETY OF CIVIL
ENGINEERS
ASTM AMERICAN SOCIETY FOR TESTING AND
MATERIALS
AB ANCHOR BOLT
ADD'L ADDITIONAL
ARCH ARCHITECT, ARCHITECTURAL
@ AT (MEASUREMENT)
BP BASE PLATE
BRG BEARING
BF BOTH FACES
BOT BOTTOM
BLDG BUILDING
CL CENTERLINE
CLR CLEAR
COL COLUMN
CONC CONCRETE
CMU CONCRETE MASONRY UNIT
CONN CONNECTION
CONST. CONSTRUCTION
CONT CONTINUOUS
CJ CONTROL OR CONSTRUCTION JOINT
COORD COORDINATE
DL DEAD LOAD
DET DETAIL
DIA DIAMETER
DIST. DISTANCE
DWG(S) DRAWING(S)
EA EACH
ES EACH SIDE
EW EACH WAY
EOF EDGE OF FLANGE
EL/ELEV ELEVATION
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FF EL FINISHED FLOOR ELEVATION
FDTN FOUNDATION
GA GAGE
GALV GALVANIZED
HORZ HORIZONTAL
IBC INTERNATIONAL BUILDING CODE
IJ ISOLATION JOINT
k KIP OR KIPS
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONG LONGITUDINAL
LW LIGHTWEIGHT
MFG('S) MANUFACTURER('S)
MAX MAXIMUM
MECH MECHANICAL
MIN MINIMUM
NTS NOT TO SCALE
OC ON CENTER
OCEW ON CENTER EACH WAY
lb(s) POUND(S) plf POUNDS PER LINEAL FOOT psf POUNDS PER SQUARE FOOT pcf POUNDS PER CUBIC FOOT
PEMB PRE-ENGINEERED METAL BUILDING
PEJ PREMOLDED EXPANSION JOINT
PL PLATE
QTY QUANTITY
RC REINFORCED CONCRETE
REINF REINFORCEMENT
REBAR REINFORCING STEEL BARS
REQ(D) REQUIRE(D)
SJ SAW JOINT
SCHED SCHEDULE
SIM SIMILAR
SQ SQUARE
sf SQUARE FOOT sq in SQUARE INCH sq yd SQUARE YARD
SSMR STANDING SEAM METAL ROOF
SJI STEEL JOIST INSTITUTE
STRUCT STRUCTURAL
TH THICK
THRU THROUGH
T&B TOP AND BOTTOM
T.O. TOP OF
T.O.F. TOP OF FOOTING
T.O.B. TOP OF BEAM
T.O.W. TOP OF WALL
TYP TYPICAL
UFC UNIFORM FACILITIES CRITERIA
U.N.O. UNLESS NOTED OTHERWISE
VAR. VARIABLE
VERT VERTICAL
WWF WELDED WIRE FABRIC
W/ WITH
yd YARD
TYPICAL ABBREVIATIONS
FOUNDATION & SOIL DATA
1. FOUNDATION DESIGN IS IN ACCORDANCE WITH THE GEOTECHNICAL ENGINEERING REPORT DATED
APRIL 2020, PREPARED BY THE GEOTECHNICAL BRANCH, US ARMY CORPS OF ENGINEERS, FORT
WORTH DISTRICT.
2. DESIGN CRITERIA:
FROST DEPTH ....................................................................................................... 6 in ALLOWABLE FOUNDATION BEARING PRESSURE (NET) .................................... 2,000 psf MODULUS OF SUBGRADE REACTION ...................................................................125 psi/in
3. EXISTING SURFICIAL SOILS WITHIN THE BUILDING FOOTPRINT AND EXTENDING AT LEAST 5 FT BEYOND THE FOUNDATION PERIMETER SHALL BE EXCAVATED TO A MINIMUM DEPTH OF 12 INCHES.
ANY IRREGULARITIES OR SOFT AREAS SHALL BE EXCAVATED TO AN ADDITIONAL DEPTH OF SIX INCHES AND THE AREA BACKFILLED WITH NON-EXPANSIVE STRUCTURAL FILL. PROOF ROLL THE
EXPOSED SURFACE. REPLACE THE EXCAVATED AREA WITH NON-EXPANSIVE STRUCTURAL FILL
COMPACTED IN ACCORDANCE WITH SPECIFICATIONS SECTION 31 00 00. PLACE ANY ADDITIONAL FILL
REQUIRED AS SHOWN IN THE DRAWINGS.
4. PLACE STRUCTURAL FILL IN LOOSE LIFTS OF 8 INCHES AND COMPACT TO A MINIMUM OF 95% OF THE MODIFIED PROCTOR MAXIMUM DENSITY IN ACCORDANCE WITH ASTM D1557. REFER TO CIVIL SITE
DRAWINGS FOR THE REQUIRED ELEVATION OF FINISHED GRADE ADJACENT TO THE BUILDING.
5. A 10 mil POLYETHYLENE VAPOR BARRIER AND 6 in MIN. CAPILLARY WATER BARRIER SHALL BE
PROVIDED BENEATH THE SLAB, UNLESS NOTED OTHERWISE.
6. DO NOT PLACE CONCRETE ON FROZEN OR SATURATED SOILS. PLACE CONCRETE THE SAME DAY
EXCAVATIONS ARE MADE OR AS SOON AS PRACTICAL THEREAFTER. THE CONTRACTOR SHALL
PROVIDE FOR DEWATERING OF EXCAVATIONS, IF REQUIRED, FOR SURFACE WATER, GROUND
WATER, OR SEEPAGE.
7. CHECK FOUNDATION PLANS AND UNDERFLOOR PLUMBING PLANS FOR APPROXIMATE LOCATION
OF LINES AND SLEEVES THROUGH FOUNDATION SLABS. PIPES, CONDUIT, AND/OR DUCTS SHALL
BE INSTALLED BELOW THE SLAB-ON-GRADE WITHIN THE GRANULAR SUB-BASE. CONTRACTOR
SHALL VERIFY LOCATION BEFORE CONCRETE PLACEMENT.
8. SLABS-ON-GRADE ARE STRUCTURAL DIAPHRAGMS, DESIGNED TO RESIST LATERAL FORCES
IMPARTED BY THE RIGID BUILDING FRAMES. SAW-CUTTING OF SLABS SHALL NOT BE PERMITTED
UNLESS SPECIFICALLY SHOWN OTHERWISE ON THE FOUNDATION PLANS.
GENERAL NOTES:
1. DESIGN DRAWINGS SHOW INTENT OF REQUIRED CONSTRUCTION AND SPECIFIC CONSTRUCTION
AS NEEDED TO FACILITATE CLEAR DETAILING. FOR SPECIFIC CONDITIONS NOT SHOWN, THE
CONTRACTOR SHALL PROVIDE DETAILS OF CONSTRUCTION SIMILAR TO THOSE SHOWN. VERIFY
ALL EXISTING CONDITIONS, DIMENSIONS, AND ELEVATIONS PRIOR TO COMMENCING WORK. IF
DISCREPANCIES EXIST, NOTIFY THE CONTRACTING OFFICER IN WRITING PRIOR TO COMMENCING
WORK. CONTRACTOR SHALL MAKE NO DEVIATION FROM THE CONTRACT DOCUMENTS WITHOUT
WRITTEN APPROVAL FROM THE CONTRACTING OFFICER.
2. THE CONTRACT DOCUMENTS REPRESENT THE FINISHED STRUCTURE AND DO NOT INDICATE THE
METHOD OR SEQUENCE OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL MEASURES
NECESSARY TO PROTECT THE STRUCTURE DURING CONSTRUCTION. SUCH MEASURES SHALL
INCLUDE, BUT ARE NOT LIMITED TO, TEMPORARY BRACING AND/OR SHORING FOR LOADS AND
CONDITIONS WHICH OCCUR PRIOR TO ATTAINING DESIGN STRENGTH OR COMPLETION OF THE
STRUCTURE. TEMPORARY CONSTRUCTION LOADING MAY INCLUDE AND ARE NOT LIMITED TO
LATERAL LOADS, LOADS DUE TO STOCKPILES OF MATERIAL, AND LOADS DUE TO CONSTRUCTION EQUIPMENT. SUCH BRACING SHALL BE LEFT IN PLACE AS LONG AS REQUIRED FOR SAFETY AND
UNTIL ALL FRAMING INCLUDING ROOF BRACING IS IN PLACE.
3. THE CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIES, STRUCTURES, AND UTILITY LINES
FROM ALL DAMAGE. DAMAGE TO ALL WORK SHALL BE REPAIRED TO THE SATISFACTION OF THE
CONTRACTING OFFICER AT THE CONTRACTOR'S EXPENSE.
4. THE CONTRACTOR SHALL ESTABLISH AND VERIFY ALL OPENINGS AND INSERTS FOR
ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING, AND OTHER ITEMS WITH APPROPRIATE
TRADE DRAWINGS AND SUBCONTRACTORS PRIOR TO CONSTRUCTION.
5. THE FINISHED FLOOR ELEVATION SHOWN ON THE STRUCTURAL SHEETS ARE BASED ON A
RELATIVE DATUM OF 0'-0". FINISHED FLOOR ELEVATION SHOWN ON THE CIVIL SHEETS ARE BASED ON MEAN SEA LEVEL ELEVATION. COORDINATE THE FINISHED FLOOR ELEVATION SHOWN ON THE
STRUCTURAL SHEETS WITH THE ELEVATION SHOWN ON THE CIVIL SHEETS.
6. JOB SAFETY AND CONSTRUCTION PROCEDURES ARE THE RESPONSIBILITY OF THE CONTRACTOR.
7. DRAWINGS SHALL NOT BE SCALED FOR DIMENSIONS.
8. SHOP DRAWINGS AND SUPPORTING DATA FOR ALL STRUCTURAL STEEL AND CONCRETE STEEL
REINFORCING SHALL BE SUBMITTED FOR REVIEW IN ACCORDANCE WITH THE SUBMITTAL SECTION OF THE SPECIFICATIONS. FABRICATION SHALL NOT BEGIN UNTIL SHOP DRAWINGS COVERING THAT WORK HAVE BEEN REVIEWED BY THE ENGINEER. ANY FABRICATION THAT BEGINS PRIOR TO REVIEW
OF SHOP DRAWINGS SHALL BE AT THE CONTRACTOR'S RISK.
REINFORCED CONCRETE
1. DESIGN CODES: BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318-14)
2. MATERIAL STRENGTHS:
2.1 CONCRETE COMPRESSIVE STRENGTH (f'c) AT 28 DAYS:
SLABS................................................................................. 4,000 PSI
2.2 REINFORCING STEEL:
BARS AND TIES........................................................................ ASTM A615, GR. 60 KSI WELDED WIRE MESH................................................................ASTM A1064, GR. 60 KSI
3. NOTES:
3.1 ALL CONCRETE OPERATIONS AND REINFORCEMENT SHALL BE IN ACCORDANCE WITH
THE LATEST ACI AND CRSI STANDARDS.
3.2 REFER TO ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR
ADDITIONAL EMBEDDED ITEMS AND ACCESSORIES. NO CALCIUM CHLORIDE OR OTHER
DELETERIOUS SALTS ARE PERMITTED IN CONCRETE. NO ALUMINUM EMBEDMENTS
ARE PERMITTED. PROVIDE 3/4" CHAMFER AT ALL EXPOSED CORNERS.
3.3 FURNISH THE FOLLOWING SPECIFIED CONCRETE COVER ON REINFORCING BARS UNO:
SINGLE LAYER REINFORCEMENT FOR SLAB-ON-GRADE...............1-1/2" FROM TOP
ALL MEMBERS CAST AGAINST AND PERMANENTLY IN CONTACT WITH GROUND:
ALL REINFORCEMENT SIZES................................................... 3"
FORMED CONCRETE SURFACES EXPOSED TO WEATHER OR IN CONTACT WITH GROUND:
#6 THROUGH #18 BARS............................................................ 2"
#5 BAR, W31 OR D31 WIRE AND SMALLER............................. 1-1/2"
CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND:
SLABS, JOISTS AND WALLS (#11 BARS AND SMALLER)....... 1-1/2"
BEAMS, COLUMNS, PEDESTALS, AND TENSION TIES...........1-1/2"
3.4 PROVIDE CONCRETE FINISHES PER SPECIFICATIONS U.N.O.
3.5 LONGITUDINAL REINFORCING IN THE GRADE BEAMS AND PIERS SHALL BE PLACED
CONTINUOUS AT CORNERS AND INTERSECTIONS. MATCHING CORNER BARS SHALL
BE USED PER THE TYPICAL CONCRETE REINFORCEMENT DETAILS ON THE CONTRACT
DRAWINGS.
3.6 WHERE INDICATED ON THE DRAWINGS, PROVIDE AN INTENTIONALLY ROUGHENED
CONSTRUCTION JOINT BETWEEN CONCRETE SURFACES. PROVIDE 1/4" MINIMUM AMPLITUDE
AT EXISTING CONCRETE SURFACE AND REMOVE LAITANCE BY ABRASIVE BLASTING AND
COMPRESSED AIR CLEANING PRIOR TO PLACING NEW CONCRETE.
3.7 ALL CONCRETE IS REINFORCED W/ DEFORMED STEEL BARS (REBAR) UNLESS SPECIFICALLY
CALLED OUT OTHERWISE. REINFORCE ALL CONCRETE NOT OTHERWISE SHOWN WITH
THE SAME STEEL AS IN SIMILAR SECTIONS AND AREAS.
3.8 CONTRACTOR SHALL COORDINATE LOCATIONS OF ALL FLOOR DRAINS, FLOOR FINISHES,
CURBS, CONCRETE PADS, AND SLAB DEPRESSIONS WITH ARCHITECTURAL, MECHANICAL,
AND ELECTRICAL DRAWINGS.
3.9 CONTRACTOR SHALL FIELD VERIFY DIMENSIONS AND LOCATIONS OF ALL OPENINGS, PIPE
SLEEVES, CURBS, ETC., AS REQUIRED WITH OTHER TRADES PRIOR TO PLACING CONCRETE.
3.10 CONTRACTOR SHALL COORDINATE LOCATIONS OF INSERTS, WELDED PLATES, AND OTHER
ITEMS EMBEDDED IN CONCRETE WITH ARCHITECTURAL DRAWINGS, MECHANICAL
DRAWINGS, ELECTRICAL DRAWINGS AND OTHER TRADES.
3.11 ALL SLABS SHALL BE FLAT AND LEVEL PER SPECIFICATIONS UNLESS OTHERWISE NOTED.
3.12 ALL REINFORCING BARS SHALL BE LAPPED AS SPECIFICALLY DETAILED ON THE DRAWINGS.
REFERENCE SPLICE AND EMBEDMENT SCHEDULE PER THE TYPICAL CONCRETE DETAILS.
WHERE NOT SPECIFICALLY DETAILED ON THE DRAWINGS, ALL REINFORCING BARS SHALL
BE LAPPED USING TENSION LAP SPLICE LENGTHS PER ACI 318-19.
SHEET
NUMBER
D ra w n by
D es ig ne d by
Su bm itt ed b y:
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
C he ck ed b y:
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
4/12/2022 9:01:13 AM
FO
R
T H
O O
D , T
EX
AS
AD
M
IN
R
EP
LA
C E
B
5-
S-001
G
EN
ER
AL
S
TR
UC
TU
RA
L
NO
TE
I
N
1. MATERIALS:
W SHAPES..................................................................................... ASTM A 992, GRADE 50 (Fy = 50 ksi) M AND S SHAPES, CHANNELS, ANGLES................................. ASTM A 36 (Fy = 36 ksi) RECTANGULAR HSS.................................................................... ASTM A 500, GRADE C (Fy = 50 ksi) ROUND HSS.................................................................................. ASTM A 500, GRADE B (Fy = 46 ksi) PIPE................................................................................................ ASTM A 53, GRADE B (Fy = 35 ksi) PLATES AND BARS...................................................................... ASTM A 36 (Fy = 36 ksi) HIGH STRENGTH BOLTS............................................................. ASTM F 3125, GRADE A325 & A490 NUTS ............................................................................................... ASTM A 563, HEAVY HEX, GRADE A ANCHOR RODS............................................................................. ASTM F 1554, GRADE 55 (Fy = 55 ksi)
SUPPLEMENTARY REQUIREMENTS (WELDABLE STEEL).. S1 FOR GRADE 55 ANCHORS
NON-SHRINK GROUT ................................................................... ASTM C 1107, 5,000 psi (NON-METALLIC) WELDING ELECTRODES ............................................................ E70XX, LOW HYDROGEN
2. WELDING: ALL WELDING SHALL BE PERFORMED BY CERTIFIED WELDERS IN ACCORDANCE WITH AWS D1.1.
A) GROOVE AND BUTT WELDS SHALL BE COMPLETE JOINT PENETRATION WELDS, U.N.O.
B) FILLET WELD SIZES SPECIFIED ARE MINIMUMS, INCREASE AS REQUIRED PER AISC 360 TABLE J2.4.
C) WELD TERMINATIONS: WELDS TERMINATING AT ENDS OR SIDES, WHEREVER APPLICABLE, SHALL BE RETURNED CONTINUOUSLY AROUND CORNERS A DISTANCE OF 2 TIMES THE WELD SIZE PER AISC.
D) WHERE WELD LENGTH IS NOT SPECIFIED, THE WELD SHALL BE THE FULL LENGTH OF THE JOINT.
3. THE CONTRACTOR SHALL SUBMIT A WELDING PROCEDURE SPECIFICATION (WPS), DEVELOPED BY THE FABRICATOR/ERECTOR, IN CONFORMANCE WITH AWS D1.1 FOR REVIEW BY THE CONTRACTING OFFICER.
ALL WELDS SHALL BE PRE-QUALIFIED PER AWS D1.1. THE WPS SHALL INCLUDE THE WELDING
PARAMETERS RECOMMENDED BY THE ELECTRODE MANUFACTURER.
4. SHEAR/BEARING CONNECTIONS: SHALL BE DETAILED BASED ON THE DESIGN INFORMATION PROVIDED IN
THE STRUCTURAL DRAWINGS.
A) STANDARD SHEAR CONNECTIONS: DETAIL AS BOLTED OR WELDED DOUBLE-ANGLE, SINGLE PLATE, SINGLE ANGLE, OR TEE CONNECTIONS IN ACCORDANCE WITH THE CONNECTION TABLES IN THE AISC
MANUAL OF STEEL CONSTRUCTION, 15TH EDITION.
B) ALL BEAM TO WIDE FLANGE COLUMN AND BEAM TO GIRDER CONNECTIONS SHALL BE DETAILED AS
DOUBLE ANGLE CONNECTIONS, UNLESS OTHERWISE SHOWN.
C) SHEAR/BEARING CONNECTIONS SHALL BE DESIGNED BY A LICENSED PROFESSIONAL ENGINEER IN THE PROJECT STATE. THIS DESIGN SERVICE SHALL BE INCLUDED IN THE CONTRACTOR'S SCOPE OF SERVICES. SHOP DRAWINGS OF CONNECTIONS SHALL BE SEALED BY A LICENSED PROFESSIONAL
ENGINEER IN THE PROJECT STATE.
D) FACTORED DESIGN FORCES/REACTIONS: AS SHOWN ON THE STRUCTURAL DRAWINGS OR, IF NOT SHOWN, THE FACTORED DESIGN REACTION SHALL BE HALF OF THE "MAXIMUM TOTAL UNIFORM LOAD
(LRFD)" TABULATED IN THE AISC MANUAL OF STEEL CONSTRUCTION, 15TH EDITION.
5. ANCHORS: ANCHOR RODS SHALL BE CAST-IN-PLACE, SET WITH TEMPLATES IN FINAL POSITION PRIOR TO PLACEMENT OF CONCRETE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FABRICATION AND CORRECT POSITION OF ANCHOR ROD SETTING TEMPLATES. POST-INSTALLED ANCHORS, INCLUDING BUT NOT LIMITED TO EXPANSION, DRILLED OR ADHESIVE-TYPE ANCHORS, SHALL NOT BE SUBSTITUTED FOR ANY EMBEDDED ANCHORS SHOWN ON THE DRAWINGS. POST-INSTALLED ANCHORAGE WILL ONLY BE
CONSIDERED FOR REMEDIAL PURPOSES WITH APPROVAL FROM CONTRACTING OFFICER.
6. THE STRUCTURE SHALL NOT BE CONSIDERED STABLE DURING CONSTRUCTION UNTIL ALL ELEMENTS (INCLUDING METAL DECKING, CONCRETE FLOOR SLABS, JOISTS, ETC.) ARE IN PLACE, CONNECTED, AND
ACHIEVED THEIR FULL DESIGN STRENGTH. TEMPORARY SUPPORTS AND BRACING SHALL NOT BE
REMOVED OR MODIFIED UNTIL ALL ELEMENTS ARE IN PLACE, CONNECTED, AND HAVE ACHIEVED THEIR FULL DESIGN STRENGTH. THE CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY CONSTRUCTION
BRACING.
7. STRUCTURAL STEEL EXPOSED TO WEATHER SHALL BE HOT-DIP GALVANIZED PER ASTM A123 AFTER
FABRICATION.
STRUCTURAL STEEL FRAMING NOTES:
36/4 PATTERN
36" COVERAGE
1.5 B DECK EDGE FASTENER LAYOUT
1. DESIGN OF COLD-FORMED STEEL STUD WALLS AND THEIR CONNECTIONS SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR UNLESS OTHERWISE NOTED. SUBMITTALS SHALL COMPLY WITH THE
REQUIREMENTS OF THE SPECIFICATIONS AND DRAWINGS.
2. COLD-FORMED STEEL DESIGN, FABRICATION, AND ERECTION SHALL CONFORM TO AISI STANDARDS FOR
COLD-FORMED STEEL DESIGN, AND THE SPECIFICATIONS AND DRAWINGS.
3. ALL COMPONENTS OF EXTERIOR STUD WALLS SHALL BE MINIMUM 18 GAGE (43 MILS) THICKNESS, AND G90
GALVANIZED PER ASTM A653.
4. BOTTOM TRACK OF COLD-FORMED STUD WALLS SHALL BE FASTENED TO CONCRETE SLAB AT A MAXIMUM SPACING OF 12" O.C. WITH A MINIMUM EMBEDMENT OF 1-1/2”. ATTACHMENT DESIGN OF STUD WALL TO
STRUCTURE IS THE RESPONSIBILITY OF THE CONTRACTOR.
5. FOR COLD-FORMED STUD WALLS, PROVIDE COLD FORMED CHANNEL HORIZONTAL BRIDGING THROUGH THE STUD PUNCH OUTS. BRIDGING SYSTEM MUST BE ATTACHED TO EACH STUD AND MAY NOT EXCEED 4'-0"
VERTICAL SPACING.
6. FOR THE STUD WALLS ATTACHED TO STRUCTURAL FRAMING, CONNECTIONS AT TOP SHALL BE MADE TO ALLOW FOR THE MAIN FRAMING VERTICAL DEFLECTION. MINIMUM DEFLECTION CLEARANCE SHALL BE AS NOTED IN TYPICAL NOTES AND DETAILS. IF NOT NOTED IN NOTES AND DETAILS, PROVIDE A MINIMUM 2 IN.
CLEARANCE BETWEEN TOP OF STUD AND TRACK.
7. REFER TO ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR, COATING, VAPOR PROOFING, ADHESIVES, AND BRICK TIE REQUIREMENTS FOR WALLS.
COLD-FORMED STEEL FRAMING:
1. THE DESIGN/ FABRICATION AND ERECTION OF JOISTS EXTENSIONS, JOIST SUBSTITUTES, AND JOIST GIRDERS
SHALL CONFORM TO THE CURRENT SJI STANDARD SPECIFICATIONS.
2. JOISTS, JOIST EXTENSIONS, JOIST SUBSTITUTES, AND JOIST GIRDERS SHALL BE AS SHOWN ON THE PLANS
FOR THE INDICATED SLOPES AND FOLLOWING CRITERIA:
3. DEAD LOAD IS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .