This solicitation is for an indefinite delivery indefinite quantity multiple award paving construction contract to complete work at Fort Hood in Texas. The contract has an estimated value between $100-250 million and is set aside entirely for small businesses. Work includes constructing new parking lots, roads, resurfacing existing pavements, striping, repairing tank trails, concrete work, landscaping, building new tank trails and low water crossings. The Army Materiel Command Mission and Installation Contracting Command at Fort Hood will administer the contract. Bids are due on October 13th and the site visit will take place on September 8th, with contract performance determined by timelines in individual task orders. The wage determination is TX20220007 and bonds must equal 100% of the task order value. Interested parties must register in the System for Award Management to receive an award and ensure their information remains current.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE - BASE & 4 YEARS
| Project Name | Note: The IGE preparer(s) and IGE approving reviewer(s) certify the IGE was developed independently and prior to seeking proposal from any contractor | OEPS-23 |
| Duration |
Liu, Sim Mr. CIV IMCOM: # of days
| Project Code | ||
| Liu, Sim Mr. CIV IMCOM: (i.e. IGE - Paving IDIQ) | BASE & FOUR OPTION YEARS | |
| Type |
Liu, Sim Mr. CIV IMCOM: (i.e. Firm Fixed Price) Project Number PM Signature
| Project Manager | Reviewer Signature | |||||||||||
| IGE Reviewer | ||||||||||||
| Series Number | Section Number / Line Item | WORK DESCRIPTION | UNIT | Bid Quantity | Unit Price | Total Item Cost | Bid Quantity | Bid Quantity | Bid Quantity | Bid Quantity | Bid Quantity | Bid Quantity |
| Series 000 Items: General Requirements | Base Year | year 1 | Year 2 | Year 3 | year 4 | TOTAL | ||||||
| General | ||||||||||||
| 001 | Performance Bond | LS | 1 | $0.00 | 1 | 1 | 1 | 1 | 1 | 5 | ||
| 002 | As-Built Drawings | EA | 25 | $0.00 | 25 | 25 | 25 | 25 | 25 | 125 | ||
| 003 | Miscellaneous Project Elements | LS | 1 | $0.00 | 1 | 1 | 1 | 1 | 1 | 5 | ||
| 004.1 | Surveying - Project Control, Realignment, Boundary Work | AC | 100 | $0.00 | 100 | 100 | 100 | 100 | 100 | 500 | ||
| 004.2 | Surveying - Existing, As-Builts, Construction | AC | 100 | $0.00 | 100 | 100 | 100 | 100 | 100 | 500 | ||
| Series 100 Items: Earth Work and Landscape | 101 | 0 | ||||||||||
| Saw Cutting | 0 | |||||||||||
| 101.1 | Asphalt | LF | 30,000 | $0.00 | 20,000 | 20,000 | 20,000 | 20,000 | 20,000 | 100,000 | ||
| 101.3 | Concrete | LF | 24,000 | $0.00 | 4,000 | 4,000 | 4,000 | 4,000 | 4,000 | 20,000 | ||
| 0 | ||||||||||||
| Demolition | 0 | |||||||||||
| 102.1 | Removal of Flexible Pavements, to 4" Depth | SY | 8,000 | $0.00 | 8,000 | 8,000 | 8,000 | 8,000 | 8,000 | 40,000 | ||
| 102.2 | Removal of Flexible Pavements, Beyond 4" Depth | CY | 2,000 | $0.00 | 2,000 | 2,000 | 2,000 | 2,000 | 2,000 | 10,000 | ||
| 103 | Removal of Reinforced Concrete | CY | 1,000 | $0.00 | 1,000 | 1,000 | 1,000 | 1,000 | 1,000 | 5,000 | ||
| 105 | 0 | |||||||||||
| Remove Pipe Culverts | 0 | |||||||||||
| 105.1 | Less than 36" Diameter | LF | 600 | $0.00 | 600 | 600 | 600 | 600 | 600 | 3,000 | ||
| 105.2 | 36" Diameter or Greater | LF | 300 | $0.00 | 300 | 300 | 300 | 300 | 300 | 1,500 | ||
| 105.3 | Clean Out Clogged Culverts, Less than 36" Diameter | LF | 100,000 | $0.00 | 100,000 | 100,000 | 100,000 | 100,000 | 100,000 | 500,000 | ||
| 105.4 | Clean Out Clogged Culverts, 36" Diameter or Greater | LF | 10,000 | $0.00 | 10,000 | 10,000 | 10,000 | 10,000 | 10,000 | 50,000 | ||
| 106 | 0 | |||||||||||
| Cold Milling of Asphaltic Concrete | 0 | |||||||||||
| 106.1 | 0 to 2" Depth | SY | 100,000 | $0.00 | 100,000 | 100,000 | 100,000 | 100,000 | 100,000 | 500,000 | ||
| 106.2 | >2" to 3" Depth | SY | 10,000 | $0.00 | 10,000 | 10,000 | 10,000 | 10,000 | 10,000 | 50,000 | ||
| 106.3 | >3" to 4" Depth | SY | 10,000 | $0.00 | 10,000 | 10,000 | 10,000 | 10,000 | 10,000 | 50,000 | ||
| 107 | 0 | |||||||||||
| Clear & Grubbing | 0 | |||||||||||
| 107.1 | Clear & Grub <3" Diameter | AC | 2 | $0.00 | 2 | 2 | 2 | 2 | 2 | 10 | ||
| 107.2 | Clear & Grub 3" to 7" | AC | 2 | $0.00 | 2 | 2 | 2 | 2 | 2 | 10 | ||
| 107.3 | Per Tree 3 to 7" Diameter | EA | 500 | $0.00 | 500 | 500 | 500 | 500 | 500 | 2,500 | ||
| 107.4 | Per Tree 8" or Larger Diameter | EA | 25 | $0.00 | 25 | 25 | 25 | 25 | 25 | 125 | ||
| 0 | ||||||||||||
| Earthwork | 0 | |||||||||||
| 108.1 | Embankment Material (On-Post Borrow) | CY | 25,000 | $0.00 | 25,000 | 25,000 | 25,000 | 25,000 | 25,000 | 125,000 | ||
| 108.2 | Embankment Material (Off-Post Borrow) | CY | 15,000 | $0.00 | 15,000 | 15,000 | 15,000 | 15,000 | 15,000 | 75,000 | ||
| 109 | Excavation | CY | 45,000 | $0.00 | 45,000 | 45,000 | 45,000 | 45,000 | 45,000 | 225,000 | ||
| 110 | Ditch Reconditioning | SY | 50,000 | $0.00 | 50,000 | 50,000 | 50,000 | 50,000 | 50,000 | 250,000 | ||
| 0 | ||||||||||||
| Landscape Aggregate & Geotextile Material (Installed) | 0 | |||||||||||
| 111 | Landscape Aggregate | CY | 5,000 | $0.00 | 5,000 | 5,000 | 5,000 | 5,000 | 5,000 | 25,000 | ||
| 112 | Geotextile Material | SY | 50,000 | $0.00 | 50,000 | 50,000 | 50,000 | 50,000 | 50,000 | 250,000 | ||
| 113 | Plant Native 2" Texas Tree | EA | 20 | $0.00 | 20 | 20 | 20 | 20 | 20 | 100 | ||
| 114 | Top Soil with Seeding | SY | 75,000 | $0.00 | 75,000 | 75,000 | 75,000 | 75,000 | 75,000 | 375,000 | ||
| 115 | Erosion Control | 0 | ||||||||||
| 0 | ||||||||||||
| 115.1 | Type A slope protection (clay, slope less than 3:1) | SY | 1,000 | $0.00 | 1,000 | 1,000 | 1,000 | 1,000 | 1,000 | 5,000 | ||
| 115.2 | Type B slope protection (sand, slope less than 3:1) | SY | 1,000 | $0.00 | 1,000 | 1,000 | 1,000 | 1,000 | 1,000 | 5,000 | ||
| 115.3 | Type C slope protection (clay, slope more than 3:1) | SY | 2,000 | $0.00 | 2,000 | 2,000 | 2,000 | 2,000 | 2,000 | 10,000 | ||
| 115.4 | Type D slope protection (sand, slope more than 3:1) | SY | 2,000 | $0.00 | 2,000 | 2,000 | 2,000 | 2,000 | 2,000 | 10,000 | ||
| 115.5 | Type E slope protection (channel liners, <1psf) | SY | 1,000 | $0.00 | 1,000 | 1,000 | 1,000 | 1,000 | 1,000 | 5,000 | ||
| 115.6 | Type F slope protection (channel liners, 1-2psf) | SY | 1,000 | $0.00 | 1,000 | 1,000 | 1,000 | 1,000 | 1,000 | 5,000 | ||
| 115.7 | Type G slope protection (channel liners, 2-5psf) | SY | 1,000 | $0.00 | 1,000 | 1,000 | 1,000 | 1,000 | 1,000 | 5,000 | ||
| 115.8 | Type H slope protection (channel liners, >5psf) | SY | 2,000 | $0.00 | 2,000 | 2,000 | 2,000 | 2,000 | 2,000 | 10,000 | ||
| Landscape Maintenance | 0 | |||||||||||
| 0 | ||||||||||||
| 116 | Herbicide | SF | 50,000 | $0.00 | 50,000 | 50,000 | 50,000 | 50,000 | 50,000 | 250,000 | ||
| 117 | Top Soil with Sodding | SF | 250,000 | $0.00 | 250,000 | 250,000 | 250,000 | 250,000 | 250,000 | 1,250,000 | ||
| Series 200 Items: Subgrade Treatments and Base | 0 | |||||||||||
| Base (Installed) | 0 | |||||||||||
| 201 | Reprocess Existing Base (Plow/ Re-compact) | CY | 5,000 | $0.00 | 5,000 | 5,000 | 5,000 | 5,000 | 5,000 | 25,000 | ||
| 202 | Subgrade Preparation | SY | 400,000 | $0.00 | 400,000 | 400,000 | 400,000 | 400,000 | 400,000 | 2,000,000 | ||
| 203 | Lime Stabilization (Stabilize In-Place Material) | SY | 20,000 | $0.00 | 20,000 | 20,000 | 20,000 | 20,000 | 20,000 | 100,000 | ||
| 204 | Washed Sand (Utility Bedding) | CY | 100 | $0.00 | 100 | 100 | 100 | 100 | 100 | 500 | ||
| 205 | Flexible Base Material (In-Place, Compacted) | CY | 100,000 | $0.00 | 100,000 | 100,000 | 100,000 | 100,000 | 100,000 | 500,000 | ||
| 206 | Proof Rolling | HR | 5,000 | $0.00 | 5,000 | 5,000 | 5,000 | 5,000 | 5,000 | 25,000 | ||
| Series 300 Items: Surface Courses and Pavement | 0 | |||||||||||
| Flexible Pavement (Installed) | 0 | |||||||||||
| 301.1 | Bituminous Prime Coat | GA | 40,000 | $0.00 | 40,000 | 40,000 | 40,000 | 40,000 | 40,000 | 200,000 | ||
| 301.2 | Bituminous Tack Coat | GA | 40,000 | $0.00 | 40,000 | 40,000 | 40,000 | 40,000 | 40,000 | 200,000 | ||
| 302 | Hot-Mix Asphaltic Concrete | TN | 30,000 | $0.00 | 30,000 | 30,000 | 30,000 | 30,000 | 30,000 | 150,000 | ||
| 304 | Double Bituminous Surface Treatment | SY | 50,000 | $0.00 | 50,000 | 50,000 | 50,000 | 50,000 | 50,000 | 250,000 | ||
| 305 | Emulsified Asphalt Base Treatment | GA | 20,000 | $0.00 | 20,000 | 20,000 | 20,000 | 20,000 | 20,000 | 100,000 | ||
| 306 | Seal Coat Jennite A.E. (2 Coats) | SY | 40,000 | $0.00 | 40,000 | 40,000 | 40,000 | 40,000 | 40,000 | 200,000 | ||
| 307 | Microsurfacing | SY | 150,000 | $0.00 | 150,000 | 150,000 | 150,000 | 150,000 | 150,000 | 750,000 | ||
| 308 | Fog Seal | GA | 40,000 | $0.00 | 40,000 | 40,000 | 40,000 | 40,000 | 40,000 | 200,000 | ||
| 309 | IRI Ride Quality Testing | Day | 30 | $0.00 | 30 | 30 | 30 | 30 | 30 | 150 | ||
| 310 | 0 | |||||||||||
| Pulverization (Full Depth Reclamation) | 0 | |||||||||||
| 0 | ||||||||||||
| 310.1 | 6" Depth | SY | 50,000 | $0.00 | 50,000 | 50,000 | 50,000 | 50,000 | 50,000 | 250,000 | ||
| 310.2 | 8" Depth | SY | 5,000 | $0.00 | 5,000 | 5,000 | 5,000 | 5,000 | 5,000 | 25,000 | ||
| 310.3 | 12" Depth | SY | 5,000 | $0.00 | 5,000 | 5,000 | 5,000 | 5,000 | 5,000 | 25,000 | ||
| Series 400 Items: Structures | 401 | 0 | ||||||||||
| Rip Rap Rock (Installed) | 0 | |||||||||||
| 401.1 | 5" Rip Rap Rock | TN | 2,500 | $0.00 | 2,500 | 2,500 | 2,500 | 2,500 | 2,500 | 12,500 | ||
| 401.2 | 12" Rip Rap Rock | TN | 2,500 | $0.00 | 2,500 | 2,500 | 2,500 | 2,500 | 2,500 | 12,500 | ||
| 401.3 | 18" Rip Rap Rock | TN | 1,000 | $0.00 | 1,000 | 1,000 | 1,000 | 1,000 | 1,000 | 5,000 | ||
| 0 | ||||||||||||
| Grouted Rip Rap (Installed) | 0 | |||||||||||
| 402 | Concrete Grouted Rip Rap Rock | CF | 1,000 | $0.00 | 1,000 | 1,000 | 1,000 | 1,000 | 1,000 | 5,000 | ||
| 403 | 0 | |||||||||||
| Wheel Stop Removal and/or Replacement | 0 | |||||||||||
| 403.1 | Removal & Disposal of Existing | EA | 200 | $0.00 | 200 | 200 | 200 | 200 | 200 | 1,000 | ||
| 403.2 | Removal & Reinstallation of Existing | EA | 200 | $0.00 | 200 | 200 | 200 | 200 | 200 | 1,000 | ||
| 403.3 | Installation of New Wheel Stop (Materials Included) | EA | 200 | $0.00 | 200 | 200 | 200 | 200 | 200 | 1,000 | ||
| 0 | ||||||||||||
| Corrugated Metal Pipe (Installed) | 0 | |||||||||||
| 404.1 | Corrugated Metal Pipe Culvert, 18-inch | LF | 1,000 | $0.00 | 1,000 | 1,000 | 1,000 | 1,000 | 1,000 | 5,000 | ||
| 404.2 | Corrugated Metal Pipe Culvert, 24-inch | LF | 500 | $0.00 | 500 | 500 | 500 | 500 | 500 | 2,500 | ||
| 404.3 | Corrugated Metal Pipe Culvert, 36-inch | LF | 200 | $0.00 | 200 | 200 | 200 | 200 | 200 | 1,000 | ||
| 405 | 0 | |||||||||||
| Reinforced Concrete Pipe (Installed) | 0 | |||||||||||
| 405.1 | 18" Diameter | LF | 1,000 | $0.00 | 1,000 | 1,000 | 1,000 | 1,000 | 1,000 | 5,000 | ||
| 405.2 | 24" Diameter | LF | 500 | $0.00 | 500 | 500 | 500 | 500 | 500 | 2,500 | ||
| 405.3 | 30" Diameter | LF | 100 | $0.00 | 100 | 100 | 100 | 100 | 100 | 500 | ||
| 405.4 | 36" Diameter | LF | 100 | $0.00 | 100 | 100 | 100 | 100 | 100 | 500 | ||
| 0 | ||||||||||||
| French Drains (Installed) | 0 | |||||||||||
| 406 | Furnish & Install 6" Perforated Pipe, Gravel, Geofabric | LF | 1,000 | $0.00 | 1,000 | 1,000 | 1,000 | 1,000 | 1,000 | 5,000 | ||
| 407 | 0 | |||||||||||
| Safety End Treatment (Installed) | 0 | |||||||||||
| 407.1 | SET for 18-inch CMP Culvert | EA | 10 | $0.00 | 10 | 10 | 10 | 10 | 10 | 50 | ||
| 407.2 | SET for 24-inch CMP Culvert | EA | 10 | $0.00 | 10 | 10 | 10 | 10 | 10 | 50 | ||
| 407.3 | SET for 36-inch CMP Culvert | EA | 5 | $0.00 | 5 | 5 | 5 | 5 | 5 | 25 | ||
| 407.4 | SET for 18-inch RCP Culvert | EA | 10 | $0.00 | 10 | 10 | 10 | 10 | 10 | 50 | ||
| 407.5 | SET for 24-inch RCP Culvert | EA | 10 | $0.00 | 10 | 10 | 10 | 10 | 10 | 50 | ||
| 407.6 | SET for 30-inch RCP Culvert | EA | 5 | $0.00 | 5 | 5 | 5 | 5 | 5 | 25 | ||
| 407.7 | SET for 36-inch RCP Culvert | EA | 5 | $0.00 | 5 | 5 | 5 | 5 | 5 | 25 | ||
| 0 | ||||||||||||
| Utilities Adjustments | 0 | |||||||||||
| 408 | Valve Box Adjusted to Grade | EA | 50 | $0.00 | 50 | 50 | 50 | 50 | 50 | 250 | ||
| 409.1 | Manhole Adjusted to Up to Grade | EA | 20 | $0.00 | 20 | 20 | 20 | 20 | 20 | 100 | ||
| 409.2 | Manhole Adjusted to Down to Grade | EA | 20 | $0.00 | 20 | 20 | 20 | 20 | 20 | 100 | ||
| 0 | ||||||||||||
| Misc Line Items (Installed) | 0 | |||||||||||
| 410 | Structural Steel Fabrication | LB | 15,000 | $0.00 | 15,000 | 15,000 | 15,000 | 15,000 | 15,000 | 75,000 | ||
| 411 | Detectable Warning Paver | SF | 300 | $0.00 | 300 | 300 | 300 | 300 | 300 | 1,500 | ||
| 413 | 0 | |||||||||||
| Metal Beam Guard Fence (Installed) | 0 | |||||||||||
| 413.1 | Metal Beam Guard Fence | LF | 5,000 | $0.00 | 5,000 | 5,000 | 5,000 | 5,000 | 5,000 | 25,000 | ||
| 413.2 | Terminal Anchor Section | EA | 100 | $0.00 | 100 | 100 | 100 | 100 | 100 | 500 | ||
| 413.3 | Impact Head & Assembly | EA | 50 | $0.00 | 50 | 50 | 50 | 50 | 50 | 250 | ||
| 413.4 | Remove Beam or Cable Guard Fence | LF | 700 | $0.00 | 700 | 700 | 700 | 700 | 700 | 3,500 | ||
| Series 500 Items: Rigid Pavement | 0 | |||||||||||
| Rigid Pavement | 0 | |||||||||||
| 0042 | 501 | Miscellaneous Concrete | CY | 2,000 | $0.00 | 2,000 | 2,000 | 2,000 | 2,000 | 2,000 | 10,000 | |
| 0044 | 502 | Concrete Retaining Wall | CY | 25 | $0.00 | 25 | 25 | 25 | 25 | 25 | 125 | |
| 0045 | 503.1 | Standard Concrete Curb & Gutter | LF | 50,000 | $0.00 | 50,000 | 50,000 | 50,000 | 50,000 | 50,000 | 250,000 | |
| 503.2 | Standard Ribbon Curb | LF | 30,000 | $0.00 | 30,000 | 30,000 | 30,000 | 30,000 | 30,000 | 150,000 | ||
| 0047 | 504 | Concrete Sidewalk | CY | 1,000 | $0.00 | 1,000 | 1,000 | 1,000 | 1,000 | 1,000 | 5,000 | |
| 0048 | 505 | Concrete Headwall | CY | 500 | $0.00 | 500 | 500 | 500 | 500 | 500 | 2,500 | |
| 0049 | 506 | Concrete Box Inlet/Manhole | CY | 300 | $0.00 | 300 | 300 | 300 | 300 | 300 | 1,500 | |
| 507 | High Strength Epoxy Concrete Patching | CF | 1,000 | $0.00 | 1,000 | 1,000 | 1,000 | 1,000 | 1,000 | 5,000 | ||
| 508 | Concrete Pavement (Roadways & Motorpool) | CY | 20,000 | $0.00 | 20,000 | 20,000 | 20,000 | 20,000 | 20,000 | 100,000 | ||
| 509 | Reinforcement for Concrete Pavement | LB | 1,800,000 | $0.00 | 1,800,000 | 1,800,000 | 1,800,000 | 1,800,000 | 1,800,000 | 9,000,000 | ||
| 0053 | 510 | Roller-Compacted Concrete Paving | CY | 20,000 | $0.00 | 20,000 | 20,000 | 20,000 | 20,000 | 20,000 | 100,000 | |
| Series 600 Items: Signing, Markings and Signal Equipment | 601 | 0 | ||||||||||
| Permanent Signs (Installed) | 0 | |||||||||||
| 601.1 | Sign Face Diamond Grade | SI | 400,000 | $0.00 | 400,000 | 400,000 | 400,000 | 400,000 | 400,000 | 2,000,000 | ||
| 601.2 | Sign Post with Footing & Wedge Anchor | EA | 400 | $0.00 | 400 | 400 | 400 | 400 | 400 | 2,000 | ||
| 601.3 | Sign Post with Footing & Slipbase Anchor | EA | 600 | $0.00 | 600 | 600 | 600 | 600 | 600 | 3,000 | ||
| 601.4 | Remove Sign with Post & Footing | EA | 1,000 | $0.00 | 1,000 | 1,000 | 1,000 | 1,000 | 1,000 | 5,000 | ||
| 602 | 0 | |||||||||||
| Delineators (Installed) | 0 | |||||||||||
| 602.1 | Reflector Units | EA | 30 | $0.00 | 30 | 30 | 30 | 30 | 30 | 150 | ||
| 602.2 | Object Markers | EA | 50 | $0.00 | 50 | 50 | 50 | 50 | 50 | 250 | ||
| 603 | 0 | |||||||||||
| Pavement Striping & Markings (Removal) | 0 | |||||||||||
| 603.1 | Concrete Surface | SF | 1,000 | $0.00 | 1,000 | 1,000 | 1,000 | 1,000 | 1,000 | 5,000 | ||
| 603.2 | All Other Surfaces | SF | 200,000 | $0.00 | 200,000 | 200,000 | 200,000 | 200,000 | 200,000 | 1,000,000 | ||
| 0 | ||||||||||||
| Pavement Striping & Markings (Installed) | 0 | |||||||||||
| 604.1 | Water/Oil Based Striping (2 Coats) | SF | 165,000 | $0.00 | 165,000 | 165,000 | 165,000 | 165,000 | 165,000 | 825,000 | ||
| 604.2 | Water/Oil Based Markings | SF | 12,000 | $0.00 | 12,000 | 12,000 | 12,000 | 12,000 | 12,000 | 60,000 | ||
| 604.3 | Thermoplastic Striping (Long-line) | SF | 160,000 | $0.00 | 160,000 | 160,000 | 160,000 | 160,000 | 160,000 | 800,000 | ||
| 604.4 | Thermoplastic Markings (Handliners) | SF | 40,000 | $0.00 | 40,000 | 40,000 | 40,000 | 40,000 | 40,000 | 200,000 | ||
| 604.5 | Thermoplastic Markings (Preformed) | SF | 5,000 | $0.00 | 5,000 | 5,000 | 5,000 | 5,000 | 5,000 | 25,000 | ||
| 604.6 | Add Highway Beads | LB | 25,000 | $0.00 | 25,000 | 25,000 | 25,000 | 25,000 | 25,000 | 125,000 | ||
| 604.7 | Add Airfield Beads | LB | 2,500 | $0.00 | 2,500 | 2,500 | 2,500 | 2,500 | 2,500 | 12,500 | ||
| 604.8 | Fire Lane Striping | SF | 5,000 | $0.00 | 5,000 | 5,000 | 5,000 | 5,000 | 5,000 | 25,000 | ||
| 605 | Temporary Flexible Reflective Roadway Marker Tabs | EA | 10,000 | $0.00 | 10,000 | 10,000 | 10,000 | 10,000 | 10,000 | 50,000 | ||
| 606 | 0 | |||||||||||
| Raised Reflective Markers on Concrete (Installed) | 0 | |||||||||||
| 606.1 | Type II-A-A | EA | 5,000 | $0.00 | 5,000 | 5,000 | 5,000 | 5,000 | 5,000 | 25,000 | ||
| 606.2 | Type II-C-R | EA | 500 | $0.00 | 500 | 500 | 500 | 500 | 500 | 2,500 | ||
| 606.3 | Type I-A, I-C, Type I-R, Type W or Type Y | EA | 500 | $0.00 | 500 | 500 | 500 | 500 | 500 | 2,500 | ||
| 607 | 0 | |||||||||||
| Raised Reflective Markers on Asphaltic (Installed) | 0 | |||||||||||
| 607.1 | Type II-A-A | EA | 5,000 | $0.00 | 5,000 | 5,000 | 5,000 | 5,000 | 5,000 | 25,000 | ||
| 607.2 | Type II-C-R | EA | 500 | $0.00 | 500 | 500 | 500 | 500 | 500 | 2,500 | ||
| 607.3 | Type I-A, I-C, Type I-R, Type W or Type Y | EA | 500 | $0.00 | 500 | 500 | 500 | 500 | 500 | 2,500 | ||
| 0 | ||||||||||||
| Message Board | 0 | |||||||||||
| 608 | Portable Changeable Message Sign | EA | 50 | $0.00 | 50 | 50 | 50 | 50 | 50 | 250 | ||
| Series 700 Items: Maintenance | 0 | |||||||||||
| Stop-Gap Maintenance | 0 | |||||||||||
| 701 | Pothole Repair | SY | 5,000 | $0.00 | 5,000 | 5,000 | 5,000 | 5,000 | 5,000 | 25,000 | ||
| 0 | ||||||||||||
| Crack Seal Flexible Pavement (Installed) | 0 | |||||||||||
| 702 | Crack Seal (Cold Applied) Plyolastic (for Seal Coating) | LF | 1,000 | $0.00 | 1,000 | 1,000 | 1,000 | 1,000 | 1,000 | 5,000 | ||
| 703 | Crack Seal (Hot Applied) Seals Cracks in Bituminous Pavement | LF | 300,000 | $0.00 | 300,000 | 300,000 | 300,000 | 300,000 | 300,000 | 1,500,000 | ||
| 704 | 0 | |||||||||||
| Resealing of Joints in Ridged Pavement | 0 | |||||||||||
| 704.1 | 3/8" Joint | LF | 1,000 | $0.00 | 1,000 | 1,000 | 1,000 | 1,000 | 1,000 | 5,000 | ||
| 704.2 | 1/2" Joint | LF | 10,000 | $0.00 | 10,000 | 10,000 | 10,000 | 10,000 | 10,000 | 50,000 | ||
| 704.3 | 3/4" Joint | LF | 20,000 | $0.00 | 20,000 | 20,000 | 20,000 | 20,000 | 20,000 | 100,000 | ||
| 704.4 | 1" Joint | LF | 20,000 | $0.00 | 20,000 | 20,000 | 20,000 | 20,000 | 20,000 | 100,000 | ||
| Total | $0.00 |