This solicitation seeks indefinite delivery indefinite quantity construction contracts for paving projects at Fort Hood, Texas. The Mission and Installation Contracting Command Fort Hood will award multiple ID/IQ contracts for a total estimated value between $100-250 million. Services include constructing new parking lots, roads, resurfacing existing pavements, striping, repairing tank trails, concrete work, landscaping, constructing new tank trails and building low water crossings. The 100% small business set-aside contracts will have a period of performance determined by individual task orders. Interested parties must register in SAM and ensure their information is current. A site visit is scheduled for September 8th and bids are due October 13th. The wage determination is TX20220007. Performance and payment bonds must equal 100% of task order values. The point of contact is the listed contracting specialist.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MICC-FORT HOOD
BLDG 36000 SHOEMAKER LANE
FORT HOOD TX 76544
0011750636 AD205072P
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
A. Add the Site Visit Date, Time and Location for the (Seed Project). Site Visit scheduled for 15 September 2022 at 10:00 A.M CST at DPW, Building 4610, COR Conference Room 112, 4610 Engineer Drive, Fort Hood, Texas 76544.
B. Add the Request for Information (RFI) questions due date and time for the (Seed Project) to 22 September 2022 at 2:00 P.M. CST. All RFI questions are to be emailed to the Contract Specialist at lisa.d.lew is2.civ@army.mil.
C. Add the follow ing attachments Project Synopsis, Draw ings and Bid Schedule for the (seed contract).
D. Bid Schedule Proposal for the (seed contract) w ill be submitted as part of the Bid Packet for the Open-End Paving IDIQ (MATOC), Solicitation W91151-22-B-0009, w ith a bid opening date of 13 October 2022 at 2:00 PM CST at Shoemaker Center, Building 36000 Shoemaker Lane, Room 1463, Fort Hood, Texas 76544.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Sep-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9115122B0009
X 9B. DATED (SEE ITEM 11)
30-Aug-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Sep-2022
CODE
MICC - FORT HOOD
36000 SHOEMAKER LANE, ROOM 1300B
FORT HOOD TX 76544-5025
W91151 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W91151
FACILITY CODECODE
EMAIL:TEL:
W9115122B0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
Amendment 01:
The purpose of this amendment is to:
A. Add the Site Visit Date, Time and Location for the (Seed Project). Site Visit scheduled for 15 September 2022 at 10:00 A.M CST at DPW, Building 4610, COR Conference Room 112, 4610 Engineer Drive, Fort Hood, Texas 76544.
B. Add the Request for Information (RFI) questions due date and time for the (Seed Project) to 22 September 2022 at 2:00 P.M. CST. All RFI questions are to be emailed to the Contract Specialist at lisa.d.lewis2.civ@army.mil.
C. Add the following attachments Project Synopsis, Drawings and Bid Schedule for the (seed contract).
D. Bid Schedule Proposal for the (seed contract) will be submitted as part of the Bid Packet for the Open-End Paving IDIQ (MATOC), Solicitation W91151-22-B-0009, with a bid opening date of 13 October 2022 at 2:00 PM CST at Shoemaker Center, Building 36000 Shoemaker Lane, Room 1463, Fort Hood, Texas 76544.
(End of provision)
(End of Summary of Changes)
PROJECT SYNOPSIS
Improve Drainage Vicinity Building 92064
Project No. LRC920471P Seed Project for Solicitation W91151-22-B-0009
DESCRIPTION OF WORK:
The work shall be located at vicinity of Building 92064, located on Survey Road on West Fort Hood, TX.
The exact location will be shown by the Contracting Officer. Building(s) will be occupied during performance of work under this Contract.
The purpose of this project is to install new concrete drainage flume establishing positive drainage away from building and concrete structures.
The following drawings are included as part of the Solicitation.
G-101 COVER SHEET
G-102 LEGEND AND GENERAL NOTES
C-101 SITE PLAN – LOCATION
CE-101 SITE PLAN - UTILITIES
CI-101 SITE PLAN – IMPROVEMENTS
C-501 TRAPEZOIL CONCRETE CHANNEL
After award, one set of Adobe PDF contract drawings and PDF specifications, and one set of Micro Station format drawings (if available) will be furnished to the Contractor on CD. Reference publications will not be furnished. Contractor shall immediately check furnished drawings and notify the Government of any discrepancies.
A project construction sign will not be required for this project. Contractor shall keep all permits and other documents required to be on the job site in a 3-ring binder or posted on a bulletin board within the construction area.
PERFORMANCE PERIOD: Barring any contingencies that arise during construction, the Government requires this project be completed within 120 calendar days. Completion is defined as completion of all contractual obligations.
IDENTIFICATION OF THE PROCUREMENT TEAM:
Contracting Officer (ACO): The Contracting Officer has sole authority to obligate the Government.
Contracting Officer's Representative (COR): The COR is appointed by the Contracting Officer and serves as the Government's technical representative and primary point of contact in the field following contract award. The COR will inspect various phases of work in progress to ensure the 3-phase inspection plan is in place and being adhered to. The COR will perform all inspection and acceptance on behalf of the Government for this project.
Project Manager: The Project Manager developed and reviewed this requirement, and will participate in further developing the project through negotiation of a firm fixed price. The PM will serve as the technical liaison between the Government (fire and safety staff) and the contractor in clarifying work requirements, performance standards, and other technical requirements. Following contract award, the Project Manager is accessible only through coordination with the COR.
Design Engineer: Design Engineer developed this requirement, and will participate in further developing and reviewing the project through negotiation of a firm fixed price with the Project Manager. The DE will serve as a technical liaison to the in clarifying work requirements, performance standards, and other technical requirements. Following contract award, the Design Engineer is accessible only through coordination with the COR to the PM.
Site Work:
1. Contractor shall be responsible for all labor, materials, transportation and equipment for the complete construction and installation of a typical trapezoid style flume for drainage. Concrete used shall have a compressive strength of not less than 3,000 pounds per square inch, within twenty-eight (28) days of installation.
2. Contractors are advised to visit the site, verify the existing site conditions to develop their proposal. All work to be carried out in a workmanship like manner. The work shall be carefully laid out in advance, and unnecessary excavation of site shall be avoided.
3. The contractor shall be responsible to field verify locations, accurate field dimensions, sizes, quantities, square feet, linear feet, etc. prior to submitting a bid for the project.
4. Contractor shall be responsibility to locate and protect all underground utility lines which may be encountered. A Fort Hood dig permit shall be obtain prior to starting any excavation work. In case it is necessary to remove or relocate utility lines or if utility lines are accidentally broken by the Contractor's operations, then it shall be the Contractor's responsibility, without additional compensation, to have such lines restored to a state of repair existing prior to the interruption.
Special arrangements must be made between the Contractor and the officials of the utility companies for the removal or crossing of their lines. Wherever it is necessary for the Contractor to do work of a replacement nature, he/she shall use new materials of same quality.
5. COR shall notify customer Mr. Javier Jimenez, (254) 286-5602 before any work begin.
6. Contractor shall report to the COR any unforeseen site conditions or issues that cause or may cause additional work not covered in this scope of work.
7. Contractor shall use caution and keep work area organized and clear during the work day.
Contractor shall remove from the project site any defective product or material that has been delivered to the site in error.
8. Contractor will not dispose of or discard recyclables, packing materials or trash in building provided recycling or trash containers or dumpsters.
Concrete Flume Installation:
1. Contractor shall install a concrete channel between building 92064 and building water towel to allow water to flow away from building 92064 work area preventing standing water.
2. Muck, rock, and other soils unsatisfactory for use in embankments shall be disposed of by the Contractor.
3. All side slopes shall be smooth earthen free of rocks.
4. Contractor shall backfill and compact 6” of crushed stone or washed rock in channel area to maximum density prior to concrete being poured.
5. The flume shall be contained in a permanent drainage easement with a minimum width of 5’ with a maximum slope of 2:1. The channel shall be 3’-0” wide to allow water to flow away from building 92064 preventing standing water. Slopes shall be concrete with a minimum thickness of 4” and 100’ in length. (See detail sheet 502)
6. Contractor shall use 6X6-10-10 wire mesh to re-enforce concrete used throughout this project.
7. All control joints shall be constructed and spaced in direct proportion of width of the flume, i.e. 5’ flume width results in 5’ control joint spacing.
8. New Bermuda sod grass shall be install ,after construction is complete, at edge of easement line on each side of flume and extend outward 5’. This shall follow throughout the full length of the flume.
9. The Contractor shall protect the new work from traffic or physical damage at his expense until adequately cured and of required strength. This includes erection and maintenance of barricades.
10. Contractor shall be responsible for watering vegetation until root system has been establish.
11. Contractor shall be responsible for watering vegetation until root system has been establish.
I. Final Site Cleanup:
1. The Contractor shall be responsible for final clean up at the end of the project to a level satisfactory to the Government. All construction debris, no matter how small, shall be collected and removed from the site. All wheel ruts shall be filled in and be leveled to match the adjacent grade and material. Re-seeding, or other re-surfacing may be necessary to repair any construction related impacts or damage.
II. Sanitation:
1. Temporary sanitary facilities shall be provided by the contractor during construction and maintained by the Contractor who will comply with state and local regulations. The cost of furnishing, installing, and maintaining sanitary facilities shall be considered incidental to other items of work and no additional compensation will be allowed.
*********************END OF SCOPE**************
� a.
co 'fl C\I '51:
C\I
C\I C\I
A
SANTA FE
ALBUQUERUE
NEW
MEXICO
MEXICO
OKLAHOMA @)
OKLAHOMA
TULSA C ®
AMARILLO
WICHITA FALLS
TEXAS
PROJECT
LOCATION
FORT HOOD WACO @)
KILLEEN
10 o AUSTIN
HOUS T ON
SANANTONIO v'.'.:_____-��"-'-"\\
FORT (,n\
S M ITH�
ARKANSAS
LOUISIANA
LAREDO CORPUS
CHRISTI
� GULFOF
MEXICO
B
COPPERAS
COVE
HWY190
C
HWY84 GATESVILLE
fiJ
J FORT HOOD
RESERVATION
HwYB4
HWY3a
Ii>�& -e�
HWY190
N
KE
D
VICINITY MAP
0 100 200
SCALE IN MILES
US HIGHWAY 190
o � �__."""s,,__-�1 o
FORT HOOD AREA MAP
SCALE IN MILES
._\ ____ r __ _
I) J__J
FORT HOOD MILITARY RESERVATION
WEST FORT HOOD
0 1/2
SCALE IN MILES
0 200
1 "=200'
INSTALL DRAINAGE SYSTEM
FORT HOOD,TEXAS
PROJECT NO: LRC920471P
CD
BUILDING LEGEND (POINTS OF INTEREST)
Ill CORPS HEADQUARTERS
DARNALL ARMY HOSPITAL
BUILDING 4612 (DIRECTORATE OF PUBLIC WORKS)
PROJECT SITE
FORT HOOD DIRECTORATE OF PUBLIC WORKS-ENGINEERING DIVISION
F
INDEX OF DRAWINGS
SHEET SHEET DESCRIPTION
G-101 COVER SHEET
G-102 LEGEND AND GENERAL NOTES
C-101 SITE PLAN - LOCATION
CE-101 SITE PLAN - UTILITIES
Cl-101 SITE PLAN - IMPROVEMENTS
C-501 CONCRETE FLUME DETAILS
GENERAL SYMBOLS
DETAIL NUMBER
-....._ ___ REFERENCE TO
REFERENCE FROM
� NORTH SYMBOL REVISION NUMBER
0 NOTE BY SYMBOL ----0 WALL TYPE MARK
0 WINDOW MARK 10001 DOOR MARK
1--1-----------------------,----------------------,-----------------------.-----------------------..----------------�-------,-----------------------i
,r w t- Cf)
Cf) w
(9 z
....J ....J
Cf) z
Q)
C:
C.
ro
C\I C\I c., .. >'<Ii� �w�iiic:', OM c., w 1-----t
<( oil
ZN
<( w � -' I- � �z -, 00 c., � a. z t-w w
I
N ·· w
Q) z §,o ·;;; c., Q) oz
Cf)
0::
w
92064
Bldg. No.
LRC920471P
Project No.
SHEET
REFERENCE
NUMBER
G-101
NUMBER
REFERENCE
SHEET
Project No.
D e s ig n e d B y
D a te
M a rk
Bldg. No.
F
T
H O
O D
T
E X
A S
S A
N T
A F
E E
N G
IN
E
E R
D R
B L
D G
F O
R T
H O
O D
T
E X
A S
P U
B L
IC
W
O R
K S
D
IR
E C
T O
R A
T E
O F
A B C D E F
D a te
D e s c ri p ti o n
DPW
FORT HOOD TEXAS
D ir ec to rat eofPublic
W o rk s
P R
O J E
C T
M A
N A
G E
R
/3
/2
:4
:5
P
M C
U s e rs
\N A
T H
A L
Y .N
.G O
N Z
A L
E Z
\D e s k to p
\N a th a ly
\P R
O J E
C T
D R
A
IN
A G
E I
N S
T A
L L
\N E
W L
R C
P \D ra w in g s \0
G
-0
-L e g e n d
G e n e ra l N o te s .d g n
LRC920471P
N
G O
N Z
A L
E Z
E
R
IV
A
S
-A U
G -2
IN
S
T A
L L
D R
A
IN
A G
E S
Y S
T E
M
92064
F O
R B
ID
IN
G P
U R
P O
S E
O N
L Y
W -2
-B
-X X
X X
C O
N T
R A
C T
N U
M B
E R
T E
C H
N
IC
A L
E X
H
IB
IT
A
N
G O
N Z
A L
E Z
EXISTING OVERHEAD COMMUNICATIONS LINE
EXISTING OVERHEAD ELECTRIC LINE
EXISTING UNDERGROUND ELECTRIC LINE
EXISTING GAS LINE
EXISTING SANITARY SEWER LINE
EXISTING STORM DRAIN LINE
EXISTING TELECOMMUNICATION DUCTBANK
EXISTING WATER LINE
EXISTING FENCE LINE
ABANDONED GAS LINE
EXISTING DITCH
EXISTING CONTOUR - MAJOR (5 FT.)
EXISTING CONTOUR - MINOR (1 FT.)
LIMITS OF CONSTRUCTION
(PLAN VIEW)
RIP-RAP ROCK - NEW
BASE COURSE
SUBGRADE, STABILIZED AS NOTED.
NATURAL SUBGRADE
PORTLAND CEMENT CONCRETE (PCC)
(HOT MIX ASPHALTIC CONCRETE)
SURFACE COURSE
W
WCO
G
F
ST
EXISTING LIGHT POLE
EXISTING POWER POLE
EXISTING COMMUNICATIONS PEDESTAL
EXISTING GAS REGULATOR
EXISTING GAS VALVE
EXISTING WATER METER
EXISTING WATER VALVE
EXISTING FIRE HYDRANT
EXISTING SANITARY SEWER EQUIPMENT
EXISTING WASTEWATER CLEANOUT
EXISTING WASTEWATER MANHOLE
EXISTING WASTEWATER VALVE
EXISTING TELECOMMUNICATION MANHOLE
EXISTING TREE
EXISTING VEGETATIVE AREA
EXISTING SIGN
EXISTING ELECTRICAL SWITCH
EXISTING HEADWALL AND CULVERT
EXISTING TRANSFORMER PAD
"N" SIGNAGE SCHEDULE REFERENCE NUMBER
LEGEND:
G-002
L E
G E
N D
G
E N
E R
A L
N O
T
S
KEEP A 3 FT CLEARANCE FROM ANY NATURAL GAS LOCATION MARK(S).
INSTALLATION PROCEDURE(S) AND ACCORDING TO CONTRACT DOCUMENTS.
DIG PERMIT FOR EXCAVATION IN ACCORDANCE TO THE MOST CURRENT
EXCAVATION WORK, THE CONTRACTOR MUST SUBMIT A REQUEST FOR
PRIOR TO "BREAK GROUND" I.E. TOPSOIL REMOVAL, GRADING, AND/OR9.
EXIST.
IMMEDIATELY NOTIFY THE GOVERNMENT FOR ANY DISCREPANCIES THAT MAY
VERIFY THE LOCATION OF ALL UTILITIES PRESENT AND SUSPECTED AND
MOST OF UTILITIES ARE UNKNOWN. THE CONTRACTOR IS RESPONSIBLE TO
LOCATIONS ARE TO BE CONSIDERED APPROXIMATE ONLY AND THE DEPTH OF
FROM FORT HOOD'S GEOSPATIAL INFORMATION SYSTEM (GIS), THEREFORE
LOCATION OF EXISTING UTILITIES AND SITE FEATURES HAVE BEEN OBTAINED8.
PRIOR TO CONSTRUCTION.
THE CONTRACTOR SHALL VERIFY DISCREPANCIES AND NOTIFY THE COR
OR CENTERLINE OF PAVEMENT MARKING UNLESS OTHERWISE NOTED.
OF THE PAVEMENT, CENTERLINE OF THE ROAD, FACE OF THE BUILDING,
CENTER OF UTILITY, CENTER LINE OF MANHOLE OR CATCH BASIN, EDGE
ALL DIMENSIONS WERE TAKEN FROM / TO FENCE LINES, FACE OF CURB,7.
SECTION 01 35 13, PARAGRAPH 1.5.4 UNLESS OTHERWISE NOTED.
THE GOVERNMENT PER CONTRACT SPECIFICATIONS. REFER TO DIVISION-1,
A TEMPORARY TRAFFIC CONTROL PLAN (TTCP) SHALL BE SUBMITTED TO6.
LOCATION(S) AS APPROVED BY THE CONTRACTING OFFICER.
FOUNDATION RUBBLE FROM GOVERNMENT PROPERTY TO THE
SAW CUT AND REMOVE ASPHALT PAVEMENT, CONCRETE AND5.
DO NOT OVERLOAD PAVEMENTS TO REMAIN.
CONDITION, OR REPLACE WITH NEW AT CONTRACTOR'S EXPENSE.
IS DAMAGED DURING WORK PERFORMANCE TO ITS ORIGINAL
PROTECT ALL EXISTING FEATURES, REPAIR ANY ITEM WHICH4.
EXISTING AND PROVIDE POSITIVE DRAINAGE.
CONTRACTOR SHALL MATCH ALL NEW PAVEMENT FLUSH WITH3.
ORIGINAL CONDITION OR REPLACE AT CONTRACTOR'S EXPENSE.
DAMAGED DURING THE PERFORMANCE OF THE WORK TO ITS
PROTECT ALL EXISTING FEATURES TO REMAIN. REPAIR ANY ITEM 2.
THE CONTRACTOR SHALL VERIFY DISCREPANCIES PRIOR TO CONSTRUCTION.
THIS INFORMATION IS NOT TO BE RELIED ON TO BE EXACT OR COMPLETE.
ARE BASED ON RECORDS (AS-BUILT DRAWINGS) AND FIELD OBSERVATIONS.
ELEVATIONS OF EXISTING STRUCTURES SHOWN IN THESE PLANS
IS FOR CONTRACTOR'S INFORMATION ONLY. LOCATIONS AND
EXISTING FEATURES, ELEVATIONS, AND TOPOGRAPHY PROVIDED1.
GENERAL NOTES :
EXCEED 40'- 0" FOR ALL CURBS.
EXPANSION/CONTRACTION JOINTS INTERVALS NOT TO25.
NOT EXCEED 10'-0".
CONSTRUCTION JOINTS FOR CURB AND GUTTER SPACING SHALL24.
AND THE NEW HMAC.
WHERE APPLIES, APPLY TACK COAT BETWEEN THE CONCRETE SURFACE 23.
FLEX BASE.
ALL SIDEWALKS AND CURBS SHALL HAVE A MINIMUM OF 6" OF COMPACTED 22.
DRAWINGS.
1/4 INCH UNLESS NOTED OTHERWISE IN THE CONSTRUCTION
EXPOSED EDGES SHALL BE ROUNDED TO A MINIMUM RADIUS OF 21.
SURFACE, BUT NOT LESS THAN 2 INCHES.
ONE-THIRD (1/3) OF THE SLAB THICKNESS BELOW THEAPPROXIMATELY
AND FOR PARKING PAVEMENT SHALL BE # 4, GRADE 60. PLACED
REINFORCEMENT FOR CONCRETE PAVEMENT SHALL BE # 4, GRADE 6020.
GUTTERS, AND SIDEWALKS. SHALL CONFORM CONTRACT SPECIFICATIONS.
AND SITE, f'c = 4000 PSI FOR PARKING PAVEMENT, AND f'c = 3500 PSI FOR CURBS, CONCRETE SHALL BE NOT LESS THAN MR=600 PSI (FLEX) FOR ROAD PAVEMENT19.
CONCRETE :
AND CONFORMING WITH ALL TESTING REQUIREMENTS.
SECTION 307 "CONCRETE PAVEMENT" (ROADWAYS AND MOTORPOOLS"
RIGID PAVEMENT. CONSTRUCT ACCORDING TO CONTRACT SPECIFICATION29.
CONFORMING WITH ALL TESTING REQUIREMENTS.
CONTRACT SPECIFICATION SECTION 302 "HOT-MIX ASPHALTIC CONCRETE"
HOT-MIX ASPHALTIC CONCRETE (HMAC). INSTALL HMAC ACCORDING TO28.
BEFORE A NEW LIFT IS PLACED.
EACH LIFT SHALL NOT EXCEED 6" AND PASS TESTING REQUIREMENTS
CONTRACT SPECIFICATION SECTION 205. "FLEXIBLE BASE MATERIAL".
AGGREGATE BASE COURSE. INSTALL FLEXBASE ACCORDING TO27.
"SUBBASE PREPARATION".
IN ACCORDANCE WITH CONTRACT SPECIFICATION SECTION 202,
BY SCARIFYING A MINIMUM DEPTH OF SIX (6) INCHES AND RECOMPACT
SUBGRADE. UNLESS OTHERWISE INDICATED, PREPARE SUBGRADE26.
PAVEMENT MATERIALS:
DETAILS AND ADDITIONAL NOTES.
REFER TO DRAWING SHEET C-5XX FOR "PAVEMENT MARKINGS"33.
CURING TIME. REFER TO CURRENT OEPS CONTRACT.
REQUIRED DURING THE HOT MIX ASPHALT PAVEMENT
TEMPORARY FLEXIBLE ROADWAY MARKER TABS ARE32.
SPECIFIED ON THE DRAWINGS.
THE TYPE, WIDTH, AND COLOR OF ALL LINES SHALL BE AS31.
ROADWAY AND WATER/OIL BASED FOR PARKING. ADD REFLECTIVE BEADS.
ALL PAVEMENT MARKING MATERIAL SHALL BE: THERMOPLASTIC FOR30.
PAVEMENT MARKINGS :
SIGNAGE SCHEDULE, AND DRAWINGS WHERE APPLY.
WITH BREAK-AWAY SUPPORT & FOOTING AS NOTED. REFER TO
ALL SIGNS SHALL BE DIAMOND GRADE AND RETRO REFLECTIVE34.
SIGNS :
SHALL BE MADE ACCORDINGLY.
COORDINATION WITH DPW ENVIRONMENTAL DIVISION THROUGH THE COR
DISTURBANCE, TO INCLUDE INSPECTING THEIR FACILITIES AND EQUIPMENT.
PRUNING/TRIMMING, 10:1 TREE REPLACEMENT POLICY, AND ANY OTHER
MIGRATORY BIRD TREATY ACT (MBTA) TO INCLUDE BUT NOT LIMITED TO TREE
AUGUST, THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF THE
DURING THE MIGRATORY BIRD NESTING SEASON, FROM 15 MARCH TO 1537.
PRACTICES" (BMPs) ARE INSTALLED.
BEEN APPROVED, IF APPLICABLE, AND ALL "BEST MANAGEMENT
THE STORM WATER POLLUTION PREVENTION PLAN (SWP3) HAS
THE CONTRACTOR SHALL NOT BEGIN CLEARING WORK UNTIL36.
DISTURBED UNLESS OTHERWISE NOTED.
EXISTING CULVERT BEDDING OR DITCH PATH CANNOT BE35.
ENVIRONMENTAL :
CONTACT NETWORK ENTERPRISSE CENTER (NEC), AT: 254-287-3969 / 3563 / 4208.
18. ANY INQUIRES AND/OR ISSUES REGARDING COMMUNICATIONS UTILITIES,
DOMINION ENERGY (DE) CONTACT DPW EMERGENCY 27/7 AT: 254-287-2113.
17. ANY INQUIRIES AND/OR ISSUES REGARDING GAS AND ELECTRICAL UTILITIES,
AMERICAN WATER (AW), CONTACT DPW EMERGENCY 24/7 AT: 254-287-2113.
16. ANY INQUIRIES AND/OR ISSUES REGARDING WATER & SEWER UTILITIES,
NO ADDITIONAL COST TO THE GOVERNMENT.
UTILITIES, SHALL BE REPLACED TO EQUAL OR BETTER CONDITIONS, WITH
15. UTILITIES SHALL REMAIN IN PLACE. ANY DAMAGE TO THE EXISTING
USARMY.HOOD.IMCOM-CENTRAL.MBX.DPW-ENV-DIG-PERMITS@ARMY.MIL.
TO DPW ENVIRONMENTAL DIVISION TO THE FOLLOWING E-MAIL ADDRESS:
A LAND EXCAVATION & WATER USE PERMIT "DIG PERMIT"
14. PRIOR TO EXCAVATION, THE CONTRACTOR SHALL SUBMIT
UTILITIES:
IN THE PLANS.
TOP SOIL GRADING SHALL BE 6:1, EXCEPT WHEN SPECIFIED13.
FLOW.
GRADING MUST PROMOTE POSITIVE AND UNOBSTRUCTED12.
CONSTRUCTION
BE APPROVED BY THE PROJECT COR PRIOR TO
ADHERED TO .CHANGES TO THE PROPOSED LIMITS MUST
GRADING LIMITS PROVIDED BY THE ENGINEER SHALL BE 11.
EXCAVATION AREA SHALL BE REMOVED/PUMPED OUT.
SHALL NOT BE DISTURBED DURING CONSTRUCTION. WATER IN THE
FEATURES/STRUCTURES. THE NATURAL FLOW OF SURROUNDING WATERS
ENSURE POSITIVE DRAINAGE AWAY FROM ALL BUILDINGS AND TO DRAIN
CONTRACTOR IS RESPONSIBLE TO GRADE ALL DISTURBED AREAS TO10.
GRADING :
n oi siviD gnire en i g n
C-101
IT
E P
L A
N
L O
C A
T
IO
N
NUMBER
REFERENCE
SHEET
Project No.
D e s ig n e d B y
D a te
M a rk
Bldg. No.
F
T
H O
O D
T
E X
A S
S A
N T
A F
E E
N G
IN
E
E R
D R
B L
D G
F O
R T
H O
O D
T
E X
A S
P U
B L
IC
W
O R
K S
D
IR
E C
T O
R A
T E
D a te
D e s c ri p ti o n ec to rat eofPublic
W o rk s
P R
O J E
C T
M A
N A
G E
R
/3
/2
:4
:5
P
M C
U s e rs
\N A
T H
A L
Y .N
.G O
N Z
A L
E Z
\D e s k to p
\N a th a ly
\P R
O J E
C T
D R
A
IN
A G
E I
N S
T A
L L
\N E
W L
R C
P \D ra w in g s \0
C
-0
S
IT
E P
L A
N
L O
C A
T
IO
N .d g n
LRC920471P
N
G O
N Z
A L
E Z
E
R
IV
A
S
-A U
G -2
IN
S
T A
L L
D R
A
IN
A G
E S
Y S
T E
M
92064
F O
R B
ID
IN
G P
U R
P O
S E
O N
L Y
W -2
-B
-X X
X X
C O
N T
R A
C T
N U
M B
E R
T E
C H
N
IC
A L
E X
H
IB
IT
A
N
G O
N Z
A L
WORK SITE LOCATION
oi siviD gnire en i g
CE-101
IT
E P
L A
N
U T
IL
IT
IE
S
NUMBER
REFERENCE
SHEET
Project No.
D e s ig n e d B y
D a te
M a rk
Bldg. No.
F
T
H O
O D
T
E X
A S
S A
N T
A F
E E
N G
IN
E
E R
D R
B L
D G
F O
R T
H O
O D
T
E X
A S
P U
B L
IC
W
O R
K S
D
IR
E C
T O
R A
T E
D a te
D e s c ri p ti o n ec to rat eofPublic
W o rk s
P R
O J E
C T
M A
N A
G E
R
/3
/2
:4
:0
P
M C
U s e rs
\N A
T H
A L
Y .N
.G O
N Z
A L
E Z
\D e s k to p
\N a th a ly
\P R
O J E
C T
D R
A
IN
A G
E I
N S
T A
L L
\N E
W L
R C
P \D ra w in g s \0
C
E -1
S
IT
E
P L
A N
U
T
IL
IT
IE
S .d g n
LRC920471P
N
G O
N Z
A L
E Z
E
R
IV
A
S
-A U
G -2
IN
S
T A
L L
D R
A
IN
A G
E S
Y S
T E
M
92064
F O
R B
ID
IN
G P
U R
P O
S E
O N
L Y
W -2
-B
-X X
X X
C O
N T
R A
C T
N U
M B
E R
T E
C H
N
IC
A L
E X
H
IB
IT
A
N
G O
N Z
A L
PRIMARY OVERHEAD ELECTRIC LINE
2 INCH UNDERGROUND NATURAL GAS LINE
SECONDARY UGE
STORM WATER DRAINAGE
EXISTING GAS REGULATOR
MOUNTED
EXISTING TRANSFORMER - POLE
EXISTING FENCE LINE
EXISTING STORM DRAIN LINE
EXISTING SANITARY SEWER LINE
ABANDONED GAS LINE
EXISTING GAS LINE
ELECTRIC LINE (UGE)
EXISTING UNDERGROUND
LINE
EXISTING OVERHEAD ELECTRIC
--UGE--
--UGE--
-----UGE------
-----OHE------
-----GAS-----
------SS-------
------SD-------
---X---X--X---
T
G
--UGE--
LEGEND:
n oi siviD gnire en i g
CI-101
T
U C
K E
R
S
IT
E P
L A
N
I M
P R
O V
E M
E N
T S
NUMBER
REFERENCE
SHEET
Project No.
D e s ig n e d B y
D a te
M a rk
Bldg. No.
F
T H
O O
D T
E X
A S
S A
N T
A F
E E
N G
IN
E
E R
D R
B L
D G
F O
R T
H O
O D
T
E X
A S
P U
B L
IC
W
O R
K S
D
IR
E C
T O
R A
T E
D a te
D e s c ri p ti o n ec to rat eofPublic
W o rk s
P R
O J E
C T
M A
N A
G E
R
/3
/2
:4
:0
P
M C
U s e rs
\N A
T H
A L
Y .N
.G O
N Z
A L
E Z
\D e s k to p
\N a th a ly
\P R
O J E
C T
D R
A
IN
A G
E I
N S
T A
L L
\N E
W L
R C
P \D ra w in g s \0
C
I-
S
IT
E
P L
A N
I
M P
R O
V E
M E
N T
S .d g n
LRC920471P
N
G O
N Z
A L
E Z
E
R
IV
A
S
-A
U G
-2
IN
S
T A
L L
D R
A
IN
A G
E S
Y S
T E
M
92064
F O
R B
ID
IN
G P
U R
P O
S E
O N
L Y
W -2
-B
-X X
X X
C O
N T
R A
C T
N U
M B
E R
T E
C H
N
IC
A L
E X
H
IB
IT
A
N
G O
N Z
A L
G
EXISTING OVERHEAD ELECTRIC LINE
EXISTING UNDERGROUND ELECTRIC LINE
EXISTING GAS LINE
EXISTING SANITARY SEWER LINE
EXISTING STORM DRAIN LINE
EXISTING FENCE LINE
EXISTING POWER POLE
EXISTING TRANSFORMER - POLE MOUNTED
EXISTING GAS REGULATOR
EXISTING GAS VALVE
EXISTING WATER VALVE
EXISTING WASTEWATER MANHOLE
LEGEND:
MH
W
G
T
ABANDONED GAS LINE
EXISTING STORM DRAIN INLET
PROJECT BENCHMARK
100'-0"1
N n oi siviD gnire en i g n E
NOTES:
6. A DIG PERMIT IS REQUIRED FOR THEIS PROJECT.
THE SURVEY. DESIGN IS IN GRID COORDINATES.
FEET. NO SURFACE ADJUSTMENT SCALE FACTOR WAS APPLIED TO
COORDINATE SYSTEM USED: WGS84; UTM-14N, US SURVEY 5.
ROADWAYS IN THE DESIGNATED PROJECT COORDINATES.
ALL INSTALLED AND EXISTING UTILITIES, STRUCTURES, AND
CONTRACTOR INCLUDING BUT NOT LIMITED TO SURVEY DATA OF
CONSTRUCTION SURVEY IS THE SOLE RESPONSIBILITY OF THE 4.
THE CONTRACTOR'S EXPENSE.
POINT, WILL BE REPLACED OR REPAIRED BY THE CONTRACTOR AT
THE CONTROL POINTS RESULTING IN THE LOSS OF THE CONTROL
COST TO THE GOVERNMENT. ANY DAMAGE BY THE CONTRACTOR TO
STAKING AND CONTROL TO CONSTRUCT THE WORK, AT NO EXTRA
CONTROL POINTS. CONTRACTOR SHALL PROVIDE ANY ADDITIONAL
ENGINEERING DESIGN TEAM. CONTRACTOR SHALL PROTECT THESE
CONTROL POINTS HAVE BEEN ESTABLISHED BY THE 3.
THE WORK. DO NOT SCALE DRAWINGS FOR DIMENSIONS.
DISCREPANCIES OR INCONSISTENCIES BEFORE PROCEEDING WITH
CONDITIONS. CONTRACTOR SHALL NOTIFY THE COR OF ANY
DRAWINGS, SURVEY DATA PROVIDED, AND EXISTING FIELD
DIMENSIONS AND CONDITIONS THOROUGHLY WITH THE CONTRACT
THE CONTRACTOR SHALL VERIFY ALL QUANTITIES, 2.
THE LAWS OF THE STATE OF TEXAS, AND NATIONAL CODES.
WITH THE REQUIREMENTS OF LOCAL LAWS, LOCAL ORDINANCES,
EXECUTION OF THIS WORK SHALL COMPLY IN EVERY WAY POSSIBLE
CURRENT IDIQ CONTRACT AND DPW SPECIFICATIONS. THE
ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH THE 1.
C
C
SCALE: 1" = 20'-0"
SITE PLAN - IMPROVEMENTS
BM1
92064
92060
IN
NER
FE
NCE
RD
S U
R V
E Y R
C-501
C O
N C
R E
T E
F L
U M
E D
E T
A
IL
S
NUMBER
REFERENCE
SHEET
Project No.
D e s ig n e d B y
D a te
M a rk
Bldg. No.
F
T
H O
O D
T
E X
A S
S A
N T
A F
E E
N G
IN
E
E R
D R
B L
D G
F O
R T
H O
O D
T
E X
A S
P U
B L
IC
W
O R
K S
D
IR
E C
T O
R A
T E
D a te
D e s c ri p ti o n ec to rat eofPublic
W o rk s
P R
O J E
C T
M A
N A
G E
R
/3
/2
:4
:0
P
M C
U s e rs
\N A
T H
A L
Y .N
.G O
N Z
A L
E Z
\D e s k to p \N a th a ly
\P R
O J E
C T
D R
A
IN
A G
E I
N S
T A
L L
\N E
W L
R C
P
\D ra w in g s \C
-5
C
O N
C R
E T
E F
L U
M E
D E
T A
IL
S
.D G
N
LRC920471P
N
G O
N Z
A L
E Z
E
R
IV
A
S
-A U
G -2
IN
S
T A
L L
D R
A
IN
A G
E S
Y S
T E
M
92064
F O
R B
ID
IN
G P
U R
P O
S E
O N
L Y
W -2
-B
-X X
X X
C O
N T
R A
C T
N U
M B
E R
T E
C H
N
IC
A L
E X
H
IB
IT
A
N
G O
N Z
A L
TRAPEZOIDAL CONCRETE CHANNEL
2:1 MAX
C
C
C
C
0 1 2
SCALE (FEET)
.5
SCALE: 1" = 1'
NOTES:
CONSTRUCTION.
SPECIFICATIONS FOR PUBLIC WORKS
THE REQUIREMENTS OF TECHNICAL
CONCRETE WORK SHALL CONFORM TO 2.
#3 REBAR @ 12" O.C.E.W 1.
1'-0" 1'-
0"
#3 REBAR @ 12" O.C.E.W
REQUIRED.
STONE WITH FILTER FABRIC
6” THICK LAYER OF 6” CRUSHED
13’-0” MAX DRAINAGE EASEMENT WIDTH
3'-0"
NEW SOD GRASS
NEW SOD GRASS
2'
M A
X
M A
X
5'-0" MAX
SCALE: 1 1/2" = 1'
.50 1 2
SCALE (FEET)
2 CHANNEL ENLARGEMENT
TRAPEZOIDAL CONCRETE
6"
OUTSIDE EDGE
TOOL OR CHAMFER
C
C
NEW SOD GRASS
n oisiviD gnire en ig
Project Name
Duration
Project Code
Type
Project Manager
IGE Reviewer
General 001 Performance Bond LS $0.00 002 As-Built Drawings EA $0.00 003 Miscellaneous Project Elements LS $0.00
004.1 Surveying - Project Control, Realignment, Boundary Work AC $0.00
004.2 Surveying - Existing, As-Builts, Construction AC $0.00
Saw Cutting
101.1 Asphalt to 3" Depth LF $0.00
101.2 Additional 1" LF $0.00
101.3 Concrete to 3" Depth LF $0.00
101.4 Additional 1" LF $0.00
Demolition
102.1 Removal of Flexible Pavements, to 4" Depth SY $0.00
102.2 Removal of Flexible Pavements, Beyond 4" Depth CY $0.00
103 Removal of Reinforced Concrete CY $0.00 104 Rubbish Handling (Dumpster & Rental) Day $0.00
Remove Pipe Culverts
105.1 Less than 36" Diameter LF $0.00
105.2 36" Diameter or Greater LF $0.00
105.3 Clean Out Clogged Culverts, Less than 36" Diameter LF $0.00
105.4 Clean Out Clogged Culverts, 36" Diameter or Greater LF $0.00
Cold Milling of Asphaltic Concrete
106.1 0 to 2" Depth SY $0.00
106.2 >2" to 3" Depth SY $0.00
106.3 >3" to 4" Depth SY $0.00
Clear & Grubbing
107.1 Clear & Grub <3" Diameter AC $0.00
107.2 Clear & Grub 3" to 7" AC $0.00
107.3 Per Tree 3 to 7" Diameter EA $0.00
107.4 Per Tree 8" or Larger Diameter EA $0.00
Earthwork
108.1 Embankment Material (On-Post Borrow) CY $0.00
108.2 Embankment Material (Off-Post Borrow) CY $0.00
109 Excavation (Exporting to On-Post Borrow) CY $0.00
110.1 Cut & Fill (Stays On-Site, Compacted) CY $0.00
110.2 Ditch Reconditioning LF $0.00
Landscape Aggregate & Geotextile Material (Installed) 111 Landscape Aggregate CY $0.00 112 Geotextile Material SY $0.00 113 Plant Native 2" Texas Tree EA $0.00 114 Top Soil with Seeding SY $0.00
115.1 Type A slope protection (clay, slope less than 3:1) SY $0.00
115.2 Type B slope protection (sand, slope less than 3:1) SY $0.00
115.3 Type C slope protection (clay, slope more than 3:1) SY $0.00
115.4 Type D slope protection (sand, slope more than 3:1) SY $0.00
115.5 Type E slope protection (channel liners, <1psf) SY $0.00
115.6 Type F slope protection (channel liners, 1-2psf) SY $0.00
115.7 Type G slope protection (channel liners, 2-5psf) SY $0.00
115.8 Type H slope protection (channel liners, >5psf) SY $0.00
116 Herbicide SF $0.00 117 Top Soil with Sodding SF $0.00
Base (Installed) 201 Reprocess Existing Base (Plow/ Re-compact) CY $0.00 202 Subgrade Preparation SY $0.00 203 Lime Stabilization (Stabilize In-Place Material) SY $0.00 204 Washed Sand (Utility Bedding) CY $0.00
115 Erosion Control
Landscape Maintenance
Series 200 Items: Subgrade Treatments and Base
Total Item Cost
Series 000 Items: General Requirements
Series 100 Items: Earth Work and Landscape
Series Number
Section Number / Line Item WORK DESCRIPTION UNIT
Project Number PM Signature
Reviewer Signature
Improve Drainage vicinity Building 92064 (Seed Project) Note: The IGE preparer(s) and IGE approving reviewer(s) certify the IGE was developed independently and prior to seeking proposal from any contractor
OEPS‐23
120 calendar days
LRC920471P
BASE YEARFIRM FIXED PRICE
Bid Quantity Unit Price
Specification:
Ordering Period:
FOR BIDDING PURPOSES ONLY
205 Flexible Base Material (In-Place, Compacted) CY $0.00 206 Proof Rolling HR $0.00
Flexible Pavement (Installed)
301.1 Bituminous Prime Coat GA $0.00
301.2 Bituminous Tack Coat GA $0.00
302.1 Hot-Mix Asphaltic Concrete TN $0.00
302.2 Fiber Reinforced Hot-Mix Asphaltic Concrete TN $0.00
303 Asphalt Stabilized Base TN $0.00 304 Double Bituminous Surface Treatment SY $0.00 305 Emulsified Asphalt Base Treatment GA $0.00 306 Seal Coat Jennite A.E. (2 Coats) SY $0.00 307 Microsurfacing SY $0.00 308 Fog Seal GA $0.00 309 IRI Ride Quality Testing Day $0.00
Pulverization (Full Depth Reclamation)
310.1 6" Depth SY $0.00
310.2 8" Depth SY $0.00
310.3 12" Depth SY $0.00
Rip Rap Rock (Installed)
401.1 5" Rip Rap Rock TN $0.00
401.2 12" Rip Rap Rock TN $0.00
401.3 18" Rip Rap Rock TN $0.00
Grouted Rip Rap (Installed) 402 Concrete Grouted Rip Rap Rock CF $0.00
Wheel Stop Removal and/or Replacement
403.1 Removal & Disposal of Existing EA $0.00
403.2 Removal & Reinstallation of Existing EA $0.00
403.3 Installation of New Wheel Stop (Materials Included) EA $0.00
Corrugated Metal Pipe (Installed)
404.1 Corrugated Metal Pipe Culvert, 18-inch LF $0.00
404.2 Corrugated Metal Pipe Culvert, 24-inch LF $0.00
404.3 Corrugated Metal Pipe Culvert, 36-inch LF $0.00
Reinforced Concrete Pipe (Installed)
405.1 18" Diameter LF $0.00
405.2 24" Diameter LF $0.00
405.3 30" Diameter LF $0.00
405.4 36" Diameter LF $0.00
French Drains (Installed) 406 Furnish & Install 6" Perforated Pipe, Gravel, Geofabric LF $0.00
Safety End Treatment (Installed)
407.1 SET for 18-inch CMP Culvert EA $0.00
407.2 SET for 24-inch CMP Culvert EA $0.00
407.3 SET for 36-inch CMP Culvert EA $0.00
407.4 SET for 18-inch RCP Culvert EA $0.00
407.5 SET for 24-inch RCP Culvert EA $0.00
407.6 SET for 30-inch RCP Culvert EA $0.00
407.7 SET for 36-inch RCP Culvert EA $0.00
Utilities Adjustments 408 Valve Box Adjusted to Grade EA $0.00
409.1 Manhole Adjusted to Up to Grade EA $0.00
409.2 Manhole Adjusted to Down to Grade EA $0.00
Misc Line Items (Installed) 410 Structural Steel Fabrication LB $0.00 411 Detectable Warning Paver SF $0.00
412.1 Portable Concrete Traffic Barrier (Furnish, Install, Remove) EA $0.00
412.2 Portable Concrete Traffic Barrier (From Stockpile) EA $0.00
412.3 Portable Concrete Traffic Barrier (Move and Reset) EA $0.00
Metal Beam Guard Fence (Installed)
413.1 Metal Beam Guard Fence LF $0.00
413.2 Terminal Anchor Section EA $0.00
413.3 Impact Head & Assembly EA $0.00
413.4 Remove Beam or Cable Guard Fence LF $0.00
Rigid Pavement 501 Miscellaneous Concrete CY $0.00 502 Concrete Retaining Wall CY $0.00
503.1 Standard Concrete Curb & Gutter LF $0.00
503.2 Standard Ribbon Curb LF $0.00
504 Concrete Sidewalk CY $0.00 505 Concrete Headwall CY $0.00
Series 500 Items: Rigid Pavement
Series 300 Items: Surface Courses and Pavement
Series 400 Items: Structures
506 Concrete Box Inlet/Manhole CY $0.00 507 High Strength Epoxy Concrete Patching CF $0.00 508 Concrete Pavement (Roadways & Motorpool) CY $0.00 509 Reinforcement for Concrete Pavement LB $0.00 510 Roller-Compacted Concrete Paving CY $0.00
Permanent Signs (Installed)
601.1 Sign Face Diamond Grade SI $0.00
601.2 Sign Post with Footing & Wedge Anchor EA $0.00
601.3 Sign Post with Footing & Slipbase Anchor EA $0.00
601.4 Remove Sign with Post & Footing EA $0.00
Delineators (Installed)
602.1 Reflector Units EA $0.00
602.2 Object Markers EA $0.00
Pavement Striping & Markings (Prep & Removal)
603.1 New Concrete Surface SF $0.00
603.2 All Other Surfaces SF $0.00
Pavement Striping & Markings (Installed)
604.1 Water/Oil Based Striping (2 Coats) SF $0.00
604.2 Water/Oil Based Markings SF $0.00
604.3 Thermoplastic Striping (Long-line) SF $0.00
604.4 Thermoplastic Markings (Handliners) SF $0.00
604.5 Thermoplastic Markings (Preformed) SF $0.00
604.6 Add Highway Beads LB $0.00
604.7 Add Airfield Beads LB $0.00
604.8 Fire Lane Striping SF $0.00
605 Temporary Flexible Reflective Roadway Marker Tabs EA $0.00
Raised Reflective Markers on Concrete (Installed)
606.1 Type II-A-A EA $0.00
606.2 Type II-C-R EA $0.00
606.3 Type I-A, I-C, Type I-R, Type W or Type Y EA $0.00
Raised Reflective Markers on Asphaltic (Installed)
607.1 Type II-A-A EA $0.00
607.2 Type II-C-R EA $0.00
607.3 Type I-A, I-C, Type I-R, Type W or Type Y EA $0.00
Message Board 608 Portable Changeable Message Sign EA $0.00
Stop-Gap Maintenance 701 Pothole Repair SY $0.00
Crack Seal Flexible Pavement (Installed) 702 Crack Seal (Cold Applied) Plyolastic (for Seal Coating) LF $0.00 703 Crack Seal (Hot Applied) Seals Cracks in Bituminous Pavement LF $0.00
Resealing of Joints in Ridged Pavement
704.1 3/8" Joint LF $0.00
704.2 1/2" Joint LF $0.00
704.3 3/4" Joint LF $0.00
704.4 1" Joint LF $0.00
Total $0.00
Series 600 Items: Signing, Markings and Signal Equipment
Series 700 Items: Maintenance
| Final Amendment 01 22-B-0009 Seed Project |
| S.O.W. LRC920471P- Rpr Drainage at Bldg 92064 (Seed Project) |
| LRC920471P Technical Exhibit A - Drawings (Seed Project) |
| Technical Exhibit B - Bid Schedule (Seed Project) |
File details come from the government source that posted it. Updated .