TE_T_-_Request_for_Training_Resources_Redacted.pdf

PDF 3 MB Posted

Attached to
Range Operations Support Services Federal contract opportunity
Solicitation number
W91151-16-R-0014
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

TE T - Request for Training Resources_Redacted

View the file

Other files for this federal contract opportunity

Other files attached to Range Operations Support Services, newest first.
File Type Posted
Amendment_16-R-0014-0011.pdf PDF
Amendment_0010.pdf PDF
W91151-16-R-0014-0009.pdf PDF
W9115116R0014_Amendment_0008.pdf PDF
Amendment_16-R-0014-0007.pdf PDF
Conformed_16-R-0014-0006.pdf PDF
Revised_TE_K_-_Generator_Small_Engine_Maintenance_Workload.xlsx XLSX spreadsheet
Amendment_16-R-0014-0006.pdf PDF
Amendment_16-R-0014-0005.pdf PDF
TE_U_-_Baseline_Staffing _revised_Amendment_0005.xlsx XLSX spreadsheet
Attachment_6_-_Site_Visit_Attendees_Range_Operations.pdf PDF
TE_Y_-_UTF_92050_Room_Map_16-R-0014.pptx PPTX presentation
TE_X_-_Fiber _Copper _Combination_and_RF_breakdown_16-R-0014.xlsx XLSX spreadsheet
Amendment_16-R-0014-0004.pdf PDF
Attachment_5_-_Site_Visit_Briefing_Range_Operations.pptx PPTX presentation
Revised_Attachment_3_Past_Performance_Questionnaire_-_Range_16R0014_FH_20160715.docx DOCX document
Amendment_16-R-0014-0003.pdf PDF
Amendment_16-R-0014-0002.pdf PDF
Amendment_16-R-0014-0001.pdf PDF
Attachment_3_Past_Performance_Questionnaire_-_Range_16R0014_FH_20160715.docx DOCX document
Attachment_4_Cost_Price_-_Range_16R0014_FH_201600713.xls XLS spreadsheet
Attachment_1_Consent_Letter_-_Range_16R0014_FH_20160505.docx DOCX document
Attachment_2_Specific_Relevant_Contracts_-_Range_16R0014_FH_20160505.docx DOCX document
TE_V_-_Government_Property.xlsx XLSX spreadsheet
TE_E_-_Computer_Equipment_Maintenance_Workload.xlsx XLSX spreadsheet
TE_D_-_Central_Issue_Point_Tasks_and_Workload.xlsx XLSX spreadsheet
TE_A_-_Wage_Determination.pdf PDF
TE_C_-_Battery_Shop_Tasks_and_Workload.xlsx XLSX spreadsheet
TE_J_-_Electrical_and_Mechanical_Maintenance_and_Workload.xlsx XLSX spreadsheet
TE_N_-_Target_Fabrication_and_Workload.xlsx XLSX spreadsheet
TE_H_-_Vehicle_Maintenance _Welding _Target_Devices.xlsx XLSX spreadsheet
TE_W_-_Performance_Requirement_Summary_(PRS).pdf PDF
TE_U_-_Baseline_Staffing.xlsx XLSX spreadsheet
TE_O_-_Detailed_Range_Maps_-_Range_16R0014_FH.pdf PDF
TE_L_-_Government_Furnished_Property_as_of_14_July_16.xlsx XLSX spreadsheet
TE_B_-_Annual_Supply_Action_Tasks_and_Workload.xlsx XLSX spreadsheet
TE_F_-_Ground_Work_Repairs_and_Maintenance_Workload.xlsx XLSX spreadsheet
TE_P_-_Reports.xlsx XLSX spreadsheet
TE_S_-_Range_Utilization_Data.xlsx XLSX spreadsheet
TE_G_-_Detailed_Range_Listing_and_Workload.xlsx XLSX spreadsheet
TE_Q_-_Supplemental _Reports _Monthly_Central_Issue_Point_Usage_Report.xlsx XLSX spreadsheet
Solicitation_Range_16R0014.pdf PDF
TE_K_-_Generator _Small_Engine_Maintenance_Workload.xlsx XLSX spreadsheet
TE_R_-_Minimum_Safety_Briefing.xlsx XLSX spreadsheet
TE_M_-_Telephone_Network.xlsx XLSX spreadsheet
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT T

REQUEST FOR TRAINING RESOURCES

Technical Exhibit T contains the following examples:

Request For Training Resources (RFMSS)

Scenario Input Guide Sheet

FHT Form 200-X10, Dig Permit or current version

These forms detail training requirements and targets and ammunition to be used during the training exercise. These forms are subject to change.

Some information has been redacted to protect personally identifiable information (PII).

(b) (4)

(b) (4)

(b) (4)

(b) (4)

(b) (4)

(b) (4)

(b) (4)

(b) (4)

(b) (4)

(b) (4)

(b) (4) (b) (4)(b) (4)

(b) (4)

(b) (4)

(b) (4)

(b) (4)

(b) (4)

(b) (4)

(b) (4)

(b) (4) (b (4

Scenario Input Guide Sheet

TURNIN DATE The date the input sheet is turned into Range Control.

DATES OF FIRE Dates that the Unit has the range to include the setup and clearing of the range.

UNIT Unit that will be using the range.

RANGE Range that the Unit is training on.

TABLE The type of training that will be done on the range.

POINT OF CONTACT The person to contact for any problems or questions with the scenario.

PHONE The phone number of the Point of Contact.

TARGET SCALE

1/10,1/4,1/2,FULL

The scale of the targets that you want to use for training.

SCENARIO #

FILE #

This section will be filled out by the scenario programmer.

ENG NO# Sequence in which the Unit will run the engagements.

TASK NO# Taken from the FM. This does not have to be in any order.

FL/FP/FB/HD Where the Unit will fire that engagement from. Firing Line, Firing

Point, Firing Box, Hull Down, Battle Position.

PRI TGT NO# The Primary Target that the unit will fire at. If a target is a Primary

Target it cannot be used as an Alternate Target in the same scenario!!

ALT TGT NO# This is the Alternate Target to be used in case the PRI TGT malfunctions. On fully computerized targets the ALT TGT is a separate step and will automatically raise if the PRI TGT malfunctions. If a target is used as an Alternate Target it can not be used as a Primary Target in the same scenario!!

TYPE OF WPNS This is the type of weapon being used.

TYPE OF AMMO The type of Ammo being used

TYPE OF TGT This is the type of target that you want to use.

EXPOS START TIME IN

SEC

When you want the target to start to raise in the engagement. If you are using multiple target type and you want them to be presented at the same time, you need to start with the target that takes the most time to raise at 0.

EXPOS DURATION IN SEC This is the amount of time that you want the target to be exposed during that engagement.

(b) (4)

Scenario Input Guide Sheet

A How the target will respond when hit.

B Hit Mode –

C Hits To Kill –

HF Hostile Fire –

HF START TIME IN SEC When do you want the hostile fire to go off.

MOVER MOVES LEFT TO

RIGHT

If you want the mover to move from left to right then place an X in this box.

MOVER MOVES RIGHT TO

LEFT

If you want the mover to move from right to left then place an X in this box.

START TIME FOR MOVER When do you want the Mover to start moving.

END TIME FOR MOVER This is the time that the Mover will stop moving during the step.

MOVER SPEED this is the speed that the mover can travel.

(b) (4)

(b) (4)

(b) (4)

(b) (4)

(b) (4)

(b

(4

(b

(4

(b

(4

(b

(4

(b

(4

(b

(4

(b

(4

(b

(4

(b

(4

(b

(4

(b

(4

(b

(4

(b

(4

File details come from the government source that posted it. Updated .