Attch_8_Task_MultiRqmt.doc

DOC document 108 KB Posted

Attached to
Non-Personal Test Support Services
Solicitation number
W91151-12-R-0037
Issued by

About this file

Attachment 8 - Multi-Requirement Sample TAR

View the file

Other files

File Type Posted
Attch_1_OTC_MAP.pdf PDF
TE_J_DID_A009_Technical_Manuals.doc DOC document
Attch_6_Security_Clearances.doc DOC document
TE_C_DID_A002_Quarterly_Briefing.doc DOC document
Attch_2_GFF.pdf PDF
TE_Y_DID_A007_Sensitive_Items_Rpts.doc DOC document
TE_Q_USAOTC_Policy_CG_9_CCIR.pdf PDF
TE_P_Wage_Determinations.doc DOC document
W91151-12-R-0037_Final_RFP.doc DOC document
TE_T_USAOTC_Policy_SOP_Safety.pdf PDF
TE_A_CDRL_Page_2of4.pdf PDF
TE_G_DID_A006_Test_Validation_Rpts.doc DOC document
TE_E_DID_A004_Weekly_Report.doc DOC document
Attch_9_Task_Limited_Req.doc DOC document
Attch_3b_GFSoftware.xls XLS spreadsheet
TE_A_CDRL_Page_3of4.pdf PDF
TE_K_DID_A010_Software_Doc.doc DOC document
TE_A_CDRL_Page_1of4.pdf PDF
TE_H_DID_A008_Engineering_Reports.doc DOC document
Attch_14_Past_Performance_Questionnaire.doc DOC document
Attch_11_Airborne_Tech_Svc.doc DOC document
Attch_13_HAZMAT.xls XLS spreadsheet
TE_V_USAOTC_SOP_G4_6_Env.pdf PDF
TE_W_Acronym_List.doc DOC document
TE_M_DID_A012_HAZMAT.doc DOC document
TE_S_USAOTC_Policy_G4_3_Loaned.pdf PDF
Attch_5_Historic.xls XLS spreadsheet
TE_U_USAOTC_SOP_G4_7_Fire_Prev.pdf PDF
Attch_4_Inst_Catalog.doc DOC document
Attch_10_Techn_Base_Sample.doc DOC document
TE_D_DID_A003_TIP.doc DOC document
TE_R_USAOTC_Policy_G6_1_IT.pdf PDF
TE_N_DD_Form_254.pdf PDF
TE_B_DID_A001_Monthly_Report.doc DOC document
Attch_12_Airborne_Data.doc DOC document
TE_A_CDRL_Page_4of4.pdf PDF
Attch_7_Base_Operations.DOC DOC document
TE_F_DID_A005_Emergency_Contact.doc DOC document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Number Task Number xxxx – Multi-RequirementTest Attachment 8 NOTE: This Task Authorization Request (TAR) is forwarded for your action in accordance with the basic terms and conditions of the contract. The TSC Implementation Plan (TIP) is due back to this office no later than 10 days after receipt of this task. You may incur costs against this requirement only to the extent necessary to prepare the TIP.

1. GENERAL TEST INFORMATION: Unless specifically changed by this task order, the contractor performance shall be in accordance with the terms and conditions of the contract. If there is a conflict, the terms and conditions of the task order shall take priority.

1.1. BACKGROUND

a. Full name of test:

b. Test Location/Dates: Fort Knox, Kentucky

Pilot Test: 17-22 August

Record Test: 25 August-22 September

c. Classification: UNCLASSIFIED

d. System/Functional Description: The System Under Test consists of mounted and dismounted infantry troops connected via a family of internet platforms providing situational understanding in a variety of environments. It will provide Chemical, Biological, Radiological, and nuclear (CBRN) situational awareness and Detect to Warn (Detect to treat for biological detection and identification) via cooperative CBRN networks and reconnaissance. The system has similar survivability, mobility, communication, lethality, and transportability characteristics as the Mine Resistant Ambush Protected (MRAP). 1. Base Vehicle: Employs work stations for a crew of four (4) personnel. For self-defense, it employs a remote weapon station with a .50 cal machine gun that can be operated from within the vehicle when in an overpressure state. The system has a specialized overpressure and climate control system. The system employs a 400 ampere alternator to provide power to the vehicle and mission equipment. It has provisions inside and outside for the crew to carry personal equipment, basic loads of ammunition, rations, water, and Petroleum, Oil, and Lubrication (POL) products. The vehicle provides personnel survivability against specified threat munitions. Two MRAP versions will be used as base vehicles. MRAP CAT 1 is a Mine Resistent Utility Vehicle used for Urban Combat Operations. MRAP CAT 2 is a multi-mission platform capable of providing convoy escort and troop/cargo transport as well as ambulance and Explosive Ordnance (EOD) Combat Engineer operations. 2. Mission Equipment: Employs as GFE the following NBC sensor components and equipment. 3. Command and Control: The command and control capabilities are similar to those of the base vehicle. Navigation is provided by the Precise Lightweight Global Positioning System Receiver (PLGR), and the Vehicular Intercom system (VIC-3) provides interior communication. External communication is provided by Single Channel Ground/Airborne Radio System (SINCGARS). External data communication is provided through the Force Battle Command Brigade and Below (FBCB2) computer through the Enhanced Position Location Reporting System (EPLRS). Unique to the system is the central CBRN Sensor Processing Group (NBCSPG), which consists of Central Data Processing Unit (CDPU) computers with data storage capability, and printer. The NBCSPG processes alarm and identification information from the sensors, formats it into an NBC-1 or NBC-4 report, and sends the report to the FBCB2, which then transmits it outside of the vehicle to the appropriate location.

e. Safety/HUC:

(1) Human Use Committee (HUC) constraints and requirements: None identified at this time.

(2) Safety issues and concerns. Travel to and from the test site requires about one hour and is over a potentially dangerous mountain pass. On long duty days (more than 10 hours), personnel should travel in groups.

(3) Other safety issues and concerns IAW Section C, 1.3.5 (Hazardous Duty) of the contract. The following are elements of the test program which are anticipated to pose potential hazards in the course of test implementation activities. Actions should be considered to mitigate the risks associated with these hazards and should be considered in the development of the TIP.

- Radio Frequencies

- Mounts

- Brackets

- Lasers

- Power Interfaces

- Stimulants of CBRN Agents

- Batteries

- Head protection is required

- Blank Ammunition

- Battery charging station

f. Contracting Officer’s Representative:

g. Alternate Contracting Officer’s Representative:

1.2 SCOPE: During the IOTE, typical user soldiers will operate the SYSTEM to execute missions in accordance with (IAW) Operational Mode Summary/Mission Profile (OMS/MP), Threat Test Support Package (TTSP) and the Doctrinal and Organizational Test Support Package (D&O TSP). The IOT will consist of four 96-hour scenarios conducted over a 28-day period IAW selected portions of the OMS/MP. Conduct of the 96-hour scenarios will include 24-hour per day operations. Weekend scenarios are not anticipated. The primary focus will be the integration of the CBRN suite and the soldiers’ ability to use the complete system during daylight and darkness as well as in Mission-Oriented Protective Posture (MOPP) levels I through IV. Data will be collected on the integration of the CBRN suite into the MRAP base platform. Data will be collected on the crew’s ability to use the training to operate the SYSTEM in its intended environment. There will be two systems used for the test with an additional vehicle available for backup. Prior to start of the record test, soldiers will attend MRAP New Equipment Training (NET) for Common and CBRN specific missions. Test players will also be provided unit/collective Doctrine and Tactics Training (DTT). Following the training and prior to the record test there will be a 96-hour pilot test. Three complete crews will be trained. Crews will rotate during pilot and record testing as only two crews will be needed to man the Systems Under Test (SUT). Maintenance, to include recovery and management of the System Supply Package (SSP) will be performed by contractors. One Stryker-trained soldier team will be inserted during the first record test 96-hour scenario to provide for comparison of crew activities between the MRAP and Stryker configurations.

*NOTE: Be aware that Kevlar Helmets are required due to potential dangers associated with the firing range. Additionally, personnel are required to don chemical protective gear during test execution as stimulants will be released on the test range. Personnel will be performing duties in a tactical field environment during ambient weather conditions and may be required to traverse rough terrain on foot.

1.3. TECHNICAL POINTS OF CONTACT:

Test Officer:

Technical Support Officer:

Personnel identified herein are constrained by the Performance Work Statement (PWS). All technical coordination shall be within the general scope of the contract and the work requirement. Technical coordination shall not result in any action that:

a. Constitutes an assignment of additional work outside Section C or the Government requirement.

b. Constitutes a change as defined in the contract clause entitled "Changes ‑- Cost-Reimbursement" (FAR 52.243‑2 Alt I).

c. Changes in any of the expressed terms, conditions or specifications of the contract.

d. Interferes with the Contractor's right to perform the terms and conditions of the contract.

2. SPECIFIC TECHNICAL REQUIREMENT:

The contractor's TIP response shall describe the technical approach and methodology with associated labor and reimbursables for each of the below subparagraphs. Cost shall be separately identified by each month and segregated by fiscal years.

2.1 Instrumentation Engineering Development/Methodology Requirements

a. Point of Contact:

b. Period of Support: 16 April-28 August

c. Requirements:

NOTE: Instrumentation shall be installed on four (4) SYSTEMs: Three (3) MRAPS and one (1) Stryker. Only two MRAP SYSTEMs will be in test at any given time. The remaining MRAP SYSTEM will be prepped and ready for use if needed. The Stryker SYSTEM will utilize cage armor. Government provided MILES will be used to provide Real Time Casualty Assessment (RTCA) and Position Location (PL) of the test players during scenarios. Anticipate up to 28 vehicles and 72 dismounted troops being tracked at any given time.

(1) Provide systems with appropriate mounts, hardware, and cables to monitor and record the following:

[a] Video of surveyor, performing normal NBC detection and identification, while stationary and on the move to include position-location (PL) time tag.

[b] Provide external video camera-recording systems to capture and record the actions of the Dismounted Warrior Support System (DWSS) while the SUT is stationary and moving.

[c] Video of manual sampling activity; i.e., digging and storing test specimens from within the SUT utilizing the rubber glove seals.

[d] Access and record the SYSTEM intercommunication system and provide microphones to capture non-intercom comments. Access and record the communication over the SYSTEM systems integrated radios.

[e] Provide external video camera-recording systems to capture and record the Surveyor’s placement of the NBC marker identification flags while stationary and on the move.

[f] Provide equipment as appropriate to record the position location of each NBC marker flag as it is being emplaced. The position location of the placement of the marker flags shall be displayed on the Surveyor’s video camera-recording system.

[g] Provide two (2) Overview Systems (OVS) per SYSTEM to monitor and capture crew activities inside the vehicle.

[h] All camera field of view and aspect angles will be approved by the Government ORSA. Multiplex or Quad recording machines may be used.

[i] Provide equipment, brackets, and cables to interface with, capture and record the digital message traffic of the on board SYSTEM radios.

[j] Provide equipment as appropriate for the video recording and playback of the Video Graphics Adapter (VGA) taps of the Commander and Surveyor station displays. Select the recording media that best accommodates resolution requirements.

[k] Provide thru-site video on the Stryker SYSTEM.

(2) Provide equipment as appropriate to monitor and record the RS-232 alarm data, both as input to and output from the on-board EPLRS system for the following on board systems:

[a] JSLSCAD

[b] CBMS Block II

[c] ACADA

[d] METSMAN

(3) Travel as required for an engineering evaluation of the SYSTEM. Evaluation shall encompass form, fit and function of requested instrumentation support. Time and location will be provided by the Government Test Officer. Anticipate two locations to explore different armor configurations: Yuma, AZ and Aberdeen Proving Ground, MD.

(4) Conduct a demonstration for Government's approval of the technical approach. The demonstration shall address and exercise all of the instrumentation elements and illustrate form, fit, and function.

(5) Provide support to the Electromagnetic Interference/Electromagnetic Compatibility (EMI/EMC) Test, at the direction of the Test Officer. All EMI/EMC testing shall be completed prior to the start of the Pilot Testing. Resolve any EMI/EMC issue(s) caused by Operational Test Command's Instrumentation Suites. The test should be conducted with the instrumentation suite powered on and with all appropriate cables connected. Provide status to the Test Officer when OTC’s instrumentation suites have demonstrated functional success and any EMI/EMC issues have been resolved.

(6) Instrumentation Description Documentation: Provide the necessary certification documentation and specifications of each instrumentation device: what they do, mounting technique, etc., that will allow the Test Officer to obtain an ATEC certification of the Instrumentation Suites.

NOTE: Vehicle power may not be utilized for instrumentation elements.

(7) Provide the following documentation:

[a] Informal weekly status reports

[b] Monthly progress reports

[c] Instrumentation Description Documentation

(8) Perform certification and ground truth test to confirm that instrumentation provides the expected data, instrumentation is not intrusive, and the data is delivered in a format useful to the customer or evaluator. Certification includes the items that are non-developmental.

(9) Provide a Certification Report describing certification test results.

(10) Provide mounts, cables, brackets and other systems needed to support the use of items discussed in paragraph 2.3.

d. Milestones/Deliverables:

DATE

EVENT/REQUIREMENT/DELIVERABLE

RESPONSIBILITY

TBD Apr

Travel for engineering evaluation of systems under test

TSC

TBD May

Travel for Form, Fit, and Function

TSC

2 Jun Deliver Instrumentation Description Documentation to the Government 28 Jun

Demonstrate Instrumentation Suite

14 Jul

Deliver Certification Report

24 Jul

Complete Coverage test

3 Aug

Coverage Test Report Due

TBD

Travel to participate in EMI/EMC certification

16-26 Aug

Travel to support Pilot Test

2.2 Data Management Requirements.

b. Period of Support: 25 January-5 October

c. Requirements:

*Note: New Equipment Training events listed at paragraph c.2.c.(16 ) of this document will require minimal support. Anticipate full time requirements to commence not earlier than 23 May.

(1) Attend test planning meetings, providing technical input to briefing slides and discussions.

(2) Provide weekly reports.

(3) Provide Information Assurance Security Officer (IASO) services. Required level 1 training is available online and can be provided by OTC G6. The IASO will coordinate all documentation with the Government ORSA.

[a] Develop an approved accreditation plan.

[b] Monitor information technology resources (ITR) during test events to ensure no unauthorized users/computers obtain access to event data and/or networks.

(4) Develop form instructions for the forms provided by the Government ORSA.

(5) Establish and provide:

[a] A program of instruction (POI) for data collection training. Develop and publish a data collector handbook.

[b] Control plans for data collection procedures at the test site.

[c] Safety measures and operating procedures for data collection personnel as required.

[d] Documentation of environmental controls and procedures at test site.

[e] Training to data collectors on forms, data collection procedures, safety measures, control procedures and quality control of data.

[f] Test values/variables for event scenarios into the RAM database.

[g] Provide input to the validation of the test database with dummy data. This will involve generating 25 sample records for each hard-copy form and running a complete end-to-end data reduction of these sample records in accordance with ORSA guidance prior to OTRR 2.

[h] Conduct system integration testing.

[i] Data collection quality control and accountability of Manpower and Personnel Integration (MANPRINT), Reliability and Maintainability (RAM) and performance data for both pilot and record tests.

[j] Methodology to segregate RS-232 alarm data from the different on board systems listed in paragraph 2.1.c.(2) for evaluation and scoring.

[k] Procedures for transferring, reducing, and reporting of all data collected.

[l] Applications that convert, merge, extract and create views of the data to assist in the data reduction and review processes.

[m] Procedures to provide quick review of RAM, Performance, MANPRINT and survey data.

(6) Provide support for pre-test activities on data management, collection and reduction processes prior to test execution with ramp up exercises to validate training and performance demonstrations with practical exercises to prepare for data collection.

(7) Establish and maintain an on-site data library for tracking of all data flowing into and out of the data management cell. Develop procedures for maintaining all test data and manual documentation. Documentation shall include, but not be limited to, test reference documentation such as collection requirements, training plans, system description documentation, doctrine and organizational support packages, control plans, and other test related reference materials and items. Paper-based products received (surveys, questionnaires for example) shall be transferred to digital images for archival to electronic media.

(8) Collect Performance, MANPRINT, and RAM data; instrumented data files, and SYSTEM subsystem electronic data files. Ensure quality of these files. Data will be collected on each SUT, as well as in the Green, Red, and White cells. Subsystem data files will be harvested at the end of each test scenario and provided to the data center.

(9) Video recorded interviews shall be conducted with selected test players at the end of each scenario.

(10) Establish a forward data operations cell to harvest and perform quality control of data prior to forwarding it to the data management cell.

(11) The TSC is responsible for the completeness of all data collected and for the validation of data in accordance with the approved test design.

(12) All manual data shall be entered into Microsoft (MS) Access.

(13) Data reduction to Level III data shall be completed within 24 hours after data collection. After data entry and final quality control check, all data shall be made available on automated systems to allow the Test Analyst and other personnel to perform essential data review. Test Analyst will review, approve and release data to the Data Authentication Group (DAG) members for review and inquiry.

(14) Develop a group interview plan based on guidance from the Government ORSA. Conduct group interviews.

(15) Transcribe MANPRINT data from group interviews.

(16) Attend New Equipment Training (NET) at Fort Hood, Texas, and fill out the training activity record form provided by the Government ORSA. Enter data from this form into the MANPRINT database and email the database to the ORSA daily. Anticipate training to be at Ft Hood. Draft training schedule is as follows:

· Field Level Training – 1 Feb – 3 Mar

· Hand Off – 17 Mar

· OPNET Training – 18 Mar – 27 May

· DTT – 3 – 25 June

· TADSS (virtual crew trainer) training/Issue – 28 – 30 June

(17) Perform backups of all data twice each day.

(18) Provide support to the Data Authentication Group (DAG) chair for DAG member training, data authentication, and anomaly investigations and resolution to the scoring conference committee members.

[a] Develop DAG viewing screens and provide procedures for electronic data authentication for inclusion into the Government’s DAG SOP. Support shall consist of recording details of data anomalies, performing investigation and resolution of data anomalies, tracking Request for Information (RFI) items, and assist in the preparation of DAG minutes.

[b] Develop data displays for presenting Performance, RAM and MANPRINT data to the DAG. Develop/use provided tools to build summary tables and graphs for presenting the electronic data to the DAG. Populate these displays and summaries with data as the test progresses. Provide the results to the DAG chair.

[c] Provide monitoring of the DAG area to facilitate scoring of data by DAG and RAM Scoring Conference (RSC) members. This task shall require DAG/RSC technical knowledge as well as daily and ongoing communication with the ORSA and data managers.

[d] Provide final authenticated level III test databases and data dictionaries formatted for distribution. Databases shall be submitted to the government no later than two (2) days after the final DAG meeting. Required media for electronic deliverables is digital video disk (DVD) to include cases and proper labels.

(19) Archive test data for delivery to the Government.

[a] Scan Raw Data Forms: Verify the scanned copy is readable and an exact copy of the original. Save the scanned forms and make them retrievable as if they were stored in paper form (manila folders). Once the verification process is completed and with approval from the ORSA, the paper forms are to be shredded. Electronic copies shall be provided as Adobe Acrobat files.

[b] Video Footage: All video shall be provided in digital format.

[c] Electronic/Digital Records: If the document is received electronically or in digital format, then keep it that way. No need to print the document for archiving - it can be archived in electronic format.

[d] Briefings: Keep in electronic format. No need to print the document for archiving - it can be archived in electronic format.

[e] Signed Word Documents: At a minimum, keep the signature pages in paper form and the rest of the document electronically.

[f] When archiving data, keep test planning files separate from raw data files; for example, use separate disks.

(20) Computers, instrumentation, and other Information Technology supporting the test shall be compliant with Army policies. (DIACAP, DITSCAP, net-worthiness.)

(21) Data personnel may be required to drive High Mobility Multipurpose Wheeled Vehicles (HMMWV) and shall be scheduled for training if not previously certified. Night driving is required due to the continuous 24-hour operations planned during test conduct. Data personnel shall be night vision device (NVD) qualified.

(22) Perform a test site communication coverage test. Contractor shall confirm that the planned test areas have effective radio coverage. Prepare and conduct two coverage tests. Provide a combined coverage test report not later than ten working days after the second test completion.

d. Milestones/Deliverables:

DATE

EVENT/REQUIREMENT/DELIVERABLE

TBD

Attend test planning meetings

1 Feb - 27 May

Attend NET (Fort Hood)

21 June

Databases and forms provided to TSC

Govt TT

3-25 June

Unit’s Doctrinal Tactics & Techniques Training Govt TT

20 June

Conduct end-to-end data run with dummy data

22 June

OTRR 2

Govt TT/TSC

28 June

Provide IA Guidance

OTC (G6)

1 July

Forms Instructions

6 July

Provide Information Assurance

Compliance Statement

6 July

Provide accreditation plan for ITR

8 July

Databases Due

8 July

Group Interview Plan

15 July

Data Collector Handbook

3 Aug

Test Team Deploys to Test Site

14 Aug

Data Collector Training Complete

17-22 Aug

Pilot Test

23 Aug

Pilot Test RSC/DAG

24 Aug

OTRR 3

25 Aug-22 Sep

Record Test

25 Sep

Record Test RSC

25 Sep

Record Test DAG

26 Sep

Database validation complete

28 Sep

Redeploy to Fort Hood

3 Oct

Provide input for Lessons Learned

3 Oct

Provide input for After Action Review

5 Oct

Provide data for archives

2.3 Instrumentation Requirements (other than engineering development).

b. Period of Support: 20 July-28 September

c. Requirements:

(1) Install, operate and maintain instrumentation on four (4) SUTs as described in paragraph 2.1.

(2) Install, operate and maintain Government provided MILES for up to 28 vehicles and 72 dismounted troops during pilot and record test phases. Equipment and manpower resources are required at test site not later than two weeks prior to the start of pilot test.

(3) Provide equipment as appropriate to facilitate the downloading, display, and archiving of all instrumentation data within 12 hours after completing each test iteration.

(4) Provide the equipment necessary to monitor and record the temperature, humidity and air quality inside the crew compartment of the SYSTEMs. Air quality will include monitoring for carbon monoxide, carbon dioxide and oxygen levels. The recorded data shall consist of tabulated time tagged concentration values in units of percent (%). Data sampling rate shall be once per second.

(5) Provide two (2) Overview Video Systems, per SYSTEM to monitor and capture crew activities. Camera field of view and aspect angle shall be set to provide clear view of crew stations. The Government ORSA will provide approval of the camera locations.

(6) Access and record the SYSTEM Intercommunication System and provide microphones as necessary to capture non-intercom conversation.

(7) Install, operate and maintain all the instrumentation during the certification test, demonstration, coverage test, pilot and record test. De-install the instrumentation upon the completion of the record test. Installation, de-installation and checkout periods for the instrumentation shall be coordinated with the Test Team.

(8) All other instrumented data shall be harvested quick looked, provided to the data library, labeled and pre-processed every 12 hours of test execution. Deliverables are raw data compact discs (no copies).

(9) De-install all instrumentation at the conclusion of the final test scenario.

d. Milestones/Deliverables:

DATE

EVENT/REQUIREMENT/DELIVERABLE

NLT 14 Aug

Instrumentation equipment installed

17 Aug-22 Sep

Test Events

23-26 Sep

De-install instrumentation

2.4. Logistics Requirements.

b. Period of Support: 1 April-5 October

c. Requirements: All logistics requirements and resources are allocated and issued based on availability.

(1) Provide logistics support to the test team, including but not limited to receipt, turn-in (as needed), storage, and issue expendable supplies and equipment to test team members as needed on a 24-hour basis during testing.

(a) The contractor shall provide consolidated logistics support for the entire test team. The Contractor shall prepare a detailed Logistics Support Plan (LSP) and provide a copy for review and approval. The plan should include accountability and control procedures, inventory processes, receipt of supplies and materials.

(b) Consolidated logistical support will be required in the following areas:

[1] Motor Pool Operation (dispatch, control, security, etc), sensitive items, and equipment

[2] Receive all Government Furnished Property (GFP)

[3] Maintain accountability and control of all items within the test team.

[4] Store and secure NVDs, supplies, equipment, and blank ammunition

[5] Point of contact for required services, fuel, power issues, facility maintenance, water, etc.

[6] Check the availability of GFP and equipment when required.

[7] MILES receipt and property accountability. Contractor shall be prepared to store MILES equipment between test scenarios.

[8] At the conclusion of the test, assist the test team in closure of the test site and the turn-in of all issued GFP.

[9] Shipping of MRAP equipment, 20 crates/pallets to Fort Knox, KY, as follows:

Dimensions

Weight

42X36X24

42X36X24

35X24X41

45X42X19

46X26X32

47X32X22

49X36X31

56X46X61

68X39X47

72X55X51

48X40X68

48X40X52

48X40X52

49X22X42

37X30X40

44X27X32

48X40X32

(c) The Contractor’s plan shall address all property/equipment identified as Individual type property (ITE) and will include sensitive items like radios, night vision devices, and computer equipment (Laptops and Desktops) etc. These items shall be signed for and accounted for in accordance with the approved Property Control Plan (PCP).

(d) The plan shall be reviewed by the Government and approved by the Contracting Officer and/or the AMSCA Government Property Administrator. The contractor shall submit the plan for review NLT 30 days after receipt of the TAR.

(3) Provide one (1) locking 40-foot cargo trailer for transport and storage of test team equipment throughout the test period.

(4) Ship equipment to arrive at Fort Knox, KY, between 4-8 August.

(5) Provide operational support to the test operations cell to support 24 hours daily during the pilot and the record tests to include radio communications center and visitor control center.

(a) Provide input to the OTA TP and Tabs C,E,G, and I of the Detailed Test Plan (DTP).

(b) Provide input to test scenarios/scripts; e.g., the Master Scenario Events List (MSEL).

(c) Coordinate with other test members and agencies for operational requirements pertaining to data collection and daily test events.

(d) Maintain a digital log of daily test events and back up this data to an external device daily.

(e) Provide input to briefings on test operations as required.

(f) Provide input to the test report on Test Execution/ Operations as required. Ensure that all test events are in accordance with (IAW) with the test plan and all operations are conducted in a safe manner.

(g) Provide a VIP Van Operator.

(h) Establish access control of test site in conjunction with the government test team to include control plans for setting up the test site, ensuring safety, and 24-hour access control to include days between test scenarios.

(i) Design, provide, issue and control test team and visitor badges and ensure that only authorized or escorted personnel are admitted into test site areas. Maintain a visitor log and a test badge log to control issue and turn-in of badges.

(6) Provide on-site maintenance and repair support for OTC equipment during all phases of test execution.

d. Milestones/Deliverables: Provide the following Government Furnished Property (GFP). All items to be issued on 9 Aug or as otherwise indicated below.

Item Description

Date/Quantity Trailer, Triple Wide (FTC)

Expenses $3,500

ISU 90 Storage Container

Base Station SINCGARS Radio Set w/antenna

Base Station, Hand Held Radio w/antenna/repeater

Commercial Hand Held Radio w/battery/holster

Charger, Commercial Hand Held, 6 unit

Wet Weather Gear (pants/jacket)

Action Packers

Night Vision Goggles, AN/PVS-14 w/2 spare batteries for each

Wrecker, 5 Ton

VIP Bus

HMMWV, 4 door w/SINCGARS

HMMWV, 2 door w/SINCGARS

Generator, dual purpose, 30KW

Generator, dual purpose, 15 KW

Global Positioning System, Handheld

Helmet, Kevlar with chin strap

Stopwatch, Digital

Weather Station, Portable

(capable to record barometric pressure, wind speed and direction, humidity)

Fax Machine (at test site)

15 Aug /01

Copier, Large w/maintenance support (at test site)

15 Aug/01

Clocks, Office

Coffee Pot, 12 cup

Microwave Oven

Refrigerator, 16 cu ft

Shredders, large, medium use

Tables, six foot

Chairs

Fire Extinguisher, 5 lbs, all purpose

Trash Cans, 33 Gallon

Trash Cans, Office

Light Sets, 150 ft

Jug, insulated, 5 gallon

Ice Chest, 50 quart capacity

Test Team Uniforms, DAC

Parka, Wet Weather, DAC

Engineer Tape, 90 foot roll

Duct tape, 120 foot roll

Chem Lights, Amber, case

Chem Lights, Red, Case

Chem Lights, Green, Case

Chem Lights, Blue, Case

(7) Travel Requirements:

Purpose

# Personnel/Dates Trip 1:

Engineering evaluation of systems under test

2/ TBD

Trip 2:

Form, Fit and Function

2 /TBD

Trip3:

Participate in EMI/EMC certification (cage and panel)

2 / TBD

Trip4:

Site Survey, Support Coordination at test site

2 /TBD

Trip5:

Test Execution, Instrumentation

Trip 6:

Test Execution, Logistics and Operations

Trip 7:

Test Execution, Data Management

File details come from the government source that posted it. Updated .