Attachment 12 - Airborne Data Collectors Sample TAR

View the file

Other files

File Type Posted
Attch_1_OTC_MAP.pdf PDF
TE_J_DID_A009_Technical_Manuals.doc DOC document
Attch_6_Security_Clearances.doc DOC document
TE_C_DID_A002_Quarterly_Briefing.doc DOC document
Attch_2_GFF.pdf PDF
TE_Y_DID_A007_Sensitive_Items_Rpts.doc DOC document
TE_Q_USAOTC_Policy_CG_9_CCIR.pdf PDF
TE_P_Wage_Determinations.doc DOC document
W91151-12-R-0037_Final_RFP.doc DOC document
TE_T_USAOTC_Policy_SOP_Safety.pdf PDF
TE_A_CDRL_Page_2of4.pdf PDF
TE_G_DID_A006_Test_Validation_Rpts.doc DOC document
TE_E_DID_A004_Weekly_Report.doc DOC document
Attch_9_Task_Limited_Req.doc DOC document
Attch_3b_GFSoftware.xls XLS spreadsheet
TE_A_CDRL_Page_3of4.pdf PDF
TE_K_DID_A010_Software_Doc.doc DOC document
TE_A_CDRL_Page_1of4.pdf PDF
TE_H_DID_A008_Engineering_Reports.doc DOC document
Attch_14_Past_Performance_Questionnaire.doc DOC document
Attch_11_Airborne_Tech_Svc.doc DOC document
Attch_13_HAZMAT.xls XLS spreadsheet
TE_V_USAOTC_SOP_G4_6_Env.pdf PDF
TE_W_Acronym_List.doc DOC document
TE_M_DID_A012_HAZMAT.doc DOC document
TE_S_USAOTC_Policy_G4_3_Loaned.pdf PDF
Attch_5_Historic.xls XLS spreadsheet
TE_U_USAOTC_SOP_G4_7_Fire_Prev.pdf PDF
Attch_4_Inst_Catalog.doc DOC document
Attch_10_Techn_Base_Sample.doc DOC document
TE_D_DID_A003_TIP.doc DOC document
Attch_8_Task_MultiRqmt.doc DOC document
TE_R_USAOTC_Policy_G6_1_IT.pdf PDF
TE_N_DD_Form_254.pdf PDF
TE_B_DID_A001_Monthly_Report.doc DOC document
TE_A_CDRL_Page_4of4.pdf PDF
Attch_7_Base_Operations.DOC DOC document
TE_F_DID_A005_Emergency_Contact.doc DOC document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Airborne Data Collectors (ADC) Attachment 12

1. GENERAL TEST INFORMATION: Unless specifically changed by this task order, the contractor performance shall be in accordance with the terms and conditions of the contract. If there is a conflict, the terms and conditions of the contract shall take priority.

1.1. BACKGROUND

a. Full name of effort: Airborne Data Collectors (ADC)

b. Location/Dates: Fort Bragg/Pope Field, NC / Date of transition (DOT) through term of contract (TOC) (DOT – TOC)

c. Classification: Unclassified.

d. System/Functional Description: This is a continuous program designed to facilitate the collection of data during developmental and operational testing at the Airborne and Special Operations Test Directorate (ABNSOTD).

e. Safety/HUC:

(1) Human Use Committee (HUC) constraints and requirements: None identified at this time. Late or subsequent publishing of HUC constraints and requirements will be included in a follow-on point change or TIL.

(2) Safety issues and concerns. The risk at all levels in the performance of responsibilities pertaining to human subject participation in research and development activities must be considered IAW Section C, 1.4.3 (Safety Regulations) of the contract.

(3) Other safety issues and concerns IAW Section C, 1.3.5 (Hazardous Duty) of the contract. The following are elements of the test program which are anticipated to pose potential hazards in the course of test implementation activities. Actions should be considered to mitigate the risks associated with these hazards and should be considered in the development of the TIP.

Lasers

Power Interfaces

Brackets

Radio Frequencies

Radars

f. Contracting Officer’s Representative: Sam Xxxx, ABNSOTD, 910-396-8587 (DSN prefix – 236).

1.2 SCOPE:

a. This Force Development Test and Evaluation (FDTE) is designed to provide data to support an assessment of the operational effectiveness, suitability, and survivability of personnel airdrop procedures and equipment.

b. Emphasis will be placed on gathering data from all test missions.

1.3 TECHNICAL POINTS OF CONTACT:

a. ORSA: Mike Xxxx, ABNSOTD, 910-XXX-XXXX (DSN prefix – 236)

b. Technical Support Officer: Sam Xxxx, ABNSOTD, 910- XXX-XXXX (DSN prefix – 236).

2. SPECIFIC TECHNICAL REQUIREMENT:

The contractor's TIP response shall describe the technical approach and methodology with associated labor and reimbursables for each of the below sub-paragraphs. Cost shall be separately identified by each month and segregated by fiscal years.

2.1 Instrumentation Engineering Development Requirements

(1) Point of Contact: N/A

(2) Period of Support: N/A

(3) Requirements: N/A

(4) Milestones/Deliverables:

DATE

EVENT/REQUIREMENT/DELIVERABLE

RESPONSIBILITY

N/A

2.2 Data Management Requirements.

(3) Requirements: N/A

(4) Milestones/Deliverables:

DATE

EVENT/REQUIREMENT/DELIVERABLE

RESPONSIBILITY

N/A

2.3 Instrumentation Requirements (other than engineering development).

(3) Requirements: N/A

(4) Milestones/Deliverables:

DATE

EVENT/REQUIREMENT/DELIVERABLE

RESPONSIBILITY

2.4. Logistics Requirements.

(1) Point of Contact: Mike Xxxx, ABNSOTD, 910- XXX-XXXX (DSN prefix – 236)

(2) Period of Support: DOT – TOC

(3) Requirements:

(a) Travel Requirements.

(1) Contractor personnel will be required to make several round trips to the locations listed below to support testing. Additional travel dates and duration may be provided by the Test Officer or Assistant Test Officer.

a. Aberdeen Test Center, MD

Date: TBD estimated duration – 1 week

(1 data collector)

b. Yuma Proving Grounds, AZ

Date: TBD estimated duration – 1 Week

(1 data collector)

(2) Meetings: Test Event Planning meetings, and specific contractor meetings at various locations conducted /coordinated by Government agencies to provide operational test technical clarification during the meetings. The Test Officer or Assistant Test Officer will provide date, time and location of remote installation meetings.

(3) Milestones/Deliverables: Provide the following Government Furnished Property (GFP).

Item Description

Date/Quantity

2.5. Non-Personal Technical Support Services.

(1) Point of Contact: Mike Xxxx, ABNSOTD, 910- XXX-XXXX (DSN prefix – 236)

(2) Period of Support: – see individual sections below

(3) Requirements:

Note: The purpose of this section is to define the non-personal technical support services required to support the ABNSOTD test mission. The contractor should structure its response to this section of the TAR to fill the requirements outlined below. Additional requirements by the government will require a specific scope determination by the contracting officer.

(a) Provide one functional lead who has the technical knowledge and be able to apply that knowledge in the rigging of aerial delivery (personnel) equipment and related airdrop items. This equipment includes items such as the T-10 parachute and T-11 parachute. This person must possess the ability to enter data into a specific test database on a laptop or desktop computer operating in the Microsoft Windows environment. This person may also be required to drive tactical and commercial type vehicles ranging from 1/4-ton to 3/4 ton. Period of Support: – DOT - TOC

(b) Provide one functional lead who has the technical knowledge and be able to apply that knowledge in the rigging of aerial delivery equipment and related airdrop items. This equipment includes items such as the G-11 parachute and the airdrop platform. This person must possess the ability to enter data into a specific test database on a laptop or desktop computer operating in the Microsoft Windows environment. This person may also be required to drive tactical and commercial type vehicles ranging from 1/4-ton to 3/4 ton. Period of Support: – DOT - TOC