W90VN8-19-R-0037.pdf

PDF 807 KB Posted

Attached to
Repair Building 2399 & 2388 CP Casey
Solicitation number
W90VN819R0037
Issued by

About this file

SOLICITATION

View the file

Other files

File Type Posted
1)_Drawing_files___Title.pdf PDF
Submittal_Register.pdf PDF
2)_Drawing__ARCH_2388.pdf PDF
7)_Drawing__MECH_2388.pdf PDF
8)_Drawing__MECH_2399.pdf PDF
W90VN8-19-R-0037.pdf PDF
6)_Drawing__ELEC_2399.pdf PDF
5)_Drawing__ELEC_2388.pdf PDF
3)_Drawing__ARCH_2399.pdf PDF
4)_Drawing__CIVIL.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011346944

Repair building No. 2399 and 2388 at Camp Casey (PROJECT# 160851)

1. This is a Request for Proposal (RFP) issued to existing General Construction Multiple Aw ard Indefinite Delivery Indefinite Quantity (IDIQ) holding contract number(s) listed below ; Contract Numbers W91QVN-18-D-0021, 0022, 0023, 0025, 0026, 0027, 0028, 0030, 0031, 0042, 0044, 0045, 0046, 0050, 0051 and 0162.

2. Site Visit: All MATOC contractors w ho intend to propose on this solicitation are strongly recommended to attend the Site Visit. See Section L for the schedule.

3. If the contractor is unable to submit the proposal in response to this solicitation, the Contractor shall submit the "NO OFFER LETTER" by date and time specif ied in this solicitation.

MR. OM, IK-CHUNG 315-722-1385

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

07-Jun-2019

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________150 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Section F

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________21 Jun 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

411TH CSB, KOREA - IMB

UNIT#15289

APO AP 96205

W91QVN

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

01:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: 724-6977 TEL: FAX:

W90VN819R0037 35

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W90VN819R0037

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

REPAIR BLDG #2399, 2388 - K Work

FFP

WORK CLASS: K

PROJECT#: 160581

Repair Building No 2399 and 2388, Camp Casey

- See attached Specification, Approval Material List and Drawing Information.

FOB: Destination

PURCHASE REQUEST NUMBER: 0011346944

PSC CD: Z2AA

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Job

REPAIR BLDG #2399, 2388 - L Work

FFP

WORK CLASS: L

PROJECT#: 160581

Repair Building No 2399 and 2388, Camp Casey

- See attached Specification, Approval Material List and Drawing Information.

FOB: Destination

PURCHASE REQUEST NUMBER: 0011346944

PSC CD: Z2AA

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003 1 Lot War Hazard

FFP

Estimated Cost for War Hazard Losses is Zero (0)

FOB: Destination

PSC CD: Z2AA

NET AMT

Section C - Descriptions and Specifications

STATEMENT OF WORK

TECHNICAL PROVISIONS - I

STATEMENT OF WORK

PROJECT NO TITLE LOCATION

160851 Repair building No. 2399, 2388 Camp Casey

1. DESCRIPTION: The work to be performed to repair building No. 2399, 2388 is described below and executed by one or more of the groups.

1.1. Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings and in accordance with the specifications.

1.2. Work by In-House Labor: Not applicable to this project.

1.3. Work by Troop Labor: Not applicable to this project.

2. PRINCIPAL FEATURES: This project includes the following principal features:

2.1. Schedule #I, Repair (K): All work shall be in accordance with the attached drawings and specifications.

2.1.1. Civil Work

2.1.1.1. Mill 40mm thickness of existing Portland Cement Concrete (PCC) pavement and overlay with 40mm thickness Asphalt Concrete (AC) surface course.

2.1.1.2. Paint parking line marking same as it is.

2.1.2. Architectural Work

2.1.2.1. Building No. 2399

2.1.2.1.1. Floor work

2.1.2.1.1.1. Replace existing floor tile with new Polyvinyl Chloride Tile (PVCT) including Vinyl Cove Base (VCB) as shown on floor plan and interior finish schedule. The existing concrete flooring shall be smooth, true, level plane with all defects such as rough or scaling concrete, low spots, high spots, painting, and uneven surface shall have been corrected for new flooring. Provide leveling concrete for existing concrete slab with government approval. (Drawing No. A-1, A-2, A-5, A-10)

2.1.2.1.1.2. Replace existing Floor Ceramic Tile (FCT) with new including cement bond coat, water proof membrane, and mortar bed as shown on floor plans and detail drawings. (Drawing No. A-1 ,A- 2, A-7, A-10)

2.1.2.1.1.3. Replace existing concrete slab as shown on floor plan, existing and removal plan, section, and interior finish schedule. (Drawing No. A-1, A-2, A-6, A-10)

2.1.2.1.1.4. Apply epoxy coating on existing concrete slab including non-slip abrasive grain finish as shown on floor plan, sections and finish schedule.

2.1.2.1.1.5. Replace existing concrete stoop with new as shown on floor plan and elevations.

(Drawing No. A-1, A-2, A-4, A-6, A-9)

2.1.2.1.2. Interior and exterior wall work

2.1.2.1.2.1. Replace existing all Gypsum Wall Board (GWB) walls with new including metal studs and insulation as shown on floor plans, sections and detail drawings. (Drawing No. A-1, A-2, A-6, A-10)

2.1.2.1.2.2. Paint all interior and exterior wall surfaces including other components as shown on interior finish schedule and section. (Drawing No. A-1, A-2, A-7, A-10)

2.1.2.1.2.3. Block up existing door, window, duct and louver opening with Concrete Masonry Unit (CMU), re-bar, and Exterior Insulation and Finish System (EIFS) as shown on floor plans and elevations.

2.1.2.1.2.4. Replace existing Glazed Ceramic Wall Tile (GCWT, Full height) with new including cement bond coats, water proof membrane, plastering including metal lath, and waterproof GWB as shown on floor plans and sections. (Drawing No. A-1, A-2, A-7, A-10)

2.1.2.1.2.5. Replace existing pipe chases and pipe cover with new CMU, waterproof or X type of GWB for new mechanical piping system and duct as per floor plans, sections, and detail drawings.

(Drawing No. A-1, A-2, A-6, A-10)

2.1.2.1.2.6. Replace existing protected wall liner panel with new including wall blank insulation and vapor retard as shown on floor plan and sections. (Drawing No. A-1, A-2, A-5, A-6, A-10)

2.1.2.1.3. Interior and exterior ceiling and roof work

2.1.2.1.3.1. Apply acrylic fluid-applied waterproofing coating on existing roof as shown on floor plan and sections.

2.1.2.1.3.2. Replace existing roof with new built up roofing including insulation, vapor and air barrier, protected metal flashing, metal roof deck, and purlin as shown on floor plan, roof plan, and sections.

(Drawing No. A-1, A-2, A-3, A-4, A-5, A-6, A-9)

2.1.2.1.3.3. Paint all interior ceiling surfaces as shown on interior finish schedule and section.

2.1.2.1.3.4. Paint all existing exterior exposed metal, woods, fascia, and soffit as shown on floor plan and elevations.

2.1.2.1.3.5. Replace existing canopy with new as shown on floor plans, elevations, sections, and detail drawings. (Drawing No. A-1, A-2, A-3, A-4, A-5, A-6, A-8, A-9)

2.1.2.1.3.6. Replace existing protected roof liner panel with new as shown on floor plan and sections.

(Drawing No. A-1, A-2, A-3, A-4, A-5, A-6, A-8, A-9)

2.1.2.1.4. Misc. Work

2.1.2.1.4.1. Replace existing doors and door frames with new including hardware sets as shown on new floor plan and door schedule. (Drawing No. A-1, A-2, A-3, A-4, A-6, A-11)

2.1.2.1.4.2. Replace existing windows including insect screen with new aluminum thermal breaker type windows including glass as shown on floor plans, elevations, and window schedule. (Drawing No. A-1, A-2, A-3, A-4, A-6, A-11)

2.1.2.1.4.3. Replace existing window horizontal mini blinds with new, fireproof type. (Drawing No. A- 1, A-2, A-3, A-4, A-6, A-11)

2.1.2.1.4.4. Replace existing metal shelf with mop rack with new as shown on floor plans and detail drawing. (Drawing No. A-1, A-2, A-3, A-8, A-9)

2.1.2.1.4.5. Replace existing Fire Extinguishers Cabinets (FEC) with new as shown on floor plans and detail drawing. (Drawing No. A-1, A-2, A-3, A-8)

2.1.2.1.4.6. Replace existing all toilet accessories with new as shown on floor plans and detail drawings. (Drawing No. A-1, A-2, A-3, A-7)

2.1.2.1.4.7. Replace existing Stainless Steel (SST) laundry shelves with new as shown on floor plan and detail. (Drawing No. A-1, A-2, A-3, A-8, A-9)

2.1.2.1.4.8. Replace interior and exterior signages with new for all rooms as shown on signage schedule. (Drawing No. A-1, A-2, A-3, A-12)

2.1.2.1.4.9. Paint existing guard posts as shown on floor plan and elevations.

2.1.2.1.4.10. Replace existing roll up doors with new thermal insulated galvanized steel roll up doors including motors, emergency manual chains, steel guide rails, casing hood, and accessories as shown on floor plan, picture, door schedule, and detail drawing. (Drawing No. A-1, A-2, A-3, A-4, A- 6, A-11)

2.1.2.1.4.11. Clean existing natural daylights and clerestory as shown on roof plan and elevations.

2.1.2.1.4.12. Replace existing aluminum louver with new as shown on floor plans and louver schedule. (Drawing No. A-1, A-2, A-3, A-4, A-6, A-11)

2.1.2.1.4.13. Replace existing rain gutters and downspouts with new including concrete splash blocks as shown on floor plans, elevations, sections, and detail drawings. (Drawing No. A-1, A-2, A- 3, A-4, A-6, A-8)

2.1.2.1.4.14. Replace existing steel post and safety chain around inspection pit with new as shown on floor plans and section. (Drawing No. A-1, A-2, A-3, A-5, A-9)

2.1.2.1.4.15. Replace bulletin boards with new as shown on floor plans and detail drawings.

(Drawing No. A-1, A-2, A-3, A-9)

2.1.2.1.4.16. Replace window guard at tool room with new as shown on floor plan, elevation, and detail drawings. (Drawing No. A-1, A-2, A-3, A-4, A-6, A-8, A-11)

2.1.2.1.4.17. Replace steel grating cover at inspection pit with new as shown on floor plan, section, and detail drawings. (Drawing No. A-1, A-2, A-3, A-5, A-9)

2.1.2.1.4.18. Replace chain link fence with new on sub-buildings as shown on pictures. (Drawing No.

A-1, A-2, A-3, A-4)

2.1.2.1.4.19. Remove existing Asbestos Containing Material (ACM) as below.

- Caulk around CMU: 4LF in male latrine

- Duct insulation: 120SF in mechanical room

- White pipe fitting insulation: 1ea in mechanical room

2.1.2.2. Building No. 2388

2.1.2.2.1. Floor work

2.1.2.2.1.1. Replace existing FCT with new including cement bond coat, water proof membrane, and mortar bed as shown on floor plans and detail drawings. (Drawing No. A-1, A-3, A-6, A-7)

2.1.2.2.1.2. Replace existing concrete slab as shown on floor plan, existing and removal plan section, and interior finish schedule. (Drawing No. A-1, A-3, A-6, A-7)

2.1.2.2.1.3. Apply epoxy coating with non-slip grits on existing floors as shown on floor plan and interior finish schedule.

2.1.2.2.1.4. Replace existing floor tile with new PVCT including VCB as shown on floor plan and interior finish schedule. The existing concrete flooring shall be smooth, true, level plane with all defects such as rough or scaling concrete, low spots, high spots, painting, and uneven surface shall have been corrected for new flooring. Provide leveling concrete for existing concrete slab with government approval. (Drawing No. A-1, A-3, A-6, A-7)

2.1.2.2.2. Interior and exterior wall work

2.1.2.2.2.1. Paint all interior and exterior wall surfaces including other components as shown on interior finish schedule and section.

2.1.2.2.2.2. Block up existing window and louver opening with CMU, re-bar, and EIFS as shown on floor plan and sections.

2.1.2.2.2.3. Replace existing GCWT (Full height) with new including cement bond coats, water proof membrane, plastering including metal lath, and waterproof GWB as shown on floor plan and sections. (Drawing No. A-1, A-3, A-4, A-6, A-7)

2.1.2.2.2.4. Replace existing pipe chases and pipe cover with new CMU, waterproof or X type of GWB for new mechanical piping system and duct as per floor plan, sections, and detail drawings.

(Drawing No. A-1, A-3, A-4, A-7)

2.1.2.2.3. Interior and exterior ceiling and roof work

2.1.2.2.3.1. Replace existing asphalt shingle roof with new including plywood sheathing, asphalt felt, insulation, wooden fascia and eaves with metal flashing as shown on floor plan, roof plan, elevation and sections. (Drawing No. A-1, A-2, A-3)

2.1.2.2.3.2. Replace existing ceiling with new GWB (Normal, Water resistant or 'X' type) ceiling including ceiling suspension system and sound attenuation insulation as shown on floor plan, section and finish schedule. (Drawing No. A-1, A-3, A-4, A-6, A-6, A-7)

2.1.2.2.3.3. Paint all interior ceiling surfaces as shown on interior finish schedule and section.

2.1.2.2.3.4. Paint all existing exterior exposed metal, woods, fascia, and soffit as shown on floor plan and elevations.

2.1.2.2.3.5. Replace existing canopy with new as shown on floor plan, elevations, sections and detail drawings. (Drawing No. A-1, A-2, A-3, A-4)

2.1.2.2.3.6. Replace existing wooden gable with new as shown on floor plan and elevations.

(Drawing No. A-1, A-2, A-3)

2.1.2.2.4. Misc. Work

2.1.2.2.4.1. Replace existing doors and door frames with new including hardware sets as shown on new floor plan and door schedule. (Drawing No. A-1, A-2, A-3, A-8)

2.1.2.2.4.2. Replace existing windows including insect screen with new aluminum thermal breaker type windows including glass as shown on floor plan, elevations, and window schedule. (Drawing No. A-1, A-2, A-3, A-8)

2.1.2.2.4.3. Replace existing window horizontal mini blinds with new, fireproof type. (Drawing No. A- 1, A-2, A-3, A-8)

2.1.2.2.4.4. Replace existing metal shelf with mop rack with new as shown on floor plan and detail drawing. (Drawing No. A-1, A-3, A-5)

2.1.2.2.4.5. Replace existing aluminum louver with new as shown on floor plan and louver schedule.

(Drawing No. A-1, A-2, A-3, A-8)

2.1.2.2.4.6. Replace existing FEC with new as shown on floor plan and detail drawing. (Drawing No.

A-1, A-3, A-4)

2.1.2.2.4.7. Replace existing all toilet accessories with new as shown on floor plan and detail drawings. (Drawing No. A-1, A-3, A-5, A-6)

2.1.2.2.4.8. Replace existing all access doors on wall and ceiling with new. (Drawing No. A-1, A-3, A- 5, A-6)

2.1.2.2.4.9. Replace existing lavatory cabinet with new as shown on floor plan, elevation, and detail drawing. (Drawing No. A-1, A-3, A-6)

2.1.2.2.4.10. Replace interior and exterior signages with new for all rooms as shown on floor plan, elevations, and signage schedule. (Drawing No. A-1, A-2, A-3, A-9)

2.1.2.2.4.11. Replace existing rain gutters and downspouts with new including concrete splash blocks as shown on floor plan, elevations, sections, and detail drawings. (Drawing No. A-1, A-2, A-3, A-8)

2.1.2.2.4.12. Replace bulletin boards with new as shown on floor plan and detail drawings. (Drawing No. A-1, A-3, A-6)

2.1.2.2.4.13. Replace existing concrete stoop with new including vapor barrier and Non Frost Susceptible Material (NFSM) as shown on floor plan, elevation, and detail drawing. (Drawing No. A- 1, A-2, A-3)

2.1.2.2.4.14. Apply skim coat plaster on existing CMU wall at room 101, corridor as shown on floor plan and interior finish schedule.

2.1.2.2.4.15. Remove existing ACM as below.

- Transit board (Gable): 100SF on exterior wall

- Duct insulation: 16SF in mechanical room

- Roof caulk: 16SF

2.1.3. Mechanical Work

2.1.3.1. Building No. 2399

2.1.3.1.1. Heating, Ventilating, and Air Conditioning (HVAC)

2.1.3.1.1.1. Replace existing split and window type air conditioning units, controls and associated piping with new packaged heat pump units, controls, and associated piping. (Drawing No. M-2, M-3, M-6, M-8)

2.1.3.1.1.2. Replace existing roof exhaust fan, motorized dampers, control, and associated ductwork with new. (Drawing No. M-2, M-3, M-7, M-8)

2.1.3.1.1.3. Replace existing ceiling fan and wall mounted smart sense with new. (Drawing No. M-2, M-3, M-7)

2.1.3.1.1.4. Replace existing individual hose reel type vehicle exhaust system with new. (Drawing No. M-2, M-7, M-7, M-8)

2.1.3.1.1.5. Replace existing air compressor, compressed air filter, air pressure filter-regulator lubricator, and piping with new. (Drawing No. M-2, M-4, M-6, M-8, M-9)

2.1.3.1.1.6. Replace existing electric wall heater with new. (Drawing No. M-2, M-4, M-8, M-10)

2.1.3.1.1.7. Replace existing electric unit heater with new. (Drawing No. M-2, M-4, M-7, M-8)

2.1.3.1.2. Plumbing

2.1.3.1.2.1. Replace existing electric domestic hot water heater and associated piping with new.

(Drawing No. M-2, M-3, M-9)

2.1.3.1.2.2. Replace existing plumbing fixtures, dryer vent, and associated piping with new. (Drawing No. M-2, M-9, M-10)

2.1.3.1.2.3. Replace existing emergency shower and eyewash associated piping with new. (Drawing No. M-2, M-4, M-9, M-10)

2.1.3.1.2.4. Replace existing electric water cooler and associated piping with new. (Drawing No. M-2, M-3, M-9, M-10)

2.1.3.1.2.5. Replace existing domestic cold water, hot water, sewer, and vent piping including water hammer arrestors with new. (Drawing No. M-2, M-9, M-10)

2.1.3.1.2.6. Replace existing compressor air outlet and piping with new. (Drawing No. M-2, M-8, M-9)

2.1.3.1.2.7. Replace existing domestic hot water circulation pump and piping with new. (Drawing No.

M-2, M-4, M-9)

2.1.3.2. Building No. 2388

2.1.3.2.1. Heating, Ventilating, and Air Conditioning (HVAC)

2.1.3.2.1.1. Replace existing window type air conditioning units, controls, and associated piping with new packaged heat pump units, controls, and associated piping. (Drawing No. M-1, M-2, M-4)

2.1.3.2.1.2. Replace existing roof exhaust fan, and associated ductwork with accessories with new.

(Drawing No. M-1, M-2, M-4, M-6)

2.1.3.2.1.3. Replace existing electric wall heater with new. (Drawing No. M-1, M-2, M-4)

2.1.3.2.2. Plumbing

2.1.3.2.2.1. Replace existing oil type domestic hot water heater with electric hot water heater and associated piping with new. (Drawing No. M-1, M-2, M-5)

2.1.3.2.2.2. Replace existing plumbing fixtures and associated piping with new. (Drawing No. M-1, M-5)

2.1.3.2.2.3. Replace existing domestic cold water, hot water, sewer, and vent piping including water hammer arrestors with new. (Drawing No. M-1, M-5)

2.1.3.2.2.4. Replace existing domestic hot water circulation pump, domestic hot water re-circulation pump, and associated piping with new. (Drawing No. M-1, M-2, M-5)

2.1.3.2.2.5. Replace existing domestic hot water storage tank and associated piping with new.

(Drawing No. M-1, M-2, M-5)

2.1.4. Electrical Work

2.1.4.1. Building no. 2399

2.1.4.1.1. Replace existing interior lighting fixtures, exit lights, exterior lights, toggle switches, 3-way switches, wires and conduits with new. (Drawing No. E-1, E-4, E-5, E-6, E-10)

2.1.4.1.2. Replace existing panelboards, watthour meter including current transformers, receptacles including cover plates, and associated wiring and conduits with new. (Drawing No. E-1, E-2, E-7, E- 8, E-9, E-10)

2.1.4.1.3. Replace existing safety switch, motor controllers, junction boxes, control/power wires and conduits for mechanical systems and roll-up doors with new. (Drawing No. E-1, E-7, E-8, E-9, E-10)

2.1.4.1.4. Replace fire alarm control system with new addressable fire alarm control and mass notification system panel, manual pull station, smoke detector and relay module, building transmitter, antenna, visual and signal strobes (15 or 75 candela), microphone, speaker device, and associated wiring and conduit. (Drawing No. E-1, E-11, E-12)

2.1.4.1.5. Replace existing telephone system including telephone terminal cabinet, telephone and data outlets including cover plates, terminal blocks, equipment cabinet, and associated wire and conduit with new. (Drawing No. E-1, E-3, E-13, E-14)

2.1.4.1.6. Replace existing pad mounted transformer, overhead and underground exterior secondary line, and accessories with new. (Drawing No. E-1, E-2, E-9)

2.1.4.1.7. Replace existing exterior underground telecommunication line and accessories with new.

(Drawing No. E-1, E-3)

2.1.4.2. Building no. 2388

2.1.4.2.1. Replace existing lighting fixtures, exit lights, exterior lights, toggle switches, 3-way switches, wires and conduits with new. (Drawing No. E-1, E-2, E-3, E-4)

2.1.4.2.2. Replace existing panel boards, receptacles including cover plates, and associated wiring and conduits with new. (Drawing No. E-1, E-2, E-4)

2.1.4.2.3. Replace existing safety switch, motor controllers, junction boxes, control/power wires and conduits for mechanical systems with new. (Drawing No. E-1, E-2, E-4)

2.2. Schedule #II, New Construction (L): All work shall be in accordance with the attached drawings and specifications.

2.2.1. Civil Work

2.2.1.1. Install 100mm diameter Polyvinyl Chloride (PVC) water line with Post Indicator Valve (PIV).

2.2.1.2. Restore AC pavement.

2.2.1.3. Restore sidewalk.

2.2.1.4. Restore solid sodding.

2.2.2. Architectural Work

2.2.2.1. Building No. 2388

2.2.2.1.1. Interior and exterior wall work

2.2.2.1.1.1. Install concrete footing including reinforcement bars, perimeter rigid insulation, and NFSM for shower room as shown on floor plan and sections

2.2.2.1.1.2. Install CMU wall including reinforcement bars as shown on floor plan, sections, and interior finish schedule.

2.2.3. Mechanical Work

2.2.3.1. Building No. 2399

2.2.3.1.1. Install sprinkler system.

TECHNICAL PROVISIONS - II

TECHNICAL DETAIL SPECIFICATIONS

GENERAL: The specification sections listed below are applicable to this project. The specifications are from the “Standard Technical Specifications for O&MA Projects, Korea, Revision 1” (2014 OMA SPECS, REVISION 1), dated 20151030, located on the http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION- 1.pdf. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader® software.

The Standard Technical Detail Specifications:

The work shall conform to the most current version of the listed standards/specifications below.

DIVISION 01 – GENERAL REQUIREMENTS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 45 00.00 10 QUALITY CONTROL

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED

MATERIAL

02 65 00 UNDERGROUND STORAGE TANK REMOVAL

http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION-1.pdf http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION-1.pdf

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS

MATERIALS

02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES

02 83 19.00 10 LEAD BASED PAINT HAZARD ABATEMENT, TARGET

HOUSING & CHILD OCCUPIED FACILITIES

DIVISION 03 – CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 04 – MASONRY

04 20 00 MASONRY

DIVISION 05 – METALS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS

07 60 00 FLASHING AND SHEET METAL

07 92 00 JOINT SEALANTS

DIVISION 08 – OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL AND DOOR LOUVERS

DIVISION 09 – FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 22 36 LATH

09 29 00 GYPSUM BOARD

09 30 00 CERAMIC TILE, QUARRY TILE, AND PAVER TILE

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 90 00 PAINTS AND COATINGS

DIVISION 10 – SPECIALTIES

10 14 01 EXTERIOR SIGNAGE

10 14 02 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 28 13 TOILET ACCESSORIES

DIVISION 12 – FURNISHINGS

12 21 00 WINDOW BLINDS

12 32 00 MANUFACTURED WOOD CASEWORK

12 36 00 COUNTERTOPS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 – PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS

23 52 00 HEATING BOILERS

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

DIVISION 26 – ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 08 00 APPARATUS INSPECTION AND TESTING

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 – COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 33.00 10 FIRE ALARM REPORTING SYSTEM, RADIO TYPE

28 31 49 CARBON MONOXIDE DETECTORS

28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 – EARTHWORK

31 00 00 EARTHWORK

DIVISION 33 - UTILITIES

33 11 00 WATER DISTRIBUTION

33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

TECHNICAL PROVISIONS - III

SPECIAL CONDITIONS

1. Material Approval Submittal:

(1) The contractor shall submit a shop drawing submittal schedule and the material approval request with all supporting documents to the COR within 7 days after receipt of NTP.

(2) Attached list of materials in Appendix “B” shall be included in the shop drawing submittal schedule and material approval request.

2. The contractor shall have personnel on site for the sprinkler work and the fire alarm work upon Government's direction, who are certified by the National Institute for Certification in Engineering Technologies (NICET) Level III or equivalent. Equivalent Certificates in Korea are the followings which are issued by the Human Resource Development Service of Korea. If the contractor doesn’t have personnel who are certified by NICET, the contractor shall have two personnel that one is certified for (1) and the other for (2) below.

(1) Engineer Fire Fighting Facilities - Electrical (소방설비기사 -전기)

(2) Engineer Fire Fighting Facilities - Mechanical (소방설비기사 -기계)

3. Environmental Requirements in Contract

The Contractor shall perform work consistent with the relevant policy and objectives identified in Installation’s Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection. The Contractor shall provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In addition, the Contractor shall advise their employees of their roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract. The Contractor is responsible for ensuring that the Contractor and any persons involved in the supervision or performance of the contract complete all required Environmental training.

In the event of any environmental nonconformance or noncompliance associated with the contracted services, the contractor shall take corrective and/or preventative actions. In the event of any noncompliance with any federal, state, or local environmental law, regulation or requirement, the Contractor shall immediately respond by taking all appropriate corrective actions and notifying the

Contracting Officer’s Representative (COR) and the Environmental Office. For any nonconformance with the EMS, the Contractor shall take corrective action and initiate further preventative action, as required by the Environmental Office.

All on-site contractor personnel shall complete necessary safety and environmental training specified for the type of work conducted on-site. Upon contract award, the COR will notify the EMS Manager to arrange Environmental training for appropriate staff.

Additionally, when ordering supplies for use on Installation, all contractor personnel must favor energy-efficient, recycled or reclaimed material whenever practicable.

The responsibilities of all contractor personnel include:

(1) Comply with all applicable environmental laws, regulations and installation environmental policies.

(2) Control and prevent spills or hazardous substances releases IAW installation Spill Prevention

Plan.

(3) Ensure dust, debris, materials, trash, etc., do not become air borne and travel off the project site.

(4) Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, topsoil and land forms without approval, except in areas indicated on the drawings or specified to be cleared.

(5) Monitor all water areas affected by construction activities to prevent pollution of surface and ground waters. Do not apply toxic or hazardous chemicals to soil or vegetation unless otherwise indicated.

(6) Open burning is prohibited on the Government premises IAW installation environmental policy.

(7) Participate in installation’s recycling program.

(8) Reducing the amount of hazardous material and/or solvent used by purchasing fewer hazardous materials and by increasing the use of products with recycled content. Spills of hazardous or toxic materials must be immediately reported to the Contracting Officer and the Environmental Office.

Storage, describing, packaging, labeling, marking and placarding of hazardous waste and hazardous material IAW applicable environmental laws, regulations and local environmental policies. Transport hazardous waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.

(9) Reducing the amount of solid waste from construction and demolition debris, and scrap metal sent to municipal and rubble landfills by reducing, reusing, and recycling. Handling, storage, and disposal of solid waste must be conducted to prevent contamination. Transport solid waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.

(10) Conserving energy and water usage by turning off lights and equipment when not in use and using only the necessary amount of water needed to complete the required tasks. Continuous conservation of our natural resources is a must.

(11) When potential cultural or historic items are inadvertently found during construction activities, immediately cease activities in the vicinity of the discovery and report the findings to the Environmental Office.

(12) Participate in installation’s Integrated Pest Management (IPM) program whenever practicable.

(13) Minimize interference with disturbance to, and damage to fish, wildlife, and plants including their habitat.

4. CONTRACT REQUIREMENTS PACKAGE ANTITERRORISM/OPERATIONS SECURITY REVIEW

COVER SHEET

After Notice to process is issued, COR shall take following action, Section IV. Standard Contract Language/Contract Clause Applicability and/or Additional SOW Language.

A. AT Level I training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 05 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil

B. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area.

Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

B-a. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

C. iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 05 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.

http://jko.jten.mil/

Section F - Deliveries or Performance

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the

Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 150 days including 90 days for procuremnt of US materials after Notice to proceed (NTP) is issed.

* The time stated for completion shall include final cleanup of the premises.

(End of clause)

Section J - List of Documents, Exhibits and Other Attachments

DRAWING INFORMATION

APPENDIX "A"

LIST OF APPLICABLE CONTRACT DRAWINGS

GENERAL: The work shall conform to the following contract drawings and OMA standard detail drawings, 2014 (dated 30 November 2015), issued by the Department of the Army, Installation Management Agency, Korea Region Office and located on http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/STANDARD-DETAIL-DRAWINGS- FOR-OMA-PROJECTS-KOREA_20151130.pdf, all of which form a part of the specifications.

Ring No. Sheet No. Description Date

1 T-1 TITLE SHEET - 1 19 APR 19

2 T-2 TITLE SHEET - 2 19 APR 19

BUILDING NO. 2399

CIVIL

3 C-1 LOCATION PLAN AND GENERAL NOTES 19 APR 19

4 C-2 SITE LAYOUT PLAN AND SCOPE OF WORK 19 APR 19

5 C-3 MISC. DETAILS-1 19 APR 19

6 C-4 MISC. DETAILS-2 19 APR 19

ARCHITECTURAL

7 A-1 EXISTING/REMOVAL FLOOR PLAN, GENERAL NOTES,

ACM NOTES AND LEGEND

19 APR 19

8 A-2 NEW GROUND FLOOR PLAN AND SCOPE OF WORK 19 APR 19

9 A-3 NEW ROOF PLAN AND SCOPE OF WORK LIGHTING

FIXTURE SCHEDULE

19 APR 19

10 A-4 ELEVATIONS AND PICTURES 19 APR 19

11 A-5 SECTIONS 19 APR 19

12 A-6 EXTERIOR / INTERIOR WALL SECTIONS 19 APR 19

13 A-7 ENLARGED PARTIAL PLAN, INTERIOR ELEVATIONS

AND DETAILS

19 APR 19

14 A-8 DETAILS-1 19 APR 19

A-1

15 A-9 DETAILS-2 19 APR 19

16 A-10 INTERIOR, EXTERIOR FINISH SCHEDULE AND

MATERIAL & COLOR SCHEDULE

17 A-11 DOOR / WINDOW SCHEDULE, ELEVATIONS,

HARDWARE SCHEDULE & NOTES

18 A-12 SIGNAGE PLAN AND SCHEDULE 19 APR 19

MECHANICAL

19 M-1 MECHANICAL MATERIAL INDICATIONS & SYMBOLS 19 APR 19

20 M-2 GENERAL NOTES & SCOPE OF WORK 19 APR 19

21 M-3 MECHANICAL EQUIPMENT SCHEDULE-1 AND

GENERAL NOTE

19 APR 19

22 M-4 MECHANICAL EQUIPMENT SCHEDULE-2 AND

GENERAL NOTE

19 APR 19

23 M-5 EXISTING/REMOVAL PLAN(GROUND FLOOR) AND

SPECIFIC NOTES

19 APR 19

24 M-6 GROUND FL HEAT PUMP AND NOTES 19 APR 19

25 M-7 GROUND FL HVAC PLAN AND NOTES 19 APR 19

26 M-8 CONTROLS 19 APR 19

27 M-9 GROUND FL PLUMBING PIPING PLAN AND NOTES 19 APR 19

28 M-10 GROUND PLUMBING PIPING PARTIAL PLAN, FIXTURE

SCHEDULE AND NOTES

19 APR 19

29 M-11 FIRE PROTECTION LEGEND & ABBREVIATION,

AUTOMATIC FIRE SUPPRESSION GENERAL NOTES,

SPRINKLER Q'TY LIST AND NOTE

19 APR 19

30 M-12 MECH ROOM FIRE PROTECTION PIPING PARTIAL

PLAN

19 APR 19

31 M-13 FIRE PROTECTION PIPING PLAN 19 APR 19

32 M-14 DETAILS - 1 19 APR 19

33 M-15 DETAILS – 2 19 APR 19

34 M-16 DETAILS – 3 19 APR 19

35 M-17 DETAILS – 4 19 APR 19

36 M-18 DETAILS - 5 19 APR 19

ELECTRICAL

37 E-1 LEGEND, GENERAL NOTES AND SCOPE OF WORK 19 APR 19

38 E-2 EXIST/NEW EXTERIOR POWER LINE DISTRIBUTION

PLAN

19 APR 19

39 E-3 EXIST/NEW EXTERIOR TELECOMMUNICATION

DISTRIBUTION PLAN

19 APR 19

40 E-4 NEW GROUND FLOOR LIGHTING PLAN 19 APR 19

41 E-5 LIGHTING FIXTURE DETAILS 19 APR 19

42 E-6 LIGHTING FIXTURE SCHEDULE 19 APR 19

A-2

43 E-7 NEW GROUND FLOOR POWER PLAN 19 APR 19

44 E-8 NEW GROUND FLOOR POWER & CONTROL PLAN

FOR MECHANICAL EQUIPMENT

19 APR 19

45 E-9 EXIST/NEW POWER ONE-LINE DIAGRAM & MAIN

PANELBOARD "MP" LOAD SCHEDULE

46 E-10 NEW PANELBOARD "PA", "PB" & "PC" LOAD

SCHEDULE

19 APR 19

47 E-11 NEW GROUND FLOOR FIRE ALARM/MASS

NOTIFICATION PLAN

19 APR 19

48 E-12 NEW FIRE ALARM/MASS NOTIFICATION SYSTEM

DIAGRAM

19 APR 19

49 E-13 NEW GROUND FLOOR LAN/TEL SYSTEM PLAN 19 APR 19

50 E-14 TEL SYSTEM DIAGRAM 19 APR 19

BUILDING NO. 2388

ARCHITECTURAL

51 A-1 EXISTING/REMOVAL FLOOR PLAN, NEWFLOOR

PLAN, GENERAL NOTES, ACM NOTES AND LEGEND

19 APR 19

52 A-2 ELEVATIONS 19 APR 19

53 A-3 SECTIONS AND SCOPE OF WORK 19 APR 19

54 A-4 SECTION AND DETAILS - 1 19 APR 19

55 A-5 DETAILS-2 19 APR 19

56 A-6 DETAILS-3 19 APR 19

57 A-7 INTERIOR, EXTERIOR FINISH SCHEDULE AND

MATERIAL & COLOR SCHEDULE

19 APR 19

58 A-8 DOOR / WINDOW SCHEDULE, ELEVATIONS,

HARDWARE SCHEDULE & NOTES

59 A-9 SIGNAGE PLAN AND SCHEDULE 19 APR 19

MECHANICAL

60 M-1 GENERAL NOTES & SCOPE OF WORK 19 APR 19

61 M-2 MECHANICAL EQUIPMENT SCHEDULE AND

GENERAL NOTE

19 APR 19

62 M-3 EXISTING/REMOVAL PLAN(GROUND FLOOR) AND

SPECIFIC NOTES

19 APR 19

63 M-4 GROUND FL HVAC PLAN AND NOTES 19 APR 19

64 M-5 GROUND PLUMBING PIPING PLAN, FIXTURE

SCHEDULE AND NOTES

65 M-6 DETAILS 19 APR 19

A-3

ELECTRICAL

66 E-1 LEGEND, GENERAL NOTES AND SCOPE OF WORK 19 APR 19

67 E-2 NEW GROUND FLOOR LIGHTING & POWER PLAN

AND LIGHTING FIXTURE SCHEDULE

19 APR 19

68 E-3 LIGHTING FIXTURE DETAILS 19 APR 19

69 E-4 NEW GROUND FLOOR POWER/CONTROL PLAN FOR

MECHANICAL EQUIPMENT & MAIN PANELBOARD "P"

LOAD SCHEDULE

SUBMITTAL REGISTER

- SEE ATTACHED SUBMITTAL REGISTER.

MATERIAL LIST FOR APPROVAL

APPENDIX "B"

List of materials for Material Approval Submittal

Submittal Identification

Description of Submittal

LC-1 Asphalt Concrete

OC-1 150mm DIA PIV

OC-2 200X200X150MM TAPPING SLEEVE

OC-3 200X200X150MM TAPPING VALVE W/ BOX

LA-1 Ready mixed concrete, 210kg/CM, slump 12

LA-2 Waterproofing wall membrane with asphalt primer, compound & felt

LA-3

Steel insulated thermal blast door with steel frame door size; 915W. X 2133H. X

44.5 Thk. 100 X 600 insulated glass

LA-4

Steel insulated thermal blast door with steel frame door size; 915W. X 2133H. X

44.5 Thk.

LA-5

Steel thermal insulated double door w/steel frame door size: 1,625 W X 2133 H X

44.5 Thk. w/louver

LA-6

Steel hollow core door, 1 hrs fire rate w/frame door size; 915W. X 2133H. X 44.5 Thk.

LA-7

Wood solid core single door w/frame, 19mm under cut door size; 914W. X 2133H.

X 44.5 Thk.

LA-8

Steel hollow core door, dutch door, 1 hrs fire rate w/frame door size; 915W. X 2133H. X 44.5 Thk with metal shelf

LA-9

Steel hollow core single door, 1hrs fire door w/frame door size; 712W X 2133H. X

44.5 Thk.

LA-10 Steel hollow core single door w/frame door size; 712W X 2133H. X 44.5 Thk.

LA-11 Exit device, type 1, F-08, lever type

LA-12 Lockset, 1000-1, F-01, lever type

LA-13 Lockset, 1000-1, F-04, lever type

LA-14 Lockset, 1000-1, F-07, lever type

LA-15 Door closer, C02021

LA-16 Door closer, C02011

LA-17 Hinge, butt, A5111, 114 x 114 (NRP)

LA-18 Hinge, butt, A5111, 114 x 114

B-1

Identification

Description of Submittal

LA-19 Door stop and holder, Exterior type w/Conc, H9", 3"x3"

LA-20 Door stop , L02161

LA-21 Push plate, J302

LA-22 Pull plate, J405

LA-23 Kick plate, J102

LA-24 Flush bolt, L04081

LA-25 Astragal

LA-26 Flate astragal

LA-27 Soundproof/Weather proof seal R0E154 for head and jamb.

LA-27 Soundproof/Weather proof seal R3B435 for bottom

LA-28 Threshold, aluminum, 150W, SGL

LA-29 Threshold, aluminum, 150W DBL

LA-30 Key box, E8331

LA-31

Aluminum blast window thermal break type, fixed & tilting window, 1220x1117, 26.75thk Low-e insulated glass, insect screen

LA-32

Aluminum blast window thermal break type, sliding window, 1016x609, 26.75thk Low-e insulated glass, insect screen

LA-33 Steel security window bar

LA-34

Thermal insulated roll up door with motor operation, emergency hand chain, weatherstripping, safety sense and three button control station with accessories, 5486 x 5486

LA-35

Thermal insulated roll up door with motor operation, emergency hand chain, weatherstripping, safety sense and three button control station with accessories, 4267 x 4267

LA-36 Horizontal blinds, 1" aluminum slats

LA-37 Metal stud, 0.8 mm

LA-38 Non-sip ceramic floor tile

LA-39 Glazed ceramic wall tile with accessories

LA-40 Epoxy joint grout mortar for 300 x 600 GCWT

LA-41 PVC tile, KCC Neo Sense, 450 x 450 x 3Thk

LA-42 Vinyl cove base w/adhesive

LA-43 Paint, MPI 11, acrylic emulsion, exterior

LA-44 Paint, MPI 54, latex, interior

LA-45 Paint, MPI 47, enamel, interior

LA-46 Paint, MPI 94, enamel, exterior

LA-47 Paint, MPI 79, primer for metal

LA-48

Noroo Paint, MPI 77, Epoxy Primer, DHDC-6500P, 0.157kg/M2 Mid, DHDC- 6500M, 1.758kg/M2 & Slica-10.6kg/M2 Top, DHDC-6500T, 0.175kg/M2

B-2

Identification

Description of Submittal

LA-49 Toilet partition 1600 x 900

LA-50 Urinal partition, 1200 x 430

LA-51 Toilet tissue dispenser, Double Roll, Horizontal Type

LA-52 Paper towel dispenser with receptacle

LA-53 Mirror, 450x600 with plywood back board

LA-54 Soap dispenser, liquid, wall type, SST

LA-55 Mop rack with STS shelf

LA-56 SST metal shelf for laundry room, 2400 x 450 with accessories

LA-57 S.M.L.D (Shelf Metal Light Duty)

LA-58 Shower curtain with rod, 1,800W Curtain

LA-59 Shower curb, 4T SST w/ 12T SSM, 1800L x 100W x 100H

LA-60 Robe Hook, SST cover with wood

LA-61

Lavatory Base Cabinet W/PL Finish & Solid Surface Material Counter Top 2000 x 650 x 860H

LA-62 Hard wood shower bench, 300W x 450H

LA-63 Asplhat shingle roof

LA-64 Plywood 18T

LA-65 Signage, interior room, Misc BB3

LA-66 Toilet signage

LA-67 Signage, exterior

LA-68 Bulletin board, 1200 x 900, oak trim, tan nucork

LA-69 Safety STL chain, 5mm D

LA-70 Fire extinguish cabinet

LA-71 Steel grating 960 x 610 x 40

LA-72 Chain link fence with gate

LA-73 Acrylic fluid applied waterproofing

LA-74 Fiber glass, blanket w/VB. FG. 24K. 100mmThk

LA-75 Vapor retarder 1.8m x 45m 0.15mm Thk

LA-76

Built up Roof with Perlite Board, Mineral Surface Cap Sheet and Eave Built up Roofing.

LA-77 Rigid insulation, T=100, 4.57K.SM/W

LA-78 Self-adhesive air & vapor barrier membrane

LA-79 Protected metal liner panel #28GA

LA-80 Protected metal liner panel #24GA

LA-81 Rain gutter, protect MET, 150 x 100H, 24GA W/accessories

LA-82 Downspout, protect MET, 100 x 75, 24GA W/accessories

LA-83 Splash concrete block

B-3

Description of Submittal

LA-84

Metal canopy w/protected metal roof, lining, rain gutter w/flashing. Wall hung type (C-100x50x20x3.2, GALV. STL & EXP. Bolt 12DIA)

OA-1 Electro Magnetic door holer, C00011 (wall mount type)

LM-1 Package Heat Pump Unit, various capa.

LM-2 Wired controller

LM-3 Refrigerant piping

LM-4 Drain piping

LM-5 Black steel pipe line including fittings & pipe hangers, various size

LM-6 Pipe flexible cellular insulation w/adhesive, various size

LM-7 Gate valve, 10Kg/cm2, various size

LM-8 Ball valve

LM-9 Registers, various size

LM-10 Duct, various size

LM-11 Duct insulation, various size

LM-12 Volume damper, varios size

LM-13 Water closet

LM-14 Lavatory w/ faucet

LM-15 Shower unit

LM-16 Laundry sink

LM-17 Service sink with faucet

LM-18 Washer connection box

LM-19 Water hammer arrester, various size

LM-20 Copper tube water line, including fittings & pipe hangers, various size

LM-21 Galvanized steel pipe with fittings & hangers, various size

LM-22 Vent thru roof

LM-23 Cast iron soil pipe with coupling including accessories, various size

LM-24 Floor cleanout, various size

LM-25 Floor drain, various size

LM-26 Misc.

LM-27

Black steel pipe line including fittings & pipe hangers including accessories, various size

LM-28 Grooved 90, elbow, various size

LM-29 Grooved tee, various size

LM-30 Grooved coupling, various size

LM-31 Grooved flexible coupling, various size

LM-32 Valve flange adapter, various size

LM-33 Clevis pipe hanger, various size

LM-34 4-way bracing, various size

B-4

Identification

Description of Submittal

LM-35 Pipe support , various size

LM-36 Sprinkler system shop drawing, calculatio, test & report

OM-1 Ceiling exhaust fan, various size

OM-2 Roof exhaust fan, various capa.

OM-3 Air compressor

OM-4 Compressed air filter

OM-5 Air pressure filter-regulator lubricator

OM-6 Hose reel w/exhaust fan

OM-7 Elec. Wall heater

OM-8 Ventilation thermostat

OM-9 Temp. controller

OM-10 Vacuum breaker

OM-11 Aquastat

OM-12 Thermometer

OM-13 Pressure gauge

OM-14 Electric Unit heater

OM-15 Elec. Hot water heater

OM-16 Domestic hot water circ. pump

OM-17 Domestic hot water re-circ. pump

OM-18 Domestic hot water storage tank

OM-19 3-way thermostatic mixing valve

OM-20 Hose bibb

OM-21 Washer connector box

OM-22 Electric water cooler,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.