Drawing 5 Electrical - B2388

View the file

Other files

File Type Posted
W90VN8-19-R-0037.pdf PDF
1)_Drawing_files___Title.pdf PDF
Submittal_Register.pdf PDF
2)_Drawing__ARCH_2388.pdf PDF
7)_Drawing__MECH_2388.pdf PDF
8)_Drawing__MECH_2399.pdf PDF
W90VN8-19-R-0037.pdf PDF
6)_Drawing__ELEC_2399.pdf PDF
3)_Drawing__ARCH_2399.pdf PDF
4)_Drawing__CIVIL.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES

1.

2.MOUNTING HEIGHTS ABOVE FLOOR SHALL BE AS FOLLOW UNLESS OTHERWISE

NOTED ON THE DRAWING.

LIGHTING FIXTURE SEE LIGHTING FIXTURE SCHEDULE

PANELBOARD SEE SPECIFICATION

SAFETY SWITCH 1524mm TO CENTER OF THE ENCL

350mm TO CENTER OF THE ENCL

MOTOR CONTROLLER 1524mm TO CENTER OF THE ENCL

3.

4.

6.THE SOIL RESISTANCE TO GROUND FOR THE ELECTRICAL AND COMMMUNICATION

SYSTEMS SHALL BE 25 OHMS OR LESS. THE SOIL RESISTANCE TEST SHALL BE

7.

5.

CONDUCTED BY THE CONTRACTOR TO OBTAIN THE REQUIRED SOIL RESISTANCE.

INDICATEDS 2 #12AWG IN 16C

INDICATEDS 3 #12AWG IN 16C

INDICATEDS 4 #12AWG IN 16C

A GREATER NUMBER OF WIRES ARE INDICATED AS FOLLOWS;

1219mm TO CENTER OF THE ENCLWALL SWTICH

CONDUIT UNLESS OTHERWISE INDICATED.

ALL EQUIPMENT CONTROL WIRING SHALL BE #14 AWG. "TW" IN 16C

AND LOCATION OF THE F/A ANTENNA WITH THE CENTRAL FIRE DEPARTMENT

THE CONTRACTOR SHALL SUBMIT THE SHOP DRAWING FOR THE MOUNTING

TO TRANSMIT THE ALARM RADIO SIGNAL WAVE WITHOUT ANY OBSTRUCTION.

DETAIL OF THE F/A ANTENNA, AND COORDINATE THE MOUNTING HEIGHT

F/A EQUIPMENT IN THE CENTRAL FIRE DEPARTMENT.

THE EQUIPMENT SHOULD BE COMPATIBLE WITH THE MAIN EXISTING

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

SCOPE OF WORKS

LEGEND, GENERAL NOTES AND

E-1

12.

13.

14.

10.

11.

8.

9.

15.

SINGLE POLE TOGGLE SWITCH, 15A-125V

L E G E N D

FLEXIBLE CONDUIT W/CONNECTORS

LIGHTING

WIRING

POWER

INTERIOR

S

SYMBOL DESCRIPTION

DESCRIPTION

DESCRIPTION

J JUNCTION BOX

SYMBOL

SYMBOL

F FAN MOTOR (UNDER MECH. ITEM)

SAFETY SWITCH

C CONTROL CIRCUIT

3-WAY SWITCH, 15A-125V

AND GOVERNMENT INSTALLED

GOVERNMENT FURNISHED

GFGI

WEATHERPROOFWP

LA LIGHTNING ARRESTER

EXPLOSIONPROOFEP

DISTRIBUTIONDIST

GROUND FAULT PROTECTIONGFP

A AMPERE

AC ALTERNATING CURRENT

AF/AT AMPERE FRAME/AMPERE TRIP

AWG AMERICAN WIRE GAUGE

BC BARE COPPER

BLDG BUILDING

BRKR BREAKER

C CONDUIT

CB CIRCUIT BREAKER

CKT CIRCUIT

CONN CONNECTION

CT CURRENT TRANSFORMER

DET(S) DETAIL(S)

DIAG DIAGRAM

DISC DISCONNECT

DWG(S) DRAWING(S)

EA EACH

EM EMERGENCY

ENCL ENCLOSURE

EXST EXISTING

F/A FIRE ALARM

FL FLOOR

FLUOR FLUORESCENT

FXTR FIXTURE

GEN GENERATOR

GND GROUND

HP HORSE POWER

HZ HERTZ

INCAND INCANDESCENT

INSTL INSTALLATION

J-BOX JUNCTION BOX

K KILO

KV KILO VOLT

KVA KILO VOLT AMPERE

LTG LIGHTING

MAG MAGNETIC

MAX MAXIMUM

MIN MINIMUM OR MINUTE

MTG MOUNTING

NO NUMBER

O/H OVER HEAD

PH PHASE

PNLBD PANELBOARD

PRIM PRIMARY

PWR POWER

Q'TY QUANTITY

RCPT RECEPTACLE

REQ'D REQUIRED

SCHED SCHEDULE

SEC SECONDARY

SPEC SPECIFICATION

STD STANDARD

SW SWITCH

TEL TELEPHONE

TYP TYPICAL

U/G UNDERGROUND

V VOLT

VA VOLT AMPERE

W WATT

W/ WITH

XFMR TRANSFORMER

& AND

CABNET TYPE, RATED WATT ON LTG SCHEDULE

LED LIGHTING FIXTURE, WALL MOUNTED OR UNDER

ON LTG SCHEDULE, WET LOCATION

LED LIGHTING FIXTURE, RATED WATT & TYPE OF MTG PANELBOARD

HOMERUN CIRCUIT TO PANELBOARD

TYPE OF MTG ON LTG SCHEDULE

EXTERIOR LED LIGHTING FIXTURE, RATED WATT &

ABBREVIATION

THE COTNRACTOR SHALL SUBMIT A SHOP DRAWING OF HVAC SYSTEM

IN ACCORDANCE WITH SEQUENCE OF OPERATION INDICATED ON THE

MECHANICAL DRAWINGS.

ANY CIRCUIT WITHOUT FURTHER DESIGNATION INDICATES 2-#12AWG

WIRES IN 16C CONDUIT UNLESS OTHERWISE INDICATED.

THE GROUNDING CONDUCTORS SHALL BE SEPARATELY PROVIDED FOR

ELECTRICAL EQUIPMENT UNLESS OTHERWISE INDICATED ON THE DRAWING.

CATV BEFORE CONSTRUCTION.

CONTRACTOR SHALL COORDINATE WITH AREA MP, DO IMO, SIGNAL BRIGADE,

AND GOVERNMENT ACCEPTANCE.

PANELBOARD DOOR, REQUIRED BEFORE FINAL BUILDING INSPECTION

CONTRACTOR SHALL MAKE CIRCUIT CHARTS AND ATTACH THEM TO

FIRE CODE AND SPECIFICATIONS.

OF THE NATIONAL ELECTRICAL CODE, NATIONAL ELECTRICAL SAFETY CODE,

ALL ELECTRICAL WORK SHALL CONFORM TO THE CURRENT REQUIREMENTS

OR RENOVATION.

CONDITION AND DIMENSIONS PRIOR TO COMMENCING ANY CONSTRUCTION

THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFING ALL EXISTING

FIXTURE A MINIMUM DISTANCE OF 458mm.

FIRE ALARM DETECTORS SHALL BE LOCATED TO CLEAR ANY LIGHTING

AUXILIARY

DESCRIPTIONSYMBOL

L

L

L

ON LTG SCHEDULE

LED LIGHTING FIXTURE, RATED WATT & TYPE OF MTG

ON LTG SCHEDULE

LED LIGHTING FIXTURE, RATED WATT & TYPE OF MTG

W/EMERGENCY BATTERY UNIT

L

W/EMERGENCY UNIT

ON LTG SCHEDULE

LED LIGHTING FIXTURE, RATED WATT & TYPE OF MTG

ON LTG SCHEDULE

LED LIGHTING FIXTURE, RATED WATT & TYPE OF MTG

L

L

UNITS.

CERTIFICATE FROM MANUFACTURER FOR LED LIGHTING FIXTURES AND POWER

CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE 10YEARS WARRANTY

16.

THE GRADING LINE OF NEW DUCTS WILL BE LIMITED TO THE

WIDTH OF DUCT EXCAVATION.

AND AFTER INSTALLATION OF ELECTRICAL SYSTEM.

TO THEIR ORIGINAL CONDITION AND OPERATION DURING

ALL DAMAGED AREA INCLUDING SODDING, UTILITIES, STRUCTURES

THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING

THE MANUFACTURER AND MODEL OF NEW BUILDING TRANSMITTER EQUIPMENT

IN THE CENTRAL FIRE DEPARTMENT.

THE EQUIPMENT SHOULD BE TESTED WITH THE RECEIVING SYSTEM(D21)

SHALL BE COORDINATED WITH THE CENTRAL FIRE DEPARTMENT.

RECEPTACLE

AND WALL

WIRING CONCEALED OR EXPOSED IN/ON THE CEILING

CEILING OR CONCEALED IN NEW WALL.

ALL WIRING SHALL BE CONCEALED ABOVE CEILING WHEN THE ROOM HAS

SCOPE OF WORK

1.

A. REPAIR/MAINTENANCE ( K )

2.

3.

3S

CONDUITS WITH NEW.

EXTERIOR LIGHTS, TOGGLE SWITCHES, 3-WAY SWITCHES, WIRES AND

REPLACE DETERIORATED EXISTING LIGHTING FIXTURES, EXIT LIGHTS,

CP CASEY

REPAIR BUILDING S-2399,

TAK, YS

160851

(BUILDING S-2388)

ELECTRICAL

PLATES ASSOCIATED WIRING & CONDUITS WITH NEW.

REPLACE EXISTING PANEL BOARDS, RECEPTACLES W/COVER

SYSTEMS WITH NEW.

JUNCTION BOXES, CONTROL/POWER WIRES AND CONDUITS FOR MECHANICAL

REPLACE DETERIORATED EXISTING SAFETY SWTICH, MOTOR CONTROLLERS,

TYPE

DUPLEX RECEPTACLE, 2P-3W-20A-125V, GROUNDING

FAULT PROTECTED TYPE

DUPLEX RECEPTACLE, 2P-3W-20A-125V, GROUNDED

WP

FAULT PROTECTED TYPE, WEATHER PROOF

DUPLEX RECEPTACLE, 2P-3W-20A-125V, GROUNDED

TYPE WITH PLUG

SINGLE RECEPTACLE, 2P-3W-20A-125/250V, GROUNDING

FEC

CORRIDOR

BATHROOM

DRYROOM

SHOWER ROOM

MECH ROOM

S S

FEC

PTDWR

BB

L

L

L

L

L L

L L

LL

L L

S

S3

S3

S

S

S

S

L

E-2

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

CORRIDOR

BATHROOM

DRYROOM

SHOWER ROOM

MECH ROOM

S S

BB

S

"P"

WP

SCALE:

SCALE:

REMARKSMOUNTING METHODQ'TY

NO

SHT

WATTSTYPE

LAMP

NAME

ROOM

TYPE

LIGHT FIXTURE SCHEDULE

OCE STD DET 40-06-04

NO

LED NS-11a

NS-11b

1-

1-

CEILING RECESSED

CEILING RECESSED W/"EM" UNIT

2-

1-

CEILING RECESSED

104 - 4

18 3

NS-4b 45 CEILING RECESSED

1-

BATHROOM

CEILING RECESSED W/"EM" UNIT

W/"EM" UNITDRYROOM

NS-11b

NS-11a 45

NS-12 2- ABOVE THE DOOR TOPWALL MOUNTED22

ABOVE THE DOOR TOPWALL MOUNTED4.99NS-3

EXTERIOR

EXIT

CEILING SURFACE

105 45

1-

1-

NEW GROUND FLOOR POWER PLANNEW GROUND FLOOR LIGHTING PLAN

1/50 1/50

S

"P"

P-2

PB-2

P-1

CORRIDOR

SHOWER ROOM

MECH ROOM

NS-8

NS-7

NS-6a

NS-6b

WALL MOUNTED ABOVE MIRROR TOP

W/"EM" UNITCEILING SURFACE

CEILING SURFACE

LL

CP CASEY

REPAIR BUILDING S-2399,

TAK, YS

160851

(BUILDING S-2388)

ELECTRICAL

SCHEDULE

POWER PLAN AND LIGHTING FIXTURE

NEW GROUND FLOOR LIGHTING &

L

L

E-3

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

DIODE(LED) EXIT LIGHT FIXTURE 1PH, 120V, 4.99W

WALL SURFACE MOUNTED LIGHT EMITTING

NS-7

NS-8

100 WALL

245mm

254mm

CEILING RECESSED MOUNTED LIGHT EMITTING DIODE (LED)

FIXTURE, 1PH, 120V, 18W, WITH CONVERTER & ACCESSORIES,

CEILING SURFACE MOUNTED LIGHT EMITTING DIODE (LED) FIXTURE, 1PH, 120V, 18W, WITH CONVERTER & ACCESSORIES

WALL SURFACE MOUNTED LIGHT EMITTING DIODE (LED)

WET LOCATION SHOWER LIGHT TRIM, UL LISTED POWER UNIT

AS REQUIRED, UL LISTED POWER UNIT

FIXTURE, 1PH, 120V, 45W, UL LISTED, WITH CONVERTER &

ACCESSORIES AS REQUIRED, (NS-4a) & WITH EM UNIT (NS-4b)

NS-3

(MAX. INPUT), BATTERY BACK-UP WITH BATTERY CHARGER

WALL MOUNTED LED LIGHT FIXTURE, 1PH, 120V, 22W LED

LAMP, CONVERTER & ACCESSORIES AS REQUIRED,

WET LOCATION TYPE, UL LISTED POWER UNIT

CEILING SURFACE/PENDANT MOUNTED LIGHT EMITTING DIODE (LED)

FIXTURE, 1PH, 120V, 45W, UL LISTED, WITH CONVERTER AND

ACCESSORIES AS REQUIRED, (NS-6a) & EM UNIT(NS-6b)

NS-6a & 6bNS-11a & 11b

NS-12

CP CASEY

REPAIR BUILDING S-2399,

TAK, YS

160851

(BUILDING S-2388)

ELECTRICAL

LIGHTING FIXTURE DETAILS

E-4

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

SCALE: 1/50

CORRIDOR

BATHROOM

DRYROOM

SHOWER ROOM

MECH ROOM

S S

"P"

EF-1J

EF-2

J

HPU

-1

B

(UNDER MECH ITEM)

(TYP. OF 2)

NON-FUSIBLE, NEMA 3R ENCL.

SAFETY SWITCH-B, DPST, 240VAC, 30A,

P-4

HPU

-1

B

J

EWHJ

P-1

P-2J

EH

P-5

P-6

P-7

B

HEAT PUMP UNIT-1, 1PH, 220V, 0.96KW

(TYP. OF 2)

(UNDER MECH ITEM)

PUMP, 1PH, 120V, 1/4HP

HOT WATER CIRCULATION

ELECTRIC WATER HEATER, 1PH,

220V, 20KW(UNDER MECH ITEM)

B

(UNDER MECH ITEM)

PUMP, 1PH, 120V, 1/2HP

HOT WATER RE-CIRCULATION

P-10

P-8

P-9 P-11

S

(UNDER MECH ITEM)

ELECTRIC WALL HEATER,

1PH, 120V, 1.0KW

(TYP)

TOTAL LOAD 32482

LOAD

TOTAL

MAIN PANELBOARD "P" LOAD SCHEDULE

LOAD DESCRIPTION

NO.

CKT

GND

S/N

DIAGRAM

CONNECTION

CIRCUIT BREAKER

PHASE LOAD

A B PC AT

SIZE

AF AIC

B CA N G

REMARK

MAIN 3P-100AF-100AT CIRCUIT BREAKER

MTD TYPE, NEMA 1 ENCL.

60HZ, SN & GND, SURFACE

3PHASE ,4WIRE, 120/208V,

1 10000100

ELECTRIC HOT WATER HEATER

SPARE

960 480

SPACE

706667

SPARE

11 12

1000 1000

RCPTS 180VAx4

RCPTS 180VAx4

P-12

S

0.96KW

HEAT PUMP UNIT, 1PH, 220V,

0.96KW

HEAT PUMP UNIT, 1PH, 220V,

ELECTRIC WALL HEATER

ELECTRIC WALL HEATER

PUMP, 1PH, 120V, 1/2HP

HOT WATER RE-CIRCULATION

PUMP, 1PH, 120V, 1/4HP

HOT WATER CIRCULATION

(UNDER MECH ITEM)

(UNDER MECH ITEM)

EXH. FAN-2, 120V, 1/4HP

EXH. FAN-1, 120V, 1/4HP

EXH. FAN 1/4HP

EXH. FAN 1/4HP

22Wx2, 4.99Wx2

LIGHT, LED 45Wx8, 18W x6, 20000

480 480

6667 6666

TOTAL DEMAND LOAD ; 27,906(VA)

SPACESPACE

2#12&1#12(G)

2#12&1#12(G)20

3#4&1#8(G)

ELECTRIC UNIT HEATER 3000 15001500

SPACE

1182711209 11446

SPACE

SPACE

CP CASEY

REPAIR BUILDING S-2399,

TAK, YS

160851

(BUILDING S-2388)

ELECTRICAL

NEW GROUND FLOOR POWER/CONTROL PLAN FOR MECHANICAL EQUIPMENT

EUH

P-13

EXIST ELECTRIC UNIT HEATER, 1PH, 208V, 3KW

PANELBOARD "P" LOAD SCHEDULE

PLAN FOR MECHANICAL EQUIPMENT & MAIN

NEW GROUND FLOOR POWER/CONTROL

EH

3-AWG#4 & 1#8(G) IN 35C

W/WELDING CONNECTION

NEW GROUND ROD, COPPER

CLAD STEEL, 19diax3000LG

(TYPICAL)

1-AWG#2(G) IN 21C

4#2 & 1#8(G) IN 35C

NEMA 1 ENCL. (TYP.)

MANUAL MOTOR STARTER, 2P-120V, 1HP(MAX.)

COIL VOLTAGE 120V, NEMA 1 ENCL. (TYP.)

120V, NEMA SIZE 0, "H-O-A" SEL. SWITCHES, PILOT LIGHTS,

MAGNETIC MOTOR STATRER W/O.L RELAYS, 2P,

E-1
E-2
E-3
E-4