8)_Drawing__MECH_2399.pdf

PDF 5 MB Posted

Attached to
Repair Building 2399 & 2388 CP Casey
Solicitation number
W90VN819R0037
Issued by

About this file

Drawing 8 Mechanical B2399

View the file

Other files

File Type Posted
W90VN8-19-R-0037.pdf PDF
1)_Drawing_files___Title.pdf PDF
Submittal_Register.pdf PDF
2)_Drawing__ARCH_2388.pdf PDF
7)_Drawing__MECH_2388.pdf PDF
W90VN8-19-R-0037.pdf PDF
6)_Drawing__ELEC_2399.pdf PDF
5)_Drawing__ELEC_2388.pdf PDF
3)_Drawing__ARCH_2399.pdf PDF
4)_Drawing__CIVIL.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M-1

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

M E C H A N I C A L M A T E R I A L I N D I C A T I O N S & S Y M B O L S

NTS

PD

Pa

OS&Y

OXY

OD

OAIL

OA

QT

PRV

PPM

POL

POC

PLMB

PH

PG

RT

RPM

RH

RDTR

RA

R12, R22

QTY

A B B R E V I A T I O N S

SBM

SAN

SA

SCH

FLOWMETER, ORIFICEBUTTERFLY

REFRIGERANT LIQUID

CHILLED WATER SUPPLY

CHILLED WATER RETURN

AIR COOLED CONDENSING UNIT

AIR CONDITION UNIT (S)

APPARATUS DEW POINT

AIR CONDITION (-ING,-ED)

HOT CHILLED WATER RETURN

AMERICAN WIRE GAUGE

PRESSURE, BAROMETRIC

CUBIC METER PER HOUR

HOT/CHILLED WATER SUPPLY

CAPACITYCAP

CONNECTION

CONTINUE

COMPRESSOR

CUBIC METER

CPRSR

CONN

CONT

CU M

CHILLED WATER

CAST IRON PIPE

CIRCUIT

CLASSIFICATION

COOLING LOAD

COEFFICIENT

COUNTER CLOCKWISE

CLASS

CLG LOAD

COEF

CMH

CIP

CCW

CHW

CKT

ACV ALARM CHECK VALVE

AVERAGEAVG

BOILING POINT

CENTIGRADE

BAROMETER(-TRIC)

BRAKE HORSEPOWER

BP

BHP

C

BARO PR

AWG

BARO

ALUMINUM

ALTITUDE

AMBIENT

AIR HANDLING UNIT

AMPERE(AMP, AMPS)

APPROXIMATEAPPROX

ALT

AMB

AMP

AIR COND

ADP

AL

AHU

AIR COOLED

ACCU

ACLD

ACU

CHR

C/HWR

C/HWS

CHS

RL

D DRAIN

DIAMETER, INSIDE

ISOMETRIC

IRON PIPE SIZE

JOULE

THERMAL CONDUCTIVITY

KILOGRAM

KILOGRAM PER SQ. CENTIMETER (GAUGE)

KILOGRAM PER SQ. CENTIMETER

KILOGRAM PER SQ. CENTIMETER (ABSOLUTE)

KILOCALORIE PER HOUREXPANSION JOINT

EXPLOSION PROOF

FIRE HOSE CABINET

FULL LOAD AMPERES

ENTERING WATER TEMP

EVAPORAT (-E,-ING,-ED,-OR)

EXTERNAL STATIC PRESSURE

FACE AREA OR FRESH AIRFA

FHC

FHY

FLA

FIRE HYDRANT

ESP

EXPJT

EWT

EVAP

EP

EQPT

ENT

EFF

EQUIPMENT

ENTERING

EFFICIENCY

KG/SQ CM

KG/SQ CM A

KG/SQ CM G

KG

KCAL/HR

J

K

ID

ISO

IPS

NO

N.O.

NIC

NPT

MPS

NC

N/A

N.C.

MAX

MIN

MPH

MM

NOT IN CONTRACT

NATIONAL TAPER PIPE (THREAD)

NUMBER

NORMALLY OPEN

MINIMUM OR MINUTE

METERS PER HOUR

METERS PER SECOND

NORMALLY CLOSED

NOISE CRITERIA

NOT APPLICABLE

MAXIMUM

MILLIMETER R

FEMALE PIPE THREAD

FUEL OIL

GALVANIZED STEEL

GAGE OR GAUGE

FIXTURE

FEED WATER PUMP

FACE VELOCITY

FLUSH VALVE

FREQUENCY

FIBERGLASS REINFORCED PLASTIC

HORIZONTAL

HOT WATER HEATER

HOT WATER

HOUR(S)

HORSEPOWER

MERCURY

HEAD

HOSE BIBB

HERTZ

GRAMS

FRP

CWP CIRCULATING WATER PUMP

DIRECT EXPANSION

DRY PIPE VALVE

EQUIVALENT DIRECT RADIATION

ENTERING AIR TEMPERATURE

DOUBLE POLE DOUBLE THROW

DEWPOINT TEMPERATURE

DRY BULB TEMPERATURE

DECIBEL OR DRY BULB

DIESEL OILDO

ECON

ECC

EAT

EDR

DX

DPV

DPDT

DPT

ECONOMIZER

ECCENTRIC

o

DIFF

DIAG

DIA or

DIV

DBT

DB

DIFFERENCE

DIAGRAM

DIAMETER

DIVISION

DEGREE

HR

HORIZ

HWH

HW

HZ

HP

HG

HD

HB

GALVS

GA

GR

FXTR

FWP

FVEL

FV

CUBIC MILLIMETER

CLOCKWISE OR COLD WATER

COEFFICIENT, VALVE FLOWCv

CU MM

CW

PLUG VALVE

THREE WAY

FPT

FO

FREQ

GATE, ANGLE

GATE, GLOBE

GLOBE

GATE

CONTROL

KJ KILOJOULE

LH

LT

LWT

LPS

M

LL

LPD

LPH

LM

LAV

LAT

LBS

LG

KW

KWH

L

LATENT HEAT

LEAVING WATER TEMPERATURE

LITERS PER HOUR

LITERS PER SECOND

LAUNDRY TRAY

METERS

LIQUID LINE

LITERS PER DAY

LINEAR METER

LEAVING AIR TEMPERATURE

LAVATORY

POUNDS

LENGTH

KILOWATT

KILOWATT HOUR

LITERS

P

FLOWMETER, VENTURI

FLOW SWITCH

PRESSURE SWITCH

PRESSURE GAUGE AND COCK

PUMP (INDICATE USE)

STRAINER

STRAINER, BLOW OFF

KG/SM

KG/SM A

KG/SM G

PS

P

OFM

FS

VFM

KILOGRAM PER SQ. METER

KILOGRAM PER SQ. METER (ABSOLUTE)

KILOGRAM PER SQ. METER (GAUGE)

JACKET WATER RETURN

MEDIUM PRESSURE STEAM

MEDIUM PRESSURE CONDENSATE

LOW PRESSURE STEAM

LOW PRESSURE CONDENSATE

BOILER BLOW DOWN

PUMPED CONDENSATE

JACKET WATER SUPPLY

VACUUM PUMP DISCHARGE

FUEL OIL TANK VENT

CONDENSATE WATER SUPPLY

CONDENSATE WATER RETURN

MEDIUM TEMPERATURE HOT WATER SUPPLY

MEDIUM TEMPERATURE HOT WATER RETURN

LOW TEMPERATURE HOT WATER SUPPLY

LOW TEMPERATURE HOT WATER RETURN

PIPE TO BE REMOVED

REFRIGERANT DISCHARGE

REFRIGERANT SUCTION

LPS

CONTROL AIR MAIN

air conditioning and refrigeration

RD

RS

(NAME)E

(NAME)

M

EXISTING PIPE

COMPRESSED AIR

VACUUM (AIR)

HWR

VAC

A

MTWS

MTWR

HWS

FOD FUEL OIL DRAIN

FOR

CS

CR

FOV

FOG

FOS FUEL OIL SUPPLY

FUEL OIL RETURN

FUEL OIL GAUGE

PC

VPD

MU

LPC

BBD

MAKE UP WATER

MPS

MPC

JWR

JWS

heating

PIPING

CHECK, SWINGSANITARY DRAIN

PITCH OR PIPE, UP(U), DOWN(D)

FLOOR SINK (200mm x 200mm)

PIPE SLEEVE WITH FIRE STOPPING

VENT THRU ROOF

BFP

valves : (for selective actuators)

PLAN

HOSE BIBB

AIR LINEA

BALL

ELEV.

BACKFLOW PREVENTER

PIPE SLEEVE

(NAME)

ACID

200mm x 200mm

SURFACE CLEANOUT

FLOOR CLEANOUT

FLOOR DRAIN

CHEMICAL SUPPLY PIPES

FUNNEL DRAIN, OPEN

FCO

FD

SCO

FLOOR OR GRADE

FLOOR OR GRADE

CONDENSATE DRAIN BELOW

CONDENSATE DRAIN ABOVE

ACID WASTE

GASG

CD

CD

AIR VENT, MANUAL

AIR VENT, AUTOMATIC

W/ MEASURING TAP

EXPANSION LOOP

EXPANSION JOINT

BALL JOINT

ANCHOR, MAIN

ANCHOR, INTERMEDIATE

ALIGNMENT GUIDE

AIR SEPARATOR

FLEXIBLE CONNECTOR

SQUARE HEAD BALANCING COCK

EJ

S

MV

AVV

CHECK, NON-SLAM

CONTROL, ELECTRIC-PNEUMATIC

CONTROL, PNEUMATIC-ELECTRIC

QUICK OPENING

PRESSURE REDUCING

NEEDLE

LOCK SHIELD

HOSE END DRAIN

SAFETY

RELIEF

SQUARE HEAD BALANCING COCK

QUICK CLOSING, FUSIBLE LINK

R

S

PE

EP

plumbing

COLD WATER(DCW)

HOT WATER RETURN(DHWR)

HOT WATER SUPPLY(DHW)

VENT

MOTOR ELECTRIC

DIAPHRAGM

valves, special duty :

SOLENOIDS

valve actuators

M

FDAD

SUCTIONQUANTITY SUCT

TONS OF REFRIGERATION

TEMPERATURE DIFFERENCE

HEAT TRANSFER COEFFICIENTSANITARY

SUBMERSIBLE

SUPPLY AIR

SCHEDULE

RADIATOR

REFRIGERATION TON

REVOLUTIONS PER MINUTE

RELATIVE HUMIDITY

RETURN AIR

THERMAL RESISTANCE

REFRIGERANT (12, 22, ETC)

TYPICALTYP

URINAL

UNIT HEATER

UR

UH

U

THERMOSTAT

THICKNESS

THERMOMETER

TEMPERATURE

SYMBOL

TSTAT

TONS

THERM

THK

TEMP

TD

SYM

SINGLE POLE DOUBLE THROW

LPH, STANDARD CONDITIONS

LPS, STANDARD CONDITIONS

LPD, STANDARD CONDITIONS

SAYBOLT SECONDS UNIVERSAL

SAYBOLT SECONDS FUROL

SENSIBLE HEATOUTSIDE AIR INTAKE LOUVER SH

PRESSURE DROP OR DIFFERENCE

PRESSURE REDUCING VALVE

PHASE (ELECTRIC)

PERCENT

PARTS PER MILLION

POINT OF CONNECTION

PLUMBING

PETROLEUM, OIL AND LUBRICANTS

QUART

OUTSIDE SCREW & YOKE

DIAMETER, OUTSIDE

PRESSURE GAGE

POLE

PASCAL

OXYGEN

SPRINKLERSPR

STEEL

STANDARD

STEAM

SQUARE

STAINLESS STEEL

STORAGESTOR

STL

STD

ST

SSU

SST

SSF

SQ

SENSIBLE LOAD

STATIC PRESSURE

SQUARE METER

SPECIFICATION

SPDT

SPEC

SM

SP

SLPH

SLPS

SLPD

SL

ALARM CHECK VALVE

SIDEWALL SPRINKLER

PENDENT SPRINKLER

UPRIGHT SPRINKLER

FIRE DEPARTMENT CONNECTION

PRE-ACTION VALVE

NOT TO SCALE

OUTSIDE AIR

(2-WAY SHOWN)

DRY-PIPE VALVE

SECOND

SAFETY FACTOR

SPECIFIC GRAVITYSG

SF

SEC

VARIABLE AIR VOLUMEVAV

VENTILATION

PRESSURE, DYNAMIC(VELOCITY)

WATER-COOLED

WATER CLOSET

WATTHOUR OR WATER HEATER

WET BULB TEMPERATURE

WATERPROOF

WSHR

WCLD

WTRPRF

WH

WT

W/

WD

WC

WBT

WEIGHT

WITH

WASHER

WIDTH

VP

VOL

WB

W

VISC

VERT

VENT

VEL

VOLUME

WET BULB

WATT

VISCOSITY

VERTICAL

VELOCITY

MANUAL VOLUME DAMPER

SMOKE DAMPER (PROVIDE ACCESS DOOR)

PNEUMATIC OPERATED DAMPER

VLV

V

VAC

M

VALVE

VOLT

VACUUM

SPLITTER DAMPER

SD

AD

VD

grilles, registers and diffusers :

SG

SR

600/300

300x150

200mm NCD

FIGURE IS ON TOP

810mm x 400mm dampers

ELBOW, TURNED DOWN

REDUCER, CONCENTRIC

REDUCER, ECCENTRIC (STRAIGHT, INVERT)

REDUCER, ECCENTRIC (STRAIGHT, DOWN)

TEE, OUTLET DOWN

TEE, SINGLE SWEEP

sprinkler

UNION, SCREWED

UNION, FLANGED

TEE, OUTLET UP

TEE

LATERAL

CONNECTION, BOTTOM

CONNECTION, TOP

ELBOW, TURNED UP

BUSHING

CAP

WELDED

FLANGED

SOLDERED

SCREWED BELL AND SPIGOT

SOLVENT CEMENT

SOUND ATTENUATOR

DETECTORS, FIRE AND/OR SMOKE

ELECTRIC MOTOR OPERATED DAMPER

FIRE DAMPER (PROVIDE ACCESS DOOR)

BACKDRAFT DAMPER

BDD

S

TRANSITION

TURNING VANES

SF

CHANGE OF ELEVATION, RISE(R), DOWN(D)

DUCT SECTION, NEGATIVE PRESS., FIRST

ACCESS DOOR, VERTICAL OR HORIZONTAL

COWL, (GOOSENECK) AND FLASHING

ACOUSTICAL LINING

FLEXIBLE DUCT

FLEXIBLE CONNECTIONFC

FIGURE IS ON TOP

R

AD

47.2

TG

94.4

UC 13mm

DG

500/300L

DUCT WORK

810mm x 400mm

810mm x 400mm

THERMOSTAT, ELECTRIC

TRAP, ELECTRIC (INDICATE TYPE)

fitting :

R

THERMOMETER

EXHAUST AIR GRILLE OR REGISTER, CEILING

DUCT SECTION, POSITIVE PRESS., FIRST

DIRECTION OF FLOW

SR

DIFFUSER, LINEAR

RETURN AIR GRILLE OR REGISTER, CEILING

CEILING DIFFUSER, SQUARE TYPE

CEILING DIFFUSER, ROUND TYPE (200mm

(600mm x 300mmH, 472 LPS)

UNDERCUT DOOR (13mm, 47.2 LPS)

DOOR GRILLE (300mmx150mmH)

NECK DIAMETER)

TRANSFER GRILLE ASSEMBLY

LOUVER, DOOR OR WALL

(500mmWx300mmH, 94.4 LPS)

RG

RR

SUPPLY AIR GRILLE OR REGISTER, SIDEWALL

EXHAUST AIR GRILLE OR REGISTER, CEILING

SUPPLY AIR GRILLE OR REGISTER, CEILING

ER

SG

EG

FD FIRE DAMPER

VOLUME DAMPERVD

EXHAUST AIREA

B.O.P BOTTOM OF PIPE INVERT

EL. ELEVATION

INV. INVERT

INDICATIONS & SYMBOLS

MECHANICAL MATERIAL

(BLDG S-2399)

MECHANICAL

CAMP CASEY

REPAIR BUILDING S-2399,

CHONG, ST

160851

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

15.

14.

13.

12.

11.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

PIPING SYSTEMS SHALL BE FLUSHED, PURGED & CLEANED PER SPECS REQUIREMENTS

AND FLUSHED UNTIL ALL WATER BEING FLUSHED IS CLEAR AS TAP WATER.

RA & EA DUCT SHALL BE PRESSURE CLASS -50mm AQ.

ALL AIR DUCT DIMENSION SHOWN ARE INDICATED AS ACTUAL INSIDE DIMENSIONS.

DUCTWORK SHALL BE PATCHED OR RESTORED TO MATCH ADJACENT SURFACE OR AREAS.

TO SMACNA STATIC PRESSURE CLASS 500PA AND DUCTWORK SHALL MEET THE REQUIREMENTS

ALL SUPPLY, RETURN AND EXHAUST AIR DUCTWORK SHALL BE CONSTRUCTED ACCORDING

OF SEAL CLASS C.

CONNECT TO EXISTING SYSTEM SHALL BE DONE IN SUCH A MANNER AS NOT DAMAGE

THE EXISTING EQUIPMENT ANY EQUIPMENT, DUCT WORK, PIPING ETC. DAMAGED DUE TO

THE WORK PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED OR REPLACED BY

THE CONTRACTOR SHALL VISIT THE SITE AND SHALL FAMILIARIZE HIMSELF WITH

THE EXISTING CONDITIONS, EQUIPMENT, FINISHES, ETC., PRIOR TO START OF WORK.

IF ANY DISCREPANCY IS DETECTED, IT SHOULD BE BROUGHT TO THE CONTRACTING OFFICER'S

REPRESENTATIVE ATTENTION WITH RECOMMENDATIONS FOR PROPER CORRECTIONS FOR

LOCATION AND SIZES OF EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC. APPROXIMATE

SHOP DRAWING SHALL NOT BE THE EXACT DUPLICATION OF THE CONTRACT DRAWING.

NO MECHANICAL WORK CAN BE STARTED WITHOUT AN APPROVED SHOP DRAWINGS.

ANY PIPES THAT PENETRATE FIRE RATED WALL (EXISTING/ NEW) SHALL BE SEALED PER SPEC.

ALL WALL/FLOOR/ROOF OPENINGS RESULTED FROM THE REMOVAL OF PIPING AND

CONTRACTING OFFICER'S APPROVAL.

AND SHALL BE VERIFIED AT THE JOB SITE.

THIS CONTRACTOR.

GENERAL NOTES

PATCHED OR RESTORED TO MATCH ADJACENT SURFACE OR AREA.

ANY OPENING RESULT FROM THE REMOVAL WORK THAT'S NOT TO BE RE-USED SHALL BE

ALL HVAC PIPING/DUCTWORK TO BE REMOVED SHALL INCLUDE ALL IT'S ACCESSORIES

SUCH AS ANCHORS, HANGERS/SUPPORT, ETC.

SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH EXACTLY

FIELD CONDITIONS. SUCH DETAILS SHALL BE PREPARED IN THE FIELD BY THE CONTRACTOR

ACCORDING TO ACTUAL FIELD CONDITIONS AND SUBMITTED TO THE

CONTRACTING OFFICER FOR APPROVAL.

THE EXIST DUCTWORK AND INSTALL NEW DUCTWORK AND MAKE ALL NECESSARY DUCT

IF THE EXIST DUCT ELEVATION IS CONFLICTED WITH NEW PIPING INSTALLATION, REMOVE

THE EXIST DUCTWORK AND PIPING ELEVATION/LOCATION.

PRIOR TO INSTALL NEW HVAC AND PLUMBING PIPING CONTRACTOR MUST COORDINATE WITH

CONNECTION TO FUNCTION AS ORIGINALLY INTENDED.

CONCRETE REMOVAL AND RESTORATION SHALL CONFORM TO SPEC.

SCOPE OF WORK

CONDITIONING UNITS, CONTROLS AND ASSOCIATED PIPING WITH NEW PACKAGED

1. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED ELECTRIC DOMESTIC HOT WATER

3. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED EMERGENCY SHOWER AND

4. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED ELECTRIC WATER COOLER AND

ASSOCIATED PIPING WITH NEW.

M-2

HEAT PUMP UNITS, CONTROLS AND ASSOCIATED PIPING.

3. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED CEILING FAN AND WALL MOUNTED

SMART SENSE WITH NEW.

VEHICLE EXHAUST SYSTEM WITH NEW.

HEATER AND ASSOCIATED PIPING WITH NEW.

5. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED DOMESTIC C.W, H.W, SEWER

6. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED COMPRESSOR AIR OUTLET

AND PIPING WITH NEW.

EYEWASH ASSOCIATED PIPING WITH NEW.

5. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED AIR COMPRESSOR, COMPRESSED

6. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED ELECTRIC WALL HEATER WITH NEW.

SCOPE OF WORK

GENERAL NOTES &

1. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED SPLIT AND WINDOW TYPE AIR

4. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED INDIVIDUAL HOSE REEL TYPE

AIR FILTER, AIR PRSSURE FILTER-REGULATOR LUBRICATOR AND PIPING WITH NEW.

7. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED ELECTRIC UNIT HEATER WITH NEW.

2. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED ROOF EXHAUST FAN,

AND PIPING WITH NEW.

7. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED DOMESTIC HOT WATER CIRC. PUMP

AND VENT PIPING INCLUDING WATER HAMMER ARRESTORS WITH NEW.

REPAIR AND MAINTENANCE WORK(K-WORK)

A. HVAC

B. PLUMBING

CONSTRUCTION WORK(L-WORK)

1. INSTALL SPRINKLER SYSTEM WITH NEW.

AND ASSOCIATED PIPING WITH NEW.

2. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED PLUMBING FIXTURES, DRYER VENT

MOTORIZED DAMPERS, CONTROL AND ASSOCIATED DUCTWORK WITH NEW.

(BLDG S-2399)

MECHANICAL

CAMP CASEY

REPAIR BUILDING S-2399,

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

M-3

THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING

ACTUAL QUANTITIES BASED ON THE CONTRACT DOCUMENT REQUIREMENTS.

QUANTITIES ARE SHOWN FOR ESTIMATING PURPOSE ONLY,

GENERAL NOTE

STANDARD 1010.

& COMPRESSOR SHALL CONFORM TO ARI

AIR COOLED WITH AIR COOLED CONDENSER

CAPACITY : 30.3 LPH, 26.7 DEG.C. TO 10 DEG.C.

WALL MOUNTED TYPE, MECHANICALLY

MOTOR : 1/5 HP, 115 V, 1 PH, 60 HZ.

D E S C R I P T I O N

ITEM NO QTY.

EWC

ELECTRIC WATER COOLER

M E C H A N I C A L E Q U I P M E N T S C H E D U L E - 1

NOTES:

1 2

1 2

1 2

1 2

HP

HP

HP

HP

HP

PACKAGED HEAT PUMP UNIT

ITEM

NO QTY. SERVICE T Y P E

(KW)

COOLING

(KW)

HEATING

(KW)

POWER INPUT

COOLING

(KW)

POWER INPUT

HEATING

TYPE

REFRIGERANT

VOLT/PH/HZ REMARKS

WALL MOUNT TYPE

PACKAGED

WALL MOUNT TYPE

PACKAGED

WALL MOUNT TYPE

PACKAGED

WALL MOUNT TYPE

PACKAGED

WALL MOUNT TYPE

PACKAGED

INSTALLED AS PER MANUFACTURER RECOMMENDATIONS.

ALL HEAT PUMP UNITS REFRIGERANT PIPING SHALL BE

3.0

3.6

4.7

5.2

6.5

3.8

4.3

5.6

6.3

7.6

0.82

1.10

1.25

1.40

2.01

0.96

1.15

1.44

1.74

2.25

R-410A

R-410A

R-410A

R-410A

R-410A

220/1/60

220/1/60

220/1/60

220/1/60

220/1/60

MECHANICAL EQUIPMENT SCHEDULE-1

EWH

ELECTRIC HOT WATER HEATER

1 BUILDING DOMESTIC

QTYITEM SERVICE

(GALS) VOLT/PH/HZ (DEG. C)KW

208/1/60 43.3

REMARKS

ELEMENT CAPACITY

T Y P E

CAPACITY

STORAGE SUPPLY

TEMP.

ROUND VERTICAL UPPER: 4.5

SYSTEM SIMULTANEOUS WIRING

NO

NON-

LOWER: 4.5TYPE

QTY

TOTAL: 4.5

ITEM NO Q'TY

FANS

SERVICE TYPE

AIR CAP

(LPS) N O T E

FAN MOTORESP

(Pa) RPM

HP VOLT/PH/HZ REMARKS

NOTE : 1 DISCONNECT SWITCH

EF

EF

2 BIRDSCREEN PREFABRICATED ROOF CURB.3

4 4

EF

BACKDRAFT DAMPER

MAINTENANCE BAY 1,260 0.14 AMP 120/1/603

CF

CEILING MOUNTED DIRECT DRIVE FAN

CEILING FAN

PER

MFG

WALL MOUNTED SMART SENSE MODEL

UNIT SHALL BE PROVIDED WITH/MFG.

"AIRIUSFANS" MODEL NO. A-15-SP6

OR APPROVED EQUAL

CENTRIFUGAL FAN

CEILING MOUNTED, DIRECT DRIVEN,

195062.237.7 80 Watts 115/1/60 8 9 10

8 CEILING GRILLE

PLUG-IN TYPE DISCONNECT SWITCH9

BUILT-IN FAN SPEED CONTROLLER.10

191.6 7

1.8 METER CORD AND PLUG PROVIDED FOR 120V11

115/1/601/499093.4189 1FOR MECH RM 32

BELT DRIVE CENTRIFUGAL FAN

POWER ROOF VENTILATOR

115/1/601/4876124.6825.8 1 2 3 12

BELT DRIVE CENTRIFUGAL FAN

UP BLAST, POWER ROOF VENTILATOR

MAINTENANCE BAY

LOW LEAKAGE MOTORIZED DAMPER W/LEAKAGE RATE MAX.12

3CFM / SF AT 1.0" W.G

FOR TOILET AND

LAUNDRY RM

(108)

FOREMAN OFFICE

(112)

LAUNDRY ROOM

(107)

SHOP CONTROL OFFICE

(109)

TOOL ROOM

(102)

INSPECTOR OFFICE

3 8

4 8

5 8

6 8

7 8

COOLING CAPACITY SHALL BE BASED ON 35 DEG C.

HEATING CAPACITY SHALL BE BASED ON 7 DEG C.

3 LG MODEL SW07B9JWAS OR APPROVED EQUAL. 4 LG MODEL SW09B9JWAS OR APPROVED EQUAL.

5 LG MODEL SW11B9KWAS OR APPROVED EQUAL. 6 LG MODEL SW13B9KWAS OR APPROVED EQUAL. 7 LG MODEL SW16B9KWAS OR APPROVED EQUAL. 8 POWER PLUG-INCODE

(BLDG S-2399)

MECHANICAL

AND GENERAL NOTE

CAMP CASEY

REPAIR BUILDING S-2399,

D E S C R I P T I O N

ITEM NO QTY.

AIR CAP. = 7.1 LPS (15 CFM)

OF COMPRESSED AIR. MAX. INLET PRESSURE = 1,103.2 KPa (160 PSI)

PROVIDE AUTOMATIC CLEANING, CONTROL AND CONDITIONING

AIR PRESSURE FILTER-REGULATOR LUBRICATOR

ITEM NO

PRESSURE. 115mmDIA(4-1/2INCHES x 345mm(13.62INCHES)

PROVIDE NOMINAL 3MICRON FILTRATION

D.O.P EFFICIENCY = 99.95%

MAX. 57 LPS(120 CFM) AT 1,103.2 KPa (160 PSI) INLET

HIGH EFFICIENCY PARTICULATE FILTER

CONNECTION SIZE = 25mm(1INCH)

COMPRESSED AIR FILTER

D E S C R I P T I O NQTY.

PF

FRL

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

M-4

THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING

ACTUAL QUANTITIES BASED ON THE CONTRACT DOCUMENT REQUIREMENTS.

QUANTITIES ARE SHOWN FOR ESTIMATING PURPOSE ONLY,

GENERAL NOTE

2 STAGE LUBRICATED

COMPRESSOR

T Y P E

FOR SHOP AREA

AC

AIR COMPRESSOR

NO

QTY. SERVICE VOLT/PH/HZ

(KPa)

5 208/ 3/ 60

MAX. PRESS.CAP.

HP REMARKS

1,206.58

ITEM

M E C H A N I C A L E Q U I P M E N T S C H E D U L E - 2

(GALLON)

HR5-8 OR APPROVED EQUAL.

CHAMPION MODEL NO.

REMARKS

HP(GPM)

CAPACITY

TYPESERVICEQ'TYITEM NO

VOLT/PH/HZ

MOTOR

HEAD

115/1/601 P

PIPE MOUNTED, CENTRIFUGAL PUMP 19 10FT TDH 1/6

CIRC. PUMP

DOMESTIC HOT WATER

PUMP

EES

D E S C R I P T I O N

EMERGENCY SHOWER AND EYEWASH

Q'TY

ITEM

NO

ENCON MODEL NO. 01052155 OR APPROVED EQUAL.

A SILENCING SWITCH, AND A FLASHING STROBE LIGHT FOR EACH EES.

WATER FLOW-INITATED ALARM TO INCLUDE A LOCAL AUDIBLE SIGNAL DEVICE,

INLET WATER = 1-1/4"(32mm), 20GPM (1.3LPS)

EYE WASH HEAD AND SPRAY, SHOWER OPERATED BY

BRASSTOKE ASSEMBLY WITH TWIN AREATED

200mm DIAMETER SHOWER HEAD CHROME PLATED

UNIT SHALL BE COMPLETELY SELF CONTAINED. (32)

PULL CHAIN AND EYE WASH BY PUSH HANDLE,

- DISPLAYS RED BLINKING ALARM LIGHT WHEN ACTIVATED.

- TO INCLUDE INTERMITTENT PULSING SOUND WHEN

ACTIVATED, LOCAL RESET BUTTON TO SILENCE THE

AUDIBLE ALARM.

- UNIT SHALL BE FACTORY INSULATED.

DISCHARGE

HORIZONTAL

TYPE

208/1/603

EUH

POWER

HEATING ELEMENT CAP

VOLT/PH/HZ

REMARKSSERVICEQTYNO

ELECTRIC UNIT HEATER

T Y P E

MECH RM

ITEM FAN CAPACITY

RPM HP VOLT/PH/HZAIR CAP.

1,600 208/1/601/100165.2

(KW) (LPS)

AND BUILT-IN THERMOSTAT.

PROVIDE UNIT MTD. DISCONNECT SWITCH.

QMARK MODEL MUH03-81 OR APPROVED EQUAL

ELECTRIC WALL HEATER

SERVICE T Y P E

WALL MTD

ELEMENT CAPACITY

120/1/601,000

TOTAL

VOLT/PH/HZ

REMARKS

EH

(WATTS) AMPERAGE

8.4

UNITS SHALL BE PROVIDED WITH DISCONNECT

SWITCH AND INTEGRAL THERMOSTAT.

QTYITEM

NO

RECESSED TYPE

M & W TOILET

ITEM NO

D E S C R I P T I O N

HOSE REEL W/ EXHAUST FAN

QTY.

WITH TAIL PIPE ADAPTER OR APPROVED EQUAL.

CAR-MON FAN CMD SERIES WITH TSR TUBING STORAGE REEL

150DIA x 8 M LONG HOSE, TAIL PIPE ADAPTER,SUPPORT FRAME, RATCHET MECHANISM, SPRING PACK ASSEMBLY, HOSE GUIDE, HOSE REEL ASSEMBLY, HOSE REEL EQUIPPED WITH FAN, HR

SERVICE

BAY

MAINTENANCE

(BLDG S-2399)

MECHANICAL

AND GENERAL NOTE

MECHANICAL EQUIPMENT SCHEDULE-2

FAN CAP = 350CFM, 435.4 Pa, 3,407 RPM, 1/3HP, 200V-3PH-60HZ

CAMP CASEY

REPAIR BUILDING S-2399,

M-5

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

M-5

M5

S /S

S.A S.A S.A

SPECIFIC NOTES

A

A

A

S A

S A

M

W W

REMAIN EXISTING WARM AIR FURNACE, PAD, SMOKE STACK, CONTROL, GAS PIPING

WITH ASSOCIATED ACCESSORIES AND ASSOCIATED DUCT.

REMOVE EXISTING DOMESTIC HOT WATER HEATER, ALL WATER PIPING AND ASSOCIATED ACCESSORIES.

REMOVE EXISTING AIR COMPRESSOR, PAD AND AIR PIPING WITH ASSOCIATED ACCESSORIES.

REMOVE EXISTING EMERGENCY SHOWER AND EYEWASH, PLUMBING FIXTURES AND

ALL ASSOCIATED PIPING(HW,CW,SEWER AND VENT PIPING)

REMOVE EXISTING HOSE REEL W/EXHAUST FANS AND ASSOCIATED DUCTS

5 3 5

6 6 6 6

REMOVE EXISTING EXH. FAN AND DUCT SYSTEM.

REMOVE EXISTING ALL PLUMBING FIXTURES AND ALL ASSOCIATED PIPING(HW,CW,SEWER AND VENT PIPING).

8 8 8

8 8 8

REMOVE EXISTING DOMESTIC ALL WATER PIPING AND ASSOCIATED ACCESSORIES.

10 REMOVE EXISTING SUPPLY AIR DUCTS AS INDICATED ON THE PLAN.

EXISTING/REMOVAL PLAN(GROUND FLOOR)

REMAIN EXISTING SUPPLY AIR DUCTS.

(BLDG S-2399)

MECHANICAL

AND SPECIFIC NOTES

EXISTING/REMOVAL PLAN(GROUND FLOOR)

SCALE : 1 / 50

CAMP CASEY

REPAIR BUILDING S-2399,

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

M-6

1 GROUND FL HEAT PUMP

SHOP AREA

MECH ROOM

FEC

S /S

EWC

LATRINE

WOMEN'S

LATRINE

MEN'S

VEST

J/C

TOOL ROOM

ROOM

LAUNDRY

OFFICE

INSPECTOR

OFFICE

FOREMAN

OFFICE

SHOP CONTROL

L/S

W WD BB

STORAGE

EQUIPMENT

D

FEC

FEC

AC

AIR COMPRESSOR

CONC. PAD

T

CONC.PAD

SPILL ON GROUND 25mm

CONDENSATE DRAIN

T

CONC.PAD

SPILL ON GROUND 25mm

CONDENSATE DRAIN

T

SPILL ON GROUND 25mm

CONDENSATE DRAIN

CONC.PAD

T

T

HP

HP

HP

HP

CONC.PAD

SPILL ON GROUND 25mm

CONDENSATE DRAIN

HP

HP

HP

HP

HP

HP

SPILL ON GROUND 25mm

CONDENSATE DRAIN

CONC.PAD

HP

HP

SPILL ON GROUND 25mm

CONDENSATE DRAIN

CONC.PAD

M6

(BLDG S-2399)

MECHANICAL

1.

NOTES:

CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND DIRECTION

2.

OF HEAT PUMPS IN FIELD(TYP)

CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR HEAT PUMPS.

PRIOR TO HEAT PUMPS INSTALLATION.

GROUND FL HEAT PUMP AND NOTES

SCALE : 1 / 50

CAMP CASEY

REPAIR BUILDING S-2399,

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

M-7

1 GROUND FL HVAC PLAN

SHOP AREA

MECH ROOM

FEC

S /S

EWC 103

LATRINE

WOMEN'S

LATRINE

MEN'S

VEST

J/C

TOOL ROOM

ROOM

LAUNDRY

OFFICE

INSPECTOR

OFFICE

FOREMAN

OFFICE

SHOP CONTROL

L/S

W WD BB

STORAGE

EQUIPMENT

D

FEC

FEC

AC

S.AS.AS.A

EUH

ELEC. UNIT HEATER

HR

HOSE REEL W/EXH. FAN

(TYP. OF 4)

HR

HR

HR

CF

1 CEILING EXH. FAN CF

CF

M

AIR COMPRESSOR

CONC. PAD

(TYP. OF 3)

EF

(TYP. OF 4)

ROOF EXH. FAN

EF

EF

EF

EF

ROOF EXH. FAN

LOW LEAKAGE MOTORIZED DAMPER

CEILING EXH. FAN

EF

CEILING EXH. FAN

EF

LOW LEAKAGE MOTORIZED DAMPER

EXHAUST WALL CAP

EXHAUST WALL CAP

EF

CEILING EXH. FAN

LOW LEAKAGE MOTORIZED DAMPER

EXHAUST WALL CAP

M7

T V

DRYER VENT(TYP)

(BLDG S-2399)

MECHANICAL

1.

NOTES:

CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND DIRECTION

2.

OF EQUIPMENTS IN FIELD(TYP)

PRIOR TO EQUIPMENTS INSTALLATION.

GROUND FL HVAC PLAN AND NOTES

CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR EQUIPMENTS.

SCALE : 1 / 50

CAMP CASEY

REPAIR BUILDING S-2399,

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

M-8

M-8 A

VALVE

SHUT-OFF

DRAIN TRAP

DRAIN VALVE

AC

PF

TO MAINTENACE

REGULATOR

QUICK DISCONNECT

COUPLER

SHOP

FILTER

LUBRICATOR

PS PRESSURE SWITCH SET AT 125PSI

TO START COMPRESSOR

- NOT TO SCALE

1 COMPRESSED AIR PIPING SYSTEM DIAGRAM

UNIT HEATER SUBJECT TO MANUFACTURE'S BUILT-IN SAFETIES

C. SAFETIES:

THE OCCUPANT-ADJUSTABLE SETPOINT VIA THE BUILT-IN THERMOSTAT.

SHALL CYCLE THE UNIT HEATER FAN (ON-OFF) TO MAINTAIN SPACE TEMPERATURE AT

SET ELECTRIC UNIT HEATER "ON-OFF" SWITCH TO "ON" POSITION, BUILT-IN THERMOSTAT

B. SPACE TEMPERATURE CONTROL:

THIS SEQUENCE OF OPERATION.

CONTRACTOR SHALL INSTALL MANUFACTURER'S CONTROL HARDWARE TO PERFORM

A. GENERAL:

UNIT HEATER(S) CONTROL

SEQUENCE OF OPERATION

ELECTRIC UNIT HEATER CONTROL DIAGRAM

HORIZONTAL TYPE

UNIT HEATER

M

T BUILT-IN THERMOSTAT

GENERAL

MANUFACTURER SHALL FURNISH THE SYSTEM TO INCLUDE

INTEGRAL THERMOSTAT.

THE THERMOSTAT SHALL HVAC A TEMPERATURE RANGE OF

12.7 DEC. C TO 29.4 DEC. C.

SEQUENCE OF OPERATION

THE THERMOSTAT SHALL CYCLE WALL HEATER TO MAINTAIN

THERMOSTAT SETPOINT. SET THE THERMOSTAT AY 20 DEG. C.

ELECTRIC WALL HEATER CONTROL (EH-1)

WALL HEATER W/

INTEGRAL THERMOSTAT

VENTILATION THERMOSTAT(T-1)

MECH RM VENT SYSTEM CONTROL DIAGRAM

SET AT 35.0 DEG. C. T-1

T

EF

E.A.

BACKDRDAFT DAMPER

T

M8

M8 NOT TO SCALE

M8 NOT TO SCALE

M8 NOT TO SCALE

(TYPICAL)

HOSE REEL

MANUAL SWITCH

SEQUENCE OF OPERATION

START EXHAUST FAN WITH

E.A.

HR

S

SWITCH

W/FAN

ON-OFF MANUAL

REPAIR BAY ENGINE EXHAUST SYSTEM

M8 NOT TO SCALE

SEQUENCE OF OPERATION

M8 NOT TO SCALE

PACKAGE HEAT PUMP UNIT CONTROL

(OUTDOOR)

PACKAGE HEAT PUMP UNIT

(INDOOR)

PACKAGE HEAT PUMP UNIT

MOUNTED THERMOSTAT

SUPPLIED WALL

MANUFACTURER

A. SYSTEM ON-OFF SWITCH (THRU A WIRED CONTROLLER)

B. SPACE TEMPERATURE CONTROL

2. OFF : WITH THE CONTROLLER "ON-OFF" SWITCH IN THE "OFF" POSITION.

UNTIL MANUALLY STOPPED.

THE SYSTEM WILL START FAN AND FAN SHALL RUN CONTINUOUSLY

1. ON : WITH THE CONTROLLER "ON-OFF" SWITCH IN THE "ON" POSITION

THE COMPRESSOR TO MAINTAIN ROOM TEMPERATURE AT 24 C

THE SPLIT HEAT PUMP UNIT BUILT-IN CONTROL SHALL CYCLE

(BLDG S-2399)

MECHANICAL

CONTROLS

CAMP CASEY

REPAIR BUILDING S-2399,

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

M-9

SHOP AREA

MECH ROOM

FEC

S /S

EWC

LATRINE

WOMEN'S

LATRINE

MEN'S

VEST

J/C

TOOL ROOM

ROOM

LAUNDRY

OFFICE

INSPECTOR

OFFICE

FOREMAN

OFFICE

SHOP CONTROL

L/S

W WD BB

STORAGE

EQUIPMENT

D

FEC

FEC

AC

A

A

A

AIR OUTLET(TYP OF 6)

20mm COMPRESSORFRL

A

PF

M-9

65mm C.W PIPING

FOR CONT.

SEE CIVIL DWG

1,500AIR FILTER

COMPRESSED

AIR COMPRESSOR

CONC. PAD

20mm HOSE

BIBB(TYP)

EWHELEC. WATER

HEATER

CONC. PAD

THERMOSTATIC MIXING VALVE

15 15 15

15 15 15

P

402015

25 25 20 15

25 25 20 15

SEE

- M8

SEE

- M8

M9

GROUND FL PLUMBING PIPING PLAN

(BLDG S-2399)

MECHANICAL

1.

NOTES:

CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND DIRECTION

2.

OF PLUMBING PIPING IN FIELD(TYP)

CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR PLUMBING PIPING.

PRIOR TO PLUMBING PIPING INSTALLATION.

AND NOTES

GROUND FL PLUMBING PIPING PLAN

SCALE : 1 / 50

CAMP CASEY

REPAIR BUILDING S-2399,

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

M-10

- M10

S /S

VEST

J/C

LATRINE

WOMEN'S

LATRINE

MEN'S

ROOM

LAUNDRY

L/S

W WD

D

RESPONSIBLE FOR VERIFYING ACTUAL QUANTITIES BASED ON THE CONTRACT DOCUMENTS

1. QUANTITIES ARE SHOWN FOR ESTIMATION PURPOSE ONLY, THE CONTRACTOR SHALL BENOTES :

REQUIREMENTS.

FLUSH VALVE WALL HUNG TYPE

SEE EQUIPMENT SCHEDULE40- 40

FLUSH VALVE MOUNTED TYPE

WASTE

15 40

PIPE CONNECTION

H.W. VENT

BACK

R E M A R K S

C.W.

EWC

ELECTRIC

WATER COOLER

QTY.

P-8

P-1

P-5

SYMBOL

SERVICE SINK1

F I X T U R E

LAVATORY

WATER CLOSET3

COUNTER TOP.

20P-3 URINAL1 - 40 50

EWC

P-1 x3

P-3

P-5 x3

P-8

S /S

VEST

J/C

LATRINE

WOMEN'S

LATRINE

MEN'S

EWC

P-3

P-5 x3

P-8

BALL VALVE (TYP.)

ESS

5015 40P-12 1 15LAUNDRY SINK SINGLE BOWL

WALL MOUNTED STAINLESS STELL TYPE

P-12

ROOM

LAUNDRY

W WD

D

75 FD

75 FD

100 FCO

EXACT SIZE & LOCATION

SHALL BE VERIFY IN FIELD

S

80 VTR

V

40 40

P-12

EXACT SIZE & LOCATION

SHALL BE VERIFY IN FIELD

S

100 FCO

P-1 x3

100 FCO

50 FD

50 FD

80 VTR

V

V

PLUMBING FIXTURE SCHEDULE

402015

EH

ELEC. WALL

HEATER

EH

ELEC. WALL

HEATER

HOT & COLD WATER PIPING SEWER & VENT PIPING SEWER & VENT PIPINGHOT & COLD WATER PIPING

GROUND FL PLUMBING PIPING PARTIAL PLAN

(BLDG S-2399)

MECHANICAL

1.

NOTES:

CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND DIRECTION

2.

OF PLUMBING PIPING IN FIELD(TYP)

CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR PLUMBING PIPING.

PRIOR TO PLUMBING PIPING INSTALLATION.

FIXTURE SCH. AND NOTES

GROUND PLUMBING PIPING PARTIAL PLAN,

SCALE : 1 / 25

CAMP CASEY

REPAIR BUILDING S-2399,

CHONG, ST

160851

WATER HAMMER ARRESTOR x 2

(PDI:"A" TYP)

(PDI:"A" TYP)

WATER HAMMER ARRESTOR x 2

WATER HAMMER ARRESTOR x 2

(PDI:"A" TYP)

SPRINKLER Q'TY LIST

SPRINKLER HEAD TYPE

US/(METRIC)

"K" FACTOR

SIZE

A R E ASYMBOL

THREAD

SPRINKLER Q'TY LIST

TOTAL

TOOL ROOM, MECH ROOM, EQUIPMENT STORAGE, SHOP AREAQUICK RESPONSE UPRIGHT TYPE SPRINKLER HEAD 8.0/(115)3/4" NPT

5.6/(80)1/2" NPTQUICK RESPONSE PENDENT TYPE SPRINKLER HEAD

TOTAL NUMBER OF SPRINKLER OF SYSTEM 71

FOREMAN OFFICE, SHOP CONTROL OFFICE, J/C, VEST, MEN'S LATRINE, WOMEN'S LATRINE, INSPECTOR OFFICE 9

8.0/(115)3/4" NPTQUICK RESPONSE PENDENT TYPE SPRINKLER HEAD LAUNDRY ROOM 1

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

M-11

SP

D

FIRE PROTECTION LEGEND & ABBREVIATION

SPRINKLER

MAIN SUPPLY SPRINKLER

PENDENT SPRINKLER(K=5.6)

UPRIGHT SPRINKLER(K=5.6)

CUTTING POINT

CAP

FIRE DEPARTMENT CONNECTION

(2-WAY SHOWN)

VALVES

CHECK VALVE

FITTING

WALL MOUNTED TEST HEADER

CONNECTION, TOP

ELBOW, 90

ELBOW, TURNED UP

ELBOW, TURNED DOWN

TEE

TEE, OUTLET UP

TEE, OUTLET DOWN

CONNECTION, BOTTOM

RISER

TEST VALVE

DRAIN VALVE

TYPICALTYP.

NO

EXST EXISTING

ABBREVIATIONS

MAX MAXIMUM

MIN MINIMUM

DRAIN PIPE

NUMBER

DRAWINGDWG

CONN

CONT CONTINUE/CONTINUATION

CONNECTION

RM ROOM

W/ WITH

W/O WITHOUT

SCH SCHEDULE

RESIDENTIAL PENDENT SPRINKLER(K=4.9)

UPRIGHT SPRINKLER(K=8.0)

9. ELEVATOR FIRE SPRINKLER SHALL BE IN ACCORDANCE WITH UFC 3-600-01

AUTOMATIC FIRE SUPPRESSION(S) GENERAL NOTES:

1. THE CONTRACTOR SHALL PROVIDE AND INSTALL AN AUTOMATIC WET PIPE SPRINKLER SYSTEM

TO FULLY PROTECT THIS FACILITY. THE FIRE SPRINKLER SYSTEM SHOWN THESE DRAWING IS

PERFORMANCE BASED WHICH MEANS CONCEPTUAL REQUIREMENT ONLY. THE SPRINKLER

CONTRACTOR SHALL SUBMIT A COMPLETE FIRE SPRINKLER SYSTEM SHOPDRAWINGS BASED ON

NFPA 13 AND SPECIFICATION REQUIREMENTS AND SUBMIT FOR APPROVAL PRIOR TO

INSTALLATION. THE EQUIPMENT SHOWN ARE SUGGESTED LOCATIONS HOWEVER FINAL LAYOUT

SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, MANUFACTURER'S RECOMMENDATIONS, AND

EQUIPMENT LISTINGS. CONTRACTOR SHALL COORDINATE SPRINKLER HEADS LOCATIONS WITH,

CEILING PANELS, LIGHTING FIXTURES, AND HVAC AIR DEVICES. ALL EQUIPMENT SHALL BE UL

LISTED AND FM APPROVED IN ACCORDANCE WITH NFPA 13 AND THE PROJECT SPECIFICATION.

2. THE CONTRACTOR SHALL CONDUCT WATER SUPPLY HYDRANT TEST FOR THIS PROJECT BASED

ON NFPA 291 REQUIREMENTS AND UTILIZE THIS DATA TO DESIGN THE SPRINKLER SYSTEM.

THE HYDRANT LOCATIONS, FLOW TESTS, AND DATE SHALL BE INDICATED ON THE

SHOPDRAWINGS. AUTOMATIC SPRINKLER PROTECTION SYSTEM IS REQUIRED TO PROTECT THIS

ENTIRE FACILITY. A MINIMUM 10% SAFETY FACTOR IS REQUIRED BETWEEN THE AVAILABLE

WATER SUPPLY AND THE SPRINKLER SYSTEM DEMAND.

INSTALLED IN THE HORIZONTAL POSITION.

7. ALL AUTOMATIC SPRINKLER DRAIN VALVES FOR FIRE DEPARTMENT CONNECTIONS SHALL BE

BE INSTALLED ON THE EXTERIOR.

DRAINS, BUT MUST TERMINATE TO THE BUILDING EXTERIOR. SPRINKLER RISERS SHALL NOT

AND MAINTENANCE. TEST DRAINS ARE NOT TO BE TERMINATED AT WALL SINKS OR FLOOR

6. PROVIDE MINIMUM 1M X 2M SPACE FOR EACH FIRE SPRINKLER RISER FOR INSTALLATION

AS-BUILT DRAWINGS FOR THIS PROJECT.

CONTRACTOR SHALL CONFORM TO THE SYMBOLS INDICATED IN NFPA 170 TO DEVELOP THE

22-"PLANS AND CALCULATIONS" PRIOR TO SPRINKLER PIPING INSTALLATION. THE

5. CONTRACTOR SHALL SUBMIT HYDRAULIC CALCULATIONS AS REQUIRED BY NFPA 13 CHAPTER

4. FIRE PROTECTION PLANS SHOWN ARE USED FOR COST ESTIMATE PURPOSE ONLY.

WITH O-RINGS ARE NOT PERMITTED.

BRACING CALCULATION IN ACCORDANCE WITH NFPA 13 REQUIREMENTS; SPRINKLERS

3. PROVIDE EARTHQUAKE PROTECTION (SWAY BRACING), END OF BRANCH LINE AND SEISMIC

8. FLEXIBLE COUPLINGS SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 13

10. ALL PIPING, SANITARY, VENT, WASTE, PLUMBING, OTHER PIPING, POWER OR CONTROL CIRCUTS, OR DUCT SHALL PENETRATE ANY STAIR OR EXIT PASSAGEWAY ENCLOSURE UNLESS IT SERVES

AN APPLIANCE WITHIN THE ENCLOSURE AND DEAD ENDS IN THE ENCLOSURE.

SIDEWALL SPRINKLER(K=5.6)

OS&Y GATE VALVE(N.O.)

W/TAMPER SWITCH

OS&Y GATE VALVE(N.C.)

W/TAMPER SWITCH

VERIFYING ACTUAL QUANTITIES BASED ON THE CONTRACT DOCUMENT REQUIRMENTS.

1. QUANTITIES ARE SHOWN FOR ESTIMATING PURPOSE ONLY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR

NOTE

FIRE PROTECTION LEGEND & ABBREVIATION,

AUTOMATIC FIRE SUPPRESSION GENERAL

NOTES, SPRINKLER Q'TY LIST AND NOTE

(BLDG S-2399)

MECHANICAL

CAMP CASEY

REPAIR BUILDING S-2399,

WET SPRINKLER

4.1 LPM/SM (0.10 GPM/SF)

QUICK RESPONSE

20.90 SM (225 SF)

950 LPM (250 GPM)

MAX. 4.6 M (15 FT)

140 SM (1500 SF)

MIN. 1.8 M (6 FT)

60 MIN.

ORDINARY TEMPERATURE RATING

SHOP CONTROL OFFICE, MEN'S LATRINE,

TYPE OF SYSTEM

SPRINKLER

SPRINKLER TYPE

MAX. COVERAGE PER

BETWEEN SPRINKLERS

MAX. & MIN. SPACE OF

RATING*

SPRINKLER TEMPERATURE

DESCRIPTION

HAZARD

FIRE PROTECTION REQUIREMENTS

DESIGN DENSITY

DURATION OF SUPPLY

HOSE STREAM

DESIGN AREA

APPLICATION AREA

WET SPRINKLER

8.2 LPM/SM (0.20 GPM/SF)

QUICK RESPONSE

12.07 SM (130 SF)

950 LPM (250 GPM)

MAX. 4.6 M (15 FT)

230 SM (2500 SF)

MIN. 1.8 M (6 FT)

60 MIN.

INTERMEDIATE TEMPERATURE RATING

LIGHT HAZARD

OCCUPANCY

ORDINARY HAZARD

OCCUPANCY

SHOP AREA

SPRINKLER NOZZLE

K-FACTOR OF

(8.0)

(5.6)

ORDINARY TEMPERATURE RATING

EQUIPMENT STORAGE, LAUNDRY ROOM,

TOOL ROOM, MECH ROOM, FOREMAN OFFICE, J/C, VEST,

WOMEN'S LATRINE, INSPECTOR OFFICE

100 100

MECH ROOM FIRE PROTECTION

PIPING PARTIAL PLAN

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

000000

HEAD CABINET

SPARE SPRINKLER

UL/FM APPROVED ASSEMBLY

150mm BACKFLOW PREVENTER

150mm ALARM CHECK VALVE

W/TEMPER SWITCH

100mm OS & Y GATE VALVE

100mm CHECK VALVE

W/20mm BALL DRIP VALVE

100mmX65mmX65mm

FIRE DEPARTMENT SIAMESE CONNECTION

FOR BACKFLOW PREVENTER FLOW TEST

W/20mm BALL DRIP VALVE

W/2-65mm HOSE VALVE

100mm X 2-65mm TEST HOSE HEADER

WATER MOTOR ALARM GONG

- SCALE : 1/25M12

1 MECH ROOM FIRE PROTECTION PIPING PARTIAL PLAN

M-12

(BLDG S-2399)

MECHANICAL

CAMP CASEY

REPAIR BUILDING S-2399,

SHOP CONTROL

OFFICE

MEN'S

LATRINE

WOMEN'S

LATRINE

INSPECTOR

OFFICE

LAUNDRY ROOM

EQUIPMENT

STORAGE

MECH ROOM

TOOL ROOM

FOREMAN

OFFICE

J/C

VEST

150 150

150150

FIRE PROTECTION PIPING PLAN

20mm QUICK RESPONSE

UPRIGHT TYPE SPRINKLER HEAD

150 150 150 150 150 150 150 150

150 150 150 150 150 150 150

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

- M13

M-13

FIRE PROTECTION PLAN

SYSTEM TEST CONNECTIONAUXILIARY DRAIN VALVE

PENDENT TYPE SPRINKLER HEAD

15mm QUICK RESPONSE CONCEALED

PIPING PARTIAL PLAN

SEE MECH ROOM FIRE PROTECTION

PENDENT TYPE SPRINKLER HEAD

20mm QUICK RESPONSE CONCEALED

(BLDG S-2399)

MECHANICAL

SCALE : 1/50

CAMP CASEY

REPAIR BUILDING S-2399,

MAIN RISER CONNECTION(TYPICAL)

AND SPIGOT PIECE

DUCTILE IRON FLANGE

AND SPIGOT PIIPE

RODS NOT LESS

THAN 20Ø

DUCTILE IRON BELL

SERVICE

FROM FIRE

MAIN

G.L

GENERAL NOTE :

OR LEAVING THE SUBJECT BUILDINGS.

THIS DETAIL SHALL BE UTILIZED WHERE

.FIRE MAIN SERVICE LINES ARE ENTERINE

STEEL PIPE

THRUST BLOCK

CONC.

FL

BITUMASTIC COATED

BITUMASTIC COATED

SPRINKLER ALARM CHECK VALVE & MAIN RISER FIRE DEPT SIAMESE CONNECTION

SEE

M10

PIPE

O N

I C T

E N

AU

O

F

IR

E

DEPT C

TOSPK

N

R

CONNECTION

FIRE DEPT

CLAPPER

SWIVEL

2-1/2" NS OR BS

EASE - OFF

HOSE COUPLING

PLUG

THREAD

- M14

SYSTEM TEST CONNECTION

PIPE EXTENDS THROUGH WALL TO OUTSIDE.

2. THE TEST VALVE SHOULD BE LOCATED AT AN

ACCESSIBLE POINT AND PREFERABLY NOT

OVER 7FT (2.1M) ABOVE THE FLOOR.

PIPE IN WARM ROOM BEYOND VALVE WHERE

1. NOT LESS THAN 4FT (1.2M) OF EXPOSED TEST

NOTES :

ACCESSIBLE LOCATION

TEST VALVE IN READILY

SEE NOTE

BRANCH LINE

P.G.

SWAY BRACING3

CONC

SLAB

SWAY BRACE

FITTINGS

SCHEDULE 40

PIPE *

PIPE

CLAMP

SPRINKLER

CROSSMAIN

EXPANSION BOLT

(TYP)

CONC

SLAB

SWAY BRACE

FITTINGS

SCHEDULE 40

PIPE *

SPRINKLER

CROSS

MAIN

EXPANSION

BOLT

PIPE

CLAMP

* PIPE SIZE SHALL BE DETERMINED BY CALCULATIONS

ON WET PIPE SYSTEM

WATER MOTOR ALARM DRAIN

PRESSURE SWITCH

PIPE SUPPORT

RISER TO SPRINKLER SYSTEM

RETARDING CHAMBER

WATER MOTOR ALARM GONG

MAIN DRAIN VALVE

DESCRIPTION

ALARM CHECK VALVE

(2-REQUIRED)

PRESSURE GAGE

ITEM

MAIN DRAIN AND TEST VALVE

FIRE DEPT CONNECTION

(WITH TAMPER SWITCH)

SUPERVISORY VALVE

DESCRIPTIONITEM

OS & Y GATE VALVE13

TAMPER SWITCH14

BACKFLOW PREVENTER15

TEST VALVE16

TEST VALVE HEADER17

PRESSURE RELIEF VALVE18

W /T

A M

P E

R

S

W

IT

C H

G A T E

V

L V E

O S

Y

PER NFPA 13

FLEXIBLE COUPLING

FOR EARTH QUAKE

FIRST SUPPORT W/CROSS BRACING

SWAY BRACING PER NFPA 13 FOR

FLEXIBLE COUPLERS PER NFPA 13

FOR EARTH QUAKE

VALVE

BALL DROP

VALVE

BALL DROP

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

M-14

DETAILS-1

CAMP CASEY

REPAIR BUILDING S-2399,

CHONG, ST

160851

(BLDG S-2399)

MECHANICAL

M14 M14

M14M14

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

DUCT ACCESS DOOR

DUCTWORK DETAILS

NOTE: S = SIDE OPPOSITE HINGES

NOTE; ABOVE APPLY TO SUPPLY AND RETURN

BRANCH TAKEOFFS

C cmh

A cmh

HINGE POS.2 HINGE POS.3

DOOR

300 X 300

400 X 500

600 X 600

SIZE

AND LESS

2" W.G.

STATIC

HINGES

NO.

BUTT HINGE OR

PIANO HINGE

FASTENER

FROM RECTANGULAR MAIN

OFFSETS

W

R=W

W

W

W

FULL RADIUS WHERE POSSIBLE

W

W

PREFERED OFFSET

SD

Y

YX

X

TURNING VANES (TYP.)

Y x Y=X

SD

C LESS THAN 300

(1985) FIGS. 2-7

NOTE; SEE SMACNA DUCT MANUAL

C c m h A cmh

C cmh

ROUND DUCT TAKEOFF

C 300 OR MORE

C c h m

SD

A cmh B cmh B cmh

A cmh

TYPE1

METAL GAGE

1-S

2-S

2-S

LOCKS

NO.

22 22

FRAME

DOOR

BACK

GASKET

DOOR

DUCT

GASKET

FASTENER

APPROVED

TYPE 2

DUCT

(REQ'D 2)

DOOR

FASTENER

DUCT HANGER DETAIL

X OR Y LESS THAN 300

R1=(X+Y)/2

FOR D OF 300 OR MORE

USE VANED ELBOW

D LESS THAN 300

R2=X+Y

D

R=D

R

D X

R

Y

SPLITTER DAMPER(TYP.)

R1=(W1+W2)/2

R2=W1+W2

R1=(X+Y)/2

R2=X+Y

X

X OR W LESS THAN 300

R1

Y

SD

W2

RETURN ONLY

MANUAL DAMPER

PROVIDE VE WHEN COIL OR DIFFUSER IS

1,500 OR LESS FROM BRANCH TAKEOFF.

x Y=X

Y

2 REFER TO ARCHITECTURAL DWGS. FOR CEILING TYPE.

PROVIDE FRAME TYPE TO SUIT CEILING SPECIFIED, REFER TO AIR DEVICE SCHEDULE

1 REFER TO PLAN DRAWINGS AND AIR DEVICE SCHEDULE FOR DIFFUSER TYPE.

CEILING DIFFUSER DETAIL

DETAIL NOTES;

EQUALIZING DEFLECTOR

OPPOSED BLADE DAMPER

TEE-BAR CEILING

REMOVABLE FACE PANEL

CEILING DIFFUSER WITH

600x600 LAY-IN 3-CONE

NOMINALLY

25 THICK DUCT LINER, OR

RECTANGULAR DUCTWORK

DUCTWORK W/EXTERNAL

EXTERNAL THERMAL

VAPOR SEAL

INSULATION W/VAPOR

DIFFUSER NECK SIZE

SAME SIZE AS CEILING

THERMAL INSULATION

VARRIER

INSULATION

VAPOR SEAL

AND ANTI-SMUDGING

HANGER

STRAPS

SCREWS

STRAP HANGERS

OMITTED IF

SCREWS MAY BE

HANGER LOOPS

250 DIA MAX.

TRAPEZE HANGERS FOR DUCTS UNDER 0.6 M AREA

DISTANCE IS NOT EXCEED 1,500 UNLESS FOOT OF STRAP IS

REINFORCEMENT MAY BE USED FOR ATTACHMENT IF IT QUALIFIES

HANGER SIZES FOR RECTANGULAR DUCT

BAND OF

SAME SIZE

AS HANGER

STRAP

600 DIA MAX. 700 DIA MAX.

LOAD CAPACITY)

SEE NOTE 2

LOAD RATED

FASTENERS

ALTERNATIVE LOCATION

(VERIFY UPPER TRAPEZE

SECURE

WIRE

SEE NOTE 1

SIZE BOLT(S)

FOR LOAD

INSULATION

STRAP

OR ROD

ANGLES

HANGER

ROD

NUTS

FOR BOTH DUTIES.

PLACED UNDER A BOTTOM REINFORCEMENT.

DO NOT EXCEED ALLOWABLE LOAD LIMITS.

1275 THRU 2,100

NOTES :

10 DIA

1.

2.

3,00025 x 16 GA 2

HANGER SIZES FOR ROUND DUCT

DIAMETER

925 THRU 1,250

475 THRU 900

UP THRU 450

OVER 2425

DUCT

8 GA WIRE

HANGER

6 DIA OR

RODS

10 DIA

10 DIA

15 DIA

DIMENSION

1,075 THRU 1,500

UP THRU 450

475 THRU 750

775 THRU 1,050

2,125 THRU 2,400

1,525 THRU 2,100

OF DUCT

RODS

10 DIA

10 DIA

10 DIA

10 DIA

3,000

3,000

3,000

MAXIMUM

SPACING

25 x 22 GA

STARP

HANGERS

25 x 20 GA

25 x 20 GA

40 x 16 GA

NUMBER OF

HANGERS

50 x 50 x 6

25 x 22 GA

25 x 22 GA

HANGERS

25 x 16 GA

25 x 16 GA

25 x 18 GA

25 x 18 GA

25 x 25 x 3

25 x 25 x 3

ANGLES

50 x 50 x 5

50 x 50 x 3

40 x 40 x 3

40 x 40 x 3

TRAPEZE HANGERS

LONGEST HANGER STARP TRAPEZE SHELF

REMARKS

2,400

3,000

3,000

SPACING

2,400

2,400

3,000

3,000

MAXIMUM

25MIN.

EXHAUST DUCT STAKE

DUCT UP TO VEHICLE

ENGINE EXHAUST HOSE REEL EXHAUST DUCT DETAIL

ADAPTER

EXHAUST FAN

FLEXIBLE

(TYPICAL)

CONNECTOR

TAIL PIPE

WITH 150 HOSE

HOSE REEL

HOSE REEL

SUPPORT TO

3M A.F.F.

STRUCT.

HR

DETAILS - 2

M-15

M15

CAMP CASEY

REPAIR BUILDING S-2399,

CHONG, ST

160851

(BLDG S-2399)

MECHANICAL

M15

M15M15M15

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

RUNNER TYPE 2

DIVISION 7 WORK

BACKDRAFT MOTORIZED

INSULATED ROOF CURVE,

EXHAUST DUCT WORK

POWER ROOF VENTILATOR

POWER ROOF VENTILATOR

MIN. 2 EACH SIDE

BY FAN MFR.,

RECOMMENDED

LAGBOLTS AS

CURB HT.

300 MIN.

SEE ARCH. DWGS.

WOOD BLOCKING,

SEE ARCH. DWGS.

ROOF CONSTR.

22 GA

RUNNER TYPE 1

DOUBLE WALL VANES

FREE AREA BETWEEN

INLET AREA.

WELD EVERY 6TH VANE TO RUNNER(OVER 1,000 FPM)

OR RUN A TIE ROD THROUGH THE CENTER VANE.

APPROXIMATES ELBOW

SEE ARCH. DWGS.

WOOD NAILER

ALL AROUND

GASKET SEAL

(SPECIFIED IN DIVISION 7)

FLASHING

UNIT HOOD

SEE NOTES ON FIG.2-4

APPROVAL.

DUCT TURNING VANE DETAIL

ACCEPTABLE ON DESIGNER

SIZES OR SPACINGS

OTHER RUNNERS MAY BE

USED. OTHER VANE

WELD RUNNER TO DUCT

BOLT, SCREW, OR

LARGE

SMALL

SINGLE VANE SCHEDULE

MIN

81.25

112.5

R

112.5

OR

FL

O

W

SP

GA

SP

R

SP

SINGLE VANE WITH

FLAT

SP=40

20 TRAILING EDGE

R=50

R

SP

M

DAMPER

CLASS II ADHESIVE UNDER

EMBEDDED BETWEEN COATS.(WHEN FIELD

BARRIER COATING WITH GLASS CLOTH

APPLYING TWO COATS OF VAPOR-

EDGES OF THE INSULATION JOINT.

AND NOT MORE THAN 80 FROM THE

ALL FOUR SIDE OF DUCT 300 APART

CLASS II ADHESIVE (LESS THAN 600 DUCT) AROUND ENTIRE PERIMETER OF THE

APPLY VAPOR-BARRIER JACKET)

F

DUCT INSULATION

CLASS II ADHESIVE UNDER

MORE THAN 80 FROM DUCT CORNER.

BOTTOM/SIDES 450 O.C. AND NOT

DUCT IN 150 WIDTH STRIPS ON 300 ON CENTER

100 O.C. WITH TYPE II VAPOR-BARRIER COATING

VAPOR-BARRIER JACKET

THE 50 OVERLAP.

FLEXIBLE TYPEC

E

D

600 LARGE DUCT

DUCT IN

AREA

ITEM

A

B

CONCEALED

THE 100 OVERLAP.

RIGID TYPE

EXPOSED

VAPOR-BARRIER JACKET

STAPLE

OVERLAP

DUCT

INSULATION

FASTENER

ADHESIVE

C

B

A

F

D

E

METAL JACKET

INSULATION

ALL AROUND

SEALANT #2

BACK UP MATERIAL

PIPE WITHOUT INSULATION

MIN. 6 CLEARANCE

PIPE WITH INSULATION

PIPE SLEEVE (INTERIOR WALL)

INTERIOR WALL

METAL BAND

SLEEVE

CEILING

(TYP.)

(CLOSED CELL

FLEXIBLE FOAM

RUBBER OR

MATERIAL

BACK UP

SEALANT #2

PLASTIC)

PIPE CL

SLEEVE

MOTOR

DAMPER

TACK WELD

CASING

EQUIPMENT

WITH UL 214)

FABRIC (COMPLY

FIBROUS GLASS

SPACING BETWEEN

FLEXIBLE CONNECTION & ANGLE FLANGE CONNECTION

UNLESS OTHERWISE SPECIFIED, ROOM THERMOSTAT SHALL BE

WHERE DUCTS ARE INSTALLED ABOVE CEILING ACCESS PANELS SHALL

TURNING VANES SHALL BE INSTALLED IN ALL SQUARE ELBOWS.

BE PROVIDED IN CEILING FOR DUCT ACCESS DOORS, DAMPERS, ETC.

CONSTRUCTION STANDARDS BY SMACNA, INDUSTRIAL VENTILATION BY ACGIH, ASHRAE

OTHER DUCT WORK DETAILS NOT SHOWN SHALL CONFORM TO HVAC DUCT

AND WALL OR CEILING, AND WALL REGISTERS SHALL BE INSTALLED AT LEAST 6 SPACE

SPONGE-RUBBER GASKETS SHALL BE PROVIDED BETWEEN DIFFUSERS OR REGISTERS

THE DUCT, THE DUCT SHALL BE EXTENDED 150 TO 300 BEYOND THE OPENING OF THE

WHEN A SUPPLY AIR REGISTER OR GRILLE OR DIFFUSER IS LOCATED AT THE END OF

INSTALLED 1,500 ABOVE FL.

INCHES BELOW THE CEILING.

REGISTER OR GRILLE OR DIFFUSER.

HANDBOOKS, AND NFPA 90-A.

5.

4.

6.

GENERAL NOTES :

1.

2.

3.

MIN. 100

RIVET, SOLID FLAT

HEAD @100 O.C.

APPROX 50

DETAIL

"BOTTOMS"

MALE PIECE-SNAP LOCK

BOLT & NUT

SCREW)

6 DIA x 25 LG

@100 O.C.(OR METAL

GASKET MIN. 6 THK

STEEL SHT (TYP.)

U-STRAP 20GA. GALV.

STEEL ANGLE (TYP.)

40 x 40 x 3

ALL AROUND

GASKET SEAL

2"x6"(50x150) WOOD

VENTED CURB

EXTENSION

BLOCKING NAILER

EXHAUST DUCT WORK

MET. ROOF LINER

CLOSURE STRIP

P.M CAP FLASHING

P.M ROOFING

EXHAUST FAN

MIN. 2 EACH SIDE

P.M CAP FLASHING

DRAIN CONNECTION

LAGBOLTS AS

BY FAN MFR.,

RECOMMENDED

GREASE TRAP

UPBLAST TYPE KITCHEN

UP-BLAST EXHAUST FAN FOR RANGE HOOD EXHAUST

M16-

DETAILS - 3

M-16

CAMP CASEY

REPAIR BUILDING S-2399,

CHONG, ST

160851

(BLDG S-2399)

MECHANICAL

M16 M16

M16M16M16

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ELECTRIC WATER COOLER

WATER-PROOF MEMBRANE

FLOOR DRAIN

SEE NOTE-2

AREA/PIT DRAIN

SEE NOTE-1

12550

WASHER DRAIN STAND PIPE

FRONT VIEW SIDE VIEW

DRAINS SHALL BE CONNECTED TO CAST IRON P-TRAP.

A CHROMIUM PLATED BRONZE, NICKEL BRONZE OR NICKEL BRASS STRAINER.

4. DRAINS SHALL HAVE A CAST IRON BODY AND SEEPAGE PAN AND

2. NEOPRENE RUBBER GASKET COMPRESSION TYPE JOINT.

FILL/BED

WATER-PROOF MEMBRANE

FINISH/TILE FLOOR

STRUCTURAL

DRAIN AND BACKWATER VALVE

SEE NOTE-2

A

SLAB

CEMENT

SEE NOTE-1

3.

STRUCTURAL

SLAB

CEMENT

FILL/BED

A

FINISH/TILE FLOOR

WATER-PROOF MEMBRANE

AOUTLET SIZE

FLOOR/SHOWER DRAIN

SEE NOTE-2

SEE NOTE-1

FINISH/TILE FLOOR

STRUCTURAL

SLAB

FILL/BED

CEMENT

A

1. WATER-PROOF MEMBRANE ARE NOT REQUIRED IN SLAB ON GRADE.

50 DRAIN

20 HW 50

20 CW

MACHINE

WASHING

CW & HW

225 W x 150 D x 150 H

SERVICE BOX

W/HOSE BIBB

WASHER VALVE

20 UNION

BOX

50mm OPEN

SIGHT DRAIN

40 VENT

50 STAND

PIPE

M-17

M17

DETAILS-4

TEE DRAINGE PATTERN

AS REQ'D

PIPE SLEEVE

NOTE : WATER COOLER SHELL BE STATIONARY

WATER COOLER

ELECTRIC

BUBBLER

P-TRAP

BACKDRAFT DAMPER

EXHAUST DUCT WORK

INSULATED ROOF CURB,

DIVISION 7WORK

POWER ROOF VENTILATOR

LAGBOLTS AS

RECOMMENDED

BY FAN MFR.,

MIN. 2 EACH SIDE

SEE ARCH. DWGS.

WOOD BLOCKING,

SEE ARCH. DWGS.

INSTALLATION OF GRAVITY ROOF FANS(VENTILATORS) SHALL BE SIMILAR.

NOTE;

ROOF CONSTR.

SEE ARCH. DWGS.

UNIT HOOD

FLASHING

(SPECIFIED IN DIVISION 7)CURB HT.

300 MIN.

WOOD NAILER

GASKET SEAL

ALL AROUND

POWER ROOF VENTILATOR

WALL

INSULATION

PIPE

50Ø PS DOWN

SPOUT NOZZLE

DRAIN PIPINGWALL FLANGE

PROVIDE

THREADS.

EXP BOLTS

MOUNTING

HOLES AT 120°

BUSHING

NOTE: DOWN SPOUT NOZZLES SHALL BE BRONZE BODY WITH

BONZE WALL FLANGE. UNITS SHALL HAVE FEMALE PIPE

40Ø A/C

DOWNSPOUT NOZZLE DETAIL3

CAMP CASEY

REPAIR BUILDING S-2399,

CHONG, ST

160851

(BLDG S-2399)

MECHANICAL

M17 M17

M17M17

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

EMERG. EYE WASH SHOWER DETAIL

A 200 DIA BOLT CIRCLE

90 DIA HOLES ON

225 DIA FLANGE WITH

250 DELUGE SHOWER HEAD

VALVE

SELF-CLOSING BALL

PLUGGED NIPPLE

15 IPS BRASS

32 IPS DRAIN

SELF-CLOSING

BALL VALVE

"A"

25 IPS BRASS

250DIA

"A"

,1

F L O

O R

,1

F L O

O R

DRAIN

32 IPSPUSH

250DIA

"A-A" VIEW

32 IPS SUPPLY INLET

250DIA

P U

S H

SUPPLY INLET

OPTIONAL 32 IPS

"C"

"A"

"B"

TYPE

33-60128 125

WATER HAMMER ARRESTOR

94 81

115 81

HEIGHT DIAMETER

1-11

12-32

CAPACITY

FIXTURE UNIT

FIXTURE

TO LAST

THREADED PLUG

FROM BRANCH

SUPPLY

AND SIZE

20 OR 25 SEE

DWGS FOR LOCATION

PRESSURE PNEUMATIC

STAINLESS STEELSHELL

STAINLESS STEEL

ORIFICE

FLOW CONTROL

H E

IG

H

T DISPLACEMENT

ADAPTER

FLUID

BELLOWS

HYDRAULIC

CUSHION

DISPLACEMENT

DIAMETER

M18-

M18-

DETAILS - 5

M-18

CAMP CASEY

REPAIR BUILDING S-2399,

CHONG, ST

160851

TYPICAL IN LINE PUMP PIPING DETAIL

DISCHARGE

SUCTION

CALIBRATED BALANCING

PRESSURE GAUGE

(TYP)

SHUT-OFF COCK

PROVIDE CHECK VALVE

DOMESTIC HOT WATER

RECIRULATION PUMP

IN DISCHARGES

VALVE

- M18

NOTES : 1.WATER-PROOF MEMBRANE ARE NOT REQUIRED IN SLAB ON GRADE.

PLUG Y-BRANCH

WHEN NOT THRU RUN

1/8 BEND

LEAD CAULKING

JUTE PACKING, SEE NOTE-2

FINISH FLOOR

NEOPRENE GASKET

2.CHROMIUM-PLATED BRONZE, NICKEL BRONZE,NICKEL BRASS OR

STAINLESS STEEL FLUSH TYPE ACCESS COVER PLATE

FLOOR CLEANOUT

CAST IRON

PIPE

Y-BRANCH

SCORIATED COVER

SEE NOTE-2

TWO PIECE THREADED

ADJUSTABLE HOUSING

WATER-PROOF MEMBRANE

- M18

"C"

"A"

"B"

TYPE

33-60128 125

WATER HAMMER ARRESTOR

94 81

115 81

HEIGHT DIAMETER

1-11

12-32

CAPACITY

FIXTURE UNIT

FIXTURE

TO LAST

THREADED PLUG

FROM BRANCH

SUPPLY

AND SIZE

20 OR 25 SEE

DWGS FOR LOCATION

PRESSURE PNEUMATIC

STAINLESS STEELSHELL

STAINLESS STEEL

ORIFICE

FLOW CONTROL

H E

IG

H

T DISPLACEMENT

ADAPTER

FLUID

BELLOWS

HYDRAULIC

CUSHION

DISPLACEMENT

DIAMETER

M18-

(BLDG S-2399)

MECHANICAL

160851_Repair Bldg S-2399(TMP), Cp Casey_M1
160851_Repair Bldg S-2399(TMP), Cp Casey_M2
160851_Repair Bldg S-2399(TMP), Cp Casey_M3
160851_Repair Bldg S-2399(TMP), Cp Casey_M4
160851_Repair Bldg S-2399(TMP), Cp Casey_M5
160851_Repair Bldg S-2399(TMP), Cp Casey_M6
160851_Repair Bldg S-2399(TMP), Cp Casey_M7
160851_Repair Bldg S-2399(TMP), Cp Casey_M8
160851_Repair Bldg S-2399(TMP), Cp Casey_M9
160851_Repair Bldg S-2399(TMP), Cp Casey_M10
160851_Repair Bldg S-2399(TMP), Cp Casey_M11
160851_Repair Bldg S-2399(TMP), Cp Casey_M12
160851_Repair Bldg S-2399(TMP), Cp Casey_M13
160851_Repair Bldg S-2399(TMP), Cp Casey_M14

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.