8)_Drawing__MECH_2399.pdf
PDF 5 MB Posted
- Attached to
- Repair Building 2399 & 2388 CP Casey
- Solicitation number
- W90VN819R0037
About this file
Drawing 8 Mechanical B2399
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W90VN8-19-R-0037.pdf | ||
| 1)_Drawing_files___Title.pdf | ||
| Submittal_Register.pdf | ||
| 2)_Drawing__ARCH_2388.pdf | ||
| 7)_Drawing__MECH_2388.pdf | ||
| W90VN8-19-R-0037.pdf | ||
| 6)_Drawing__ELEC_2399.pdf | ||
| 5)_Drawing__ELEC_2388.pdf | ||
| 3)_Drawing__ARCH_2399.pdf | ||
| 4)_Drawing__CIVIL.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M-1
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
M E C H A N I C A L M A T E R I A L I N D I C A T I O N S & S Y M B O L S
NTS
PD
Pa
OS&Y
OXY
OD
OAIL
OA
QT
PRV
PPM
POL
POC
PLMB
PH
PG
RT
RPM
RH
RDTR
RA
R12, R22
QTY
A B B R E V I A T I O N S
SBM
SAN
SA
SCH
FLOWMETER, ORIFICEBUTTERFLY
REFRIGERANT LIQUID
CHILLED WATER SUPPLY
CHILLED WATER RETURN
AIR COOLED CONDENSING UNIT
AIR CONDITION UNIT (S)
APPARATUS DEW POINT
AIR CONDITION (-ING,-ED)
HOT CHILLED WATER RETURN
AMERICAN WIRE GAUGE
PRESSURE, BAROMETRIC
CUBIC METER PER HOUR
HOT/CHILLED WATER SUPPLY
CAPACITYCAP
CONNECTION
CONTINUE
COMPRESSOR
CUBIC METER
CPRSR
CONN
CONT
CU M
CHILLED WATER
CAST IRON PIPE
CIRCUIT
CLASSIFICATION
COOLING LOAD
COEFFICIENT
COUNTER CLOCKWISE
CLASS
CLG LOAD
COEF
CMH
CIP
CCW
CHW
CKT
ACV ALARM CHECK VALVE
AVERAGEAVG
BOILING POINT
CENTIGRADE
BAROMETER(-TRIC)
BRAKE HORSEPOWER
BP
BHP
C
BARO PR
AWG
BARO
ALUMINUM
ALTITUDE
AMBIENT
AIR HANDLING UNIT
AMPERE(AMP, AMPS)
APPROXIMATEAPPROX
ALT
AMB
AMP
AIR COND
ADP
AL
AHU
AIR COOLED
ACCU
ACLD
ACU
CHR
C/HWR
C/HWS
CHS
RL
D DRAIN
DIAMETER, INSIDE
ISOMETRIC
IRON PIPE SIZE
JOULE
THERMAL CONDUCTIVITY
KILOGRAM
KILOGRAM PER SQ. CENTIMETER (GAUGE)
KILOGRAM PER SQ. CENTIMETER
KILOGRAM PER SQ. CENTIMETER (ABSOLUTE)
KILOCALORIE PER HOUREXPANSION JOINT
EXPLOSION PROOF
FIRE HOSE CABINET
FULL LOAD AMPERES
ENTERING WATER TEMP
EVAPORAT (-E,-ING,-ED,-OR)
EXTERNAL STATIC PRESSURE
FACE AREA OR FRESH AIRFA
FHC
FHY
FLA
FIRE HYDRANT
ESP
EXPJT
EWT
EVAP
EP
EQPT
ENT
EFF
EQUIPMENT
ENTERING
EFFICIENCY
KG/SQ CM
KG/SQ CM A
KG/SQ CM G
KG
KCAL/HR
J
K
ID
ISO
IPS
NO
N.O.
NIC
NPT
MPS
NC
N/A
N.C.
MAX
MIN
MPH
MM
NOT IN CONTRACT
NATIONAL TAPER PIPE (THREAD)
NUMBER
NORMALLY OPEN
MINIMUM OR MINUTE
METERS PER HOUR
METERS PER SECOND
NORMALLY CLOSED
NOISE CRITERIA
NOT APPLICABLE
MAXIMUM
MILLIMETER R
FEMALE PIPE THREAD
FUEL OIL
GALVANIZED STEEL
GAGE OR GAUGE
FIXTURE
FEED WATER PUMP
FACE VELOCITY
FLUSH VALVE
FREQUENCY
FIBERGLASS REINFORCED PLASTIC
HORIZONTAL
HOT WATER HEATER
HOT WATER
HOUR(S)
HORSEPOWER
MERCURY
HEAD
HOSE BIBB
HERTZ
GRAMS
FRP
CWP CIRCULATING WATER PUMP
DIRECT EXPANSION
DRY PIPE VALVE
EQUIVALENT DIRECT RADIATION
ENTERING AIR TEMPERATURE
DOUBLE POLE DOUBLE THROW
DEWPOINT TEMPERATURE
DRY BULB TEMPERATURE
DECIBEL OR DRY BULB
DIESEL OILDO
ECON
ECC
EAT
EDR
DX
DPV
DPDT
DPT
ECONOMIZER
ECCENTRIC
o
DIFF
DIAG
DIA or
DIV
DBT
DB
DIFFERENCE
DIAGRAM
DIAMETER
DIVISION
DEGREE
HR
HORIZ
HWH
HW
HZ
HP
HG
HD
HB
GALVS
GA
GR
FXTR
FWP
FVEL
FV
CUBIC MILLIMETER
CLOCKWISE OR COLD WATER
COEFFICIENT, VALVE FLOWCv
CU MM
CW
PLUG VALVE
THREE WAY
FPT
FO
FREQ
GATE, ANGLE
GATE, GLOBE
GLOBE
GATE
CONTROL
KJ KILOJOULE
LH
LT
LWT
LPS
M
LL
LPD
LPH
LM
LAV
LAT
LBS
LG
KW
KWH
L
LATENT HEAT
LEAVING WATER TEMPERATURE
LITERS PER HOUR
LITERS PER SECOND
LAUNDRY TRAY
METERS
LIQUID LINE
LITERS PER DAY
LINEAR METER
LEAVING AIR TEMPERATURE
LAVATORY
POUNDS
LENGTH
KILOWATT
KILOWATT HOUR
LITERS
P
FLOWMETER, VENTURI
FLOW SWITCH
PRESSURE SWITCH
PRESSURE GAUGE AND COCK
PUMP (INDICATE USE)
STRAINER
STRAINER, BLOW OFF
KG/SM
KG/SM A
KG/SM G
PS
P
OFM
FS
VFM
KILOGRAM PER SQ. METER
KILOGRAM PER SQ. METER (ABSOLUTE)
KILOGRAM PER SQ. METER (GAUGE)
JACKET WATER RETURN
MEDIUM PRESSURE STEAM
MEDIUM PRESSURE CONDENSATE
LOW PRESSURE STEAM
LOW PRESSURE CONDENSATE
BOILER BLOW DOWN
PUMPED CONDENSATE
JACKET WATER SUPPLY
VACUUM PUMP DISCHARGE
FUEL OIL TANK VENT
CONDENSATE WATER SUPPLY
CONDENSATE WATER RETURN
MEDIUM TEMPERATURE HOT WATER SUPPLY
MEDIUM TEMPERATURE HOT WATER RETURN
LOW TEMPERATURE HOT WATER SUPPLY
LOW TEMPERATURE HOT WATER RETURN
PIPE TO BE REMOVED
REFRIGERANT DISCHARGE
REFRIGERANT SUCTION
LPS
CONTROL AIR MAIN
air conditioning and refrigeration
RD
RS
(NAME)E
(NAME)
M
EXISTING PIPE
COMPRESSED AIR
VACUUM (AIR)
HWR
VAC
A
MTWS
MTWR
HWS
FOD FUEL OIL DRAIN
FOR
CS
CR
FOV
FOG
FOS FUEL OIL SUPPLY
FUEL OIL RETURN
FUEL OIL GAUGE
PC
VPD
MU
LPC
BBD
MAKE UP WATER
MPS
MPC
JWR
JWS
heating
PIPING
CHECK, SWINGSANITARY DRAIN
PITCH OR PIPE, UP(U), DOWN(D)
FLOOR SINK (200mm x 200mm)
PIPE SLEEVE WITH FIRE STOPPING
VENT THRU ROOF
BFP
valves : (for selective actuators)
PLAN
HOSE BIBB
AIR LINEA
BALL
ELEV.
BACKFLOW PREVENTER
PIPE SLEEVE
(NAME)
ACID
200mm x 200mm
SURFACE CLEANOUT
FLOOR CLEANOUT
FLOOR DRAIN
CHEMICAL SUPPLY PIPES
FUNNEL DRAIN, OPEN
FCO
FD
SCO
FLOOR OR GRADE
FLOOR OR GRADE
CONDENSATE DRAIN BELOW
CONDENSATE DRAIN ABOVE
ACID WASTE
GASG
CD
CD
AIR VENT, MANUAL
AIR VENT, AUTOMATIC
W/ MEASURING TAP
EXPANSION LOOP
EXPANSION JOINT
BALL JOINT
ANCHOR, MAIN
ANCHOR, INTERMEDIATE
ALIGNMENT GUIDE
AIR SEPARATOR
FLEXIBLE CONNECTOR
SQUARE HEAD BALANCING COCK
EJ
S
MV
AVV
CHECK, NON-SLAM
CONTROL, ELECTRIC-PNEUMATIC
CONTROL, PNEUMATIC-ELECTRIC
QUICK OPENING
PRESSURE REDUCING
NEEDLE
LOCK SHIELD
HOSE END DRAIN
SAFETY
RELIEF
SQUARE HEAD BALANCING COCK
QUICK CLOSING, FUSIBLE LINK
R
S
PE
EP
plumbing
COLD WATER(DCW)
HOT WATER RETURN(DHWR)
HOT WATER SUPPLY(DHW)
VENT
MOTOR ELECTRIC
DIAPHRAGM
valves, special duty :
SOLENOIDS
valve actuators
M
FDAD
SUCTIONQUANTITY SUCT
TONS OF REFRIGERATION
TEMPERATURE DIFFERENCE
HEAT TRANSFER COEFFICIENTSANITARY
SUBMERSIBLE
SUPPLY AIR
SCHEDULE
RADIATOR
REFRIGERATION TON
REVOLUTIONS PER MINUTE
RELATIVE HUMIDITY
RETURN AIR
THERMAL RESISTANCE
REFRIGERANT (12, 22, ETC)
TYPICALTYP
URINAL
UNIT HEATER
UR
UH
U
THERMOSTAT
THICKNESS
THERMOMETER
TEMPERATURE
SYMBOL
TSTAT
TONS
THERM
THK
TEMP
TD
SYM
SINGLE POLE DOUBLE THROW
LPH, STANDARD CONDITIONS
LPS, STANDARD CONDITIONS
LPD, STANDARD CONDITIONS
SAYBOLT SECONDS UNIVERSAL
SAYBOLT SECONDS FUROL
SENSIBLE HEATOUTSIDE AIR INTAKE LOUVER SH
PRESSURE DROP OR DIFFERENCE
PRESSURE REDUCING VALVE
PHASE (ELECTRIC)
PERCENT
PARTS PER MILLION
POINT OF CONNECTION
PLUMBING
PETROLEUM, OIL AND LUBRICANTS
QUART
OUTSIDE SCREW & YOKE
DIAMETER, OUTSIDE
PRESSURE GAGE
POLE
PASCAL
OXYGEN
SPRINKLERSPR
STEEL
STANDARD
STEAM
SQUARE
STAINLESS STEEL
STORAGESTOR
STL
STD
ST
SSU
SST
SSF
SQ
SENSIBLE LOAD
STATIC PRESSURE
SQUARE METER
SPECIFICATION
SPDT
SPEC
SM
SP
SLPH
SLPS
SLPD
SL
ALARM CHECK VALVE
SIDEWALL SPRINKLER
PENDENT SPRINKLER
UPRIGHT SPRINKLER
FIRE DEPARTMENT CONNECTION
PRE-ACTION VALVE
NOT TO SCALE
OUTSIDE AIR
(2-WAY SHOWN)
DRY-PIPE VALVE
SECOND
SAFETY FACTOR
SPECIFIC GRAVITYSG
SF
SEC
VARIABLE AIR VOLUMEVAV
VENTILATION
PRESSURE, DYNAMIC(VELOCITY)
WATER-COOLED
WATER CLOSET
WATTHOUR OR WATER HEATER
WET BULB TEMPERATURE
WATERPROOF
WSHR
WCLD
WTRPRF
WH
WT
W/
WD
WC
WBT
WEIGHT
WITH
WASHER
WIDTH
VP
VOL
WB
W
VISC
VERT
VENT
VEL
VOLUME
WET BULB
WATT
VISCOSITY
VERTICAL
VELOCITY
MANUAL VOLUME DAMPER
SMOKE DAMPER (PROVIDE ACCESS DOOR)
PNEUMATIC OPERATED DAMPER
VLV
V
VAC
M
VALVE
VOLT
VACUUM
SPLITTER DAMPER
SD
AD
VD
grilles, registers and diffusers :
SG
SR
600/300
300x150
200mm NCD
FIGURE IS ON TOP
810mm x 400mm dampers
ELBOW, TURNED DOWN
REDUCER, CONCENTRIC
REDUCER, ECCENTRIC (STRAIGHT, INVERT)
REDUCER, ECCENTRIC (STRAIGHT, DOWN)
TEE, OUTLET DOWN
TEE, SINGLE SWEEP
sprinkler
UNION, SCREWED
UNION, FLANGED
TEE, OUTLET UP
TEE
LATERAL
CONNECTION, BOTTOM
CONNECTION, TOP
ELBOW, TURNED UP
BUSHING
CAP
WELDED
FLANGED
SOLDERED
SCREWED BELL AND SPIGOT
SOLVENT CEMENT
SOUND ATTENUATOR
DETECTORS, FIRE AND/OR SMOKE
ELECTRIC MOTOR OPERATED DAMPER
FIRE DAMPER (PROVIDE ACCESS DOOR)
BACKDRAFT DAMPER
BDD
S
TRANSITION
TURNING VANES
SF
CHANGE OF ELEVATION, RISE(R), DOWN(D)
DUCT SECTION, NEGATIVE PRESS., FIRST
ACCESS DOOR, VERTICAL OR HORIZONTAL
COWL, (GOOSENECK) AND FLASHING
ACOUSTICAL LINING
FLEXIBLE DUCT
FLEXIBLE CONNECTIONFC
FIGURE IS ON TOP
R
AD
47.2
TG
94.4
UC 13mm
DG
500/300L
DUCT WORK
810mm x 400mm
810mm x 400mm
THERMOSTAT, ELECTRIC
TRAP, ELECTRIC (INDICATE TYPE)
fitting :
R
THERMOMETER
EXHAUST AIR GRILLE OR REGISTER, CEILING
DUCT SECTION, POSITIVE PRESS., FIRST
DIRECTION OF FLOW
SR
DIFFUSER, LINEAR
RETURN AIR GRILLE OR REGISTER, CEILING
CEILING DIFFUSER, SQUARE TYPE
CEILING DIFFUSER, ROUND TYPE (200mm
(600mm x 300mmH, 472 LPS)
UNDERCUT DOOR (13mm, 47.2 LPS)
DOOR GRILLE (300mmx150mmH)
NECK DIAMETER)
TRANSFER GRILLE ASSEMBLY
LOUVER, DOOR OR WALL
(500mmWx300mmH, 94.4 LPS)
RG
RR
SUPPLY AIR GRILLE OR REGISTER, SIDEWALL
EXHAUST AIR GRILLE OR REGISTER, CEILING
SUPPLY AIR GRILLE OR REGISTER, CEILING
ER
SG
EG
FD FIRE DAMPER
VOLUME DAMPERVD
EXHAUST AIREA
B.O.P BOTTOM OF PIPE INVERT
EL. ELEVATION
INV. INVERT
INDICATIONS & SYMBOLS
MECHANICAL MATERIAL
(BLDG S-2399)
MECHANICAL
CAMP CASEY
REPAIR BUILDING S-2399,
CHONG, ST
160851
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
15.
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PIPING SYSTEMS SHALL BE FLUSHED, PURGED & CLEANED PER SPECS REQUIREMENTS
AND FLUSHED UNTIL ALL WATER BEING FLUSHED IS CLEAR AS TAP WATER.
RA & EA DUCT SHALL BE PRESSURE CLASS -50mm AQ.
ALL AIR DUCT DIMENSION SHOWN ARE INDICATED AS ACTUAL INSIDE DIMENSIONS.
DUCTWORK SHALL BE PATCHED OR RESTORED TO MATCH ADJACENT SURFACE OR AREAS.
TO SMACNA STATIC PRESSURE CLASS 500PA AND DUCTWORK SHALL MEET THE REQUIREMENTS
ALL SUPPLY, RETURN AND EXHAUST AIR DUCTWORK SHALL BE CONSTRUCTED ACCORDING
OF SEAL CLASS C.
CONNECT TO EXISTING SYSTEM SHALL BE DONE IN SUCH A MANNER AS NOT DAMAGE
THE EXISTING EQUIPMENT ANY EQUIPMENT, DUCT WORK, PIPING ETC. DAMAGED DUE TO
THE WORK PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED OR REPLACED BY
THE CONTRACTOR SHALL VISIT THE SITE AND SHALL FAMILIARIZE HIMSELF WITH
THE EXISTING CONDITIONS, EQUIPMENT, FINISHES, ETC., PRIOR TO START OF WORK.
IF ANY DISCREPANCY IS DETECTED, IT SHOULD BE BROUGHT TO THE CONTRACTING OFFICER'S
REPRESENTATIVE ATTENTION WITH RECOMMENDATIONS FOR PROPER CORRECTIONS FOR
LOCATION AND SIZES OF EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC. APPROXIMATE
SHOP DRAWING SHALL NOT BE THE EXACT DUPLICATION OF THE CONTRACT DRAWING.
NO MECHANICAL WORK CAN BE STARTED WITHOUT AN APPROVED SHOP DRAWINGS.
ANY PIPES THAT PENETRATE FIRE RATED WALL (EXISTING/ NEW) SHALL BE SEALED PER SPEC.
ALL WALL/FLOOR/ROOF OPENINGS RESULTED FROM THE REMOVAL OF PIPING AND
CONTRACTING OFFICER'S APPROVAL.
AND SHALL BE VERIFIED AT THE JOB SITE.
THIS CONTRACTOR.
GENERAL NOTES
PATCHED OR RESTORED TO MATCH ADJACENT SURFACE OR AREA.
ANY OPENING RESULT FROM THE REMOVAL WORK THAT'S NOT TO BE RE-USED SHALL BE
ALL HVAC PIPING/DUCTWORK TO BE REMOVED SHALL INCLUDE ALL IT'S ACCESSORIES
SUCH AS ANCHORS, HANGERS/SUPPORT, ETC.
SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH EXACTLY
FIELD CONDITIONS. SUCH DETAILS SHALL BE PREPARED IN THE FIELD BY THE CONTRACTOR
ACCORDING TO ACTUAL FIELD CONDITIONS AND SUBMITTED TO THE
CONTRACTING OFFICER FOR APPROVAL.
THE EXIST DUCTWORK AND INSTALL NEW DUCTWORK AND MAKE ALL NECESSARY DUCT
IF THE EXIST DUCT ELEVATION IS CONFLICTED WITH NEW PIPING INSTALLATION, REMOVE
THE EXIST DUCTWORK AND PIPING ELEVATION/LOCATION.
PRIOR TO INSTALL NEW HVAC AND PLUMBING PIPING CONTRACTOR MUST COORDINATE WITH
CONNECTION TO FUNCTION AS ORIGINALLY INTENDED.
CONCRETE REMOVAL AND RESTORATION SHALL CONFORM TO SPEC.
SCOPE OF WORK
CONDITIONING UNITS, CONTROLS AND ASSOCIATED PIPING WITH NEW PACKAGED
1. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED ELECTRIC DOMESTIC HOT WATER
3. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED EMERGENCY SHOWER AND
4. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED ELECTRIC WATER COOLER AND
ASSOCIATED PIPING WITH NEW.
M-2
HEAT PUMP UNITS, CONTROLS AND ASSOCIATED PIPING.
3. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED CEILING FAN AND WALL MOUNTED
SMART SENSE WITH NEW.
VEHICLE EXHAUST SYSTEM WITH NEW.
HEATER AND ASSOCIATED PIPING WITH NEW.
5. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED DOMESTIC C.W, H.W, SEWER
6. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED COMPRESSOR AIR OUTLET
AND PIPING WITH NEW.
EYEWASH ASSOCIATED PIPING WITH NEW.
5. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED AIR COMPRESSOR, COMPRESSED
6. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED ELECTRIC WALL HEATER WITH NEW.
SCOPE OF WORK
GENERAL NOTES &
1. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED SPLIT AND WINDOW TYPE AIR
4. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED INDIVIDUAL HOSE REEL TYPE
AIR FILTER, AIR PRSSURE FILTER-REGULATOR LUBRICATOR AND PIPING WITH NEW.
7. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED ELECTRIC UNIT HEATER WITH NEW.
2. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED ROOF EXHAUST FAN,
AND PIPING WITH NEW.
7. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED DOMESTIC HOT WATER CIRC. PUMP
AND VENT PIPING INCLUDING WATER HAMMER ARRESTORS WITH NEW.
REPAIR AND MAINTENANCE WORK(K-WORK)
A. HVAC
B. PLUMBING
CONSTRUCTION WORK(L-WORK)
1. INSTALL SPRINKLER SYSTEM WITH NEW.
AND ASSOCIATED PIPING WITH NEW.
2. REPAIR BY REPLACEMENT OF EXISTING DETERIORATED PLUMBING FIXTURES, DRYER VENT
MOTORIZED DAMPERS, CONTROL AND ASSOCIATED DUCTWORK WITH NEW.
(BLDG S-2399)
MECHANICAL
CAMP CASEY
REPAIR BUILDING S-2399,
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
M-3
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING
ACTUAL QUANTITIES BASED ON THE CONTRACT DOCUMENT REQUIREMENTS.
QUANTITIES ARE SHOWN FOR ESTIMATING PURPOSE ONLY,
GENERAL NOTE
STANDARD 1010.
& COMPRESSOR SHALL CONFORM TO ARI
AIR COOLED WITH AIR COOLED CONDENSER
CAPACITY : 30.3 LPH, 26.7 DEG.C. TO 10 DEG.C.
WALL MOUNTED TYPE, MECHANICALLY
MOTOR : 1/5 HP, 115 V, 1 PH, 60 HZ.
D E S C R I P T I O N
ITEM NO QTY.
EWC
ELECTRIC WATER COOLER
M E C H A N I C A L E Q U I P M E N T S C H E D U L E - 1
NOTES:
1 2
1 2
1 2
1 2
HP
HP
HP
HP
HP
PACKAGED HEAT PUMP UNIT
ITEM
NO QTY. SERVICE T Y P E
(KW)
COOLING
(KW)
HEATING
(KW)
POWER INPUT
COOLING
(KW)
POWER INPUT
HEATING
TYPE
REFRIGERANT
VOLT/PH/HZ REMARKS
WALL MOUNT TYPE
PACKAGED
WALL MOUNT TYPE
PACKAGED
WALL MOUNT TYPE
PACKAGED
WALL MOUNT TYPE
PACKAGED
WALL MOUNT TYPE
PACKAGED
INSTALLED AS PER MANUFACTURER RECOMMENDATIONS.
ALL HEAT PUMP UNITS REFRIGERANT PIPING SHALL BE
3.0
3.6
4.7
5.2
6.5
3.8
4.3
5.6
6.3
7.6
0.82
1.10
1.25
1.40
2.01
0.96
1.15
1.44
1.74
2.25
R-410A
R-410A
R-410A
R-410A
R-410A
220/1/60
220/1/60
220/1/60
220/1/60
220/1/60
MECHANICAL EQUIPMENT SCHEDULE-1
EWH
ELECTRIC HOT WATER HEATER
1 BUILDING DOMESTIC
QTYITEM SERVICE
(GALS) VOLT/PH/HZ (DEG. C)KW
208/1/60 43.3
REMARKS
ELEMENT CAPACITY
T Y P E
CAPACITY
STORAGE SUPPLY
TEMP.
ROUND VERTICAL UPPER: 4.5
SYSTEM SIMULTANEOUS WIRING
NO
NON-
LOWER: 4.5TYPE
QTY
TOTAL: 4.5
ITEM NO Q'TY
FANS
SERVICE TYPE
AIR CAP
(LPS) N O T E
FAN MOTORESP
(Pa) RPM
HP VOLT/PH/HZ REMARKS
NOTE : 1 DISCONNECT SWITCH
EF
EF
2 BIRDSCREEN PREFABRICATED ROOF CURB.3
4 4
EF
BACKDRAFT DAMPER
MAINTENANCE BAY 1,260 0.14 AMP 120/1/603
CF
CEILING MOUNTED DIRECT DRIVE FAN
CEILING FAN
PER
MFG
WALL MOUNTED SMART SENSE MODEL
UNIT SHALL BE PROVIDED WITH/MFG.
"AIRIUSFANS" MODEL NO. A-15-SP6
OR APPROVED EQUAL
CENTRIFUGAL FAN
CEILING MOUNTED, DIRECT DRIVEN,
195062.237.7 80 Watts 115/1/60 8 9 10
8 CEILING GRILLE
PLUG-IN TYPE DISCONNECT SWITCH9
BUILT-IN FAN SPEED CONTROLLER.10
191.6 7
1.8 METER CORD AND PLUG PROVIDED FOR 120V11
115/1/601/499093.4189 1FOR MECH RM 32
BELT DRIVE CENTRIFUGAL FAN
POWER ROOF VENTILATOR
115/1/601/4876124.6825.8 1 2 3 12
BELT DRIVE CENTRIFUGAL FAN
UP BLAST, POWER ROOF VENTILATOR
MAINTENANCE BAY
LOW LEAKAGE MOTORIZED DAMPER W/LEAKAGE RATE MAX.12
3CFM / SF AT 1.0" W.G
FOR TOILET AND
LAUNDRY RM
(108)
FOREMAN OFFICE
(112)
LAUNDRY ROOM
(107)
SHOP CONTROL OFFICE
(109)
TOOL ROOM
(102)
INSPECTOR OFFICE
3 8
4 8
5 8
6 8
7 8
COOLING CAPACITY SHALL BE BASED ON 35 DEG C.
HEATING CAPACITY SHALL BE BASED ON 7 DEG C.
3 LG MODEL SW07B9JWAS OR APPROVED EQUAL. 4 LG MODEL SW09B9JWAS OR APPROVED EQUAL.
5 LG MODEL SW11B9KWAS OR APPROVED EQUAL. 6 LG MODEL SW13B9KWAS OR APPROVED EQUAL. 7 LG MODEL SW16B9KWAS OR APPROVED EQUAL. 8 POWER PLUG-INCODE
(BLDG S-2399)
MECHANICAL
AND GENERAL NOTE
CAMP CASEY
REPAIR BUILDING S-2399,
D E S C R I P T I O N
ITEM NO QTY.
AIR CAP. = 7.1 LPS (15 CFM)
OF COMPRESSED AIR. MAX. INLET PRESSURE = 1,103.2 KPa (160 PSI)
PROVIDE AUTOMATIC CLEANING, CONTROL AND CONDITIONING
AIR PRESSURE FILTER-REGULATOR LUBRICATOR
ITEM NO
PRESSURE. 115mmDIA(4-1/2INCHES x 345mm(13.62INCHES)
PROVIDE NOMINAL 3MICRON FILTRATION
D.O.P EFFICIENCY = 99.95%
MAX. 57 LPS(120 CFM) AT 1,103.2 KPa (160 PSI) INLET
HIGH EFFICIENCY PARTICULATE FILTER
CONNECTION SIZE = 25mm(1INCH)
COMPRESSED AIR FILTER
D E S C R I P T I O NQTY.
PF
FRL
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
M-4
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING
ACTUAL QUANTITIES BASED ON THE CONTRACT DOCUMENT REQUIREMENTS.
QUANTITIES ARE SHOWN FOR ESTIMATING PURPOSE ONLY,
GENERAL NOTE
2 STAGE LUBRICATED
COMPRESSOR
T Y P E
FOR SHOP AREA
AC
AIR COMPRESSOR
NO
QTY. SERVICE VOLT/PH/HZ
(KPa)
5 208/ 3/ 60
MAX. PRESS.CAP.
HP REMARKS
1,206.58
ITEM
M E C H A N I C A L E Q U I P M E N T S C H E D U L E - 2
(GALLON)
HR5-8 OR APPROVED EQUAL.
CHAMPION MODEL NO.
REMARKS
HP(GPM)
CAPACITY
TYPESERVICEQ'TYITEM NO
VOLT/PH/HZ
MOTOR
HEAD
115/1/601 P
PIPE MOUNTED, CENTRIFUGAL PUMP 19 10FT TDH 1/6
CIRC. PUMP
DOMESTIC HOT WATER
PUMP
EES
D E S C R I P T I O N
EMERGENCY SHOWER AND EYEWASH
Q'TY
ITEM
NO
ENCON MODEL NO. 01052155 OR APPROVED EQUAL.
A SILENCING SWITCH, AND A FLASHING STROBE LIGHT FOR EACH EES.
WATER FLOW-INITATED ALARM TO INCLUDE A LOCAL AUDIBLE SIGNAL DEVICE,
INLET WATER = 1-1/4"(32mm), 20GPM (1.3LPS)
EYE WASH HEAD AND SPRAY, SHOWER OPERATED BY
BRASSTOKE ASSEMBLY WITH TWIN AREATED
200mm DIAMETER SHOWER HEAD CHROME PLATED
UNIT SHALL BE COMPLETELY SELF CONTAINED. (32)
PULL CHAIN AND EYE WASH BY PUSH HANDLE,
- DISPLAYS RED BLINKING ALARM LIGHT WHEN ACTIVATED.
- TO INCLUDE INTERMITTENT PULSING SOUND WHEN
ACTIVATED, LOCAL RESET BUTTON TO SILENCE THE
AUDIBLE ALARM.
- UNIT SHALL BE FACTORY INSULATED.
DISCHARGE
HORIZONTAL
TYPE
208/1/603
EUH
POWER
HEATING ELEMENT CAP
VOLT/PH/HZ
REMARKSSERVICEQTYNO
ELECTRIC UNIT HEATER
T Y P E
MECH RM
ITEM FAN CAPACITY
RPM HP VOLT/PH/HZAIR CAP.
1,600 208/1/601/100165.2
(KW) (LPS)
AND BUILT-IN THERMOSTAT.
PROVIDE UNIT MTD. DISCONNECT SWITCH.
QMARK MODEL MUH03-81 OR APPROVED EQUAL
ELECTRIC WALL HEATER
SERVICE T Y P E
WALL MTD
ELEMENT CAPACITY
120/1/601,000
TOTAL
VOLT/PH/HZ
REMARKS
EH
(WATTS) AMPERAGE
8.4
UNITS SHALL BE PROVIDED WITH DISCONNECT
SWITCH AND INTEGRAL THERMOSTAT.
QTYITEM
NO
RECESSED TYPE
M & W TOILET
ITEM NO
D E S C R I P T I O N
HOSE REEL W/ EXHAUST FAN
QTY.
WITH TAIL PIPE ADAPTER OR APPROVED EQUAL.
CAR-MON FAN CMD SERIES WITH TSR TUBING STORAGE REEL
150DIA x 8 M LONG HOSE, TAIL PIPE ADAPTER,SUPPORT FRAME, RATCHET MECHANISM, SPRING PACK ASSEMBLY, HOSE GUIDE, HOSE REEL ASSEMBLY, HOSE REEL EQUIPPED WITH FAN, HR
SERVICE
BAY
MAINTENANCE
(BLDG S-2399)
MECHANICAL
AND GENERAL NOTE
MECHANICAL EQUIPMENT SCHEDULE-2
FAN CAP = 350CFM, 435.4 Pa, 3,407 RPM, 1/3HP, 200V-3PH-60HZ
CAMP CASEY
REPAIR BUILDING S-2399,
M-5
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
M-5
M5
S /S
S.A S.A S.A
SPECIFIC NOTES
A
A
A
S A
S A
M
W W
REMAIN EXISTING WARM AIR FURNACE, PAD, SMOKE STACK, CONTROL, GAS PIPING
WITH ASSOCIATED ACCESSORIES AND ASSOCIATED DUCT.
REMOVE EXISTING DOMESTIC HOT WATER HEATER, ALL WATER PIPING AND ASSOCIATED ACCESSORIES.
REMOVE EXISTING AIR COMPRESSOR, PAD AND AIR PIPING WITH ASSOCIATED ACCESSORIES.
REMOVE EXISTING EMERGENCY SHOWER AND EYEWASH, PLUMBING FIXTURES AND
ALL ASSOCIATED PIPING(HW,CW,SEWER AND VENT PIPING)
REMOVE EXISTING HOSE REEL W/EXHAUST FANS AND ASSOCIATED DUCTS
5 3 5
6 6 6 6
REMOVE EXISTING EXH. FAN AND DUCT SYSTEM.
REMOVE EXISTING ALL PLUMBING FIXTURES AND ALL ASSOCIATED PIPING(HW,CW,SEWER AND VENT PIPING).
8 8 8
8 8 8
REMOVE EXISTING DOMESTIC ALL WATER PIPING AND ASSOCIATED ACCESSORIES.
10 REMOVE EXISTING SUPPLY AIR DUCTS AS INDICATED ON THE PLAN.
EXISTING/REMOVAL PLAN(GROUND FLOOR)
REMAIN EXISTING SUPPLY AIR DUCTS.
(BLDG S-2399)
MECHANICAL
AND SPECIFIC NOTES
EXISTING/REMOVAL PLAN(GROUND FLOOR)
SCALE : 1 / 50
CAMP CASEY
REPAIR BUILDING S-2399,
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
M-6
1 GROUND FL HEAT PUMP
SHOP AREA
MECH ROOM
FEC
S /S
EWC
LATRINE
WOMEN'S
LATRINE
MEN'S
VEST
J/C
TOOL ROOM
ROOM
LAUNDRY
OFFICE
INSPECTOR
OFFICE
FOREMAN
OFFICE
SHOP CONTROL
L/S
W WD BB
STORAGE
EQUIPMENT
D
FEC
FEC
AC
AIR COMPRESSOR
CONC. PAD
T
CONC.PAD
SPILL ON GROUND 25mm
CONDENSATE DRAIN
T
CONC.PAD
SPILL ON GROUND 25mm
CONDENSATE DRAIN
T
SPILL ON GROUND 25mm
CONDENSATE DRAIN
CONC.PAD
T
T
HP
HP
HP
HP
CONC.PAD
SPILL ON GROUND 25mm
CONDENSATE DRAIN
HP
HP
HP
HP
HP
HP
SPILL ON GROUND 25mm
CONDENSATE DRAIN
CONC.PAD
HP
HP
SPILL ON GROUND 25mm
CONDENSATE DRAIN
CONC.PAD
M6
(BLDG S-2399)
MECHANICAL
1.
NOTES:
CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND DIRECTION
2.
OF HEAT PUMPS IN FIELD(TYP)
CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR HEAT PUMPS.
PRIOR TO HEAT PUMPS INSTALLATION.
GROUND FL HEAT PUMP AND NOTES
SCALE : 1 / 50
CAMP CASEY
REPAIR BUILDING S-2399,
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
M-7
1 GROUND FL HVAC PLAN
SHOP AREA
MECH ROOM
FEC
S /S
EWC 103
LATRINE
WOMEN'S
LATRINE
MEN'S
VEST
J/C
TOOL ROOM
ROOM
LAUNDRY
OFFICE
INSPECTOR
OFFICE
FOREMAN
OFFICE
SHOP CONTROL
L/S
W WD BB
STORAGE
EQUIPMENT
D
FEC
FEC
AC
S.AS.AS.A
EUH
ELEC. UNIT HEATER
HR
HOSE REEL W/EXH. FAN
(TYP. OF 4)
HR
HR
HR
CF
1 CEILING EXH. FAN CF
CF
M
AIR COMPRESSOR
CONC. PAD
(TYP. OF 3)
EF
(TYP. OF 4)
ROOF EXH. FAN
EF
EF
EF
EF
ROOF EXH. FAN
LOW LEAKAGE MOTORIZED DAMPER
CEILING EXH. FAN
EF
CEILING EXH. FAN
EF
LOW LEAKAGE MOTORIZED DAMPER
EXHAUST WALL CAP
EXHAUST WALL CAP
EF
CEILING EXH. FAN
LOW LEAKAGE MOTORIZED DAMPER
EXHAUST WALL CAP
M7
T V
DRYER VENT(TYP)
(BLDG S-2399)
MECHANICAL
1.
NOTES:
CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND DIRECTION
2.
OF EQUIPMENTS IN FIELD(TYP)
PRIOR TO EQUIPMENTS INSTALLATION.
GROUND FL HVAC PLAN AND NOTES
CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR EQUIPMENTS.
SCALE : 1 / 50
CAMP CASEY
REPAIR BUILDING S-2399,
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
M-8
M-8 A
VALVE
SHUT-OFF
DRAIN TRAP
DRAIN VALVE
AC
PF
TO MAINTENACE
REGULATOR
QUICK DISCONNECT
COUPLER
SHOP
FILTER
LUBRICATOR
PS PRESSURE SWITCH SET AT 125PSI
TO START COMPRESSOR
- NOT TO SCALE
1 COMPRESSED AIR PIPING SYSTEM DIAGRAM
UNIT HEATER SUBJECT TO MANUFACTURE'S BUILT-IN SAFETIES
C. SAFETIES:
THE OCCUPANT-ADJUSTABLE SETPOINT VIA THE BUILT-IN THERMOSTAT.
SHALL CYCLE THE UNIT HEATER FAN (ON-OFF) TO MAINTAIN SPACE TEMPERATURE AT
SET ELECTRIC UNIT HEATER "ON-OFF" SWITCH TO "ON" POSITION, BUILT-IN THERMOSTAT
B. SPACE TEMPERATURE CONTROL:
THIS SEQUENCE OF OPERATION.
CONTRACTOR SHALL INSTALL MANUFACTURER'S CONTROL HARDWARE TO PERFORM
A. GENERAL:
UNIT HEATER(S) CONTROL
SEQUENCE OF OPERATION
ELECTRIC UNIT HEATER CONTROL DIAGRAM
HORIZONTAL TYPE
UNIT HEATER
M
T BUILT-IN THERMOSTAT
GENERAL
MANUFACTURER SHALL FURNISH THE SYSTEM TO INCLUDE
INTEGRAL THERMOSTAT.
THE THERMOSTAT SHALL HVAC A TEMPERATURE RANGE OF
12.7 DEC. C TO 29.4 DEC. C.
SEQUENCE OF OPERATION
THE THERMOSTAT SHALL CYCLE WALL HEATER TO MAINTAIN
THERMOSTAT SETPOINT. SET THE THERMOSTAT AY 20 DEG. C.
ELECTRIC WALL HEATER CONTROL (EH-1)
WALL HEATER W/
INTEGRAL THERMOSTAT
VENTILATION THERMOSTAT(T-1)
MECH RM VENT SYSTEM CONTROL DIAGRAM
SET AT 35.0 DEG. C. T-1
T
EF
E.A.
BACKDRDAFT DAMPER
T
M8
M8 NOT TO SCALE
M8 NOT TO SCALE
M8 NOT TO SCALE
(TYPICAL)
HOSE REEL
MANUAL SWITCH
SEQUENCE OF OPERATION
START EXHAUST FAN WITH
E.A.
HR
S
SWITCH
W/FAN
ON-OFF MANUAL
REPAIR BAY ENGINE EXHAUST SYSTEM
M8 NOT TO SCALE
SEQUENCE OF OPERATION
M8 NOT TO SCALE
PACKAGE HEAT PUMP UNIT CONTROL
(OUTDOOR)
PACKAGE HEAT PUMP UNIT
(INDOOR)
PACKAGE HEAT PUMP UNIT
MOUNTED THERMOSTAT
SUPPLIED WALL
MANUFACTURER
A. SYSTEM ON-OFF SWITCH (THRU A WIRED CONTROLLER)
B. SPACE TEMPERATURE CONTROL
2. OFF : WITH THE CONTROLLER "ON-OFF" SWITCH IN THE "OFF" POSITION.
UNTIL MANUALLY STOPPED.
THE SYSTEM WILL START FAN AND FAN SHALL RUN CONTINUOUSLY
1. ON : WITH THE CONTROLLER "ON-OFF" SWITCH IN THE "ON" POSITION
THE COMPRESSOR TO MAINTAIN ROOM TEMPERATURE AT 24 C
THE SPLIT HEAT PUMP UNIT BUILT-IN CONTROL SHALL CYCLE
(BLDG S-2399)
MECHANICAL
CONTROLS
CAMP CASEY
REPAIR BUILDING S-2399,
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
M-9
SHOP AREA
MECH ROOM
FEC
S /S
EWC
LATRINE
WOMEN'S
LATRINE
MEN'S
VEST
J/C
TOOL ROOM
ROOM
LAUNDRY
OFFICE
INSPECTOR
OFFICE
FOREMAN
OFFICE
SHOP CONTROL
L/S
W WD BB
STORAGE
EQUIPMENT
D
FEC
FEC
AC
A
A
A
AIR OUTLET(TYP OF 6)
20mm COMPRESSORFRL
A
PF
M-9
65mm C.W PIPING
FOR CONT.
SEE CIVIL DWG
1,500AIR FILTER
COMPRESSED
AIR COMPRESSOR
CONC. PAD
20mm HOSE
BIBB(TYP)
EWHELEC. WATER
HEATER
CONC. PAD
THERMOSTATIC MIXING VALVE
15 15 15
15 15 15
P
402015
25 25 20 15
25 25 20 15
SEE
- M8
SEE
- M8
M9
GROUND FL PLUMBING PIPING PLAN
(BLDG S-2399)
MECHANICAL
1.
NOTES:
CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND DIRECTION
2.
OF PLUMBING PIPING IN FIELD(TYP)
CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR PLUMBING PIPING.
PRIOR TO PLUMBING PIPING INSTALLATION.
AND NOTES
GROUND FL PLUMBING PIPING PLAN
SCALE : 1 / 50
CAMP CASEY
REPAIR BUILDING S-2399,
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
M-10
- M10
S /S
VEST
J/C
LATRINE
WOMEN'S
LATRINE
MEN'S
ROOM
LAUNDRY
L/S
W WD
D
RESPONSIBLE FOR VERIFYING ACTUAL QUANTITIES BASED ON THE CONTRACT DOCUMENTS
1. QUANTITIES ARE SHOWN FOR ESTIMATION PURPOSE ONLY, THE CONTRACTOR SHALL BENOTES :
REQUIREMENTS.
FLUSH VALVE WALL HUNG TYPE
SEE EQUIPMENT SCHEDULE40- 40
FLUSH VALVE MOUNTED TYPE
WASTE
15 40
PIPE CONNECTION
H.W. VENT
BACK
R E M A R K S
C.W.
EWC
ELECTRIC
WATER COOLER
QTY.
P-8
P-1
P-5
SYMBOL
SERVICE SINK1
F I X T U R E
LAVATORY
WATER CLOSET3
COUNTER TOP.
20P-3 URINAL1 - 40 50
EWC
P-1 x3
P-3
P-5 x3
P-8
S /S
VEST
J/C
LATRINE
WOMEN'S
LATRINE
MEN'S
EWC
P-3
P-5 x3
P-8
BALL VALVE (TYP.)
ESS
5015 40P-12 1 15LAUNDRY SINK SINGLE BOWL
WALL MOUNTED STAINLESS STELL TYPE
P-12
ROOM
LAUNDRY
W WD
D
75 FD
75 FD
100 FCO
EXACT SIZE & LOCATION
SHALL BE VERIFY IN FIELD
S
80 VTR
V
40 40
P-12
EXACT SIZE & LOCATION
SHALL BE VERIFY IN FIELD
S
100 FCO
P-1 x3
100 FCO
50 FD
50 FD
80 VTR
V
V
PLUMBING FIXTURE SCHEDULE
402015
EH
ELEC. WALL
HEATER
EH
ELEC. WALL
HEATER
HOT & COLD WATER PIPING SEWER & VENT PIPING SEWER & VENT PIPINGHOT & COLD WATER PIPING
GROUND FL PLUMBING PIPING PARTIAL PLAN
(BLDG S-2399)
MECHANICAL
1.
NOTES:
CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND DIRECTION
2.
OF PLUMBING PIPING IN FIELD(TYP)
CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR PLUMBING PIPING.
PRIOR TO PLUMBING PIPING INSTALLATION.
FIXTURE SCH. AND NOTES
GROUND PLUMBING PIPING PARTIAL PLAN,
SCALE : 1 / 25
CAMP CASEY
REPAIR BUILDING S-2399,
CHONG, ST
160851
WATER HAMMER ARRESTOR x 2
(PDI:"A" TYP)
(PDI:"A" TYP)
WATER HAMMER ARRESTOR x 2
WATER HAMMER ARRESTOR x 2
(PDI:"A" TYP)
SPRINKLER Q'TY LIST
SPRINKLER HEAD TYPE
US/(METRIC)
"K" FACTOR
SIZE
A R E ASYMBOL
THREAD
SPRINKLER Q'TY LIST
TOTAL
TOOL ROOM, MECH ROOM, EQUIPMENT STORAGE, SHOP AREAQUICK RESPONSE UPRIGHT TYPE SPRINKLER HEAD 8.0/(115)3/4" NPT
5.6/(80)1/2" NPTQUICK RESPONSE PENDENT TYPE SPRINKLER HEAD
TOTAL NUMBER OF SPRINKLER OF SYSTEM 71
FOREMAN OFFICE, SHOP CONTROL OFFICE, J/C, VEST, MEN'S LATRINE, WOMEN'S LATRINE, INSPECTOR OFFICE 9
8.0/(115)3/4" NPTQUICK RESPONSE PENDENT TYPE SPRINKLER HEAD LAUNDRY ROOM 1
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
M-11
SP
D
FIRE PROTECTION LEGEND & ABBREVIATION
SPRINKLER
MAIN SUPPLY SPRINKLER
PENDENT SPRINKLER(K=5.6)
UPRIGHT SPRINKLER(K=5.6)
CUTTING POINT
CAP
FIRE DEPARTMENT CONNECTION
(2-WAY SHOWN)
VALVES
CHECK VALVE
FITTING
WALL MOUNTED TEST HEADER
CONNECTION, TOP
ELBOW, 90
ELBOW, TURNED UP
ELBOW, TURNED DOWN
TEE
TEE, OUTLET UP
TEE, OUTLET DOWN
CONNECTION, BOTTOM
RISER
TEST VALVE
DRAIN VALVE
TYPICALTYP.
NO
EXST EXISTING
ABBREVIATIONS
MAX MAXIMUM
MIN MINIMUM
DRAIN PIPE
NUMBER
DRAWINGDWG
CONN
CONT CONTINUE/CONTINUATION
CONNECTION
RM ROOM
W/ WITH
W/O WITHOUT
SCH SCHEDULE
RESIDENTIAL PENDENT SPRINKLER(K=4.9)
UPRIGHT SPRINKLER(K=8.0)
9. ELEVATOR FIRE SPRINKLER SHALL BE IN ACCORDANCE WITH UFC 3-600-01
AUTOMATIC FIRE SUPPRESSION(S) GENERAL NOTES:
1. THE CONTRACTOR SHALL PROVIDE AND INSTALL AN AUTOMATIC WET PIPE SPRINKLER SYSTEM
TO FULLY PROTECT THIS FACILITY. THE FIRE SPRINKLER SYSTEM SHOWN THESE DRAWING IS
PERFORMANCE BASED WHICH MEANS CONCEPTUAL REQUIREMENT ONLY. THE SPRINKLER
CONTRACTOR SHALL SUBMIT A COMPLETE FIRE SPRINKLER SYSTEM SHOPDRAWINGS BASED ON
NFPA 13 AND SPECIFICATION REQUIREMENTS AND SUBMIT FOR APPROVAL PRIOR TO
INSTALLATION. THE EQUIPMENT SHOWN ARE SUGGESTED LOCATIONS HOWEVER FINAL LAYOUT
SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, MANUFACTURER'S RECOMMENDATIONS, AND
EQUIPMENT LISTINGS. CONTRACTOR SHALL COORDINATE SPRINKLER HEADS LOCATIONS WITH,
CEILING PANELS, LIGHTING FIXTURES, AND HVAC AIR DEVICES. ALL EQUIPMENT SHALL BE UL
LISTED AND FM APPROVED IN ACCORDANCE WITH NFPA 13 AND THE PROJECT SPECIFICATION.
2. THE CONTRACTOR SHALL CONDUCT WATER SUPPLY HYDRANT TEST FOR THIS PROJECT BASED
ON NFPA 291 REQUIREMENTS AND UTILIZE THIS DATA TO DESIGN THE SPRINKLER SYSTEM.
THE HYDRANT LOCATIONS, FLOW TESTS, AND DATE SHALL BE INDICATED ON THE
SHOPDRAWINGS. AUTOMATIC SPRINKLER PROTECTION SYSTEM IS REQUIRED TO PROTECT THIS
ENTIRE FACILITY. A MINIMUM 10% SAFETY FACTOR IS REQUIRED BETWEEN THE AVAILABLE
WATER SUPPLY AND THE SPRINKLER SYSTEM DEMAND.
INSTALLED IN THE HORIZONTAL POSITION.
7. ALL AUTOMATIC SPRINKLER DRAIN VALVES FOR FIRE DEPARTMENT CONNECTIONS SHALL BE
BE INSTALLED ON THE EXTERIOR.
DRAINS, BUT MUST TERMINATE TO THE BUILDING EXTERIOR. SPRINKLER RISERS SHALL NOT
AND MAINTENANCE. TEST DRAINS ARE NOT TO BE TERMINATED AT WALL SINKS OR FLOOR
6. PROVIDE MINIMUM 1M X 2M SPACE FOR EACH FIRE SPRINKLER RISER FOR INSTALLATION
AS-BUILT DRAWINGS FOR THIS PROJECT.
CONTRACTOR SHALL CONFORM TO THE SYMBOLS INDICATED IN NFPA 170 TO DEVELOP THE
22-"PLANS AND CALCULATIONS" PRIOR TO SPRINKLER PIPING INSTALLATION. THE
5. CONTRACTOR SHALL SUBMIT HYDRAULIC CALCULATIONS AS REQUIRED BY NFPA 13 CHAPTER
4. FIRE PROTECTION PLANS SHOWN ARE USED FOR COST ESTIMATE PURPOSE ONLY.
WITH O-RINGS ARE NOT PERMITTED.
BRACING CALCULATION IN ACCORDANCE WITH NFPA 13 REQUIREMENTS; SPRINKLERS
3. PROVIDE EARTHQUAKE PROTECTION (SWAY BRACING), END OF BRANCH LINE AND SEISMIC
8. FLEXIBLE COUPLINGS SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 13
10. ALL PIPING, SANITARY, VENT, WASTE, PLUMBING, OTHER PIPING, POWER OR CONTROL CIRCUTS, OR DUCT SHALL PENETRATE ANY STAIR OR EXIT PASSAGEWAY ENCLOSURE UNLESS IT SERVES
AN APPLIANCE WITHIN THE ENCLOSURE AND DEAD ENDS IN THE ENCLOSURE.
SIDEWALL SPRINKLER(K=5.6)
OS&Y GATE VALVE(N.O.)
W/TAMPER SWITCH
OS&Y GATE VALVE(N.C.)
W/TAMPER SWITCH
VERIFYING ACTUAL QUANTITIES BASED ON THE CONTRACT DOCUMENT REQUIRMENTS.
1. QUANTITIES ARE SHOWN FOR ESTIMATING PURPOSE ONLY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
NOTE
FIRE PROTECTION LEGEND & ABBREVIATION,
AUTOMATIC FIRE SUPPRESSION GENERAL
NOTES, SPRINKLER Q'TY LIST AND NOTE
(BLDG S-2399)
MECHANICAL
CAMP CASEY
REPAIR BUILDING S-2399,
WET SPRINKLER
4.1 LPM/SM (0.10 GPM/SF)
QUICK RESPONSE
20.90 SM (225 SF)
950 LPM (250 GPM)
MAX. 4.6 M (15 FT)
140 SM (1500 SF)
MIN. 1.8 M (6 FT)
60 MIN.
ORDINARY TEMPERATURE RATING
SHOP CONTROL OFFICE, MEN'S LATRINE,
TYPE OF SYSTEM
SPRINKLER
SPRINKLER TYPE
MAX. COVERAGE PER
BETWEEN SPRINKLERS
MAX. & MIN. SPACE OF
RATING*
SPRINKLER TEMPERATURE
DESCRIPTION
HAZARD
FIRE PROTECTION REQUIREMENTS
DESIGN DENSITY
DURATION OF SUPPLY
HOSE STREAM
DESIGN AREA
APPLICATION AREA
WET SPRINKLER
8.2 LPM/SM (0.20 GPM/SF)
QUICK RESPONSE
12.07 SM (130 SF)
950 LPM (250 GPM)
MAX. 4.6 M (15 FT)
230 SM (2500 SF)
MIN. 1.8 M (6 FT)
60 MIN.
INTERMEDIATE TEMPERATURE RATING
LIGHT HAZARD
OCCUPANCY
ORDINARY HAZARD
OCCUPANCY
SHOP AREA
SPRINKLER NOZZLE
K-FACTOR OF
(8.0)
(5.6)
ORDINARY TEMPERATURE RATING
EQUIPMENT STORAGE, LAUNDRY ROOM,
TOOL ROOM, MECH ROOM, FOREMAN OFFICE, J/C, VEST,
WOMEN'S LATRINE, INSPECTOR OFFICE
100 100
MECH ROOM FIRE PROTECTION
PIPING PARTIAL PLAN
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
000000
HEAD CABINET
SPARE SPRINKLER
UL/FM APPROVED ASSEMBLY
150mm BACKFLOW PREVENTER
150mm ALARM CHECK VALVE
W/TEMPER SWITCH
100mm OS & Y GATE VALVE
100mm CHECK VALVE
W/20mm BALL DRIP VALVE
100mmX65mmX65mm
FIRE DEPARTMENT SIAMESE CONNECTION
FOR BACKFLOW PREVENTER FLOW TEST
W/20mm BALL DRIP VALVE
W/2-65mm HOSE VALVE
100mm X 2-65mm TEST HOSE HEADER
WATER MOTOR ALARM GONG
- SCALE : 1/25M12
1 MECH ROOM FIRE PROTECTION PIPING PARTIAL PLAN
M-12
(BLDG S-2399)
MECHANICAL
CAMP CASEY
REPAIR BUILDING S-2399,
SHOP CONTROL
OFFICE
MEN'S
LATRINE
WOMEN'S
LATRINE
INSPECTOR
OFFICE
LAUNDRY ROOM
EQUIPMENT
STORAGE
MECH ROOM
TOOL ROOM
FOREMAN
OFFICE
J/C
VEST
150 150
150150
FIRE PROTECTION PIPING PLAN
20mm QUICK RESPONSE
UPRIGHT TYPE SPRINKLER HEAD
150 150 150 150 150 150 150 150
150 150 150 150 150 150 150
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
- M13
M-13
FIRE PROTECTION PLAN
SYSTEM TEST CONNECTIONAUXILIARY DRAIN VALVE
PENDENT TYPE SPRINKLER HEAD
15mm QUICK RESPONSE CONCEALED
PIPING PARTIAL PLAN
SEE MECH ROOM FIRE PROTECTION
PENDENT TYPE SPRINKLER HEAD
20mm QUICK RESPONSE CONCEALED
(BLDG S-2399)
MECHANICAL
SCALE : 1/50
CAMP CASEY
REPAIR BUILDING S-2399,
MAIN RISER CONNECTION(TYPICAL)
AND SPIGOT PIECE
DUCTILE IRON FLANGE
AND SPIGOT PIIPE
RODS NOT LESS
THAN 20Ø
DUCTILE IRON BELL
SERVICE
FROM FIRE
MAIN
G.L
GENERAL NOTE :
OR LEAVING THE SUBJECT BUILDINGS.
THIS DETAIL SHALL BE UTILIZED WHERE
.FIRE MAIN SERVICE LINES ARE ENTERINE
STEEL PIPE
THRUST BLOCK
CONC.
FL
BITUMASTIC COATED
BITUMASTIC COATED
SPRINKLER ALARM CHECK VALVE & MAIN RISER FIRE DEPT SIAMESE CONNECTION
SEE
M10
PIPE
O N
I C T
E N
AU
O
F
IR
E
DEPT C
TOSPK
N
R
CONNECTION
FIRE DEPT
CLAPPER
SWIVEL
2-1/2" NS OR BS
EASE - OFF
HOSE COUPLING
PLUG
THREAD
- M14
SYSTEM TEST CONNECTION
PIPE EXTENDS THROUGH WALL TO OUTSIDE.
2. THE TEST VALVE SHOULD BE LOCATED AT AN
ACCESSIBLE POINT AND PREFERABLY NOT
OVER 7FT (2.1M) ABOVE THE FLOOR.
PIPE IN WARM ROOM BEYOND VALVE WHERE
1. NOT LESS THAN 4FT (1.2M) OF EXPOSED TEST
NOTES :
ACCESSIBLE LOCATION
TEST VALVE IN READILY
SEE NOTE
BRANCH LINE
P.G.
SWAY BRACING3
CONC
SLAB
SWAY BRACE
FITTINGS
SCHEDULE 40
PIPE *
PIPE
CLAMP
SPRINKLER
CROSSMAIN
EXPANSION BOLT
(TYP)
CONC
SLAB
SWAY BRACE
FITTINGS
SCHEDULE 40
PIPE *
SPRINKLER
CROSS
MAIN
EXPANSION
BOLT
PIPE
CLAMP
* PIPE SIZE SHALL BE DETERMINED BY CALCULATIONS
ON WET PIPE SYSTEM
WATER MOTOR ALARM DRAIN
PRESSURE SWITCH
PIPE SUPPORT
RISER TO SPRINKLER SYSTEM
RETARDING CHAMBER
WATER MOTOR ALARM GONG
MAIN DRAIN VALVE
DESCRIPTION
ALARM CHECK VALVE
(2-REQUIRED)
PRESSURE GAGE
ITEM
MAIN DRAIN AND TEST VALVE
FIRE DEPT CONNECTION
(WITH TAMPER SWITCH)
SUPERVISORY VALVE
DESCRIPTIONITEM
OS & Y GATE VALVE13
TAMPER SWITCH14
BACKFLOW PREVENTER15
TEST VALVE16
TEST VALVE HEADER17
PRESSURE RELIEF VALVE18
W /T
A M
P E
R
S
W
IT
C H
G A T E
V
L V E
O S
Y
PER NFPA 13
FLEXIBLE COUPLING
FOR EARTH QUAKE
FIRST SUPPORT W/CROSS BRACING
SWAY BRACING PER NFPA 13 FOR
FLEXIBLE COUPLERS PER NFPA 13
FOR EARTH QUAKE
VALVE
BALL DROP
VALVE
BALL DROP
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
M-14
DETAILS-1
CAMP CASEY
REPAIR BUILDING S-2399,
CHONG, ST
160851
(BLDG S-2399)
MECHANICAL
M14 M14
M14M14
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
DUCT ACCESS DOOR
DUCTWORK DETAILS
NOTE: S = SIDE OPPOSITE HINGES
NOTE; ABOVE APPLY TO SUPPLY AND RETURN
BRANCH TAKEOFFS
C cmh
A cmh
HINGE POS.2 HINGE POS.3
DOOR
300 X 300
400 X 500
600 X 600
SIZE
AND LESS
2" W.G.
STATIC
HINGES
NO.
BUTT HINGE OR
PIANO HINGE
FASTENER
FROM RECTANGULAR MAIN
OFFSETS
W
R=W
W
W
W
FULL RADIUS WHERE POSSIBLE
W
W
PREFERED OFFSET
SD
Y
YX
X
TURNING VANES (TYP.)
Y x Y=X
SD
C LESS THAN 300
(1985) FIGS. 2-7
NOTE; SEE SMACNA DUCT MANUAL
C c m h A cmh
C cmh
ROUND DUCT TAKEOFF
C 300 OR MORE
C c h m
SD
A cmh B cmh B cmh
A cmh
TYPE1
METAL GAGE
1-S
2-S
2-S
LOCKS
NO.
22 22
FRAME
DOOR
BACK
GASKET
DOOR
DUCT
GASKET
FASTENER
APPROVED
TYPE 2
DUCT
(REQ'D 2)
DOOR
FASTENER
DUCT HANGER DETAIL
X OR Y LESS THAN 300
R1=(X+Y)/2
FOR D OF 300 OR MORE
USE VANED ELBOW
D LESS THAN 300
R2=X+Y
D
R=D
R
D X
R
Y
SPLITTER DAMPER(TYP.)
R1=(W1+W2)/2
R2=W1+W2
R1=(X+Y)/2
R2=X+Y
X
X OR W LESS THAN 300
R1
Y
SD
W2
RETURN ONLY
MANUAL DAMPER
PROVIDE VE WHEN COIL OR DIFFUSER IS
1,500 OR LESS FROM BRANCH TAKEOFF.
x Y=X
Y
2 REFER TO ARCHITECTURAL DWGS. FOR CEILING TYPE.
PROVIDE FRAME TYPE TO SUIT CEILING SPECIFIED, REFER TO AIR DEVICE SCHEDULE
1 REFER TO PLAN DRAWINGS AND AIR DEVICE SCHEDULE FOR DIFFUSER TYPE.
CEILING DIFFUSER DETAIL
DETAIL NOTES;
EQUALIZING DEFLECTOR
OPPOSED BLADE DAMPER
TEE-BAR CEILING
REMOVABLE FACE PANEL
CEILING DIFFUSER WITH
600x600 LAY-IN 3-CONE
NOMINALLY
25 THICK DUCT LINER, OR
RECTANGULAR DUCTWORK
DUCTWORK W/EXTERNAL
EXTERNAL THERMAL
VAPOR SEAL
INSULATION W/VAPOR
DIFFUSER NECK SIZE
SAME SIZE AS CEILING
THERMAL INSULATION
VARRIER
INSULATION
VAPOR SEAL
AND ANTI-SMUDGING
HANGER
STRAPS
SCREWS
STRAP HANGERS
OMITTED IF
SCREWS MAY BE
HANGER LOOPS
250 DIA MAX.
TRAPEZE HANGERS FOR DUCTS UNDER 0.6 M AREA
DISTANCE IS NOT EXCEED 1,500 UNLESS FOOT OF STRAP IS
REINFORCEMENT MAY BE USED FOR ATTACHMENT IF IT QUALIFIES
HANGER SIZES FOR RECTANGULAR DUCT
BAND OF
SAME SIZE
AS HANGER
STRAP
600 DIA MAX. 700 DIA MAX.
LOAD CAPACITY)
SEE NOTE 2
LOAD RATED
FASTENERS
ALTERNATIVE LOCATION
(VERIFY UPPER TRAPEZE
SECURE
WIRE
SEE NOTE 1
SIZE BOLT(S)
FOR LOAD
INSULATION
STRAP
OR ROD
ANGLES
HANGER
ROD
NUTS
FOR BOTH DUTIES.
PLACED UNDER A BOTTOM REINFORCEMENT.
DO NOT EXCEED ALLOWABLE LOAD LIMITS.
1275 THRU 2,100
NOTES :
10 DIA
1.
2.
3,00025 x 16 GA 2
HANGER SIZES FOR ROUND DUCT
DIAMETER
925 THRU 1,250
475 THRU 900
UP THRU 450
OVER 2425
DUCT
8 GA WIRE
HANGER
6 DIA OR
RODS
10 DIA
10 DIA
15 DIA
DIMENSION
1,075 THRU 1,500
UP THRU 450
475 THRU 750
775 THRU 1,050
2,125 THRU 2,400
1,525 THRU 2,100
OF DUCT
RODS
10 DIA
10 DIA
10 DIA
10 DIA
3,000
3,000
3,000
MAXIMUM
SPACING
25 x 22 GA
STARP
HANGERS
25 x 20 GA
25 x 20 GA
40 x 16 GA
NUMBER OF
HANGERS
50 x 50 x 6
25 x 22 GA
25 x 22 GA
HANGERS
25 x 16 GA
25 x 16 GA
25 x 18 GA
25 x 18 GA
25 x 25 x 3
25 x 25 x 3
ANGLES
50 x 50 x 5
50 x 50 x 3
40 x 40 x 3
40 x 40 x 3
TRAPEZE HANGERS
LONGEST HANGER STARP TRAPEZE SHELF
REMARKS
2,400
3,000
3,000
SPACING
2,400
2,400
3,000
3,000
MAXIMUM
25MIN.
EXHAUST DUCT STAKE
DUCT UP TO VEHICLE
ENGINE EXHAUST HOSE REEL EXHAUST DUCT DETAIL
ADAPTER
EXHAUST FAN
FLEXIBLE
(TYPICAL)
CONNECTOR
TAIL PIPE
WITH 150 HOSE
HOSE REEL
HOSE REEL
SUPPORT TO
3M A.F.F.
STRUCT.
HR
DETAILS - 2
M-15
M15
CAMP CASEY
REPAIR BUILDING S-2399,
CHONG, ST
160851
(BLDG S-2399)
MECHANICAL
M15
M15M15M15
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
RUNNER TYPE 2
DIVISION 7 WORK
BACKDRAFT MOTORIZED
INSULATED ROOF CURVE,
EXHAUST DUCT WORK
POWER ROOF VENTILATOR
POWER ROOF VENTILATOR
MIN. 2 EACH SIDE
BY FAN MFR.,
RECOMMENDED
LAGBOLTS AS
CURB HT.
300 MIN.
SEE ARCH. DWGS.
WOOD BLOCKING,
SEE ARCH. DWGS.
ROOF CONSTR.
22 GA
RUNNER TYPE 1
DOUBLE WALL VANES
FREE AREA BETWEEN
INLET AREA.
WELD EVERY 6TH VANE TO RUNNER(OVER 1,000 FPM)
OR RUN A TIE ROD THROUGH THE CENTER VANE.
APPROXIMATES ELBOW
SEE ARCH. DWGS.
WOOD NAILER
ALL AROUND
GASKET SEAL
(SPECIFIED IN DIVISION 7)
FLASHING
UNIT HOOD
SEE NOTES ON FIG.2-4
APPROVAL.
DUCT TURNING VANE DETAIL
ACCEPTABLE ON DESIGNER
SIZES OR SPACINGS
OTHER RUNNERS MAY BE
USED. OTHER VANE
WELD RUNNER TO DUCT
BOLT, SCREW, OR
LARGE
SMALL
SINGLE VANE SCHEDULE
MIN
81.25
112.5
R
112.5
OR
FL
O
W
SP
GA
SP
R
SP
SINGLE VANE WITH
FLAT
SP=40
20 TRAILING EDGE
R=50
R
SP
M
DAMPER
CLASS II ADHESIVE UNDER
EMBEDDED BETWEEN COATS.(WHEN FIELD
BARRIER COATING WITH GLASS CLOTH
APPLYING TWO COATS OF VAPOR-
EDGES OF THE INSULATION JOINT.
AND NOT MORE THAN 80 FROM THE
ALL FOUR SIDE OF DUCT 300 APART
CLASS II ADHESIVE (LESS THAN 600 DUCT) AROUND ENTIRE PERIMETER OF THE
APPLY VAPOR-BARRIER JACKET)
F
DUCT INSULATION
CLASS II ADHESIVE UNDER
MORE THAN 80 FROM DUCT CORNER.
BOTTOM/SIDES 450 O.C. AND NOT
DUCT IN 150 WIDTH STRIPS ON 300 ON CENTER
100 O.C. WITH TYPE II VAPOR-BARRIER COATING
VAPOR-BARRIER JACKET
THE 50 OVERLAP.
FLEXIBLE TYPEC
E
D
600 LARGE DUCT
DUCT IN
AREA
ITEM
A
B
CONCEALED
THE 100 OVERLAP.
RIGID TYPE
EXPOSED
VAPOR-BARRIER JACKET
STAPLE
OVERLAP
DUCT
INSULATION
FASTENER
ADHESIVE
C
B
A
F
D
E
METAL JACKET
INSULATION
ALL AROUND
SEALANT #2
BACK UP MATERIAL
PIPE WITHOUT INSULATION
MIN. 6 CLEARANCE
PIPE WITH INSULATION
PIPE SLEEVE (INTERIOR WALL)
INTERIOR WALL
METAL BAND
SLEEVE
CEILING
(TYP.)
(CLOSED CELL
FLEXIBLE FOAM
RUBBER OR
MATERIAL
BACK UP
SEALANT #2
PLASTIC)
PIPE CL
SLEEVE
MOTOR
DAMPER
TACK WELD
CASING
EQUIPMENT
WITH UL 214)
FABRIC (COMPLY
FIBROUS GLASS
SPACING BETWEEN
FLEXIBLE CONNECTION & ANGLE FLANGE CONNECTION
UNLESS OTHERWISE SPECIFIED, ROOM THERMOSTAT SHALL BE
WHERE DUCTS ARE INSTALLED ABOVE CEILING ACCESS PANELS SHALL
TURNING VANES SHALL BE INSTALLED IN ALL SQUARE ELBOWS.
BE PROVIDED IN CEILING FOR DUCT ACCESS DOORS, DAMPERS, ETC.
CONSTRUCTION STANDARDS BY SMACNA, INDUSTRIAL VENTILATION BY ACGIH, ASHRAE
OTHER DUCT WORK DETAILS NOT SHOWN SHALL CONFORM TO HVAC DUCT
AND WALL OR CEILING, AND WALL REGISTERS SHALL BE INSTALLED AT LEAST 6 SPACE
SPONGE-RUBBER GASKETS SHALL BE PROVIDED BETWEEN DIFFUSERS OR REGISTERS
THE DUCT, THE DUCT SHALL BE EXTENDED 150 TO 300 BEYOND THE OPENING OF THE
WHEN A SUPPLY AIR REGISTER OR GRILLE OR DIFFUSER IS LOCATED AT THE END OF
INSTALLED 1,500 ABOVE FL.
INCHES BELOW THE CEILING.
REGISTER OR GRILLE OR DIFFUSER.
HANDBOOKS, AND NFPA 90-A.
5.
4.
6.
GENERAL NOTES :
1.
2.
3.
MIN. 100
RIVET, SOLID FLAT
HEAD @100 O.C.
APPROX 50
DETAIL
"BOTTOMS"
MALE PIECE-SNAP LOCK
BOLT & NUT
SCREW)
6 DIA x 25 LG
@100 O.C.(OR METAL
GASKET MIN. 6 THK
STEEL SHT (TYP.)
U-STRAP 20GA. GALV.
STEEL ANGLE (TYP.)
40 x 40 x 3
ALL AROUND
GASKET SEAL
2"x6"(50x150) WOOD
VENTED CURB
EXTENSION
BLOCKING NAILER
EXHAUST DUCT WORK
MET. ROOF LINER
CLOSURE STRIP
P.M CAP FLASHING
P.M ROOFING
EXHAUST FAN
MIN. 2 EACH SIDE
P.M CAP FLASHING
DRAIN CONNECTION
LAGBOLTS AS
BY FAN MFR.,
RECOMMENDED
GREASE TRAP
UPBLAST TYPE KITCHEN
UP-BLAST EXHAUST FAN FOR RANGE HOOD EXHAUST
M16-
DETAILS - 3
M-16
CAMP CASEY
REPAIR BUILDING S-2399,
CHONG, ST
160851
(BLDG S-2399)
MECHANICAL
M16 M16
M16M16M16
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
ELECTRIC WATER COOLER
WATER-PROOF MEMBRANE
FLOOR DRAIN
SEE NOTE-2
AREA/PIT DRAIN
SEE NOTE-1
12550
WASHER DRAIN STAND PIPE
FRONT VIEW SIDE VIEW
DRAINS SHALL BE CONNECTED TO CAST IRON P-TRAP.
A CHROMIUM PLATED BRONZE, NICKEL BRONZE OR NICKEL BRASS STRAINER.
4. DRAINS SHALL HAVE A CAST IRON BODY AND SEEPAGE PAN AND
2. NEOPRENE RUBBER GASKET COMPRESSION TYPE JOINT.
FILL/BED
WATER-PROOF MEMBRANE
FINISH/TILE FLOOR
STRUCTURAL
DRAIN AND BACKWATER VALVE
SEE NOTE-2
A
SLAB
CEMENT
SEE NOTE-1
3.
STRUCTURAL
SLAB
CEMENT
FILL/BED
A
FINISH/TILE FLOOR
WATER-PROOF MEMBRANE
AOUTLET SIZE
FLOOR/SHOWER DRAIN
SEE NOTE-2
SEE NOTE-1
FINISH/TILE FLOOR
STRUCTURAL
SLAB
FILL/BED
CEMENT
A
1. WATER-PROOF MEMBRANE ARE NOT REQUIRED IN SLAB ON GRADE.
50 DRAIN
20 HW 50
20 CW
MACHINE
WASHING
CW & HW
225 W x 150 D x 150 H
SERVICE BOX
W/HOSE BIBB
WASHER VALVE
20 UNION
BOX
50mm OPEN
SIGHT DRAIN
40 VENT
50 STAND
PIPE
M-17
M17
DETAILS-4
TEE DRAINGE PATTERN
AS REQ'D
PIPE SLEEVE
NOTE : WATER COOLER SHELL BE STATIONARY
WATER COOLER
ELECTRIC
BUBBLER
P-TRAP
BACKDRAFT DAMPER
EXHAUST DUCT WORK
INSULATED ROOF CURB,
DIVISION 7WORK
POWER ROOF VENTILATOR
LAGBOLTS AS
RECOMMENDED
BY FAN MFR.,
MIN. 2 EACH SIDE
SEE ARCH. DWGS.
WOOD BLOCKING,
SEE ARCH. DWGS.
INSTALLATION OF GRAVITY ROOF FANS(VENTILATORS) SHALL BE SIMILAR.
NOTE;
ROOF CONSTR.
SEE ARCH. DWGS.
UNIT HOOD
FLASHING
(SPECIFIED IN DIVISION 7)CURB HT.
300 MIN.
WOOD NAILER
GASKET SEAL
ALL AROUND
POWER ROOF VENTILATOR
WALL
INSULATION
PIPE
50Ø PS DOWN
SPOUT NOZZLE
DRAIN PIPINGWALL FLANGE
PROVIDE
THREADS.
EXP BOLTS
MOUNTING
HOLES AT 120°
BUSHING
NOTE: DOWN SPOUT NOZZLES SHALL BE BRONZE BODY WITH
BONZE WALL FLANGE. UNITS SHALL HAVE FEMALE PIPE
40Ø A/C
DOWNSPOUT NOZZLE DETAIL3
CAMP CASEY
REPAIR BUILDING S-2399,
CHONG, ST
160851
(BLDG S-2399)
MECHANICAL
M17 M17
M17M17
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
EMERG. EYE WASH SHOWER DETAIL
A 200 DIA BOLT CIRCLE
90 DIA HOLES ON
225 DIA FLANGE WITH
250 DELUGE SHOWER HEAD
VALVE
SELF-CLOSING BALL
PLUGGED NIPPLE
15 IPS BRASS
32 IPS DRAIN
SELF-CLOSING
BALL VALVE
"A"
25 IPS BRASS
250DIA
"A"
,1
F L O
O R
,1
F L O
O R
DRAIN
32 IPSPUSH
250DIA
"A-A" VIEW
32 IPS SUPPLY INLET
250DIA
P U
S H
SUPPLY INLET
OPTIONAL 32 IPS
"C"
"A"
"B"
TYPE
33-60128 125
WATER HAMMER ARRESTOR
94 81
115 81
HEIGHT DIAMETER
1-11
12-32
CAPACITY
FIXTURE UNIT
FIXTURE
TO LAST
THREADED PLUG
FROM BRANCH
SUPPLY
AND SIZE
20 OR 25 SEE
DWGS FOR LOCATION
PRESSURE PNEUMATIC
STAINLESS STEELSHELL
STAINLESS STEEL
ORIFICE
FLOW CONTROL
H E
IG
H
T DISPLACEMENT
ADAPTER
FLUID
BELLOWS
HYDRAULIC
CUSHION
DISPLACEMENT
DIAMETER
M18-
M18-
DETAILS - 5
M-18
CAMP CASEY
REPAIR BUILDING S-2399,
CHONG, ST
160851
TYPICAL IN LINE PUMP PIPING DETAIL
DISCHARGE
SUCTION
CALIBRATED BALANCING
PRESSURE GAUGE
(TYP)
SHUT-OFF COCK
PROVIDE CHECK VALVE
DOMESTIC HOT WATER
RECIRULATION PUMP
IN DISCHARGES
VALVE
- M18
NOTES : 1.WATER-PROOF MEMBRANE ARE NOT REQUIRED IN SLAB ON GRADE.
PLUG Y-BRANCH
WHEN NOT THRU RUN
1/8 BEND
LEAD CAULKING
JUTE PACKING, SEE NOTE-2
FINISH FLOOR
NEOPRENE GASKET
2.CHROMIUM-PLATED BRONZE, NICKEL BRONZE,NICKEL BRASS OR
STAINLESS STEEL FLUSH TYPE ACCESS COVER PLATE
FLOOR CLEANOUT
CAST IRON
PIPE
Y-BRANCH
SCORIATED COVER
SEE NOTE-2
TWO PIECE THREADED
ADJUSTABLE HOUSING
WATER-PROOF MEMBRANE
- M18
"C"
"A"
"B"
TYPE
33-60128 125
WATER HAMMER ARRESTOR
94 81
115 81
HEIGHT DIAMETER
1-11
12-32
CAPACITY
FIXTURE UNIT
FIXTURE
TO LAST
THREADED PLUG
FROM BRANCH
SUPPLY
AND SIZE
20 OR 25 SEE
DWGS FOR LOCATION
PRESSURE PNEUMATIC
STAINLESS STEELSHELL
STAINLESS STEEL
ORIFICE
FLOW CONTROL
H E
IG
H
T DISPLACEMENT
ADAPTER
FLUID
BELLOWS
HYDRAULIC
CUSHION
DISPLACEMENT
DIAMETER
M18-
(BLDG S-2399)
MECHANICAL
| 160851_Repair Bldg S-2399(TMP), Cp Casey_M1 |
| 160851_Repair Bldg S-2399(TMP), Cp Casey_M2 |
| 160851_Repair Bldg S-2399(TMP), Cp Casey_M3 |
| 160851_Repair Bldg S-2399(TMP), Cp Casey_M4 |
| 160851_Repair Bldg S-2399(TMP), Cp Casey_M5 |
| 160851_Repair Bldg S-2399(TMP), Cp Casey_M6 |
| 160851_Repair Bldg S-2399(TMP), Cp Casey_M7 |
| 160851_Repair Bldg S-2399(TMP), Cp Casey_M8 |
| 160851_Repair Bldg S-2399(TMP), Cp Casey_M9 |
| 160851_Repair Bldg S-2399(TMP), Cp Casey_M10 |
| 160851_Repair Bldg S-2399(TMP), Cp Casey_M11 |
| 160851_Repair Bldg S-2399(TMP), Cp Casey_M12 |
| 160851_Repair Bldg S-2399(TMP), Cp Casey_M13 |
| 160851_Repair Bldg S-2399(TMP), Cp Casey_M14 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.