1)_Drawing_files___Title.pdf
PDF 461 KB Posted
- Attached to
- Repair Building 2399 & 2388 CP Casey
- Solicitation number
- W90VN819R0037
About this file
Drawing 1. Title
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W90VN8-19-R-0037.pdf | ||
| Submittal_Register.pdf | ||
| 2)_Drawing__ARCH_2388.pdf | ||
| 7)_Drawing__MECH_2388.pdf | ||
| 8)_Drawing__MECH_2399.pdf | ||
| W90VN8-19-R-0037.pdf | ||
| 6)_Drawing__ELEC_2399.pdf | ||
| 5)_Drawing__ELEC_2388.pdf | ||
| 3)_Drawing__ARCH_2399.pdf | ||
| 4)_Drawing__CIVIL.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF DRAWINGS
RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.
T - 1
RING NO.
CIVIL
C - 1
M - 1
M - 2
M - 3
MECHANICAL
ELECTRICAL
A - 1
A - 2
A - 3
ARCHITECTURAL
DESCRIPTION OF DRAWINGS DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS
T-1
A - 4
A - 5
A - 6
A - 7
A - 8
A - 9
M - 4
M - 5
M - 6
M - 7
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
C - 2
C - 3
LOCATION PLAN AND GENERAL NOTES
A - 10
A - 11
A - 12
E - 1
E - 2
E - 3
E - 4
E - 5
E - 6
E - 7
E - 8
E - 9
E - 10
E - 11
E - 12
E - 13
M - 8
M - 9
M - 10
M - 11
M - 12
M - 13
LEGEND, GENERAL NOTES AND SCOPE OF WORK
GENERAL NOTES & SCOPE OF WORK
C - 4
LIGHTING FIXTURE DETAILS
FEWR NO. 160851, CAMP CASEY
SECTIONS
SIGNAGE PLAN AND SCHEDULE
NEW GROUND FLOOR PLAN AND SCOPE OF WORK
ENLARGED PARTIAL PLAN, INTERIOR ELEVATIONS AND DETAILS
INTERIOR, EXTERIOR FINISH SCHEDULE AND MATERIAL & COLOR SCHEDULE
DOOR / WINDOW SCHEDULE, ELEVATIONS, HARDWARE SCHEDULE & NOTES
SITE LAYOUT PLAN AND SCOPE OF WORK
MECHANICAL MATERIAL INDICATIONS & SYMBOLS
LIGHTING FIXTURE SCHEDULENEW ROOF PLAN AND SCOPE OF WORK
ELEVATIONS AND PICTURES
EXTERIOR / INTERIOR WALL SECTIONS
DETAILS-2
DETAILS-1
BUILDING S-2399, CP CASEY
MISC. DETAILS-1
MISC. DETAILS-2
A - 1
A - 2
A - 3
ARCHITECTURAL
A - 4
A - 5
A - 6
A - 7
A - 8
A - 9 SIGNAGE PLAN AND SCHEDULE
DETAILS-2
DETAILS-3
BUILDING S-2388, CP CASEY
ACM NOTES AND LEGEND
EXISTING/REMOVAL FLOOR PLAN, NEWFLOOR PLAN, GENERAL NOTES,
SECTIONS AND SCOPE OF WORK
ELEVATIONS
SECTION AND DETAILS - 1
SCHEDULE
INTERIOR, EXTERIOR FINISH SCHEDULE AND MATERIAL & COLOR
NOTES
DOOR / WINDOW SCHEDULE, ELEVATIONS, HARDWARE SCHEDULE &
MECHANICAL EQUIPMENT SCHEDULE-1 AND GENERAL NOTE
MECHANICAL EQUIPMENT SCHEDULE-2 AND GENERAL NOTE
EXISTING/REMOVAL PLAN(GROUND FLOOR) AND SPECIFIC NOTES
GROUND FL HEAT PUMP AND NOTES
GROUND FL HVAC PLAN AND NOTES
CONTROLS
GROUND FL PLUMBING PIPING PLAN AND NOTES
GROUND PLUMBING PIPING PARTIAL PLAN, FIXTURE SCHEDULE AND NOTES
SUPPRESSION GENERAL NOTES, SPRINKLER Q'TY LIST AND NOTE
FIRE PROTECTION LEGEND & ABBREVIATION, AUTOMATIC FIRE
MECH ROOM FIRE PROTECTION PIPING PARTIAL PLAN
FIRE PROTECTION PIPING PLAN
T - 2
TITLE SHEET - 1
TITLE SHEET - 2
TITLE SHEET - 1
M - 14
M - 15
DETAILS - 1
DETAILS - 2
M - 16 DETAILS - 3
M - 17 DETAILS - 4
M - 18 DETAILS - 5
EXISTING/REMOVAL FLOOR PLAN, GENERAL NOTES, ACM NOTES AND LEGEND
EXIST/NEW EXTERIOR TELECOMMUNICATION DISTRIBUTION PLAN
EXIST/NEW EXTERIOR POWER LINE DISTRIBUTION PLAN
NEW GROUND FLOOR LIGHTING PLAN
NEW GROUND FLOOR POWER PLAN
EQUIPMENT
NEW GROUND FLOOR POWER & CONTROL PLAN FOR MECHANICAL
SCHEDULE
EXIST/NEW POWER ONE-LINE DIAGRAM & MAIN PANELBOARD "MP" LOAD
NEW PANELBOARD "PA", "PB" & "PC" LOAD SCHEDULE
NEW GROUND FLOOR FIRE ALARM/MASS NOTIFICATION PLAN
NEW FIRE ALARM/MASS NOTIFICATION SYSTEM DIAGRAM
NEW GROUND FLOOR LAN/TEL SYSTEM PLAN
TEL SYSTEM DIAGRAME - 14
CAMP CASEY
REPAIR BUILDING S-2399 & S-2388
CAMP CASEY
REPAIR BUILDING S-2399 & S-2388
KWON, CH
160851
M - 1
M - 2
M - 3
MECHANICAL
M - 4
M - 5
GENERAL NOTES & SCOPE OF WORK
EXISTING/REMOVAL PLAN(GROUND FLOOR) AND SPECIFIC NOTES
GROUND FL HVAC PLAN AND NOTES
MECHANICAL EQUIPMENT SCHEDULE AND GENERAL NOTE
GROUND PLUMBING PIPING PLAN, FIXTURE SCHEDULE AND NOTES
SCHEDULE OF DRAWINGS
RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.RING NO. DESCRIPTION OF DRAWINGS DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS
T-2
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
FEWR NO. 160851, CAMP CASEY
BUILDING S-2388, CP CASEY
TITLE SHEET - 2
M - 6 DETAILS
ELECTRICAL
E - 1
E - 2
E - 3
E - 4
LEGEND, GENERAL NOTES AND SCOPE OF WORK
SCHEDULE
NEW GROUND FLOOR LIGHTING & POWER PLAN AND LIGHTING FIXTURE
LIGHTING FIXTURE DETAILS
MAIN PANELBOARD "P" LOAD SCHEDULE
NEW GROUND FLOOR POWER/CONTROL PLAN FOR MECHANICAL EQUIPMENT &
CAMP CASEY
REPAIR BUILDING S-2399 & S-2388
CAMP CASEY
REPAIR BUILDING S-2399 & S-2388
KWON, CH
160851