This document is an attachment to a federal contract opportunity that provides a template for labor category rates for unscheduled maintenance and repair work. The attachment lists over 20 labor categories such as General Manager, Site Manager, Quality Controller, Supervisory Engineer, and various technician roles. The offeror is instructed to submit this format or another with pre-priced labor rates that will be applied to quotes for emergencies and unscheduled work only. If a rate is not provided, the emergencies and unscheduled work will be negotiated on a case-by-case basis. This attachment is related to a solicitation for base maintenance services at several air bases in Korea, which is funded by Logistics Cost Sharing (LCS) funds and is only open to local Korean contractors.

View the file

Other files

File Type Posted
Attachment 17 BMC Solicitation Questions and Answers.xlsx XLSX spreadsheet
Solicitation Amendment SF30 W90VN624RA0010001.pdf PDF
Attachment 16 Addendum to 52.212-1 and 52.212-2 Amendment 0001.pdf PDF
A.02 Attachment 1 PWS 9 Sep 2024 Amend 0001.pdf PDF
Solicitation Amendment - W90VN624RA0010001 conformed.pdf PDF
Attachment 9 APPENDIX IV Contract Data Requirements List CDRL 9 Sep 2024.pdf PDF
Attachment 15 Past Performance Questionnaire.docx DOCX document
Attachment 9 APPENDIX IV Contract Data Requirements List CDRL 1APR24.pdf PDF
Attachment 8 Appendix III GFP All COBs 1 April 2024.xlsx XLSX spreadsheet
Attachment 10 APPENDIX V-GIS CONTRACT DELIVERABLES.docx DOCX document
Solicitation - W90VN624RA001 607th MMS BMC.pdf PDF
Attachment 16 Addendum to 52.212-1 and 52.212-2.pdf PDF
Attachment 7 Appendix II-4 FACILITY LISTING - Chongju 1 Apr 2024.xlsx XLSX spreadsheet
Attachment 14 Contractor Tax Exemption Declaration.docx DOCX document
Attachment 3 APPENDIX I-1 DEFINITIONS ACRONYMS.docx DOCX document
Attachment 2 Annex Peformance Requirements Summary (PRS) 1APR24.docx DOCX document
Attachment 7 Appendix II-2 FACILITY LISTING - Gimhae 17 Jun 2024.xlsx XLSX spreadsheet
Attachment 6 APPENDIX I-4 PACAF SERVICE CONTRACT STANDARDS.pdf PDF
Attachment 4 APPENDIX I-2 PUBLICATIONS FORMS 1 April 2024.docx DOCX document
Attachment 7 Appendix II-1 FACILITY LISTING - Daegu 1 Apr 2024.xlsx XLSX spreadsheet
Attachment 11 Appendix VI High Pressure Vessel 1 Apr 2024.xls XLS spreadsheet
Attachment 7 Appendix II-3 FACILITY LISTING - Suwon 17 Jun 2024.xlsx XLSX spreadsheet
Attachment 12 Technical Exhibit II _ Unscheduled Maintenance and Repair ELINS.xlsx XLSX spreadsheet
Attachment 7 Appendix II-5 FACILITY LISTING - Gwangju 17 Jun 2024.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year Attachment 13 Technical Exhibit III Labor Categories/Labor Rates for DSW and IMR

LABOR CATEGORYHOURLY RATE
GENERAL MANAGER
SITE MANAGER
QUALITY CONTROLLER
SUPERVISORY ENGINEER
ENGINEERING TECH - CAD / GIS
NEXGENT IT OPERATOR
BUILDER ASSESSOR
SAFETY MANAGER
UTILITIES SUP'T
WATER PLANT OPERATOR
HVAC/R TECH
LFM TECH
POWERPRO TECH
FIRE ALARM / HYDRANT / SPINKLER MAINT.
ELEC TECH
UTILITIES TECH - PLUMBER
CARPENTER
PAINTER
(Contractor Can Propose Additional Categories as Necessary)

The offeror shall submit in this format or another as pre-priced labor rates. These rates should be applied in the contractor’s quote if submitting a quote for emergencies and/or unscheduled work only. If the contractor does not list a rate then a emergencies and unscheduled work will be negotiated on a case by case basis.

Option 1 Attachment 13 Technical Exhibit III Labor Categories/Labor Rates for DSW and IMR

LABOR CATEGORYHOURLY RATE
GENERAL MANAGER
SITE MANAGER
QUALITY CONTROLLER
SUPERVISORY ENGINEER
ENGINEERING TECH - CAD / GIS
NEXGENT IT OPERATOR
BUILDER ASSESSOR
SAFETY MANAGER
UTILITIES SUP'T
WATER PLANT OPERATOR
HVAC/R TECH
LFM TECH
POWERPRO TECH
FIRE ALARM / HYDRANT / SPINKLER MAINT.
ELEC TECH
UTILITIES TECH - PLUMBER
CARPENTER
PAINTER
(Contractor Can Propose Additional Categories as Necessary)

The offeror shall submit in this format or another as pre-priced labor rates. These rates should be applied in the contractor’s quote if submitting a quote for emergencies and/or unscheduled work only. If the contractor does not list a rate then a emergencies and unscheduled work will be negotiated on a case by case basis.

Option 2 Attachment 13 Technical Exhibit III Labor Categories/Labor Rates for DSW and IMR

LABOR CATEGORYHOURLY RATE
GENERAL MANAGER
SITE MANAGER
QUALITY CONTROLLER
SUPERVISORY ENGINEER
ENGINEERING TECH - CAD / GIS
NEXGENT IT OPERATOR
BUILDER ASSESSOR
SAFETY MANAGER
UTILITIES SUP'T
WATER PLANT OPERATOR
HVAC/R TECH
LFM TECH
POWERPRO TECH
FIRE ALARM / HYDRANT / SPINKLER MAINT.
ELEC TECH
UTILITIES TECH - PLUMBER
CARPENTER
PAINTER
(Contractor Can Propose Additional Categories as Necessary)

The offeror shall submit in this format or another as pre-priced labor rates. These rates should be applied in the contractor’s quote if submitting a quote for emergencies and/or unscheduled work only. If the contractor does not list a rate then a emergencies and unscheduled work will be negotiated on a case by case basis.

Option 3 Attachment 13 Technical Exhibit III Labor Categories/Labor Rates for DSW and IMR

LABOR CATEGORYHOURLY RATE
GENERAL MANAGER
SITE MANAGER
QUALITY CONTROLLER
SUPERVISORY ENGINEER
ENGINEERING TECH - CAD / GIS
NEXGENT IT OPERATOR
BUILDER ASSESSOR
SAFETY MANAGER
UTILITIES SUP'T
WATER PLANT OPERATOR
HVAC/R TECH
LFM TECH
POWERPRO TECH
FIRE ALARM / HYDRANT / SPINKLER MAINT.
ELEC TECH
UTILITIES TECH - PLUMBER
CARPENTER
PAINTER
(Contractor Can Propose Additional Categories as Necessary)

The offeror shall submit in this format or another as pre-priced labor rates. These rates should be applied in the contractor’s quote if submitting a quote for emergencies and/or unscheduled work only. If the contractor does not list a rate then a emergencies and unscheduled work will be negotiated on a case by case basis.

Option 4 Attachment 13 Technical Exhibit III Labor Categories/Labor Rates for DSW and IMR

LABOR CATEGORYHOURLY RATE
GENERAL MANAGER
SITE MANAGER
QUALITY CONTROLLER
SUPERVISORY ENGINEER
ENGINEERING TECH - CAD / GIS
NEXGENT IT OPERATOR
BUILDER ASSESSOR
SAFETY MANAGER
UTILITIES SUP'T
WATER PLANT OPERATOR
HVAC/R TECH
LFM TECH
POWERPRO TECH
FIRE ALARM / HYDRANT / SPINKLER MAINT.
ELEC TECH
UTILITIES TECH - PLUMBER
CARPENTER
PAINTER
(Contractor Can Propose Additional Categories as Necessary)

The offeror shall submit in this format or another as pre-priced labor rates. These rates should be applied in the contractor’s quote if submitting a quote for emergencies and/or unscheduled work only. If the contractor does not list a rate then a emergencies and unscheduled work will be negotiated on a case by case basis.

File details come from the government source that posted it. Updated .