Consolidated Construction Project RFP.pdf
PDF 568 KB Posted
- Solicitation number
- W90VN624R0028
About this file
This document is a Request for Proposals (RFP) for multiple construction projects at Osan Air Base in South Korea. The RFP is restricted to contractors holding specific MATOC contracts (W91QVN-24-D-0021 through 0038, 0080, 0083, 0108, 0100, 0104, and 0109). The projects include repairing joint seals on aprons, repainting runway airfield markings, constructing a softball field, and replacing flooring and bleachers. Proposals are due by 1:00 PM local time on August 27, 2024. Award will be made to the responsible offeror submitting the lowest priced, technically acceptable proposal. Offerors are encouraged to attend the scheduled site visits. Proposals must include a pricing proposal, offer breakdown, and completed Section K representations and certifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C-03.pdf | ||
| Amendment 0001to RFP W90VN624R0028.pdf | ||
| Section K.docx | DOCX document | |
| SMYU 22-1063 SOW_revised_20240820.pdf | ||
| C-02.pdf | ||
| CLIN 0004 Drawings.pdf | ||
| CLIN 0002 Drawings.pdf | ||
| CLIN 0003 SOW.pdf | ||
| CLIN 0002 Submittal Register.pdf | ||
| CLIN 0004 Submittal Register.XLS | XLS spreadsheet | |
| CLIN 0003 DRAWING.pdf | ||
| CLIN 0001 Drawings.pdf | ||
| CLIN 0004 SOW.pdf | ||
| CLIN 0002 SOW.docx | DOCX document | |
| CLIN 0001 SOW.docx | DOCX document | |
| CLIN 0003 SUBMITTAL-REGISTER.pdf | ||
| CLIN 0001 Submittal Register.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE SCHEDULE
This RFP includes multiple projects on Osan AB.
1. The RFP is restricted to the follow ing MATOC Non-Work Plan Contractors that posse the follow ing
Contract No. W91QVN-24-D-0021 thru 0038 and 0080, 0083, 0108, 0100, 0104 & 0109.
2. Site Visit: Please see site visit clause.
Submission of Proposals: Please see Instructions to Offerors and Basis of Aw ard.
Each Project w ill be aw arded Separately.
MR. MOSLEY, ANTHONY S. 315-757-6006
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
09-Aug-2024
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days af ter receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Section F
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________27 Aug 2024 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCO OSAN, UNIT #2039
APO AP 96278-2039
W90VN6
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
01:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W90VN624R0028 12
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W90VN624R0028
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Repair Joint Seals on Aprons
FFP
Construction Magnitude: Between $250,000 and $500,000 FOB: Destination MFR PART NR: Null
PURCHASE REQUEST NUMBER: F3J3CE4200AW01
PSC CD: Z299
NET AMT
0002 1 Job Repaint Runway Airfield Markings
FFP
Construction Magnitude: Between $100,000 and $250,000 FOB: Destination
PURCHASE REQUEST NUMBER: F3J3CE4200AW02
0003 1 Job Construct Softball Field Osan AFB
FFP
Construction Magnitude: $500,000 and $1,000,000 FOB: Destination
PURCHASE REQUEST NUMBER: F3J3CE4206AW01
0004 1 Job Replace Flooring Board and Bleachers
FFP
Construction Magnitude: $100,000 and $250,000 FOB: Destination
PURCHASE REQUEST NUMBER: F3J3CE4207AW01
0005 1 Job
WAR HAZARD
FFP
Estimated Cost for War Hazard Losses is Zero (0).
FOB: Destination
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government 0002 N/A N/A N/A Government 0003 N/A N/A N/A Government 0004 N/A N/A N/A Government 0005 N/A N/A N/A Government
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 180 dys. ANP 1 51 CES/CED
51 CES
BLDG # 351 UNIT#2129
APO AP 96278-2129
F3J3CE
0002 90 dys. ANP 1 N/A
0003 240 dys. ANP 1 N/A
0004 120 dys. ANP 1 N/A
0005 N/A N/A N/A N/A
Section I - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
52.232-18 Availability Of Funds APR 1984
Section L - Instructions, Conditions and Notices to Bidders
CLAUSES INCORPORATED BY FULL TEXT
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for-- Dates & Times are below:
13 Aug 2024 at 1000 AM: Projects: Repair Joints and Seals
Repair Runway Airfield
If contractor(s) need escort services on base they should contact: Mr. Shin (wang_song.shin.kr@us.af.mil) NLT 12 Aug @ Noon
14 Aug 2024 at 1000 AM: Projects: Replace floorboards and bleachers Construct Softball Fields
If contractor(s) need escort services on base they should contact: Mr. Bae (jung_june.bae.kr@us.af.mil) NLT 12 Aug @ Noon
(c) Participants will meet at-- In front of Osan AB Visitors Center (Morin Gate)
(End of provision)
INSTRUCTIONS TO OFFERORS
1. GENERAL INSTRUCTIONS FOR PREPARATION OF PROPOSAL
a. The Government intends to award without discussion but reserves the right to conduct discussions if deemed necessary and to establish a competitive range for efficiency in accordance with FAR 52.215-1(f)(4).
b. Offeror(s) may, at the discretion of the Government, be asked to provide more information and clarification regarding their proposals. The Government may make a final determination as to whether an offer is acceptable or unacceptable solely based on the proposals as submitted, without requesting any further information. However, if it is deemed necessary the Government may, at its sole discretion, request additional information clarifying but not substantially changing any proposal as submitted.
2. SUBMISSION OF PROPOSAL
a. The offeror shall email offer for each project to the contract specialist, Mr. Om, Ik Chung (email address:
ikchung.om2.ln@army.mil) and Mr. Mosley, Anthony at anthony.s.mosley.civ@army.mil by the Korea local closing time and date which can be found in Block 13 on page 1 of this solicitation. After submission of the offer, the offeror shall send an additional email shall to the contract specialist to verify if offer is received. It is the offeror responsibility to verify receipt of offer from contract specialist before the Korea local closing time and date. All questions should be emailed to ikchung.om2.ln@army.mil and anthony.s.mosley.civ@army.mil within five (5) calendar days after the solicitation is issued.
b. CLOSING DATE: The electronic offer shall be submitted by 1300 hrs on the closing date of RFP.
3. SUBMISSION REQUIREMENTS
a. Pricing Proposal
b. Offer Breakdown
c. Completion of Section K (Contractor’s Tax Exemption Declaration)
4. NO OFFER LETTER: If MATOC Contractor is unable to submit the proposal in response to this RFP, the Contractor shall submit a 'No-Offer Letter' by date and time specified in this solicitation.
5. SITE VISIT
a. Offerors who intend to propose on this solicitation are strongly encouraged to attend site visit. See site visit Clause, FAR 52.236-27 Alt I. Offerors are required to have a valid Korean Identification card or driver license when attending the site visit orientation if it is not allowed to access Osan AB.
b. The attendee must bring a valid identification card with clean photo
Submission required through Procurement Integrated Enterprise Environment (PIEE) Solicitation Module
The offeror shall submit its proposal electronically through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module prior to the due date and time identified on the first page of this solicitation. Instructions for submitting proposals in PIEE can be found under Solicitation - Web Based Training at https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml. Failure to provide the proposal through the PIEE Solicitation Module will render the proposal non-responsive and not eligible for award.
CONTRACTOR’S TAX EXEMPTION DEC
ATTACHMENT: CONTRACTOR’S TAX EXEMPTION DECLARATION
(1) References:
(i) Contract clause, "FAR 52.229-06 Taxes—Foreign Fixed-Price Contracts (Jan 1991)."
(ii) US-ROK Status of Forces Agreement (SOFA), Articles IX and XVI.
(iii) ROK Customs Law, Law No. 1976, promulgated on 29 November 1967, as amended.
(iv) ROK Value Added Tax Law, Law No. 2934, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.
(v) ROK Special Excise Tax Law, Law No. 2935, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.
(2) Contractor shall state the types and estimated amount of taxes that would normally apply to such transactions but are excluded from this proposal.
(i) Customs Tax (except for ROK MND-funded contracts or delivery orders):
Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total This item will be imported specifically for this contract? Yes _________ No ________
(ii) Special Excise Tax:
Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total Name of item manufacturer
(iii) Value Added Tax (VAT):
Input VAT on materials purchased for this contract. _________ Input VAT on transportation leased/rented for this contract. _________ Input VAT on equipment leased/rented for this contract. _________ Input VAT on services purchased for this contract. _________ Output VAT on total contract amount. _________
(iv) Special Excise (Petroleum) Tax:
No. of Unit Price Total Tax
Liters w/o Tax Tax/Unit Amount
Regular Gasoline __________ (L) ₩_________ ₩________ ₩_________ Premium Gasoline __________ (L) ₩_________ ₩________ ₩_________ Diesel __________ (L) ₩_________ ₩________ ₩_________ Other __________ (L) ₩_________ ₩________ ₩_________
(3) Name of Oil Company Refinery from which POL products will be purchased:
Oil Company: _________________________________________ (Name only)
(4) I certify by this submission that all supplies and services to be purchased for this contract have been proposed exclusive of Value Added Tax, applicable Customs Tax (except for ROK MND-funded contracts and delivery orders), and Special Excise Tax.
Contractor’s Signature
Section M - Evaluation Factors for Award
BASIS OF AWARD
BASIS of AWARD
a. The pricing proposal shall be evaluated to determine whether it is complete and reasonable. A complete and reasonable pricing proposal will be deemed acceptable.
b. The detailed offer breakdown will be used by the contracting officer to determine whether proposed prices are complete and reasonable. A detailed offer breakdown may be used by the contracting officer to determine whether an offeror is able to complete the requirements under the contract, and/or whether discussions will be conducted pursuant to instructions to the offerors.
c. SECTION K - Representations, Certifications and Other Statements of Offerors
d. SECTION K-TAXES will be evaluated to determine whether it is complete. In addition, propose exemptions of specific ROK taxes will be evaluated to determine whether they are legitimate, attributable to the contract, authorized, and reasonable. A complete SECTION-K that only proposes exemptions of specific ROK taxes that are legitimate, attributable to the contract, necessary to complete the Task Order, do not improperly overstate any proposed tax exemption, authorized, and reasonable will be deemed acceptable.
e. SECTION K-OTHER will be evaluated to determine whether it is complete. A complete SECTION K-OTHER will be deemed acceptable.
2. BASIS FOR AWARD: Award shall be made to the responsible offeror submitting the lowest priced offer that is evaluated as acceptable for all evaluation criteria.
File details come from the government source that posted it. Updated .