CLIN 0003 SUBMITTAL-REGISTER.pdf
PDF 162 KB Posted
- Solicitation number
- W90VN624R0028
About this file
This document is a Submittal Register for a federal construction contract to Construct Softball Field (Dirt or Grass for Temp Use) at Osan AB. The Submittal Register lists 105 required submittals across various specification sections, including preconstruction submittals, shop drawings, product data, test reports, certificates, manufacturer's instructions, and operation and maintenance data. Key submittals include the Quality Control Plan, Safety/Accident Prevention Plan, Preliminary and Initial Project Schedules, Demolition Plan, Concrete Mix Design, Fence Assembly and Hardware, and Water Service Line Design. The related federal contract opportunity is Solicitation W90VN624R0028 issued by the Department of the Army Materiel Command Army Contracting Command for Multiple Construction Projects at Osan AB. This solicitation requires contractors to login at the PIEE web portal to obtain more details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C-03.pdf | ||
| C-02.pdf | ||
| SMYU 22-1063 SOW_revised_20240820.pdf | ||
| Section K.docx | DOCX document | |
| Amendment 0001to RFP W90VN624R0028.pdf | ||
| Consolidated Construction Project RFP.pdf | ||
| CLIN 0002 Submittal Register.pdf | ||
| CLIN 0004 Submittal Register.XLS | XLS spreadsheet | |
| CLIN 0001 Drawings.pdf | ||
| CLIN 0004 SOW.pdf | ||
| CLIN 0004 Drawings.pdf | ||
| CLIN 0002 SOW.docx | DOCX document | |
| CLIN 0003 DRAWING.pdf | ||
| CLIN 0002 Drawings.pdf | ||
| CLIN 0003 SOW.pdf | ||
| CLIN 0001 Submittal Register.pdf | ||
| CLIN 0001 SOW.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Line
Acti vity
Trans-mittal #
Specification Section
SD
# Submittal Description Item Submitted Paragraph #
Classificati on: GOVT or A/E Revwr Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR / Auth Date RCD From
CONTR
Date FWD To
Other Revwr
Date RCD From Other Revwr
Action Code
Date Of Action
Mailed To
CONTR/
Date RCD From
APPR
Authority Remarks
1 01 30 00 01 Preconstruction Submittals View location map 1.4 G
2 01 32 01.00 10 01 Preconstruction Submittals Preliminary Project Schedule 3.4.1 G
3 01 32 01.00 10 01 Preconstruction Submittals Initial Project Schedule 3.4.2 G
4 01 32 01.00 10 01 Preconstruction Submittals Periodic Schedule Updates 3.4.3 G
5 01 32 01.00 10 01 Preconstruction Submittals Schedule status report 3.1.2 G
6 01 33 00 01 Preconstruction Submittals Submittal register 1.8 G
7 01 35 26 01 Preconstruction Submittals SAFETY PLAN /ACCIDENT
PREVENTION PLAN (APP) 1.6
8 01 35 26 01 Preconstruction Submittals Activity Hazard Analysis (AHA) 1.7 G
9 01 45 00.00 10 01 Preconstruction Submittals Quality Control Plan 3.2 G
10 01 45 00 07 Certificates Key Personnel Resume (PM, CQCSM, SHO) 1.6.2.2 G
11 01 50 00 01 Preconstruction Submittals Construction site plan 1.4 G
12 01 58 00 02 Shop Drawings Construction Project Sign 1.2.1 G
13 01 78 00 03 Product Data As-Built Record of Equipment and Materials 1.3.2
14 01 78 00 03 Product Data Equipment-in-Place List 1.3.4
15 01 78 00 03 Product Data Warranty Management Plan 1.6.1
16 01 78 00 03 Product Data Warranty Tags 1.6.5
17 01 78 00 03 Product Data Spare Parts Data 1.4
18 01 78 00 08 Manufacturer’s Instructions Preventative Maintenance 1.5
19 01 78 00 08 Manufacturer’s Instructions Condition Monitoring (Predictive Testing) 1.5
20 01 78 00 08 Manufacturer’s Instructions Inspection 1.5
21 01 78 00 08 Manufacturer’s Instructions Instructions 1.6.1
22 01 78 00 10 Operation and Maintenance Data Operation and Maintenance Manuals 1.7
23 01 78 00 11 Closeout Submittals Record Drawings (As-Built) 1.3.1 G
24 01 78 00 11 Closeout Submittals Interim Form DD1354 1.9 G
25 01 78 00 11 Closeout Submittals Checklist for Form DD1354 1.9 G
26 02 41 00 07 Certificates Demolition Plan 1.2.1 G
27 02 61 13 6 Test Reports Backfill 2.2 G
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
TITLE: 2014-OMA-SPECIFICATIONS_REVISION1_2015
SUBMITTAL REGISTER
JOB NAME: CONSTRUCT SOFTBALL FIELD (DIRT OR GRASS FOR TEMP USE)
LOCATION: OSAN AB
CONTRACT NO:
CONTRACTOR:
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
TITLE: 2014-OMA-SPECIFICATIONS_REVISION1_2015
SUBMITTAL REGISTER
JOB NAME: CONSTRUCT SOFTBALL FIELD (DIRT OR GRASS FOR TEMP USE)
LOCATION: OSAN AB
CONTRACT NO:
CONTRACTOR:
28 02 65 00 01 Preconstruction Submittals Work Plan 1.4.4 G
29 02 65 00 01 Test Reports Backfill Material 2.1 G
30 02 81 00 07 Certificates Certificates of Disposal 3.2.5
31 02 82 14.00 10 02 Shop Drawings Detailed Drawings 1.3 G
32 03 30 00 03 Product Data Ready-Mix Concrete 2.3.2 G
33 03 30 00 05 Design Data Concrete mix design 1.6.4.1 G
34 03 30 00 06 Test Reports Compressive strength tests 3.12.2.3
35 03 30 00 06 Test Reports Air Content 3.12.2.4
36 03 30 00 06 Test Reports Slump Tests 3.12.2.1
37 03 30 53 02 Shop Drawings Installation Drawings 1.5 G
38 03 30 53 03 Product Data Ready-Mix Concrete 2.2
39 05 52 00 02 Shop Drawings Fabrication and Installation 2.1
40 05 52 00 03 Product Data Steel Rails and Hand Rails 2.13
41 11 68 13 02 Shop Drawings Configuration 1.5.6
42 11 68 13 02 Shop Drawings Fall Height 3.2.10
43 11 68 13 02 Shop Drawings Finished Grade and Underground 3.1.1
44 11 68 13 02 Shop Drawings Utilities
45 11 68 13 03 Product Data Equipment 2.2
46 11 68 13 03 Product Data Equipment Identification 1.3.4
47 11 68 13 03 Product Data Deliver, Storage and handling 1.6
48 11 68 13 03 Product Data Manufacturer Qualification 1.5.1
49 11 68 13 03 Product Data Wood 2.1.2
50 11 68 13 03 Product Data Spare Parts 1.8
51 11 68 13 03 Product Data Materials 2.1
52 11 68 13 04 Samples Color 2.1.7
53 11 68 13 06 Test Reports Recycled Plastic 2.1.4
54 11 68 13 06 Test Reports Wood Finishes 3.2.2
55 11 68 13 07 Certificates Materials 2.1
56 11 68 13 07 Certificates Manufacturer Qualification 1.5.1
57 11 68 13 07 Certificates Installer Qualification 1.5.2
58 11 68 13 07 Certificates Manufacturer's Representative 1.5.3
59 11 68 13 07 Certificates Wood Treatment 2.1.2.1
60 11 68 13 07 Certificates Substitution 2.2.2
61 11 68 13 07 Certificates Play Event Modification 3.2.1
62 11 68 13 07 Certificates Child Safety and Accessibility 3.4
63 11 68 13 10 Operation and Maintenance Data
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
TITLE: 2014-OMA-SPECIFICATIONS_REVISION1_2015
SUBMITTAL REGISTER
JOB NAME: CONSTRUCT SOFTBALL FIELD (DIRT OR GRASS FOR TEMP USE)
LOCATION: OSAN AB
CONTRACT NO:
CONTRACTOR:
64 11 68 13 10 Operation and Maintenance Maintenance Instructions 1.8
65 26 08 00 07 Certificates Qualifications 1.4.1 G
66 26 08 00 07 Certificates Acceptance test and inspections procedure 1.4.3 G
67 32 11 16 16 06 Test Repors Initial/In-Place/Smoothness Test 1.5.2
68 32 11 16 16 06 Test Repors Density tests 3.4.2.3
69 32 16 13 03 Product Data Concrete 2.1
70 32 16 13 06 Test Reports Field Quality Control 3.8
71 32 31 13 02 Shop Drawings Fence Installation 1.3.2
72 32 31 13 02 Shop Drawings Fence Assembly 1.3 G 1.3 G
73 32 31 13 02 Shop Drawings Location of Gate, Corner, End, Pull 3.17.1 G
74 32 31 13 02 Shop Drawings and Pull Posts
75 32 31 13 02 Shop Drawings Gate Assembly 1.3 G
76 32 31 13 02 Shop Drawings Gate Hardware and Accessories 2.17 G
77 32 31 13 02 Shop Drawings Erection/Installation Drawings 1.3 G
78 32 31 13 03 Product Data Fence Assembly 1.3 1.3
79 32 31 13 03 Product Data Gate Assembly 1.3 1.3
80 32 31 13 03 Product Data Gate Hardware and Accessories 2.17 2.17
81 32 31 13 03 Product Data Zinc Coating 2.2
82 32 31 13 03 Product Data PVC Coating 1.5.1
83 32 31 13 03 Product Data Aluminum Alloy Coating 1.5.1
84 32 31 13 03 Product Data Fabric 2.3
85 32 31 13 03 Product Data Stretcher Bars 2.12
86 32 31 13 03 Product Data Concrete 2.2
87 32 31 13 03 Product Data GATE POSTS 2.15
88 32 31 13 07 Certificates Certificates of Compliance 1.5.2 G
89 32 31 13 08 Manufacturer’s Instructions Fence Assembly 1.3
90 32 31 13 08 Manufacturer’s Instructions Gate Assembly 1.3
91 32 31 13 08 Manufacturer’s Instructions Hardware Assembly 1.3
92 32 31 13 08 Manufacturer’s Instructions Accessories 1.3
93 32 92 19 03 Product Data Wood cellulose fiber mulch 2.5.3
94 32 92 19 03 Product Data Seed 2.1
95 32 92 19 03 Product Data Fertilizer 2.4
96 32 92 19 06 Test Reports Topsoil composition tests 2.2.3
97 32 92 19 08 Manufacturer’s Instructions Erosion Control Materials 2.7
98 33 11 00 03 Product Data Piping Materials 2.1.1
99 33 11 00 03 Design Data Water service line 2.2
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
TITLE: 2014-OMA-SPECIFICATIONS_REVISION1_2015
SUBMITTAL REGISTER
JOB NAME: CONSTRUCT SOFTBALL FIELD (DIRT OR GRASS FOR TEMP USE)
LOCATION: OSAN AB
CONTRACT NO:
CONTRACTOR:
100 33 11 00 03 Design Data Corporation stops 2.2.2.1
101 33 11 00 03 Design Data Valve boxes 2.1.2.9 2.1.2.9
102 33 11 00 03 Design Data Valve boxes 2.1.2.12
103 33 11 00 05 Design Data Design calculations of water piping 1.2.1
104 33 11 00 06 Test Reports Disinfection 2.2.2.18 G
105 33 11 00 07 Certificates Water service line 2.2
106 33 11 00 07 Certificates lining and coating 2.1.1.5
107 33 11 00 07 Certificates Lining 2.1.1.2