CLIN 0004 Submittal Register.XLS
XLS spreadsheet 64 KB Posted
- Solicitation number
- W90VN624R0028
About this file
This document is a Submittal Register for CLIN 0004 of contract SMYU 22-4005, titled "REPAIR GYM FLOORS AND BLEACHERS, B433". The Submittal Register lists 37 required submittals across various specification sections, including preconstruction submittals, test reports, certificates, product data, manufacturer's instructions, and closeout submittals. Key submittals include the Initial Project Schedule, Safety Plan/Accident Prevention Plan, Quality Control Plan, Environmental Protection Plan, As-Built Record of Equipment and Materials, Warranty Management Plan, and Operation and Maintenance Manuals. The required submittal information includes specification section, submittal description, submittal classification, and contractor and approving authority action dates. This submittal information supports the overall contract requirements for the repair of the gym floors and bleachers at Building 433.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C-03.pdf | ||
| C-02.pdf | ||
| SMYU 22-1063 SOW_revised_20240820.pdf | ||
| Section K.docx | DOCX document | |
| Amendment 0001to RFP W90VN624R0028.pdf | ||
| Consolidated Construction Project RFP.pdf | ||
| CLIN 0002 Submittal Register.pdf | ||
| CLIN 0001 Drawings.pdf | ||
| CLIN 0004 SOW.pdf | ||
| CLIN 0004 Drawings.pdf | ||
| CLIN 0002 SOW.docx | DOCX document | |
| CLIN 0003 DRAWING.pdf | ||
| CLIN 0002 Drawings.pdf | ||
| CLIN 0003 SOW.pdf | ||
| CLIN 0001 Submittal Register.pdf | ||
| CLIN 0001 SOW.docx | DOCX document | |
| CLIN 0003 SUBMITTAL-REGISTER.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal Register_SMYU 22-4005
| TITLE: | SMYU 24-1071_REPAIR GYM FLOORS AND BLEACHERS, B433 | SUBMITTAL REGISTER | ||||||||||||||||||
| JOB NAME: | ||||||||||||||||||||
| LOCATION: | ||||||||||||||||||||
| CONTRACT NO: | ||||||||||||||||||||
| CONTRACTOR: | ||||||||||||||||||||
| CONTRACTOR SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |||
| Line | Activity # | Trans-mittal # | Specification Section | SD # | Submittal Description | Item Submitted | Paragraph # | Classification: GOVT or A/E Revwr | Submit | Approval Needed By | Material Needed By | Action Code | Date Of Action | Date FWD to APPR / Auth Date RCD From CONTR | Date FWD To Other Revwr | Date RCD From Other Revwr | Action Code | Date Of Action | Mailed To CONTR/ Date RCD From APPR Authority | Remarks |
| 1 | 01 32 01.00 10 | 01 | Preconstruction Submittals | Initial Project Schedule | 3.4.2 | G | ||||||||||||||
| 2 | 01 32 01.00 10 | 01 | Preconstruction Submittals | Periodic Schedule Updates | 3.4.3 | G | ||||||||||||||
| 3 | 01 32 01.00 10 | 01 | Preconstruction Submittals | Schedule Status Report | 3.1.2 | |||||||||||||||
| 4 | 01 33 00 | 01 | Preconstruction Submittals | Submittal register | 1.8 | G | ||||||||||||||
| 5 | 01 35 26 | 01 | Preconstruction Submittals | Safety Plan / Accident Prevention Plan (APP) | 1.6 | G | ||||||||||||||
| 6 | 01 35 26 | 01 | Preconstruction Submittals | Activity Hazard Analysis (AHA) | 1.7 | G | ||||||||||||||
| 7 | 01 35 26 | 01 | Preconstruction Submittals | Crane Critical Lift Plan | 1.6.1 | |||||||||||||||
| 8 | 01 35 26 | 01 | Preconstruction Submittals | Crane Operators | 1.5.1.2 | |||||||||||||||
| 9 | 01 35 26 | 06 | Test Reports | Notifications and Reports | 1.11 | |||||||||||||||
| 10 | 01 35 26 | 06 | Test Reports | Accident Reports | 1.11.2 | |||||||||||||||
| 11 | 01 35 26 | 06 | Test Reports | Crane Reports | 1.11.3 | |||||||||||||||
| 12 | 01 35 26 | 06 | Test Reports | Certificate of Compliance | 1.11.4 | |||||||||||||||
| 13 | 01 35 26 | 07 | Certificates | Confined Space Entry Permit | 1.8 | |||||||||||||||
| 14 | 01 35 26 | 07 | Certificates | Hot work permit | 1.8 | |||||||||||||||
| 15 | 01 35 26 | 07 | Certificates | License Certificates | 1.13 | |||||||||||||||
| 16 | 01 45 00.00 10 | 01 | Preconstruction Submittals | Quality Control Plan | 3.2 | G | ||||||||||||||
| 17 | 01 57 20.00 10 | 01 | Preconstruction Submittals | Environmental Protection Plan | 1.7 | |||||||||||||||
| 18 | 01 58 00 | 02 | Shop Drawings | Construction Project Sign | 1.2.1 | |||||||||||||||
| 19 | 01 78 00 | 03 | Product Data | As-Built Record of Equipment and Materials | 1.3.2 | |||||||||||||||
| 20 | 01 78 00 | 03 | Product Data | Equipment-in-Place List | 1.3.4 | |||||||||||||||
| 21 | 01 78 00 | 03 | Product Data | Warranty Management Plan | 1.6.1 | |||||||||||||||
| 22 | 01 78 00 | 03 | Product Data | Warranty Tags | 1.6.5 | |||||||||||||||
| 23 | 01 78 00 | 03 | Product Data | Spare Parts Data | 1.4 | |||||||||||||||
| 24 | 01 78 00 | 08 | Manufacturer’s Instructions | Preventative Maintenance | 1.5 | |||||||||||||||
| 25 | 01 78 00 | 08 | Manufacturer’s Instructions | Condition Monitoring (Predictive Testing) | 1.5 | |||||||||||||||
| 26 | 01 78 00 | 08 | Manufacturer’s Instructions | Inspection | 1.5 | |||||||||||||||
| 27 | 01 78 00 | 08 | Manufacturer’s Instructions | Instructions | 1.6.1 | |||||||||||||||
| 28 | 01 78 00 | 10 | Operation and Maintenance Data | Operation and Maintenance Manuals | 1.7 | |||||||||||||||
| 29 | 01 78 00 | 11 | Closeout Submittals | Record Drawings (As-Built) | 1.3.1 | G | ||||||||||||||
| 30 | 01 78 00 | 11 | Closeout Submittals | Interim Form DD1354 | 1.9 | G | ||||||||||||||
| 31 | 01 78 00 | 11 | Closeout Submittals | Checklist for Form DD1354 | 1.9 | G | ||||||||||||||
| 32 | 09 64 66 | 02 | Shop Drawings | Hardwood strip flooring system | 1.2 | G | ||||||||||||||
| 33 | 09 64 66 | 03 | Product Data | Hardwood strip flooring components | 1.2 | G | ||||||||||||||
| 34 | 09 64 66 | 04 | Samples | Strip flooring | 1.2 | G | ||||||||||||||
| 35 | 09 64 66 | 06 | Test Reports | Testing and certification | 1.2 | G | ||||||||||||||
| 36 | 09 64 66 | 08 | Manufacturer’s Instructions | Installation instructions | 1.2 | G | ||||||||||||||
| 37 | 09 64 66 | 10 | Operation and Maintenance Data | Operation and Maintenance Manuals | 1.2 | G |