CLIN 0001 Submittal Register.pdf
PDF 21 KB Posted
- Solicitation number
- W90VN624R0028
About this file
This document is a Submittal Register for Contract Line Item Number (CLIN) 0001 of a federal construction project. It lists the various submittals required from the contractor for this project, including preconstruction submittals such as the project schedule, safety plan, and quality control plan, as well as product data, shop drawings, and test reports for specific construction materials and equipment.
The related federal contract opportunity is Solicitation Number W90VN624R0028 for "Multiple Construction Projects Osan AB", issued by the Department of the Army Materiel Command's Army Contracting Command. The project scope involves repairing joint seals on aprons and other airfield areas at Osan Air Base. The submittal register provides the submittal description, paragraph number, classification, approval needed, and scheduled dates for the contractor's actions on these required submittals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C-03.pdf | ||
| C-02.pdf | ||
| SMYU 22-1063 SOW_revised_20240820.pdf | ||
| Section K.docx | DOCX document | |
| Amendment 0001to RFP W90VN624R0028.pdf | ||
| Consolidated Construction Project RFP.pdf | ||
| CLIN 0002 Submittal Register.pdf | ||
| CLIN 0004 Submittal Register.XLS | XLS spreadsheet | |
| CLIN 0001 Drawings.pdf | ||
| CLIN 0004 SOW.pdf | ||
| CLIN 0004 Drawings.pdf | ||
| CLIN 0002 SOW.docx | DOCX document | |
| CLIN 0003 DRAWING.pdf | ||
| CLIN 0002 Drawings.pdf | ||
| CLIN 0003 SOW.pdf | ||
| CLIN 0001 SOW.docx | DOCX document | |
| CLIN 0003 SUBMITTAL-REGISTER.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Line
Acti vity #
Trans-mittal #
Specification
Section SD # Submittal Description Item Submitted Paragraph #
Classificati on:
GOVT
or A/E
Revwr
Submit
Approval
Needed By
Material
Needed By
Action
Code
Date Of
Action
Date FWD to APPR /
Auth Date
RCD From
CONTR
Date FWD
To
Other
Revwr
Date RCD
From Other
Revwr
Action
Code
Date Of
Action
Mailed To
CONTR/
Date RCD
From APPR
Authority
Remarks
1 01 32 01.00 10 01 Preconstruction Submittals Preliminary Project Schedule 3.4.1 G
2 01 32 01.00 10 01 Preconstruction Submittals Initial Project Schedule 3.4.2 G
3 01 32 01.00 10 01 Preconstruction Submittals Periodic Schedule Updates 3.4.3 G
4 01 33 00 01 Preconstruction Submittals Submittal register 1.8 G
5 01 35 26 01 Preconstruction Submittals SAFETY PLAN /ACCIDENT
PREVENTION PLAN (APP)
1.6 G
6 01 35 26 01 Preconstruction Submittals Activity Hazard Analysis (AHA) 1.7
7 01 45 00.00 10 01 Preconstruction Submittals Quality Control Plan 3.2 G
8 33 82 00 07 Certificates Key Personnel Resume 1.6.2.2 G
9 01 33 00 02 Shop Drawings 100% Contract Drawing 1.1.1 G
10 32 01 19.61 03 Product Data Joint sealant catalog cut & specification 1.2. G
11 32 01 19.61 03 Product Data Material Safety Data Sheets 1.2.
12 32 01 19.61 04 Sample Separating tape 1.2.
13 32 01 19.61 03 Product Data Equipment for Sealant 3.4.2 G
14 32 01 19.61 06 Test Reports Joint sealant 3.1.1 G
15 32 01 19.61 07 Certificates Equipment list 3.1.1
16 32 01 19.61 08 Manufacture's Instructions Joint sealant 1.2.
17 32 01 29.61 05 Design Data Concrete Mix Design 1.2 G
18 32 01 29.61 05 Product Data Epoxy Resin 2.1.6.1 G
19 32 01 19.61 08 Manufacture's Instructions Joint Sealant 3.1.1 G
20 33 70 02.00 10 02 Shop Drawings As-Built Drawings 1.4.2 G
21 01 78 00 11 Closeout Submittals Checklist for Form DD1354 1.9 G
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE DATES CONTRACTOR
ACTION
TITLE: 2014-OMA-SPECIFICATIONS_REVISION1_2015
SUBMITTAL REGISTER
J
O
REPAIR JOINT SEALS ON APRONS AND OTHER AIRFIELD AREAS, FY24
L
O
OSAN AB
CONTRA
CONTRA