PERFORMANCE REQUIREMENTS SUMMARY
August 09, 2022
AQL
Performance Objective Responsible Method Frequency Performance
Standard AQL/Performance
Thresholds Surveillance Schedule
/ Method 1 AQL: The
Contractor prepared a monthly program management status and Operational Readiness report addressing required areas.
COR Data Review
Monthly PWS 2.3.1.1.7
Satisfactory: maintaining records to identified standard of the applicable publication
Unsatisfactory: finding of more than 2 non-compliant records
Periodic Sampling of monthly program management status report for compliance
2 AQL: Contractor has established and maintained a publications master library in the English language.
The contractor ensures that technical publications accompany the maintenance tasks for the duration of the task.
Publications are easily and routinely accessible.
QAS/R QAS Audit Random PWS 2.2.4.11.5 Satisfactory: maintaining publications with latest updates and revisions On hand or on requisition manual within 30 days from approved list of publications
Unsatisfactory: Not on hand or on requisition manual within 30 days from approved list of publications
Random sample
3 AQL: The Contractor developed a ground and flight operations SOP.
GFR Data Review
Initial and With Updates
PWS 2.5.2.1.9
Current AR 95-
Satisfactory: Submitted on time and accepted by gov with not more than 2 revision cycles
Unsatisfactory: not accepted by gov requiring > 2 revision cycles
100% Initial Inspection then Periodic Sampling for compliance
4 AQL: (APT) The Contractor is complying with the operating procedures contained in the combined Instruction entitled 'Contractor' s Flight and Ground Operations ' currently in effect.
GFR APT Audit Semiannually PWS 2.2.4
PWS 2.4
Current AR 95-
Satisfactory: Passing inspection
Unsatisfactory: Fail inspection
Semiannually Inspection for compliance
5 Reserved.
6 Reserved.
7 Reserved.
8 AQL: The contractor is accountable for MNG inventory assets, including tracking, configuration management, storage, condition, QAS/R /COR Data Review
Monthly PWS 2.3.1.1.4
AR 710-1
AR 710-2
AR 740-26
Satisfactory: maintaining records to identified standard of applicable publication
Unsatisfactory: finding of > 5% non-compliant records
Monthly Periodic Sampling of records for compliance total asset visibility, and reporting as established in USG inventory standards
AR 71 0-2, AR 710-
1, and AR 740-26.
9 AQL: The Contractor has input the replenishment requirements into G21 for all spares and consumables while considering the procurement lead times required for each acquisition.
Data Review
Each PWS 2.3.1.1.4
AR 710-1
AR 710-2
AR 735-5
Satisfactory: Input into G21 system within 72 hours of identification
Unsatisfactory: Not input within 72 hours of identification
100% inspection
10 AQL: The Contractor conducts inspection, packaging, and proper disposal of classes of supply.
The contract or provided proper packaging and procedures to ensure no damages occur to items shipped. If the required packaging materials were not available, the contract or procured packaging materials via the Program Purchases
CLIN.
Data Review
Random PWS 2.2.4.6.5
AR 700-15
Satisfactory: Zero identified instances of improper handling and/or disposal of packaging or waste related to any class of supply.
Unsatisfactory: Any finding improper handling and/or disposal of packaging or waste related to any class of supply.
Random Sample
11 AQL: The developed a training management SOP.
COR Data Review
Initial and With Updates
PWS 2.2.1.3
Current AR 95-
Satisfactory: Submitted on time and accepted by gov with not more than 2 revision cycles
Unsatisfactory: not accepted by gov requiring more than 2 revision cycles
100% inspection
12 AQL: The contractor maintains a Learning Management System (LMS) that supports OJT progression, and sustainment training management for the SANG AVN personnel. The LMS is used by the contractor to record all training requirements, events, and proficiency results
COR Audit Semiannually PWS 2.2.1.3 Satisfactory: maintaining records to identified standard of applicable publication
Unsatisfactory: finding of no more than 5% non-compliant records
Semiannually inspection for compliance in support of the
SANG AVN
personnel. The LMS assists trainers and training managers in managing the training of the
SANG AVN
personnel.
13 AQL: The Contractor develops on-the-job training job books and SOP
COR Data Review
Initial and With Updates
PWS 2.2.1.2
Current AR 95-
Satisfactory: Submitted on time and accepted by gov with not more than 2 revision cycles
Unsatisfactory: not accepted by gov requiring more than 2 revision cycles
100% inspection
14 Reserved.
15 AQL: The contractor supports site evaluation visits conducted by the
USG
representatives on a non-interference basis.
COR Inspection Each PWS 2.3.1.1.3 All applicable site locations Current 95-20
Satisfactory: Pass provide appropriate support; no interference
Unsatisfactory: Fail not providing appropriate support
16 AQL: Contractor conducted PMR s/ lPRs and other program related meetings. A PMR/IPR for the entire SANG Avn pgm is required .
COR Data
Semiannually PWS 2.3.1.1.2.3
Satisfactory: All required PMR documents submitted within 15 calendar days before PMR date with no error
Unsatisfactory: All required Records submitted 2 or more errors
100% inspection Semiannually
17 Reserved.
18 AQL: The
Contractor maintains physical security and accountability of all material including but not limited to property, manuals, software, equipment, and tools provided.
COR Audit Monthly PWS 2.2.2.6
PWS 2.3.1.1.4
PWS 2.3.1.1.7
PWS 2.3.5.1
AR 190-13
AR 25-2
Satisfactory: maintaining records to identified standard of applicable publication
100% Monthly accountability
19 Reserved.
20 Contractor oversees safe refueling/defueling operations, IAW US Army Safety Standards, conducted by MNG students.
QAS Audit Random PWS 2.3.2.6
PWS 2.2.4.11.2
Current AR 95-
ATP-4-43
ATP-3-04.17
Satisfactory: maintaining records to identified standard of applicable publication
Unsatisfactory: finding of any non-compliant records
21 AQL: Contractor maintains a normal work schedule of five (5) working days per week, two
(2) nine (9) working hour shifts per day, and 90 working
COR Data Review
Monthly PWS 1.4
PWS 2.2.4.1.1
PWS 2.3.2.9
PWS 2.5.2.1.7
Satisfactory: Designated amount of people per shift by name and position per location
Unsatisfactory: Designated person not present and/or accounted during shift
Monthly Random Sample hours per week.
The contractor work schedule is adjusted to accommodate the authorized holidays.
22 Reserved.
23 AQL: The
Contractor does not perform any over and above additional work requests until authorized by the
KO.
COR Data
Monthly PWS 2.3.2.9
Satisfactory: Perform with KO approval
Unsatisfactory: finding of any performance without KO approval
24 AQL: The Contractor shall work flexible shifts when required by the SANG AVN to support the aircraft maintenance program.
COR Inspection Each PWS 1.4
PWS 2.2.4.1.1
Satisfactory: Contractor is responsive to scheduling personnel needs based on operations
Unsatisfactory: Contractor is not responsive to scheduling personnel needs based on operations
Periodic Customer Feedback
25 AQL: The observes holidays per the PWS. In the event Contractor personnel work on a scheduled holiday, they are entitled to compensatory time off on a day-for-day basis. contractors will be off x number of days at x site
COR Data Review
Monthly PWS 1.4
PWS 2.2.4.1.1
Satisfactory: Prior coordination with KO
Unsatisfactory: Scheduled person not present and/or accounted during shift
26 AQL: The authorized employees' absences consistent with the accomplishment of the requirements of the PWS. The contractor ensured Key Personnel in critical positions have a hierarchy established to maintain seamless performance of duties during absences. The contractor notified the ACO or COR of planned contractor absences at least 30 days in advance.
COR Data Review
As Required PWS 1.4
PWS 2.2.4.1.1
PWS 2.3.1.1.5
PWS 2.3.2.5.5
Satisfactory: 1) 100% of staff on the force structure performing with 90-days after contract award; and, if applicable, 2) vacant position is filled/hired within 30-days and performing within 60-day.
Unsatisfactory: 1) < 100% of staff on the force structure performing with 90-days after contract award; and, if applicable, 3) vacant position is not filled/hired
27 AQL: The Contractor ensured that personnel dress is neat, professional and meets all safety requirements. All contractor / subcontractor personnel wear picture identification badges to distinguish themselves from government employees. When conversing with government personnel, during business meetings, over the telephone, via electronic mail, the Contractor shall identify themselves as such.
Contractors identify themselves on any attendance sheet or any documents they may review.
QAS Inspection Random PWS 2.2.4.13
OSHA
Regulations
Satisfactory: maintaining identified standard of professionalism
Unsatisfactory: any instance of not meeting professional standards
Random inspection
28 AQL: The contractor shall maintain a full complement of personnel to meet the performance requirements as outlined in the management plan.
The contractor shall replace key personnel within 30 days when key positions are vacated for any cause. The contractor personnel in key positions are on site during duty hours. The contractor has establish a hierarchy for each key position validated by the COR in writing before final approved by ACO.
COR Audit Random PWS 2.3.1.1.5
PWS 2.3.2.5.5
PWS 2.3.2.6
Approved US Army Manuals
Satisfactory: 1) 100% of staff on the force structure performing with 90-days after contract award; and, if applicable, 2) vacant position is filled/hired performing with 90-days after contract award; and, if applicable, 3) vacant position is not filled/hired within 30-days and performing within 60-day.
100% inspection following contract award
29 AQL: Contractor Mobilization & Demobilization is a continuous effort as it pertains to the required level of effort in regard to
COR Audit Random PWS 3.0
PWS 2.3.2.6
AR 715-9
Satisfactory: 1) 100% of staff on the force structure performing with 90-days after contract award; and, if applicable, 2) transition of personnel off contract are planned to minimize the aircraft delivery and OPTEMPO schedule. The number of personnel required for mission accomplishment coincides with the information provided in PWS.
Contractor complies with the Operational Contract Support Planning and Management predeployment requirements.
disruption and vacancy is less than 60-days
Unsatisfactory: 1) <100% of staff on the force structure performing with 90-days after contract award; and, if applicable, 2) transition of personnel off contract caused vacancy of > than 60-days
30 AQL: Contractor completed the Transition in plan per the contract and the PWS.
COR Audit Each PWS 3.1 Transition Plan
Satisfactory: maintaining records to identified standard of applicable publication
Unsatisfactory: finding of ## non-compliant records
Random Sample to ensure compliance
31 AQL: Contractor completed the Transition out plan per the contract and the PWS.
COR Audit Each PWS 3.2 Transition Out Procedures
Satisfactory: Complete Within 120 days of starting transition
Unsatisfactory: Not transitioned in 120 days
Random Sample to ensure compliance
32 AQL: Contractor has defined and is tracking quality management system (QMS) metrics used to manage and improve the system, and to demonstrate QMS effectiveness.
COR Data Review
Monthly PWS 2.4
PWS 2.4.2.2
AS 9110
HQL
Satisfactory: maintaining records to identified standard of applicable publication
Unsatisfactory: finding of 2 non-compliant records
33 AQL: The Contractor has developed a quality system plan.
COR Data Review
Initial and With Updates
PWS 2.4
AS 9110
HQL
Satisfactory: Submitted on time and accepted by gov with not more than 2 revision cycles
Unsatisfactory: not accepted by gov requiring multiple revision cycles
100% inspection
34 AQL: The Contractor is AS 9110 certified within 12 months of contract award, initial certification within 36 months
COR Data Review
Initial and With Updates
PWS 2.4.2
AS 9110
HQL
Satisfactory: Pass with initial certification within 36 months and recertification within 12 months
Unsatisfactory: Fail recertification or initial certification or timeframe not met
100% inspection
35 Reserved.
36 AQL: The
Contractor has ensured each employee possess appropriate tool
QAS Inspection Random PWS 2.2.4.13 Current AR 95- 20;
OSHA 29
CFR 1910
Satisfactory: maintaining records to identified standard of applicable publication kits to perform the duties of their specific discipline.
The contractor has ensured that each employee possesses Personnel Protective Equipment (PPE) required for their specialty of work.
Approved US Army manuals
Unsatisfactory: finding of 4 findings per week, or duplicate individual finding
37 Reserved.
38 AQL: The
Contractor provided an in-country site manager as the single point of contact for respective effort.
The contractor shall designate a Program Manager
(PM).
COR Inspection initial and With Updates
PWS 2.3.1.1.5
PWS 2.3.2.5.7
Satisfactory: 100% of key personnel identified and hired within 30 days and performing within 90 days
Unsatisfactory: key personnel not identified and hired within 30 days and performing within 90 days
100% inspection
40 Reserved.
41 AQL: The
Contractor maintains data on the MNG assets provided for their use in performing the requirements of the contract. The Contractor provides an immediate notification when damage occurs; and information leading to the accurate estimation of the cost of the damage;
and an annual report covering the type of incidents, cost estimates and totals.
PA Data Review
Monthly PWS 2.5.2.1.13 Satisfactory: maintaining records to identified standard of applicable publication
42 AQL: The Contract or key positions possess the qualifications outlined in the PWS. The contractor has provided the personnel in the quantities specified for the labor categories to serve as key positions for this effort.
COR Data Review initial and With Updates
PWS 2.3.1.1.5
Satisfactory: 1) 100% of performing with 90-days after contract award; and, if applicable, 2) vacant position is filled/hired performing with 90-days after contract award; and, if applicable, 3) vacant position is not filled/hired within 30-days and performing within 60-day.
100% Inspection following contract award, then semiannual Periodic Inspection (upon KO/COR request) inspection of training records/certifications
43 AQL: The employees are selected by the contractor based upon their technical qualifications, expertise in the specific discipline, and maintenance management as is delineated in this PWS. The Contractor has ensured all personnel are qualified on the aircraft type before the ACO or COR permits the contractor to assign them work.
COR Data Review initial and With Updates
PWS 2.3.2.6 Satisfactory: 100% of Personnel providing aircraft maintenance qualified with current credentials and all other certification requirements to fulfil the position
Unsatisfactory: Personnel found performing maintenance without proper certifications and/or current credentials and/or other required documents for their specific discipline
44 AQL: The contractor has the capability to procure items (approved by KO) in or out of the Kingdom under the applicable sections of this contract.
KO Data Review
Periodic review of purchase authorizations
PWS 2.2.4.12.1 Satisfactory: KTR has the ability to procure items in Kingdom
Unsatisfactory: KTR unable to purchase in Kingdom
Periodic Review
45 AQL: The contractor has not proceeded with actual procurement of purchases and R&R requirements prior to obtaining written authorization from the KO and the
PWS
COR Data Review
Each PWS 2.2.4.12.1 Satisfactory: Receive procurement authorization from the KO
Unsatisfactory: No authorization by KO for procurement
100% inspection
46 Reserved.
47 Reserved.
48 AQL: The
Contractor submitted a detailed summary of the sub -contractors performance.
COR Data Review
Monthly PWS 2.3.1.1.2.3.4
Satisfactory: Submitted on time and accepted by government
Unsatisfactory: not accepted by government requiring multiple revision cycles
100% inspection
49 AQL: The Contractor implemented a compliance plan to prevent any prohibited activities IAW FAR Clause 52.222-50, Combating Trafficking in Persons (CTIP)
COR Data Review
Annually PWS 2.3.2.10 Satisfactory: Submitted certification that Contractor's agents, subcontractors, or their agents have not engaged in any CTIP activities
Unsatisfactory: Abuses relating to any CTIP activity have been found without appropriate remedial and referral actions