This document contains a price model template for a federal contract to develop a Third Generation Forward Looking Infrared Dewar Cooler Bench. The template includes proposed pricing tables for hardware, services, labor categories and rates, travel expenses, and repair materials. Labor hours and assumptions are also provided for program management, engineering, testing, and manufacturing support work over five years. Industry is requested to provide feedback on the draft performance work statement and pricing template within 20 calendar days. The soliciting agency is the Department of the Army Materiel Command Army Contracting Command located at Aberdeen Proving Ground.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

Proposed Price
(106, 124, 23)Proposed Price

(212, 247, 46)

Long Lead Material$ - 0$ - 0
Hardware$ - 0$ - 0
Services$ - 0$ - 0
TOTAL$ - 0$ - 0

Hardware Hardware

CLINDescriptionPWS ReferencePart NumberQuantityProposed Unit CostEvaluated Price
Base Procurement/Award
TBDBase Procurement LLM (In support of Lot 1)3.1.6.1N/AN/AN/A$ - 0
TBDBase Procurement LLM (In support of Lot 2)3.1.6.1N/AN/AN/A$ - 0
Abrams Production
TBDAbrams Procurement - Lot 13.1.6.2N/A106$ - 0$ - 0
TBDAbrams Procurement - Lot 23.1.6.3N/A212$ - 0$ - 0
OPTION - Abrams Production
TBDAbrams - Option - Lot 33.1.7.1N/A124$ - 0$ - 0
TBDAbrams - Option - Lot 43.1.7.2N/A247$ - 0$ - 0
OPTION NGCV/OMFV Production
TBDNGCV/OMFV - Option - Lot 53.1.8.1N/A23$ - 0$ - 0
TBDNGCV/OMFV - Option - Lot 63.1.8.2N/A46$ - 0$ - 0
TOTAL$ - 0

Note: All above hardware unit costs to be entered at the full loaded rate inclusive of all burdens and fees.

Total Services

Evaluated Price
Total Services Labor$0.00
Total Repair Services Material$0.00
Total Services Travel$0.00
Total Services$0.00

Services Labor

Total Services
PWS Section 3.4
Government AssessmentGovernment Estimated HoursContractor AssessmentProposed HoursProposed Labor Rates (Fully Loaded)
#Government Labor CategoriesDescription/QualificationsFY2022FY2023FY2024FY2025FY2026Proposed Labor CategoriesDescription/QualificationsFY2022FY2023FY2024FY2025FY2026FY2022FY2023FY2024FY2025FY2026Evaluated Price
1Systems EngineerPrinciple engineer with 10+ years of experience. Interacts with client staff, plans, conducts major phases of projects, directs the activities of assigned technical staff, and manages the system level integration of functional engineering contributions.211.22352.01344.01248.0888.00.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2Electrical EngineerComposite labor category covering the senior and electrical engineering staff responsible for the design, development, test, and management of the electrical components and firmware required by the 3GEN FLIR DCB. At least one senior level electrical engineer with 8+ years of experience assumed.232.82640.01560.01464.01044.00.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3Mechanical EngineerComposite labor category covering the senior and mechanical engineering staff responsible for the design, development, test, and management of the mechanical components of the 3GEN FLIR DCB. At least one senior level electrical engineer with 8+ years of experience assumed.232.82640.01560.01464.01044.00.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
4Software EngineerSenior software engineer(s) with 5+ years experience with software architecture related to the 3GEN FLIR DCB, or similar product. Senior software engineer will formulate and define specifications for program applications. Will maintain, modify (fixes), and perform upgrades to the 3GEN FLIR DCB software applications using engineering releases and specifications provided by the customer.168.01920.01920.01680.01080.00.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
5Test EngineerTest engineer(s) with 5+ years of applicable experience. Responsible for updating and maintaining the 3GEN FLIR DCB test processes and equipment necessary to ensure the 3GEN FLIR DCB meets all performance specifications. Individual(s) must have effective working knowledge of test processes and equipment to account for DCB design modifications and/or upgrades to ensure all performance specifications are met.139.22544.0768.0672.0480.00.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
6Program MgmtComposite rate covering all program/project management activities. Includes the Program Manager with 8+ years of experience and direct support staff to include, but limited to, Financial Management, Risk Management, Schedule Management, Logistics, Supply Chain Management, and other associated management disciplines and administrative labor pools.494.42208.01915.21852.81353.60.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
7Operations SupportManufacturing engineer with 5+ years of experience. Interacts with lead principle engineers, supply chain management, quality assurance, and touch labor personnel. Responsible for production facility to ensure timely delivery of hardware while ensuring quality requirements are met.63.4897.6675.8675.8506.90.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
8Assembly MfgComposite rate covering all touch labor personnel associated with the assembly of the 3GEN FLIR DCB and DCB subassemblies and components.57.6816.0614.4614.4460.80.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
9Additional Labor Categories can be input in rows 14-250.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
10Additional Labor Categories can be input in rows 14-250.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
11Additional Labor Categories can be input in rows 14-250.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
12Additional Labor Categories can be input in rows 14-250.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
13Additional Labor Categories can be input in rows 14-250.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
14Additional Labor Categories can be input in rows 14-250.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
15Additional Labor Categories can be input in rows 14-250.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
16Additional Labor Categories can be input in rows 14-250.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
17Additional Labor Categories can be input in rows 14-250.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
18Additional Labor Categories can be input in rows 14-250.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
19Additional Labor Categories can be input in rows 14-250.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20Additional Labor Categories can be input in rows 14-250.00.00.00.00.0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL SERVICES$ - 0
Notes:
(a) All above labor rates to be entered at the full loaded rate inclusive of all burdens and fees.
(b) The Government projects the below assumptions to require a level of effort of approximately 45,000 hours as estimated in the table above.
(c) Above Government Labor Categories and associated hours were estimated to accomplish the services to be performed. In some cases the labor category and description represent composites of multiple labor categories and descriptions with varying levels of experience and education.
(d) Contractor should determine their labor category mix and associated hours to accomplish the work. Government labor categories above, do not have to be fully utilized and other labor categories can be added.
Assumptions:
(1) Eight total repairs between FY24 and FY26. All repairs expected to be minor
(2) First Article Test (FAT) performed in FY24. Single test occurrence
(3) One engineering effort such as study, hardware fabrication, or test every year over the life of the LRIP contract, 6 month period of performance
(4) Six total failure analyses expected over life of contract; each failure to require a root cause and corrective action plan
(5) Two (2) performance and/or cost trade study and investigation each with a two (2) month PoP.
(6) One (1) Production cost reduction redesign and analysis with a PoP of two (2) months.
(7) Two (2) Software upgrades and two (2) software maintenance support activities each with a six (6) month PoP
(8) Support Provisioning Technical Documentation development such as Interactive Electronic Technical Manuals, Repair Parts Special Tools List, Provisioning Parts List, Special Tools Lists, and Engineering Data for Provisioning. Qty during LRIP: 1 (1), with a one (1) month PoP
(9) Field Service Representatives (FSR); Fielding Support - Qty during LRIP: Two (2), with a one (1) month PoP each. Removal and installation - Qty during LRIP: 1 (1), with a one (1) month PoP
(10) Two (2) delta - qualification effort for 3 months to mitigate an obsolete component such as a circuit card or cooler control module.

Repair Materials Repair Material Costs

Quantity
DescriptionFY2022FY2023FY2024FY2025FY2026
CCA Repair Materials11
CCM Repair Materials11
Flex Assembly Repair Material11
Total Proposed Material Cost:$ - 0
Evaluated Price:$ - 0
Notes/Assumptions:
(1) Above materials represent replacement parts for the repair of a DCB
(2) The input for the Total Proposed Material cost represents the grand total for all replacement material parts as broken out in the table above
(3) Total Proposed Material cost shall represent the total fully loaded cost inclusive of all burdens and fees.

Services Travel

Services Travel
FY22 CONUSRatesMiles @Per Trip CostCost Per Trip# of TripsTotal Price (TY$)
TOFROM# of Ppl# of DaysAirfareLodgingM&IEAuto$ 0.575AirfareLodgingM&IEAutoMileage
Ft BelvoirOfferor Location43$ - 0$ - 0$ - 0$ - 00$0.00$0.00$0.00$0.00$0.00$0.001$0.00
Aberdeen Proving GroundOfferor Location43$ - 0$ - 0$ - 0$ - 00$0.00$0.00$0.00$0.00$0.00$0.001$0.00
Base Period (FY22)$0.00
FY23 CONUSRatesMiles @Per Trip CostCost Per Trip# of TripsTotal Price (TY$)
TOFROM# of Ppl# of DaysAirfareLodgingM&IEAuto$ 0.575AirfareLodgingM&IEAutoMileage
Ft BelvoirOfferor Location43$ - 0$ - 0$ - 0$ - 00$0.00$0.00$0.00$0.00$0.00$0.002$0.00
Yuma Proving GroundOfferor Location43$ - 0$ - 0$ - 0$ - 00$0.00$0.00$0.00$0.00$0.00$0.002$0.00
Base Period (FY23)$0.00
FY24 CONUSRatesMiles @Per Trip CostCost Per Trip# of TripsTotal Price (TY$)
TOFROM# of Ppl# of DaysAirfareLodgingM&IEAuto$ 0.575AirfareLodgingM&IEAutoMileage
Ft BelvoirOfferor Location43$ - 0$ - 0$ - 0$ - 00$0.00$0.00$0.00$0.00$0.00$0.002$0.00
Aberdeen Proving GroundOfferor Location43$ - 0$ - 0$ - 0$ - 00$0.00$0.00$0.00$0.00$0.00$0.002$0.00
Base Period (FY24)$0.00
FY25 CONUSRatesMiles @Per Trip CostCost Per Trip# of TripsTotal Price
TOFROM# of Ppl# of DaysAirfareLodgingM&IEAuto$ 0.575AirfareLodgingM&IEAutoMileage
Ft BelvoirOfferor Location43$ - 0$ - 0$ - 0$ - 00$0.00$0.00$0.00$0.00$0.00$0.002$0.00
McKinney, TxOfferor Location43$ - 0$ - 0$ - 0$ - 00$0.00$0.00$0.00$0.00$0.00$0.002$0.00
Base Period (FY25)$0.00
FY26 CONUSRatesMiles @Per Trip CostCost Per Trip# of TripsTotal Price (TY$)
TOFROM# of Ppl# of DaysAirfareLodgingM&IEAuto$ 0.575AirfareLodgingM&IEAutoMileage
Ft BelvoirOfferor Location43$ - 0$ - 0$ - 0$ - 00$0.00$0.00$0.00$0.00$0.00$0.002$0.00
Yuma Proving GroundOfferor Location43$ - 0$ - 0$ - 0$ - 00$0.00$0.00$0.00$0.00$0.00$0.002$0.00
Base Period (FY26)$0.00
TOTAL TRAVEL$0.00
Notes/Assumptions:
(1) Above travel costs are related to travel required for services only; procurement related travel should be captured within hardware costs
(2) Above cost inputs should be inclusive of inflation relative to the year estimated