W900KK23R0005_Attach_14_CBID_III_VACR_IMI_AEC_Exhibit_A_CDRLs.pdf
PDF 205 KB Posted
- Solicitation number
- W900KK-23-R-0005
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SFAE-STRI-ST-VTS
6. REQUIRING OFFICE5. CONTRACT REFERENCE
DI-ADMN-81373
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Presentation Material
2. TITLE OF THE DATA ITEM
A001
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
W900KK-23-R-0005See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER ADMN
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
ONE/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
2. Block 12: The contractor will Submit Presentation Materials to be used during In Process Reviews (IPR) NLT 7 business days prior to the IPR. The contractor will submit in current Microsoft Office format via e-mail.
3. Block 14: In addition to printed copies, data submission shall be via electronic mail, CD/DVD, or external hard drive. The email subject line shall include the contract number, CDRL Data Item Number, and reporting period. For any data submission with any file size greater than 10 MB, or if the combined size attached to the email is greater than 10 MB, data submission shall be submitted via CD/DVD or external hard drive and shall be in current Microsoft Office format. Attachments in the form of compressed or zip files or executable files are not accepted by PEO STRI firewall.
Addressees within the program and ACC shall be identified at post award conference along with electronic and physical address.
4. The Government will have 3 business days for review and acceptance or rejection of each submission. The contractor shall have 3 business days to incorporate the Government comments.
16. REMARKS
Block D: CBID III - Sample TO - VACR & AEC
1. Block 5. 3.1.3.3 In Process Reviews and 3.1.3.4 Meetings/Minutes
2. Block 9: Labels on electronic media (i.e. CD/DVD), jewel case inserts (if provided) and printed copies of the document generated from the electronic media shall display the following distribution statement:
DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE
DEPARTMENT OF DEFENSE AND U.S. DEPARTMENT OF DEFENSE
CONTRACTORS ONLY DUE TO CRITICAL TECHNOLOGY, EFFECTIVE 5 APR 21.
OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO U.S. ARMY
PEO STRI, SFAE-STRI-ST-VTS, 12211 SCIENCE DRIVE ORLANDO, FL 32826-3224.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS
RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC
2751 ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED,
TITLE 50, U.S.C.. APP. 2401, ET SEQ. VIOLATIONS OF THESE EXPORT
LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN
ACCORDANCE WITH THE PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE: UNCLASSIFIED, LIMITED DOCUMENT, DESTROY BY
ANY METHOD THAT WILL PROTECT DISCLOSURE OF CONTENTS OR
RECONSTRUCTION OF THIS DOCUMENT.
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Page 1 of 1 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001
5. CONTRACT REFERENCE
See Block 16
DI-ADMN-81505
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Report, Record of Meeting/Minutes
2. TITLE OF THE DATA ITEM
A002
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
W900KK-23-R-0005See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER ADMN
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
Block D: CBID III - Sample TO - VACR & AEC
1. Block 9: Labels on electronic media (i.e. CD/DVD), jewel case inserts (if provided) and printed copies of the document generated from the electronic media shall display the following distribution statement:
DISTRIBUTION D:
DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S.
DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO CRITICAL
TECHNOLOGY, EFFECTIVE 1 March 2016. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI,
SFAE-STRI-TRADE-VTS. The following export control warning shall be placed on document title page and disk label (where applicable): WARNING - THIS
DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.)
OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50, U.S.C., APP.
2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT LAWS ARE
SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE
WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
2. Block 12: The contractor shall write minutes for each meeting held. The contractor shall review input from all team members and coordinate the minutes and action items with the attendees before adjourning the meeting.
The contractor shall prepare and deliver the minutes, per the IMS but no later than 7 business days after the meeting (excluding the biweekly Integrated Product Team Meetings). The Contractor shall submit all Record of Meeting/Minutes in Microsoft Word Format via e-mail.
3. Block 13: Subsequent minutes to be submitted as required.
4. Block 14: In addition to printed copies, data submission shall be via electronic mail, CD/DVD, or external hard drive. The email subject line shall include the contract number, CDRL Data Item Number, and reporting period. For any data submission with any file size greater than 10 MB, or if the combined size attached to the email is greater than 10 MB, data submission shall be submitted via CD/DVD or external hard drive and shall be in Microsoft Office 2013 format. Email in the form of compressed or zip files or executable files are not accepted by PEO STRI firewall.
Addressees within the program and ACC shall be identified at post award conference along with electronic and physical address.
5. The Government will have 10 business days for review and acceptance or rejection of each submission. The contractor shall have 5 business days to incorporate the Government comments.
16. REMARKS
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Page 1 of 1 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001
3.1.3.4 Meetings/Minutes
3.1.2.4 Project Planning Chart
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Project Planning Chart
2. TITLE OF THE DATA ITEM
A003
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
W900KK-23-R-0005See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
Block D: CBID III - Sample TO - VACR & AEC
1. Block 4: The contractor will submit in Microsoft Project 2013 format and in a format that is compatible with Microsoft Office 2013 or better.
2. Block 4: The contractor shall include all sections of respective Data Item Description (DID) in the delivery. If the contractor determines a section is not applicable based on the product ordered, the contractor will state that along with the rationale as to why that section is not required.
3. Block 9: Labels on electronic media (i.e. CD/DVD), jewel case inserts (if provided) and printed copies of the document generated from the electronic media shall display the following distribution statement:
DISTRIBUTION D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF
DEFENSE AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO
CRITICAL TECHNOLOGY, EFFECTIVE 1 March 2016. OTHER REQUESTS FOR
THIS DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI,
SFAE-STRI-ST-VTS. The following export control warning shall be placed on document title page and disk label (where applicable): WARNING - THIS
DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.)
OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50, U.S.C., APP.
2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT LAWS ARE
SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE
WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
4. Block 12/13: The contractor shall submit a proposed draft schedule at the Kick Off Meeting. The contractor shall submit a master schedule for approval within 20 (twenty) business days of award. Revisions to the plan will be due at such time as necessary to reflect changes in the program schedule or work effort.
5. Block 14: In addition to printed copies, data submission shall be via electronic mail, CD/DVD, or external hard drive. The email subject line shall include the contract number, CDRL Data Item Number, and reporting period. For any data submission with any file size greater than 10 MB, or if the combined size attached to the email is greater than 10 MB, data submission shall be submitted via CD/DVD or external hard drive and shall be in Microsoft Office 2013 format. Email in the form of compressed or zip files or executable files are not accepted by PEO STRI firewall.
Addressees within the program and ACC shall be identified at post award conference along with electronic and physical address.
6. The Government will review the submittal and provide comments, if any, within ten (10) business days after receipt from the Contractor. Contractor will have 5 (five) business days to revise and resubmit. Revisions to the plan will be due at such time as necessary to reflect changes in the program schedule or work effort.
16. REMARKS
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Page 1 of 1 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001
DI-MGMT-80507C
DI-MGMT-80368A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Status Report
2. TITLE OF THE DATA ITEM
A004
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
W900KK-23-R-0005See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
MNTHLY
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
Block D: CBID III - Sample TO - VACR & AEC
1. Block 4: The report shall include but not be limited to the following:
a. Summary. The summary shall include a brief statement of the overall project status, covering the accomplished technical activities and development, objectives of efforts, summary results of efforts, identification of major problems/deficiencies with impact, and recommended solutions.
b. Milestone/task status. The status of each milestone/task as defined by the statement of work or contract, as applicable.
c. A statement as to whether or not the program/project/task is on schedule;
if not, the effort planned to meet the schedule shall be indicated. Include an overall status of each milestone, task, or unit of work. Include update schedule sheets, milestone charts, or task synopsis sheets identifying phase of task and percentage of completion of each task, technical instruction, or order.
d. A comparison of achieved end-product performance capabilities projected against contract baseline values, requirements, or allocations.
e. Effort expended on each task to date, and a brief description of technical developments and accomplishments.
f. A narrative of outstanding problems existing as of the previous status report, and their resolution status.
g. New problem areas encountered or anticipated, their effect on the overall work effort/project and steps being taken to remedy problem situations.
h. Significant results of conferences, trips, or directives for the Contracting officers representatives.
i. Any other information which may cause significant changes in the program schedule.
j. Future plans. Summary of future plans, recommendations and proposals both for the next reporting period and for any long term plans.
k. Contract deliveries status. The status of each deliverable end item, including data deliverables, as required by the contract. Provide item and contract identification, shipping/transmittal data, acceptance status, security classification, and schedule due date information.
l. Report preparer. Name of person(s) preparing report and telephone number (s).
m. Appendices. Appendices where applicable, for tables, references, charts, or other descriptive material. Each appendix shall be referenced in the appropriate area of the report.
2. Block 9: Labels on electronic media (i.e. CD/DVD), jewel case inserts (if provided) and printed copies of the document generated from the electronic media shall display the following distribution statement:
DEFENSE AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE
16. REMARKS
000 15. TOTALSee continuation sheet...
18.ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Page 1 of 2 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001
3.1.2.1 Monthly Status Report
16. REMARKS (Continued) TOCRITICAL TECHNOLOGY, EFFECTIVE 1 March 2016. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS. The following export control warning shall be placed on document title page and disk label (where applicable): WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50, U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN
ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
3. Blocks 12/13: The contractor shall submit a status report for each DO by the 10th day of the month starting with the effective date of the DO and continuing until final acceptance of all deliverables.
4. Block 14: In addition to printed copies, data submission shall be via electronic mail or CD/DVD. The email subject line shall include the contract number, CDRL Data Item Number, and reporting period. For any data submission with any file size greater than 10 MB, or if the combined size attached to the email is greater than 10 MB, data submission shall be submitted via CD/DVD and shall be in current Microsoft Office format. Email in the form of compressed or zip files or executable files are not accepted by PEO STRI firewall. Addressees within the program and ACC shall be identified at post award conference along with electronic and physical address.
5. The Government will review the submittal and provide comments, if any, within ten (10) business days after receipt from the Contractor. The Contractor will have 5 business days to revise and resubmit.
F. CONTRACTORE. CONTRACT/PR NO.
W900KK-23-R-0005CBID III - Sample TO - VACR & AEC
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Page 2 of 2 PagesDD FORM 1423-1, FEB 2001
DI-MGMT-81178
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Report, Production or Delivery Problem(s)
2. TITLE OF THE DATA ITEM
A005
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
W900KK-23-R-0005See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
2. Block 12: Whenever the contractor has identified a problem that may have potential impact on delivery, schedule or cost they shall submit a Production or Delivery Problem Report. The report will contain complete but concise explanations as to the nature of the problem and the current or potential impact on the task order. It will also describe any actions the contractor has taken to remedy the situation.
3. Block 14: In addition to printed copies, data submission shall be via electronic mail, CD/DVD, or external hard drive. The email subject line shall include the contract number, CDRL Data Item Number, and reporting period. For any data submission with any file size greater than 10 MB, or if the combined size attached to the email is greater than 10 MB, data submission shall be submitted via CD/DVD or external hard drive and shall be in current Microsoft Office format. Email in the form of compressed or zip files or executable files are not accepted by PEO STRI firewall.
Addressees within the program and ACC shall be identified at post award conference along with electronic and physical address.
4. The Government will review the submittal and provide comments, if any, within ten (10) business days after receipt from the Contractor. Contractor will have 5 (five) business days to revise and resubmit.
16. REMARKS
Block D: CBID III - Sample TO - VACR & AEC
1. 3.1.2.2 Production or Delivery Problem Report
2. Block 9: Labels on electronic media (i.e. CD/DVD), jewel case inserts (if provided) and printed copies of the document generated from the electronic media shall display the following distribution statement:
DISTRIBUTION D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF
DEFENSE AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO
CRITICAL TECHNOLOGY, EFFECTIVE 1 March 2016. OTHER REQUESTS FOR
THIS DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI,
SFAE-STRI-ST-VTS. The following export control warning shall be placed on document title page and disk label (where applicable): WARNING - THIS
DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.)
OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50, U.S.C., APP.
2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT LAWS ARE
SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE
WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Page 1 of 1 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001
6. REQUIRING OFFICE
DI-MGMT-81117
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Technical and Management Work Plan
2. TITLE OF THE DATA ITEM
A006
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
W900KK-23-R-0005See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
ONE/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
Block D: CBID III - Sample TO - VACR & AEC
1. Block 4: The contractor may submit in contractor style and format.
2. Block 5: 3.1.2.3 Technical Management and Work Plan:
3. Block 9: Labels on electronic media (i.e. CD/DVD), jewel case inserts (if provided) and printed copies of the document generated from the electronic media shall display the following distribution statement:
DISTRIBUTION D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF
DEFENSE AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO
CRITICAL TECHNOLOGY, EFFECTIVE 1 March 2016. OTHER REQUESTS FOR
THIS DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI,
SFAE-STRI-TRADE-VTS. The following export control warning shall be placed on document title page and disk label (where applicable): WARNING - THIS
DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.)
OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50, U.S.C., APP.
2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT LAWS ARE
SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE
WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
3. BLKS 12/13: The contractor shall present the proposed draft Technical and Management Work Plan at the Kick-Off Meeting (KOM), within 10 business days after award. The contractor shall submit a revised Management Plan for approval within 20 (twenty) business days of Task Order award. The Government will review the submittal and provide comments, if any, within ten (10) business days after receipt from the Contractor. Revisions to the plan will be due at such time as necessary to reflect changes in the program schedule or work effort, per COR approved Integrated Master Schedule (IMS).
4. Block 14: In addition to printed copies, data submission shall be via electronic mail, CD/DVD, or external hard drive. The email subject line shall include the contract number, CDRL Data Item Number, and reporting period. For any data submission with any file size greater than 10 MB, or if the combined size attached to the email is greater than 10 MB, data submission shall be submitted via CD/DVD or external hard drive and shall be in current Microsoft Office format. Email in the form of compressed or zip files or executable files are not accepted by PEO STRI firewall.
Addressees within the program and ACC shall be identified at post award conference along with electronic and physical address.
16. REMARKS
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Page 1 of 1 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001
DI-MGMT-82133
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
See Block 16
2. TITLE OF THE DATA ITEM
A007
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
W900KK-23-R-0005See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
Block D: CBID III - Sample TO - VACR & AEC
Block 2: REQUIREMENTS TRACEABILITY VERIFICATION MATRIX (RTVM)
1. BLOCK 9: LABELS ON ELECTRONIC MEDIA (i.e. CD/DVD), JEWEL CASE
INSERTS (IF PROVIDED) AND PRINTED COPIES OF THE DOCUMENT
GENERATED FROM THE ELECTRONIC MEDIA SHALL DISPLAY THE FOLLOWING
DISTRIBUTION STATEMENT:
DISTRIBUTION D:
DISTRIBUTION D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF
DEFENSE AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO
CRITICAL TECHNOLOGY, EFFECTIVE 1 March 2016. OTHER REQUESTS FOR
THIS DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI,
SFAE-STRI-ST-VTS. The following export control warning shall be placed on document title page and disk label (where applicable): WARNING - THIS
DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY
THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.)
OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50, U.S.C., APP.
2401 ET SEQ.), AS AMENDED. VIOLATIONS OF THESE EXPORT LAWS ARE
SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE
WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
2. BLOCK 12: INITIAL REPORT DUE 20 WORKING DAYS PRIOR TO SYSTEM
REQUIREMENTS REVIEW.
3. BLOCK 13: REVISIONS AS REQUIRED THROUGH LIFE OF THE CONTRACT.
4. BLOCK 14: THE RTVM REPORTS SHALL HAVE A COVER LETTER AND SHALL
BE DELIVERED IN BOTH MS EXCEL FORMAT AND RATIONAL DYNAMIC
OBJECT ORIENTED REQUIREMENTS SYSTEM (DOORS) IMPORTABLE FORMAT.
A FINAL REPRODUCIBLE COPY SHALL BE DELIVERED ON CD/DVD.
ADDRESSEES WITHIN THE PROGRAM AND ACC SHALL BE IDENTIFIED AT
POST AWARD CONFERENCE ALONG WITH ELECTRONIC AND PHYSICAL ADDRESSES.
5. THE GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW AND
ACCEPTANCE/REJECTION OF EACH SUBMISSION.
6. THE CONTRACTOR SHALL HAVE 10 WORKING DAYS TO INCORPORATE
GOVERNMENT COMMENTS INTO EACH SUBMISSION.
7. ALL DID CONTENT MUST BE ADDRESSED.
16. REMARKS
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Page 1 of 1 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001
3.3.3.1 System Definition Phase
DI-SAFT-80106C
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
HEALTH HAZARD ASSESSMENT REPORT (HHAR)
2. TITLE OF THE DATA ITEM
A008
1. DATA ITEM NO.
F. CONTRACTORE. CONTRACT/PR NO.
W900KK-23-R-0005See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER SAFT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
DD
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
11. AS OF DATE
12.DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
Block D: CBID III - Sample TO - VACR & AEC
1. BLOCK 4: The contractor shall address all required DID content in the active tense.
2. BLOCK 7: The contractor shall initiate a zero cost receiving report in wide area workflow (WAWF) immediately after submitting the data in accordance with BLOCK 14. A WAWF receiving report is required for every data item submission (initial and subsequent submissions) to the Government.
For data items that are separately priced, the contractor shall initiate a WAWF invoice in lieu of a zero cost receiving report.
3. BLOCK 8: Approval is required prior to test readiness review.
4. BLOCK 9: All submissions of the document shall display the following:
DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE
DEPARTMENT OF DEFENSE AND U.S. DEPARTMENT OF DEFENSE
CONTRACTORS ONLY DUE TO ADMINISTRATIVE OR OPERATIONAL USE,
EFFECTIVE 5 APR 21. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE
REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS, 12211 SCIENCE
DRIVE ORLANDO, FL 32826-3224.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS
RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC
2751 ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED,
TITLE 50, U.S.C.. APP. 2401, ET SEQ. VIOLATIONS OF THESE EXPORT
LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN
ACCORDANCE WITH THE PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE: UNCLASSIFIED, LIMITED DOCUMENT, DESTROY BY
ANY METHOD THAT WILL PROTECT DISCLOSURE OF CONTENTS OR
RECONSTRUCTION OF THIS DOCUMENT.
5. BLOCK 12: Shall be due 30 working days prior to Test Readiness Review (TRR) for Government In-Plant Acceptance Testing (IPAT). The Government will have 20 working days for review, accept/reject and provide comments/ corrective actions. The contractor shall have 10 working days to incorporate changes and resubmit back to the Government.
6. BLOCK 13: Revisions as required through the life of the contact. The Government will have 20 working days for review, accept/reject and provide comments/corrective actions. The contractor shall have 10 working days to incorporate changes and resubmit back to the Government.
7. BLOCK 14: All submissions shall be uploaded into WAWF. The submittal shall be in an editable, unlocked and reproducible electronic file(s) in current MS Word format. Files greater than 10 MB shall be submitted via DoD SAFE (Secure Access File Exchange) at https://safe.apps.mil/. All submissions shall be addressed to the Contracting Officer Representative, kenneth.m.waymire.civ@army.mil.
16. REMARKS
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Page 1 of 1 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001
3.4.6.1 Health Hazard Assessment
File details come from the government source that posted it. Updated .