Attachment 6.4a
| SOFAST-E II W900KK-20-R-0013 |
| ATTACHMENT 6.4 |
| Delivery Order (D.O.) 0001 |
| CLIN | DESCRIPTION | C TYPE | QUANTITY | UNIT | UNIT COST | AMOUNT |
| 1 | MH-47-1 CMS Upgrade | FPIF | 1 | Lot | | $ - |
| Manufacture, install and integrate MH-47G Block II upgrades | | | | | |
| into the MH-47-1 CMS | | | | | |
| CLIN | DESCRIPTION | C TYPE | QUANTITY | UNIT | UNIT PRICE | AMOUNT |
| 0002 | Emerging Requirements | T&M | 1 | Lot | $ 500,000.00 | $ 500,000 |
| Engineering and Manufacturing support for rapid deployment of | | | | | |
| new equipment for concurrency across the simulation federation | | | | | |
| CLIN | DESCRIPTION | C TYPE | QUANTITY | UNIT | UNIT PRICE | AMOUNT |
| 0003 | Spares | CPFF | 1 | Lot | $ 250,000.00 | $ 250,000 |
| To support lifecycle of MH-47G-1 CMS post modification | | | | | |
| CLIN | DESCRIPTION | C TYPE | QUANTITY | UNIT | UNIT PRICE | AMOUNT |
| 0004 | Travel | Cost | 1 | Lot | | $ - |
| To support MH-47G-1 CMS modification | | | | | |
| CLIN | DESCRIPTION | C TYPE | QUANTITY | UNIT | UNIT PRICE | AMOUNT |
| 5 | Tech Data | NSP | 1 | Lot | NSP | |
| CLIN | DESCRIPTION | C TYPE | QUANTITY | UNIT | UNIT PRICE | AMOUNT |
| 6 | CMRA | NSP | 1 | Lot | NSP | |
Sub-total $ 750,000
| D.O. 0002 | | | | | | |
| CLIN | DESCRIPTION | C TYPE | QUANTITY | UNIT | UNIT COST | AMOUNT |
| 1 | H-47 ER CFTD | FFP | 1 | Lot | | $ - |
| Manufacture, install and integrate H-47ER CFTD upgrades into the | | | | | |
| H-47ER CFTD | | | | | |
| CLIN | DESCRIPTION | C TYPE | QUANTITY | UNIT | UNIT PRICE | AMOUNT |
| 0002 | Spares | FFP | 1 | Lot | | $ - |
| To support lifecycle of MH-47ER CFTD post manufacturing | | | | | |
| CLIN | DESCRIPTION | C TYPE | QUANTITY | UNIT | UNIT PRICE | AMOUNT |
| 0003 | Travel | Cost | 1 | Lot | | $ - |
| To support MH-47ER CFTD throughout Period of performance | | | | | |
| CLIN | DESCRIPTION | C TYPE | QUANTITY | UNIT | UNIT PRICE | AMOUNT |
| 4 | Tech Data | NSP | 1 | Lot | NSP | |
| CLIN | DESCRIPTION | C TYPE | QUANTITY | UNIT | UNIT PRICE | AMOUNT |
| 5 | CMRA | NSP | 1 | Lot | NSP | |
| Sub-total | $ - |
| Total Evaluated Price (TEP) | $ 750,000.00 |
Attachment 6.4b Offeror's Name: "Offeror"
Rates (and FCCM Factors) Year 01 Year 02 Year 03 Year 04
| Year 05 | Option | | | | | | | |
| Year 06 | Option | | | | | | | |
| Year 07 | Option | | | | | | | |
| Year 08 | | Definition and Allocation Base | | | | | | |
| | 5.00% | 5.10% | 5.20% | 5.30% | 5.40% | These rates are samples to show formula breakout.* | Identify Where in the Proposal the Basis of Estimate for Each Rate is Located. |
| Base Labor Rate Escalation | | | | | | | |
| Labor Fringe | | | | | | | |
| Overhead | | | | | | | |
| Material Handing | | | | | | | |
| Subcontractor Handling | | | | | | | |
| G&A | | | | | | | |
| Proposed Profit - Fixed Price | | | | | | | |
| Proposed Fee - CPFF | | | | | | | |
| Proposed Fee - T&M | | | | | | | |
| Instructions: | | | | | | | |
| | 1. If any of the rates/factors are not used in your indirect rate structures in your accounting system, leave the blocks empty and enter "Not Applicable" in the column titled "Definition and Allocation Base". | | | | | | |
| | 2. Each Offeror shall supply their applicable rates for Base and all Seven Option Years and a description and/or calculation of how their rates/factors were developed. That information can be included either below or elsewhere in your Cost/Price Volume. | | | | | | |
| | 3. In the " Definition and Allocation Base" column, as a minimum, include a brief comment describing the base used for application of each indirect rate: For example, G&A would be, Total Cost Input, Single Element (Direct Labor Cost) or Value Added (excludes …. and … ). | | | | | | |
| | 4. If you have additional rates/factors as part of your indirect rtae structure as defined in your accounting policies and procedures, you can add rows as needed. | | | | | | |
Attachment 6.4c
| The offeror will input their base rate for each labor category proposed and then apply indirect rates to demonstrate the development of a fully burdened rate through profit for each category. The offeror can adjust this worksheet as needed to complete the calculation. In the second schedule input the fully burdened rate for each category, for each base and option year. | | | | | | | | | | | | | | |
| Offeror's Name: | "Offeror" | | | | | | | | | | | | | |
| Fully Burdened Rate Build-up | | | | | | | | | | | | | Fully Burdened Rate w/o Profit/Fee by Category and by Year | |
| Labor Category | Base Labor Rate | Fringe Rate | Fringe Dollars | Sub-Total | Overhead Rate | Overhead Dollars | Sub-Total | G&A Rate | G&A Dollars | Sub-Total | Profit | Total | Labor Category (Fully Burdened w/o Profit/Fee) | Year 01 |
Year 02 Year 03 Year 04 Year 05 Year 06 Year 07 Year 08 Year
Attachment 6.4d
| Identify the labor categories that will be required, provide description, eduction level and number of years experience for each labor category. | | |
| Labor Traceability Matrix | | |
| LABOR CATEGORY | LABOR DEFINITION | ADDITIONAL INFORMATION |
| Example: Program Manager | Manages the information systems design, development, and analysis encompassing one or more of the following areas of technical expertise: computer programming, systems analysis, computer programming/analysis, systems analysis, applications programming, software development, systems integration, and related disciplines. Requires xx number of years of experience and x level of education. | |
Attachment 6.4e
| DO 0001 |
| Fixed Price Incentive (Firm Target) (FPIF) |
| To be incorporated into Delivery Order 0001 Section G for FPIF CLIN 0001 MH-47-1 CMS Upgrade |
| The focus is for a schedule based delivery incentive to achieve early deliveries while also encouraging on time or minimally late deliveries. The price specified in the contract includes a premium (profit rate) that is partially forfeited for late delivery but is augmented by a cost incentive (profit rate) to deliver early. The incentive starts at the proposed profit for FPIF CLIN 0001 MH-47-1 CMS Upgrade and increases by month for early delivery and deteriorates to zero at three months late delivery. The deterioration rate is not evenly sequential. This was intentional to maximize a desire to be early and also minimize lateness. Please note there will be no partial percentages one (1) day sooner or later than a month will adjust the percent tier. |
| | 3 Months Early | 2 Months Early | 1 Month Early | Delivered on Time | 1 Month Late | 2 Months Late | 3 Months Late |
| | 30-Mar-21 | 30-Apr-21 | 30-May-21 | 30-Jun-21 | 30-Jul-21 | 30-Aug-21 | 30-Sep-21 |
| | Proposed Profit | | | | | | |
| Plus 4% | Proposed Profit | | | | | | | |
| Plus 3% | Proposed Profit | | | | | | | |
| Plus 2% | Proposed Profit | Proposed Profit Minus 3% | Proposed Profit Minus 5% | Minimum Profit | | | | |
| | ERROR:#VALUE! | ERROR:#VALUE! | ERROR:#VALUE! | Insert CLIN 0001 Profit | ERROR:#VALUE! | ERROR:#VALUE! | 0% |
| | *Note the maximum profit rate that can be attained and/or calculated based on the above Table is 15% and the Minimum profit rate that can be attained and/or calculated is 0% | | | | | | |
Attachment 6.4f
Performance Based Payments (PBP)
Milestone schedules will be incorporated into section G of each respective Delivery Order 0001 and 0002
| DO 0001 |
| CLIN 0001 MH-47-1 CMS Upgrade |
| Event | Type | Description | Accomplishment | Exit Criteria | Value |
| 1 | S | SRR (System Requirements Review) BASE SOW 3.2.3.8.1; DO1 SOW 3.2.3.8 | Completion of SRR | Validation from PM of Event Completion | |
| 2 | S | PDR (Preliminary Design Review) BASE SOW 3.2.1.3; DO1 SOW 3.2.1.3 | Completion of PDR | Validation from PM of Event Completion | |
| 3 | S | CDR (Critical Design Review) BASE SOW 3.2.1.6; DO1 SOW 3.2.1.6 | Completion of CDR | Validation from PM of Event Completion | |
| 4 | S | TRR (Test Readiness Review) BASE SOW 3.2.7.1; DO1 SOW 3.2.7 | Completion of TRR | Validation from PM of Event Completion | |
Final Delivery Completion of Delivery Approved DD250
| DO 0002 |
| CLIN 0001 H-47 ER CFTD |
| Event | Type | Description | Accomplishment | Exit Criteria | Value |
| 1 | S | SRR (System Requirements Review) BASE SOW 3.2.3.8.1; DO2 SOW 3.2.3.8 | Completion of SRR | Validation from PM of Event Completion | |
| 2 | S | PDR (Preliminary Design Review) BASE SOW 3.2.1.3; DO2 SOW 3.2.1.3 | Completion of PDR | Validation from PM of Event Completion | |
| 3 | S | CDR (Critical Design Review) BASE SOW 3.2.1.6; DO2 SOW 3.2.1.6 | Completion of CDR | Validation from PM of Event Completion | |
| 4 | S | TRR (Test Readiness Review) BASE SOW 3.2.7.1; DO2 SOW 3.2.7 | Completion of TRR | Validation from PM of Event Completion | |
Final Delivery Completion of Delivery Approved DD250
Pursuant to Section I, FAR 52.232-32, Performance-Based Payments, payments will be made on the dollar total of each CLIN. The schedule above sets forth the performance based payments to be made under this contract. The performance based payments above amounts are commensurate with the value of each performance event.
*Note milestones maybe finalized after award