Att 6.0 DO 0001 Sec B-J SOFAST-E II CMS Final RFP Amendment 1.pdf

PDF 221 KB Posted

Attached to
Amendment 0003 to Request for Proposal for the Special Operations Forces Aviation Systems Trainers – Enhancements II (SOFAST-E II) Procurement
Solicitation number
w900kk-20-r-0013
Issued by

About this file

This document contains an attachment to a federal contract delivery order and a related federal contract opportunity synopsis. The attachment is for Delivery Order 0001 under IDIQ contract W900KK-20-R-0013 for the Special Operations Forces Aviation Systems Trainers - Enhancements II (SOFAST-E II) program. It requires upgrading an MH-47-1 Combat Mission Simulator with MH-47G Block II modifications on a Fixed Price Incentive basis. Additional CLINs include emerging requirements engineering, spares, travel, technical data, manpower reporting, and contractor-acquired property. Delivery is required within nine months of award at Fort Campbell, KY to the 160th Special Operations Aviation Regiment (Airborne).

The related synopsis indicates the Army intends to issue a small business set-aside RFP for the SOFAST-E II IDIQ contract with an estimated $218M ceiling value and 8-year ordering period. It will provide technical, planning and management support for 160th SOAR(A) simulators, simulations and mission rehearsal systems to maintain concurrency with aircraft platforms. The anticipated RFP posting date is October 31, 2019 with a proposal response date of December 16, 2019 and anticipated award by September 27, 2020.

View the file

Other files

File Type Posted
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0003 Conformed Copy.pdf PDF
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0003 Track Changes.pdf PDF
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0003.pdf PDF
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0002 Conformed Copy.pdf PDF
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0002.pdf PDF
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0002 Track Changes.pdf PDF
Att 6.3 DO 0001 CDRLs Final RFP Amendment 1.pdf PDF
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0001 Track Changes.pdf PDF
Att 14 SOFAST-E II Government Rights for CDRLs Amendment 1.xlsx XLSX spreadsheet
Att 7.0 DO 0002 Sec B-J SOFAST-E II CFTD Final RFP Amendment 1.pdf PDF
Att 7.4 DO 0002 CDRLs Final RFP Amendment 1.pdf PDF
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0001 Conformed Copy.pdf PDF
Att 6.4 DO 0001-0002 SOFAST E II Cost-Price Electronic Workbook Final RFP Amendment 1.xlsx XLSX spreadsheet
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0001.pdf PDF
Att_8_SOFAST-E_II_Requirements_Compliance_Matrix_Final_RFP.xlsx XLSX spreadsheet
Att_7.0_DO_0002_Sec_B-J_SOFAST-E_II_CFTD_Final_RFP.pdf PDF
Att_12_DCAA_required_Preaward_Survey_of_Prospective_Contractor_Accounting_System_Checklist.pdf PDF
Att_10_Industry_Question-Comment_Form.doc DOC document
Att_11_SF1408.pdf PDF
Att_2_SOFAST-E_II_DD254_Final_RFP.pdf PDF
Att_6.4_DO_0001-0002_SOFAST_E_II_Cost-Price_Electronic_Workbook_Final_RFP.xlsx XLSX spreadsheet
Att_5_Delivery_Order_Procedures-Work_Request_Procedures.pdf PDF
Att_9_Past_Performance_Questionnaire_SOFAST-E_II_W900KK-20-R-0013.docx DOCX document
Att_6.3_DO_0001_CDRLs_Final_RFP.pdf PDF
Att_13_Instructions_for_Document_Access_Final_RFP.pdf PDF
Att_7.4_DO_0002_CDRLs_Final_RFP.pdf PDF
Att_14_SOFAST-E_II_Government_Rights_for_CDRLs_Final_RFP.xlsx XLSX spreadsheet
Att_3_SOFAST-E_II_QASP_Final_RFP.pdf PDF
Att_6.0_DO_0001_Sec_B-J_SOFAST-E_II_CMS_Final_RFP.pdf PDF
Final_RFP_SOFAST-E_II__W900KK-20-R-0013_dated_31Oct2019.pdf PDF
Att_4_Data_Item_Transmittal.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 6.0 – W900KK-20-R-0013 SOFAST-E II Delivery Order 0001

MH 47 Combat Mission Simulator (CMS)

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lot $ $

MH-47-1 CMS Upgrade

Fixed Price Incentive (Firm) (FPIF)

Manufacture, install, and integrate MH-47G Block II upgrades into the MH-47-1

Combat Mission Simulator (CMS).

In accordance with SOW-2019-26

FOB: Destination

0002 1 Lot $500,000.00 $500,000.00

Emerging Requirements

T&M

Engineering and manufacturing supporting for rapid deployment of new equipment for concurrency across the simulation federation. Work Request Procedures, Attachment 5, in section J of the base IDIQ contract will be required for approval of work under this line item.

In accordance with SOW-2019-26

NTE

0003 1 Lot $250,000.00 $250,000.00

Spares

CPFF

Spare to support lifecycle of MH-47G-1 CMS post modification.

In accordance with SOW-2019-26

NTE

COST $

FIXED FEE $

TOTAL COST + FEE $

0004 1 Lot $ $

Travel

COST

Travel to support MH-47G-1 CMS modification.

In accordance with SOW-2019-26

EST

0005 1 Lot NSP Technical Documentation

FFP

The contractor shall prepare and provide technical data and information in accordance with the requirements set forth in the SOW and Contract Data

Requirement List (CDRL), DD Forms 1423, provided as Exhibits A, B and C, in

Section J

0006 1 Lot NSP Contractor Manpower Reporting App

FFP

The contractor shall accomplish contractor manpower reporting IAW the requirements set forth in the SOW.

0007 1 Lot NSP Contractor Acquired Property

COST

Delivery of Contractor Acquired Property (CAP) classified as Material shall be in accordance with Attachment 3 CDRLs incorporated in Section J. Once delivered and accepted by the Government, the Government assumes title and the items become Government Furnished

Property (GFP).FOB: Destination

Section C - Descriptions and Specifications

C.1. DESCRIPTION/SPECIFICATION/WORK STATEMENT

The Contractor shall perform the work as identified in Section B in accordance with the Statement of Work SOW-

2019-026, entitled “Statement of Work for the Special Operations Forces Aviation Systems Trainers –

Enhancements II (SOFAST-E II), Delivery Order 0001, MH 47 Combat Mission Simulator (CMS)”, dated October

25, 2019, Attachment (1); See Section J.

C.2 INCORPORATION OF THE CONTRACTOR'S TECHNICAL PROPOSAL

The Contractor's Technical Proposal Number [ ], dated [ ], (To be completed at Contract Award) and any amendments/addendums thereof, is incorporated herein by reference, unless otherwise specified, with the same force and effect as if set forth in full text. Nothing in the Contractor's proposal shall constitute a waiver of any of the provisions of the contract, including the Statement(s) of Work and Specification. For purposes of FAR Clause

52.215-8, “Order of Precedence”, the Contractor's technical proposal shall be considered a "Specification."

C.3 All terms and conditions of the basic contract apply to this order.

C.4 Fixed Price Incentive (Firm) (FPIF)

The Government intends to incentivize schedule on this delivery order through FPIF with a Target delivery date of nine (9) months after award and an incentive to deliver early. The Government intends to incentivize through profit rate on this delivery order with a rate tied to meeting the target delivery date and an increased rate associated with early delivery. There would also be a reduced rate for missing the target delivery date.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

0002 Destination Government Destination Government

0003 Destination Government Destination Government

0004 Destination Government Destination Government

0005 Destination Government Destination Government

0006 Destination Government Destination Government

0007 Destination Government Destination Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 9 Months After Contract

Award (ACA)

1 HQ, HQ CO 160TH SOAR (A)

CW5 M. TUCKER/MR JOHN FARRELL

BLDG 7269 NIGHTSTALKER WAY

FT. CAMPBELL KY 42223-5000

270-956-3703

FOB: Destination

W80N13

0002 9 Months ACA 1 (SAME AS PREVIOUS LOCATION)

FOB: Destination

W80N13

0003 9 Months ACA 1 (SAME AS PREVIOUS LOCATION)

FOB: Destination

W80N13

0004 9 Months ACA

1 (SAME AS PREVIOUS LOCATION)

W80N13

0005 9 Months ACA 1 (SAME AS PREVIOUS LOCATION)

FOB: Destination

W80N13

0006 9 Months ACA 1 (SAME AS PREVIOUS LOCATION)

FOB: Destination

W80N13

0007 9 Months ACA 1 (SAME AS PREVIOUS LOCATION)

W80N13

Section I - Contract Clauses

CONTRACT CLAUSES

All clauses from basic contract W900KK-20-D-XXXX apply to this order and its cognizant contract type.

Section J - List of Documents, Exhibits and Other Attachments

ATTACHMENTS AND EXHIBITS

Attachment 1 DO 0001 SOW-2019-026, Rev 1.2 dated November 18, 2019

Attachment 2 DO 0001 SPEC

Attachment 3 DO 0001 CDRLs

File details come from the government source that posted it. Updated .