Att 6.0 DO 0001 Sec B-J SOFAST-E II CMS Final RFP Amendment 1.pdf
PDF 221 KB Posted
- Solicitation number
- w900kk-20-r-0013
About this file
This document contains an attachment to a federal contract delivery order and a related federal contract opportunity synopsis. The attachment is for Delivery Order 0001 under IDIQ contract W900KK-20-R-0013 for the Special Operations Forces Aviation Systems Trainers - Enhancements II (SOFAST-E II) program. It requires upgrading an MH-47-1 Combat Mission Simulator with MH-47G Block II modifications on a Fixed Price Incentive basis. Additional CLINs include emerging requirements engineering, spares, travel, technical data, manpower reporting, and contractor-acquired property. Delivery is required within nine months of award at Fort Campbell, KY to the 160th Special Operations Aviation Regiment (Airborne).
The related synopsis indicates the Army intends to issue a small business set-aside RFP for the SOFAST-E II IDIQ contract with an estimated $218M ceiling value and 8-year ordering period. It will provide technical, planning and management support for 160th SOAR(A) simulators, simulations and mission rehearsal systems to maintain concurrency with aircraft platforms. The anticipated RFP posting date is October 31, 2019 with a proposal response date of December 16, 2019 and anticipated award by September 27, 2020.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 6.0 – W900KK-20-R-0013 SOFAST-E II Delivery Order 0001
MH 47 Combat Mission Simulator (CMS)
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot $ $
MH-47-1 CMS Upgrade
Fixed Price Incentive (Firm) (FPIF)
Manufacture, install, and integrate MH-47G Block II upgrades into the MH-47-1
Combat Mission Simulator (CMS).
In accordance with SOW-2019-26
FOB: Destination
0002 1 Lot $500,000.00 $500,000.00
Emerging Requirements
T&M
Engineering and manufacturing supporting for rapid deployment of new equipment for concurrency across the simulation federation. Work Request Procedures, Attachment 5, in section J of the base IDIQ contract will be required for approval of work under this line item.
In accordance with SOW-2019-26
NTE
0003 1 Lot $250,000.00 $250,000.00
Spares
CPFF
Spare to support lifecycle of MH-47G-1 CMS post modification.
In accordance with SOW-2019-26
NTE
COST $
FIXED FEE $
TOTAL COST + FEE $
0004 1 Lot $ $
Travel
COST
Travel to support MH-47G-1 CMS modification.
In accordance with SOW-2019-26
EST
0005 1 Lot NSP Technical Documentation
FFP
The contractor shall prepare and provide technical data and information in accordance with the requirements set forth in the SOW and Contract Data
Requirement List (CDRL), DD Forms 1423, provided as Exhibits A, B and C, in
Section J
0006 1 Lot NSP Contractor Manpower Reporting App
FFP
The contractor shall accomplish contractor manpower reporting IAW the requirements set forth in the SOW.
0007 1 Lot NSP Contractor Acquired Property
COST
Delivery of Contractor Acquired Property (CAP) classified as Material shall be in accordance with Attachment 3 CDRLs incorporated in Section J. Once delivered and accepted by the Government, the Government assumes title and the items become Government Furnished
Property (GFP).FOB: Destination
Section C - Descriptions and Specifications
C.1. DESCRIPTION/SPECIFICATION/WORK STATEMENT
The Contractor shall perform the work as identified in Section B in accordance with the Statement of Work SOW-
2019-026, entitled “Statement of Work for the Special Operations Forces Aviation Systems Trainers –
Enhancements II (SOFAST-E II), Delivery Order 0001, MH 47 Combat Mission Simulator (CMS)”, dated October
25, 2019, Attachment (1); See Section J.
C.2 INCORPORATION OF THE CONTRACTOR'S TECHNICAL PROPOSAL
The Contractor's Technical Proposal Number [ ], dated [ ], (To be completed at Contract Award) and any amendments/addendums thereof, is incorporated herein by reference, unless otherwise specified, with the same force and effect as if set forth in full text. Nothing in the Contractor's proposal shall constitute a waiver of any of the provisions of the contract, including the Statement(s) of Work and Specification. For purposes of FAR Clause
52.215-8, “Order of Precedence”, the Contractor's technical proposal shall be considered a "Specification."
C.3 All terms and conditions of the basic contract apply to this order.
C.4 Fixed Price Incentive (Firm) (FPIF)
The Government intends to incentivize schedule on this delivery order through FPIF with a Target delivery date of nine (9) months after award and an incentive to deliver early. The Government intends to incentivize through profit rate on this delivery order with a rate tied to meeting the target delivery date and an increased rate associated with early delivery. There would also be a reduced rate for missing the target delivery date.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
0003 Destination Government Destination Government
0004 Destination Government Destination Government
0005 Destination Government Destination Government
0006 Destination Government Destination Government
0007 Destination Government Destination Government
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 9 Months After Contract
Award (ACA)
1 HQ, HQ CO 160TH SOAR (A)
CW5 M. TUCKER/MR JOHN FARRELL
BLDG 7269 NIGHTSTALKER WAY
FT. CAMPBELL KY 42223-5000
270-956-3703
FOB: Destination
W80N13
0002 9 Months ACA 1 (SAME AS PREVIOUS LOCATION)
FOB: Destination
W80N13
0003 9 Months ACA 1 (SAME AS PREVIOUS LOCATION)
FOB: Destination
W80N13
0004 9 Months ACA
1 (SAME AS PREVIOUS LOCATION)
W80N13
0005 9 Months ACA 1 (SAME AS PREVIOUS LOCATION)
FOB: Destination
W80N13
0006 9 Months ACA 1 (SAME AS PREVIOUS LOCATION)
FOB: Destination
W80N13
0007 9 Months ACA 1 (SAME AS PREVIOUS LOCATION)
W80N13
Section I - Contract Clauses
CONTRACT CLAUSES
All clauses from basic contract W900KK-20-D-XXXX apply to this order and its cognizant contract type.
Section J - List of Documents, Exhibits and Other Attachments
ATTACHMENTS AND EXHIBITS
Attachment 1 DO 0001 SOW-2019-026, Rev 1.2 dated November 18, 2019
Attachment 2 DO 0001 SPEC
Attachment 3 DO 0001 CDRLs