About this file

This document contains a synopsis for the Special Operations Forces Aviation Systems Trainers - Enhancements II (SOFAST-E II) procurement opportunity. The U.S. Army Contracting Command-Orlando intends to issue a small business set-aside request for proposal for an indefinite-delivery, indefinite-quantity contract with an 8-year ordering period valued at $218 million. The contract will provide design, build, test, modification, and fielding support for Combat Mission Simulators, a Combat Flight Training Device, and associated peripheral equipment and capabilities to support live, virtual, and constructive training for the 160th Special Operations Aviation Regiment (Airborne) at Fort Campbell, Kentucky. Interested parties are advised that a final RFP is expected to be posted on October 31, 2019 with a proposal response date of December 16, 2019 and anticipated award by September 27, 2020.

Attachment 4 Data Item Transmittal / Acceptance / Rejection Form

View the file

Other files

File Type Posted
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0003 Conformed Copy.pdf PDF
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0003 Track Changes.pdf PDF
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0003.pdf PDF
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0002 Conformed Copy.pdf PDF
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0002.pdf PDF
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0002 Track Changes.pdf PDF
Att 6.3 DO 0001 CDRLs Final RFP Amendment 1.pdf PDF
Att 6.0 DO 0001 Sec B-J SOFAST-E II CMS Final RFP Amendment 1.pdf PDF
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0001 Track Changes.pdf PDF
Att 14 SOFAST-E II Government Rights for CDRLs Amendment 1.xlsx XLSX spreadsheet
Att 7.0 DO 0002 Sec B-J SOFAST-E II CFTD Final RFP Amendment 1.pdf PDF
Att 7.4 DO 0002 CDRLs Final RFP Amendment 1.pdf PDF
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0001 Conformed Copy.pdf PDF
Att 6.4 DO 0001-0002 SOFAST E II Cost-Price Electronic Workbook Final RFP Amendment 1.xlsx XLSX spreadsheet
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0001.pdf PDF
Att_8_SOFAST-E_II_Requirements_Compliance_Matrix_Final_RFP.xlsx XLSX spreadsheet
Att_7.0_DO_0002_Sec_B-J_SOFAST-E_II_CFTD_Final_RFP.pdf PDF
Att_12_DCAA_required_Preaward_Survey_of_Prospective_Contractor_Accounting_System_Checklist.pdf PDF
Att_10_Industry_Question-Comment_Form.doc DOC document
Att_11_SF1408.pdf PDF
Att_2_SOFAST-E_II_DD254_Final_RFP.pdf PDF
Att_6.4_DO_0001-0002_SOFAST_E_II_Cost-Price_Electronic_Workbook_Final_RFP.xlsx XLSX spreadsheet
Att_5_Delivery_Order_Procedures-Work_Request_Procedures.pdf PDF
Att_9_Past_Performance_Questionnaire_SOFAST-E_II_W900KK-20-R-0013.docx DOCX document
Att_6.3_DO_0001_CDRLs_Final_RFP.pdf PDF
Att_13_Instructions_for_Document_Access_Final_RFP.pdf PDF
Att_7.4_DO_0002_CDRLs_Final_RFP.pdf PDF
Att_14_SOFAST-E_II_Government_Rights_for_CDRLs_Final_RFP.xlsx XLSX spreadsheet
Att_3_SOFAST-E_II_QASP_Final_RFP.pdf PDF
Att_6.0_DO_0001_Sec_B-J_SOFAST-E_II_CMS_Final_RFP.pdf PDF
Final_RFP_SOFAST-E_II__W900KK-20-R-0013_dated_31Oct2019.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM TRANSMITTAL/ACCEPTANCE/REJECTION FORM

Contract W900KK-___________

CLIN/ELIN: ______/_______ TITLE: ___________________________________________________ Block 14 Distribution: ________________ Other: CDRL Number

Doc. Ref. No.:______________________________ Date:_______________________ From:

To: U.S. Army Contracting Command - Orlando 12211 Science Drive, Orlando, FL 32826-3224

ATTN: _____________________________________

The above detailed CDRL item is forwarded for review and acceptance/ rejection. This item is due __________, Government review period is days.

Signature:

Typed Name/Title: ______________________________

FIRST ENDORSEMENT: Date Received:

( ) Accepted.

( ) Accepted. Attached comments must be incorporated into the next scheduled submission. (This block is for use with periodically submitted items only.)

( ) Rejected, comments attached. Change pages ( ) are ( ) not sufficient for correction. Contractor is allowed ( ) 30 days or ( ) days to resubmit.

Signature:

Typed Name/Title: ________________________________________ Date: _________________

VIA: Date:

VIA: PD Date:

SECOND ENDORSEMENT:

( ) Accepted.

( ) Accepted conditionally. Attached comments must be incorporated in the next scheduled submission.

( ) Rejected, comments attached. Resubmit no later than __________________

Signature:

Typed Name/Title: ____________________________ Date: ________________ Contracting Officer

CC w/Encl.:

CC w/o Encl.:

matthew.fehl Typewritten Text matthew.fehl Typewritten Text matthew.fehl Typewritten Text

CLINELIN:
undefined_2:
TITLE:
Block 14 Distribution:
Doc Ref No:
The above detailed CDRL item is forwarded for review and acceptance rejection This item is due:
ATTN:
Date_2:
VIA Date:
VIA PD Date:
Rejected comments attached Resubmit no later than:
Date_3:
CC wEncl:
CC wo Encl:
Group2: Off
MM/DD/YYYY:
Check Box5: Off
Text6:
Text7:
Check Box8: Off
Check Box9: Off
Check Box10: Off
Group1: Off
Text13:
Text15:
Text17:
Text1:
Text2:
Text3:
Text4:

File details come from the government source that posted it. Updated .