About this file

This synopsis announces a forthcoming small business set-aside request for proposal from the U.S. Army Contracting Command-Orlando on behalf of the Program Executive Office for Simulation, Training and Instrumentation. The solicitation seeks proposals for an indefinite-delivery, indefinite-quantity contract to provide technical, planning, and managerial support to the 160th Special Operations Aviation Regiment at Fort Campbell, Kentucky. Services include designing, building, testing, modifying, and fielding capabilities for combat mission simulators, a combat flight training device, and associated peripheral equipment and mission rehearsal systems to support live, virtual, and constructive training. The contract has a potential value of $218 million over an eight-year period. The anticipated request for proposal will be posted on October 31, 2019 under solicitation number W900KK-20-R-0013 with a proposal response date of December 16, 2019 and anticipated award by September 27, 2020. The North American Industry Classification System code for this requirement is 333318.

Attachment 6.3 DO 0001 CDRL Report

View the file

Other files

File Type Posted
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0003 Conformed Copy.pdf PDF
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0003 Track Changes.pdf PDF
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0003.pdf PDF
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0002 Conformed Copy.pdf PDF
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0002.pdf PDF
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0002 Track Changes.pdf PDF
Att 6.3 DO 0001 CDRLs Final RFP Amendment 1.pdf PDF
Att 6.0 DO 0001 Sec B-J SOFAST-E II CMS Final RFP Amendment 1.pdf PDF
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0001 Track Changes.pdf PDF
Att 14 SOFAST-E II Government Rights for CDRLs Amendment 1.xlsx XLSX spreadsheet
Att 7.0 DO 0002 Sec B-J SOFAST-E II CFTD Final RFP Amendment 1.pdf PDF
Att 7.4 DO 0002 CDRLs Final RFP Amendment 1.pdf PDF
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0001 Conformed Copy.pdf PDF
Att 6.4 DO 0001-0002 SOFAST E II Cost-Price Electronic Workbook Final RFP Amendment 1.xlsx XLSX spreadsheet
Final RFP SOFAST-E II W900KK-20-R-0013 Amendment 0001.pdf PDF
Att_8_SOFAST-E_II_Requirements_Compliance_Matrix_Final_RFP.xlsx XLSX spreadsheet
Att_7.0_DO_0002_Sec_B-J_SOFAST-E_II_CFTD_Final_RFP.pdf PDF
Att_12_DCAA_required_Preaward_Survey_of_Prospective_Contractor_Accounting_System_Checklist.pdf PDF
Att_10_Industry_Question-Comment_Form.doc DOC document
Att_11_SF1408.pdf PDF
Att_2_SOFAST-E_II_DD254_Final_RFP.pdf PDF
Att_6.4_DO_0001-0002_SOFAST_E_II_Cost-Price_Electronic_Workbook_Final_RFP.xlsx XLSX spreadsheet
Att_5_Delivery_Order_Procedures-Work_Request_Procedures.pdf PDF
Att_9_Past_Performance_Questionnaire_SOFAST-E_II_W900KK-20-R-0013.docx DOCX document
Att_13_Instructions_for_Document_Access_Final_RFP.pdf PDF
Att_7.4_DO_0002_CDRLs_Final_RFP.pdf PDF
Att_14_SOFAST-E_II_Government_Rights_for_CDRLs_Final_RFP.xlsx XLSX spreadsheet
Att_3_SOFAST-E_II_QASP_Final_RFP.pdf PDF
Att_6.0_DO_0001_Sec_B-J_SOFAST-E_II_CMS_Final_RFP.pdf PDF
Final_RFP_SOFAST-E_II__W900KK-20-R-0013_dated_31Oct2019.pdf PDF
Att_4_Data_Item_Transmittal.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SFAE-STRI-CT2-STS

6. REQUIRING OFFICE

DO1 SOW Paragraph 3.2.3.1

5. CONTRACT REFERENCE

DI-MGMT-82133

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

See Block 16

2. TITLE OF THE DATA ITEM

A001

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-20-R-0013-001

E. CONTRACT/PR NO.

SOFAST-E II

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMT

A

B. EXHIBIT

A. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

8. APP CODE

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13. DATE OF SUBSEQUENT

SUBMISSION

see block 16

11. AS OF DATE

N/A

12. DATE OF FIRST

Block 16

10. FREQUENCY

Repro Reg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

31-OCT-2019

J. DATE

Betancourt, Alf

I. APPROVED BY

H. DATE

G. PREPARED BY

Duran, Raquel

Block 2: REQUIREMENTS TRACEABILITY VERIFICATION MATRIX (RTVM)

Block 10,12, 13 The Contractor shall submit initial document NLT 15 calendar days prior to System Requirements Review (SRR). The Contractor shall submit subsequent document NLT 15 calendar days prior to Design Review. The

Contractor shall deliver revised data anytime the data is revised NLT 30 calendar days of revisions. Revisions shall be identified in each submittal by use of either, Changes Bars in MS Office, or by similar means to make revisions easily identifiable. The USG will review and approve or disapprove with comments NLT thirty (30) calendar days after submittal. If disapproved the Contractor shall revise IAW comments and resubmit NLT thirty (30) calendar days after receipt of comments.

Block 14 The Contractor shall electronically deliver the data to the USG via

USG supplied e-mail address in electronic format compatible with Microsoft

Office 2013 and Dynamic Object-Oriented Requirements System (DOORS). Graphics packages used to create figures, tables, and charts shall be compatible with

Microsoft Office applications. Files over 5MB shall be delivered via DOD SAFE concurrent with the notification letter to USG. Files that cannot be transmitted electronically shall be mailed to the following address:

PM CT2

ATTN: SFAE-STRI-CT2-STS

12211 SCIENCE DRIVE

Orlando, FL 32826-3276

WARNING This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq) or the

Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 reference)).

16. REMARKS

0 0 0 15. TOTAL

18. ESTIMATED

TOTAL PRICE

17. PRICE GROUP

Page 1 of 38 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

DO1 SOW Paragraph 3.2.2

DI-MISC-80711A

Risk Management Report

Scientific and Technical Reports

A002

TM OTHER MISC

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

Block 10,12 The Contractor shall submit initial document NLT 14 calendar days prior to system requirements review (SRR). Subsequent deliveries shall be submitted NLT 14 days prior to each design and test review. The USG will review and approve or disapprove with comments NLT 14 calendar days after submittal. If disapproved the Contractor shall revise IAW comments and resubmit NLT 14 calendar days after receipt of comments.

Office 2013 and PDF. Graphics packages used to create figures, tables, and charts shall be compatible with Microsoft Office applications.. Files over 5MB shall be delivered via DOD SAFE concurrent with the notification letter to

USG. Files that cannot be transmitted electronically shall be mailed to the following address:

Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25

Page 2 of 38 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

DI-SESS-81248B

Interface Control Document (ICD)

Interface Control Document (ICD)

A003

X TM OTHER

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

2TIME

Block 10,12, 13 The Contractor shall modify existing document. The Contractor shall submit modified draft document NLT 30 calendar days prior to Design

Review. The Contractor shall submit final modified document NLT 30 calendar days prior to delivery of the system (DD-250). The Contractor shall deliver revised data anytime the data is revised NLT 30 calendar days of revisions.

Revisions shall be identified in each submittal by use of either, Changes Bars in MS Office, or by similar means to make revisions easily identifiable. The

USG will review and approve or disapprove with comments NLT thirty (30) calendar days after submittal. If disapproved the Contractor shall revise IAW comments and resubmit NLT thirty (30) calendar days after receipt of comments.

Office 2013 and PDF. Graphics packages used to create figures, tables, and charts shall be compatible with Microsoft Office applications. Files over 5MB shall be delivered via DOD SAFE concurrent with the notification letter to

Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25

Page 3 of 38 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

DO1 SOW Paragraph 3.2.3.2

DI-IPSC-81442A

Software Version Description (SVD)

Software Version Description (SVD)

A004

TM OTHER IPSC

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

29-OCT-2019

Review. The Contractor shall submit final modified document NLT 30 calendar days prior to delivery of the system (DD-250). The Contractor shall deliver revised data anytime the data is revised NLT 30 calendar days of revisions.

Revisions shall be identified in each submittal by use of either, Changes Bars in MS Office, or by similar means to make revisions easily identifiable. The

USG will review and approve or disapprove with comments NLT thirty (30)

Office 2013 and PDF. Graphics packages used to create figures, tables, and charts shall be compatible with Microsoft Office applications. Files over 5MB shall be delivered via DOD SAFE concurrent with the notification letter to

Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25

Page 4 of 38 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

DI-IPSC-81441A

Software Product Specification (SPS)

A005

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

Review. The Contractor shall submit final modified document NLT 30 calendar days prior to Government Acceptance Test (GAT). The Contractor shall deliver revised data anytime the data is revised NLT 30 calendar days of revisions.

Revisions shall be identified in each submittal by use of either, Changes Bars in MS Office, or by similar means to make revisions easily identifiable. The

USG will review and approve or disapprove with comments NLT thirty (30)

USG supplied e-mail address in electronic format in native tool formats along with compatible with Microsoft Office 2013 and PDF. Graphics packages used to create figures, tables, and charts shall be compatible with Microsoft office applications. Files over 5MB shall be delivered via DOD SAFE concurrent with the notification letter to USG. Files that cannot be transmitted electronically shall be mailed to the following address:

Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25

Page 5 of 38 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

DI-AVCS-80700A

COMPUTER SOFTWARE PRODUCT END ITEMS

A006

TM OTHER AVCS

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

1TIME

shall submit data prior to DD250.

USG supplied e-mail address. Documentation shall be delivered in native tool formats along with electronic format compatible with Microsoft Office 2013 and

PDF. Software and Software source code shall be delivered in native formats.

Graphics packages used to create figures, tables, and charts shall be compatible with Microsoft Office applications. Files over 5MB shall be delivered via DOD SAFE concurrent with the notification letter to USG. Files that cannot be transmitted electronically shall be mailed to the following address:

Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25

Page 6 of 38 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

DO1 SOW Paragraph 3.2.5

DI-IPSC-81443A

Software User Manual (SUM)

A007

TM X OTHER

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the shall submit initial modified document NLT 30 calendar days prior to Design

Review. Contractor shall submit final modified document NLT 30 calendar days prior to Government Acceptance Test (GAT). The Contractor shall deliver revised data anytime the data is revised NLT 30 calendar days of revisions.

Revisions shall be identified in each submittal by use of either, Changes Bars in MS Office, or by similar means to make revisions easily identifiable. The

Contractor shall deliver final modified document prior to DD250. The USG will review and approve or disapprove with comments NLT thirty (30) calendar days after submittal. If disapproved the Contractor shall revise IAW comments and resubmit NLT thirty (30) calendar days after receipt of comments.

Office 2013 and PDF. Graphics packages used to create figures, tables, and charts shall be compatible with Microsoft office applications. Files over 5MB shall be delivered via DOD SAFE concurrent with the notification letter to

Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25

Page 7 of 38 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

DO1 SOW Paragraph 3.2.3.9

DI-CMAN-81516

As Built Configuration List (ABCL)

A008

TM OTHER CMAN

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

Review. The Contractor shall submit final modified document NLT 30 calendar days prior to Government Acceptance Test (GAT). The Contractor shall deliver revised data anytime the data is revised NLT 30 calendar days of revisions.

Revisions shall be identified in each submittal by use of either, Changes Bars in MS Office, or by similar means to make revisions easily identifiable. The

USG will review and approve or disapprove with comments NLT thirty (30)

Office 2013 and PDF. Graphics packages used to create figures, tables, and charts shall be object linking and embedding (OLE) compatible. Files over 5MB shall be delivered via DOD SAFE concurrent with the notification letter to

Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25

Page 8 of 38 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

DO1 SOW Paragraphs 3.2.3.1, 3.2.3.9

DI-SESS-81000E

Product Drawings/Models and Associated Lists

A009

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

Block 3: Product Drawings/Models and Associated Lists shall deliver modified engineering drawings to the USG NLT 30 calendar days prior to Government Acceptance Testing. The Contractor shall deliver revised drawings within 14 calendar days of revision. Revisions shall be identified in the drawing change block or by similar means to make changes easily identifiable. The USG will review and approve or disapprove with comments NLT

30 calendar days after submittal. If disapproved the Contractor shall revise

IAW comments and resubmit NLT 30 calendar days after receipt of comments.

USG supplied e-mail address in electronic format in native tool formats along with compatible Microsoft Office 2013 and PDF. Graphics packages used to create figures, tables, and charts shall be compatible with Microsoft Office applications. Files over 5MB shall be delivered via DOD SAFE concurrent with the notification letter to USG. Files that cannot be transmitted electronically shall be mailed to the following address:

Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25

Page 9 of 38 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

DO1 SOW Paragraph 3.2.7

DI-NDTI-81284

Test and Evaluation Program Plan (TEPP)

A010

TM OTHER NDTI

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

Block 10,12, 13 The Contractor shall submit initial document NLT 14 calendar days prior to Design Review. The Contractor shall deliver revised data anytime the data is revised NLT 30 calendar days of revisions. Revisions shall be identified in each submittal by use of either, Changes Bars in MS Office, or by similar means to make revisions easily identifiable. The USG will review and approve or disapprove with comments NLT 30 calendar days after submittal.

If disapproved the Contractor shall revise IAW comments and resubmit NLT 30 calendar days after receipt of comments.

USG supplied e-mail address. in electronic format compatible with Microsoft

Office 2013 and PDF. Graphics packages used to create figures, tables, and charts shall be compatible with Microsoft Office applications. Files over 5MB shall be delivered via DOD SAFE concurrent with the notification letter to

Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25

Page 10 of 38 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

DI-NDTI-80603A

Test Procedure

Test Procedure

A011

TM OTHER NDTI

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

ASREQ

Block 10,12, 13 The Contractor shall submit initial document NLT 30 calendar days prior to Design Review. The Contractor shall submit second document NLT

30 calendar days prior to Government Acceptance Testing (GAT). The Contractor shall submit final document NLT 30 calendar days prior to DD-250. The

Contractor shall deliver revised data anytime the data is revised NLT 30 calendar days of revisions. Revisions shall be identified in each submittal by use of either, Changes Bars in MS Office, or by similar means to make revisions easily identifiable. The USG will review and approve or disapprove with comments NLT 30 calendar days after submittal. If disapproved the

Contractor shall revise IAW comments and resubmit NLT 30 calendar days after receipt of comments.

Office 2013 and PDF. Graphics packages used to create figures, tables, and charts shall be compatible with Microsoft Office applications. Files over 5MB shall be delivered via DOD SAFE concurrent with the notification letter to

Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25

Page 11 of 38 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

DI-IPSC-81435A

Software Design Description (SDD)

A012

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

Review. The Contractor shall submit final modified document NLT 30 calendar days prior to Government Acceptance Testing (GAT). The Contractor shall deliver revised data anytime the data is revised NLT 30 calendar days of revisions. Revisions shall be identified in each submittal by use of either, Changes Bars in MS Office, or by similar means to make revisions easily identifiable. The USG will review and approve or disapprove with comments NLT thirty (30) calendar days after submittal. If disapproved the Contractor shall revise IAW comments and resubmit NLT thirty (30) calendar days after receipt of comments.

The Contractor shall electronically deliver the data to the USG via USG supplied e-mail address in electronic format in native tool formats along with

Microsoft Office 2013 and PDF. Files over 5MB shall be delivered via DOD

SAFE concurrent with the notification letter to USG. Files that cannot be

Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25

Page 12 of 38 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

DO1 SOW Paragraph 3.2.3.10

DI-SAFT-80102C

SAFETY ASSESSMENT REPORT

A013

TM OTHER SAFT

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

Block 10,12, 13 The Contractor shall submit draft document NLT 15 calendar days prior to Government Acceptance Test (GAT). The Contractor shall deliver revised data anytime the data is revised NLT 30 calendar days of revisions.

Revisions shall be identified in each submittal by use of either, Changes Bars in MS Office, or by similar means to make revisions easily identifiable. The

USG will review and approve or disapprove with comments NLT thirty (30)

Office 2013 and PDF. Graphics packages used to create figures, tables, and charts shall be compatible with Microsoft Office applications. Files over 5MB shall be delivered via DOD SAFE concurrent with the notification letter to

12350 Research Parkway

Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25

Page 13 of 38 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

DI-MISC-81281

Aircraft Trainer Criteria Report

A014

TM OTHER MISC

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

Block 10,12, 13 The Contractor shall submit draft document NLT 30 calendar days prior to Design Review. The Contractor shall deliver revised data anytime the data is revised NLT 30 calendar days of revisions. Revisions shall be identified in each submittal by use of either, Changes Bars in MS Office, or by similar means to make revisions easily identifiable. The USG will review and approve or disapprove with comments NLT thirty (30) calendar days after submittal. If disapproved the Contractor shall revise IAW comments and resubmit NLT thirty (30) calendar days after receipt of comments.

Office 2013 and PDF. Graphics packages used to create figures, tables, and charts shall be compatible with Microsoft Office applications. Files over 5MB shall be delivered via DOD SAFE concurrent with the notification letter to

Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25

Page 14 of 38 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

DO1 SOW Paragraph 3.2.5

DI-QCIC-81794

QUALITY ASSURANCE PROGRAM PLAN

A015

TM OTHER QCIC

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

LT

1TIME/R

1. Block 12: Shall be due 45 working days after requested by the Government.

2. Block 14 The Contractor shall electronically deliver the data to the USG via

Office 2013 and PDF. Graphics packages used to create figures, tables, and charts shall be compatible with Microsoft Office applications. Files over 5MB shall be delivered via DOD SAFE concurrent with the notification letter to

3. The Government shall have 20 working days for review and acceptance or rejection of the submission.

4. The Contractor shall have 15 working days to incorporate Government comments.

5. Contractor format is acceptable but subject to Government approval.

Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25

Page 15 of 38 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

DO1 SOW Paragraph 3.2.4

DI-MGMT-82001

A016

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

30-OCT-2019

Block 2: DOD Risk Management Framework (RMF) Package Deliverables

Block 10, 12, 13: Shall be due 14 calendar days before test readiness review

(TRR). Updated shall be submit as required.

Office 2013 and PDF, or they shall be updated directly into RMF reporting tools. Files over 5MB shall be delivered via DOD SAFE concurrent with the notification letter to USG. Files that cannot be

WARNING This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq) or the

Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App

2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive

5230.25 reference)).

Page 16 of 38 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

DI-IPSC-81432A

System/Subsystem Design Description (SSDD)

A017

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

Review. The Contractor shall submit final modified document NLT 30 calendar days prior to delivery of the system (DD-250). The Contractor shall deliver revised data anytime the data is revised NLT 30 calendar days of revisions.

Revisions shall be identified in each submittal by use of either, Changes Bars in MS Office, or by similar means to make revisions easily identifiable. The

USG will review and approve or disapprove with comments NLT thirty (30)

Office 2013 and PDF. Graphics packages used to create figures, tables, and charts shall be compatible with Microsoft Office applications. Files over 5MB shall be delivered via DOD SAFE concurrent with the notification letter to

Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App

2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25

Page 17 of 38 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

DI-PSSS-82046

SOFTWARE LICENSE REQUIREMENTS LIST

A018

TM OTHER PSSS

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

Review. The Contractor shall submit final modified document NLT 30 calendar days prior to delivery of the system (DD-250). The Contractor shall deliver revised data anytime the data is revised NLT 30 calendar days of revisions.

Revisions shall be identified in each submittal by use of either, Changes Bars in MS Office, or by similar means to make revisions easily identifiable. The

USG will review and approve or disapprove with comments NLT thirty (30)

Office 2013 and PDF. Graphics packages used to create figures, tables, and charts shall be compatible with Microsoft Office applications. Files over 5MB shall be delivered via DOD SAFE concurrent with the notification letter to

Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25

Page 18 of 38 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

DI-MGMT-81453B

DATA ACCESSION LIST (DAL)

A019

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

Review. The Contractor shall submit final modified document NLT 30 calendar days prior to delivery of the system (DD-250). The Contractor shall deliver revised data anytime the data is revised NLT 30 calendar days of revisions.

Revisions shall be identified in each submittal by use of either, Changes Bars in MS Office, or by similar means to make revisions easily identifiable. The

USG will review and approve or disapprove with comments NLT thirty (30)

Microsoft Office 2013 and PDF. Files over 5MB shall be delivered via DOD

Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App

2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25

Page 19 of 38 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

DI-SESS-80776A

TECHNICAL DATA PACKAGE

A020

TM OTHER SESS

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the shall submit data prior to DD250.

Microsoft Office 2013 and PDF. Files over 5MB shall be delivered via DOD

Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25

Page 20 of 38 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

DI-MGMT-81861A

Integrated Master Schedule (IMS)

Integrated Program Management Report (IPMR)

B001

B

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

MNTHLY

Block 10,13 The Contractor shall not re-baseline any IMS activities without concurrence from the USG. As required, the Contractor shall deliver revised

IMS baseline data anytime the data is revised NLT 30 calendar days of revisions for USG approval. The Contractor shall deliver status against the approved IMS baseline monthly. Revisions shall be identified in each submittal by use of Change Bars in MS office, or by similar means to make revisions easily identifiable. The USG will review and approve or disapprove initial baseline submittal with comments NLT thirty (30) calendar days after initial submittal. If disapproved the Contractor shall revise IAW comments and resubmit NLT thirty (30) calendar days after receipt of comments. The USG will review and approve or disapprove IMS baseline revision submittals with comments NLT seven (7) calendar days after submittal. If disapproved the

Contractor shall revise IAW comments and resubmit NLT seven (7) calendar days after receipt of comments.

Office 2013 and PDF. Graphics packages used to create figures, tables, and charts shall be compatible with Microsoft Office applications. Files over 5MB shall be delivered via DOD SAFE concurrent with the notification letter to

Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25

Page 21 of 38 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

DO1 SOW Paragraphs 3.2.2, 3.2.3.7, 3.2.6

DI-MGMT-80227

B002

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

MNTHLY

Block 2: Contractors Progress, Status and Management Report

Block 10,13 The Contractor shall deliver program status reports monthly. The

USG will review and approve or disapprove with comments NLT fifteen (15) comments and resubmit NLT ten (10) calendar days after receipt of comments.

Office 2013 and PDF. Graphics packages used to create figures, tables, and charts shall be compatible with Microsoft Office applications. Files over 5MB shall be delivered via DOD SAFE concurrent with the notification letter to

Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25

Page 22 of 38 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

DO1 SOW Paragraph 3.2.3.8

DI-MGMT-81605

SRR Briefing Materials

Briefing Material

B003

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

Block 10,12, 13 The Contractor shall deliver briefing material through the IPT process NLT 14 calendar days prior to the corresponding event. USG comments on the briefing package content will be made through the IPT within 7 calendar days of receipt. The Contractor shall deliver the final presentation updated

IAW the review event NLT 14 calendar days after the conclusion of the event.

The USG will review and approve or disapprove with comments NLT seven (7) comments and resubmit NLT seven (7) calendar days after receipt of comments.

Office 2013 and PDF. Graphics packages used to create figures, tables, and charts shall be compatible with Microsoft Office applications. Files over 5MB shall be delivered via DOD SAFE concurrent with the notification letter to

Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25

Page 23 of 38 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

DO1 SOW Paragraph 3.2.3.8

Design Review Briefing Material

B004

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

Block 3 The Contractor shall deliver either the Preliminary Design Review (PDR) and Critical Design Review (CDR) briefing material or Engineering Design

Review (EDR) briefing material. The Contractor shall notify and receive approval from the Government on the Design Review approach for this Delivery

Order.

B004-0001 Preliminary Design Review (PDR) Briefing Material

B004-0002 Critical Design review (CDR) Briefing Material

B004-0003 Engineering Design Review (EDR) Briefing Material the briefing package content will be made through the IPT within 7 calendar days of receipt. The Contractor shall deliver the final presentation updated

IAW the review event NLT 14 calendar days after the conclusion of the event.

The USG will review and approve or disapprove with comments NLT seven (7)

Office 2013 and PDF. Graphics packages used to create figures, tables, and charts shall be compatible with Microsoft Office applications.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .