Solicitation_Exhibit_A_-_CDRL_A001_-_DI-ADMN-81373.pdf

Data Item Description PDF 175 KB Posted

Attached to
Performance Based Logistics (PBL) support for Chinook H-47 Forward Rotor Blades, Aft Rotor Blades, and Blade Containers
Solicitation number
W58RGZ-18-R-0130
Issued by

About this file

Solicitation Exhibit A - CDRL A001

View the file

Other versions and copies of DI-ADMN-81373

File Revision Posted Attached to
09 DID_DI-ADMN-81373A_PresentationMaterial.pdf Rev. A ENGINEERING SERVICES (SHOCK)
DI-ADMN-81373A Presentation Material.pdf Rev. A Conversion Coating Wipe Development
DiD-DI-Admn-81373 Presentation Material.pdf Revision not stated Repair of B-2 Transponder Set (KU Band)
Attachment_10_A006_DI-ADMN-81373.pdf Revision not stated Amendment-1 RFP FA8119-25-R-0011 Multi-platform Sustainment Engineering Services Support
Attachment_09_A006_DI-ADMN-81373.pdf Revision not stated Draft Solicitation FA8119-25-R-0011 Multi-platform Sustainment Engineering Services Support
A04 DI-ADMN-81373.pdf Revision not stated Maritime Lethality Toolset
DI-ADMN-81373.pdf Revision not stated Remanufacture of Air Launched Cruise Missile (ALCM) Air Cycle Machine (ACM)
DI-ADMN-81373 Presentation Materials CDRL A001.pdf Revision not stated Post Processor & Simulation Development
A04g DI-ADMN-81373 Presentation Material.pdf Revision not stated Shock Engineering
Exhibit_A014_DI_ADMN_81373.pdf Revision not stated B2 Automatic Printer, Printer Sub Assembly, and Power Supply Repair
A001 TO1 (DI-ADMN-81373) Agenda Presentation Material.pdf Revision not stated Ammunition Industrial Base (IB) Engineering Support Services For the Project Director Joint Services
DID_DI_ADMN_81373_PresentationMaterial.pdf Revision not stated SHOCK ENGINEERING SERVICES
A012_DID_DI_ADMN_81373_FD20301602832_01.pdf Revision not stated B-2 Overhaul Program of the Receiver, Counter Measure Units
FA811917R0011_A006_B006_C006_D006_E006_DIADMN81373.pdf Revision not stated COWLING
1214-01_-_Aerothermal_Analysis_Support_-_DID_DI-ADMN-81373.pdf Revision not stated AEROTHERMAL ANALYSIS SUPPORT
DI-ADMN-81373_Presentation_Material.pdf Revision not stated Interface Test Adapter for B2 Test Program Set Development
DI-ADMN-81373_Presentation_Material.pdf Revision not stated Interface Test Adapter for B2 Test Program Set Development
DI-ADMN-81373.pdf Revision not stated T56 Component Improvement Program (CIP)
DIDforCDRLA002(DI-ADMN-81373).pdf Revision not stated MiDAESS Industry Day Briefings - 18-19 Feb 09
Show all 19

Who attaches DI-ADMN-81373

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

10/31/2016Page 1 of 2

Forward and AFT Rotor Blades NSN's 1615011457109/1615011457110

D. SYSTEM / ITEM

A001

1. DATA ITEM NO.

VINSON, SHAWN T..

G. PREPARED BY

06/22/2017

H. DATE

VINSON, SHAWN T.

I. APPROVED BY

06/22/2017

J. DATE

CONCUR:

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

DATE:

4. AUTHORITY (DATA ACQUISITION DOC NO.) 5. CONTRACT REFERENCE

2. TITLE OF DATA ITEM

6. REQUIRING OFFICE

3. SUBTITLE

F. CONTRACTORE. CONTRACTOR / PR NO.

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

8. APP CODE

b. COPIES

DRAFT FINAL

REG REPRO

a. ADDRESSEE11. AS OF DATE 13. DATE OF SUBEQUENT

SUBMISSION

15. TOTAL

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE

AMSAM-MAV-C

SEE BLK 16

PRID: Blade PBL PART NUMBER: 114R1702-37/114R1702-38 STATUS: R

Presentation Material

DI-ADMN-81373 PWS PARA 4.7.2, 4.10.5, 4.12.2, 4.12.4, 17.9 AMSAM-MAV-C

SD

N/A

A As Requested Or Required

N/A

SEE BLK 16

SEE BLK 16

0 1 0

0 2 0

16. REMARKS:

please email electronically in excel format to USARMY.REDSTONE.PEO-AVN.LIST.CARGO-

MAINTOVERHAUL-CH47@MAIL.MIL

POC: PHONE:

114R1702-37/114R1702-38 Boeing Helicopter CAGE 77272

256-313-3331Lisa Enright

Format. Microsoft excel, powerpoint, or Adobe PDF are acceptable, with the exception that the government must approve the use of any contractor insignia, trade names or symbols.

Content Presentation material/meeting minutes shall include a text of any accompanying verbal material unless the verbal portion is included as part of an electronic presentation. In either case the text or audio shall include the following statement "The publication of this material does not constitute approval by the government of the findings or conclusion herein. Wide distribution or announcement of this material shall not be made without specific approval by the sponsoring government activity.•

Required delivery:

SA Recovery Plan: 3 workings days after request.

SRT Metric: To be provided as part of the monthly COC.

SRT Recover Plan: 3 working days after request.

SA/SRT contractor maintained database report: As required.

PMR Presentations: 3 working days prior to PMR.

Meeting Minutes: 5 working days after PMR.

DigestiVL Typewritten Text

DigestiVL Typewritten Text

DigestiVL Typewritten Text

DigestiVL Typewritten Text

DigestiVL Typewritten Text

DigestiVL Typewritten Text

DigestiVL Typewritten Text

DigestiVL Typewritten Text

DigestiVL Typewritten Text

10/31/2016Page 2 of 2

2018-02-22T09:32:59-0600
VINSON.SHAWN.T.1282715160

File details come from the government source that posted it.