CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
10/31/2016Page 1 of 2
Forward and AFT Rotor Blades NSN's 1615011457109/1615011457110
D. SYSTEM / ITEM
A004
1. DATA ITEM NO.
VINSON, SHAWN T.
G. PREPARED BY
6/22/2017
H. DATE
VINSON, SHAWN T.
I. APPROVED BY
6/22/2017
J. DATE
CONCUR:
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
DATE:
4. AUTHORITY (DATA ACQUISITION DOC NO.) 5. CONTRACT REFERENCE
2. TITLE OF DATA ITEM
6. REQUIRING OFFICE
3. SUBTITLE
F. CONTRACTORE. CONTRACTOR / PR NO.
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
8. APP CODE
b. COPIES
DRAFT FINAL
REG REPRO
a. ADDRESSEE11. AS OF DATE 13. DATE OF SUBEQUENT
SUBMISSION
15. TOTAL
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE
AMSAM-MAV-C
SEE BLK 16
PRID: Blade PBL PART NUMBER: 114R1702-37/114R1702-38 STATUS: R
Rework/Repair and Scrap Cost Report
DI-SESS-81759A SOW PARA 4.16.2 AMSAM-MAV-C
SD
N/A
A Monthly
N/A
SEE BLK 16
NLT 10 DAEOM
0 1 0
0 1 0
16. REMARKS:
please email electronically in excel format to USARMY.REDSTONE.PEO-AVN.LIST.CARGO-
MAINTOVERHAUL-CH47@MAIL.MIL
POC: PHONE:
114R1702-37/114R1702-38 Boeing Helicopter CAGE 77272
256-313-3331Lisa Enright
General-For the purpose of this New Production, Rework/Repair and Scrap Cost Report, the following criteria are applicable:
The costs associated with new production, rework and the costs associated with repair shall be combined into a total new production, rework/repair, or scrap cost report. Scrap which is generated as a result of contractually required destructive testing or as a result of normal production operations not involving nonconforming material (e.g. cutting, trimming, etc.) shall not be included in scrap cost. Rework/repair and scrap costs do not apply to Government Furnished Material (GFM) which is defective upon receipt . These costs shall apply to GFM which is required to be reworked/repaired or scrapped after receipt due to the contractor's activities.
The contractor shall provide data in Microsoft EXCEL Spreadsheet format (example is attached).
New Production, Rework & Repair, and Scrap Cost
DigestiVL Typewritten Text
DigestiVL Typewritten Text
DigestiVL Typewritten Text
DigestiVL Typewritten Text
DigestiVL Typewritten Text
DigestiVL Typewritten Text
DigestiVL Typewritten Text
DigestiVL Typewritten Text
DigestiVL Typewritten Text
10/31/2016Page 2 of 2
| 2018-02-22T09:20:35-0600 | |
| VINSON.SHAWN.T.1282715160 |
File details come from the government source that posted it.