Solicitation_Exhibit_A_-_CDRL_A004_-_COSTRPTING.pdf

PDF 201 KB Posted

Attached to
Performance Based Logistics (PBL) support for Chinook H-47 Forward Rotor Blades, Aft Rotor Blades, and Blade Containers
Solicitation number
W58RGZ-18-R-0130
Issued by

About this file

Solicitation Exhibit A - CDRL A004

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

10/31/2016Page 1 of 2

Forward and AFT Rotor Blades NSN's 1615011457109/1615011457110

D. SYSTEM / ITEM

A004

1. DATA ITEM NO.

VINSON, SHAWN T.

G. PREPARED BY

6/22/2017

H. DATE

VINSON, SHAWN T.

I. APPROVED BY

6/22/2017

J. DATE

CONCUR:

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

DATE:

4. AUTHORITY (DATA ACQUISITION DOC NO.) 5. CONTRACT REFERENCE

2. TITLE OF DATA ITEM

6. REQUIRING OFFICE

3. SUBTITLE

F. CONTRACTORE. CONTRACTOR / PR NO.

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

8. APP CODE

b. COPIES

DRAFT FINAL

REG REPRO

a. ADDRESSEE11. AS OF DATE 13. DATE OF SUBEQUENT

SUBMISSION

15. TOTAL

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE

AMSAM-MAV-C

SEE BLK 16

PRID: Blade PBL PART NUMBER: 114R1702-37/114R1702-38 STATUS: R

Rework/Repair and Scrap Cost Report

DI-SESS-81759A SOW PARA 4.16.2 AMSAM-MAV-C

SD

N/A

A Monthly

N/A

SEE BLK 16

NLT 10 DAEOM

0 1 0

0 1 0

16. REMARKS:

please email electronically in excel format to USARMY.REDSTONE.PEO-AVN.LIST.CARGO-

MAINTOVERHAUL-CH47@MAIL.MIL

POC: PHONE:

114R1702-37/114R1702-38 Boeing Helicopter CAGE 77272

256-313-3331Lisa Enright

General-For the purpose of this New Production, Rework/Repair and Scrap Cost Report, the following criteria are applicable:

The costs associated with new production, rework and the costs associated with repair shall be combined into a total new production, rework/repair, or scrap cost report. Scrap which is generated as a result of contractually required destructive testing or as a result of normal production operations not involving nonconforming material (e.g. cutting, trimming, etc.) shall not be included in scrap cost. Rework/repair and scrap costs do not apply to Government Furnished Material (GFM) which is defective upon receipt . These costs shall apply to GFM which is required to be reworked/repaired or scrapped after receipt due to the contractor's activities.

The contractor shall provide data in Microsoft EXCEL Spreadsheet format (example is attached).

New Production, Rework & Repair, and Scrap Cost

DigestiVL Typewritten Text

DigestiVL Typewritten Text

DigestiVL Typewritten Text

DigestiVL Typewritten Text

DigestiVL Typewritten Text

DigestiVL Typewritten Text

DigestiVL Typewritten Text

DigestiVL Typewritten Text

DigestiVL Typewritten Text

10/31/2016Page 2 of 2

2018-02-22T09:20:35-0600
VINSON.SHAWN.T.1282715160

File details come from the government source that posted it.