W912PF24Q0087 AMD0001 MR Photovoltaic Systems Amd 20240711.pdf

PDF 119 KB Posted

Attached to
Maintenance and Repair of Photovoltaic Systems at DMC, Camp Darby, Italy
Solicitation number
W58D2M24Q0087
Issued by

About this file

This document is an Amendment to the solicitation W912PF24Q0087 for the Maintenance and Repair of Photovoltaic Systems at DMC, USAG Italy. The amendment extends the quotes due-in date from July 15, 2024 to July 29, 2024 to allow the government time to finalize the amendment and reply to questions received from offerors. The overall contract is a Hybrid Firm-Fixed Price and Time and Material type contract for a 1-year base period from September 8, 2024 to September 7, 2025, with two 1-year option periods. The work will be performed at Camp Darby, Tirrenia (Pisa), Italy. A pre-quote conference will be held on June 18, 2025. To be eligible for award, vendors must have a NCAGE number and be registered in SAM.

View the file

Other files

File Type Posted
Amendment 0003.pdf PDF
Attachment 1 - Performance Work Statement Revised 15 July 2024 - OPENABLE.pdf PDF
Attachment 12 - Enclosure 1 2 5801.02.03.04.05.06.07 ADDED.pdf PDF
Attachment 11 - Questions and Answers Revised.xlsx XLSX spreadsheet
Attachment 1 - Performance Work Statement Revised 15 July 2024.pdf PDF
Amendment 0002.pdf PDF
Attachment 15 - Enclosure 4 919_ADDED.pdf PDF
Attachment 10 - Past Experience Questionnaire Rev 1.pdf PDF
Attachment 14 - Enclosure 2 25138 ADDED.pdf PDF
Attachment 13 - Enclosure 1 3 5801.02.03.04.05.06.07 ADDED.pdf PDF
W912PF24Q0087 AMD0001 MR Photovoltaic Systems Conform 20240711.pdf PDF
Attachment 6 Standard Operating Procedures.pdf PDF
Attachment 10 Past Experience Questionnaire.pdf PDF
Attachment 1 Performance Work Statement.pdf PDF
Attachment 9 Self Certification for Antimafia Communication.pdf PDF
Attachment 2 Enclosure 1 Drawings PV systems of bldgs. 5801 02 03 04 05 06 08 and 5882.pdf PDF
Attachment 7 Hazard General List.pdf PDF
Solicitation W912PF24Q0087.pdf PDF
Attachment 5 Enclosure 4 Drawings PV system of bldg. 919.pdf PDF
Attachment 3 Enclosure 2 Drawings PV systems of bldg. 5138.pdf PDF
Attachment 4 Enclosure 3 Drawings PV systems of bldg. 5150.pdf PDF
Attachment 8 DUVRI.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

414TH CSB RCO ITALY SUBOFFICE LIVORNO

VIA AURELIA, EDIFICIO 5131

ZONA DEPOSITO

56128 TIRRENIA (PISA)

0012077029-0001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to pospone the quotes due-in date to 29 July 2024 to allow the Government the time necessary to finalize the Amendment required to reply to the Questions received by the Offerors and make other changes to the Solicitation.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Jul-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PF24Q0087

X 9B. DATED (SEE ITEM 11)

14-Jun-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Jul-2024

CODE

414TH CSB RCO ITALY SUBOFFICE LIVORNO

VIA AURELIA, EDIFICIO 5131

ZONA DEPOSITO

56128 TIRRENIA (PISA)

W912PF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

FACILITY CODECODE

EMAIL:TEL:

W912PF24Q0087

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 15-Jul-2024 12:00 PM to 29-Jul-2024 12:00 PM.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .