Attachment 14 - Enclosure 2 25138 ADDED.pdf

PDF 116 KB Posted

Attached to
Maintenance and Repair of Photovoltaic Systems at DMC, Camp Darby, Italy
Solicitation number
W58D2M24Q0087
Issued by

About this file

This document is an Attachment 14 - Enclosure 2 related to a Request for Quotation (RFQ) for the Maintenance and Repair of Photovoltaic Systems at DMC, Camp Darby, Italy.

The RFQ is issued by the Department of the Army Materiel Command Army Contracting Command for a non-personal service contract with a performance period of one base year from September 8, 2024 to September 7, 2025, plus two one-year option periods. The contractor shall provide all necessary tools and equipment to perform the services, with only technical assistance from authorized service center technicians allowed for proprietary systems. A pre-quote conference will be held on June 18, 2025. The contract will be a hybrid Firm-Fixed Price and Time and Material type. To be awarded the contract, the vendor must have a NCAGE number and be registered in the System for Award Management (SAM) website.

View the file

Other files

File Type Posted
Amendment 0003.pdf PDF
Attachment 1 - Performance Work Statement Revised 15 July 2024 - OPENABLE.pdf PDF
Attachment 12 - Enclosure 1 2 5801.02.03.04.05.06.07 ADDED.pdf PDF
Attachment 11 - Questions and Answers Revised.xlsx XLSX spreadsheet
Attachment 1 - Performance Work Statement Revised 15 July 2024.pdf PDF
Amendment 0002.pdf PDF
Attachment 15 - Enclosure 4 919_ADDED.pdf PDF
Attachment 10 - Past Experience Questionnaire Rev 1.pdf PDF
Attachment 13 - Enclosure 1 3 5801.02.03.04.05.06.07 ADDED.pdf PDF
W912PF24Q0087 AMD0001 MR Photovoltaic Systems Conform 20240711.pdf PDF
W912PF24Q0087 AMD0001 MR Photovoltaic Systems Amd 20240711.pdf PDF
Attachment 6 Standard Operating Procedures.pdf PDF
Attachment 10 Past Experience Questionnaire.pdf PDF
Attachment 1 Performance Work Statement.pdf PDF
Attachment 9 Self Certification for Antimafia Communication.pdf PDF
Attachment 2 Enclosure 1 Drawings PV systems of bldgs. 5801 02 03 04 05 06 08 and 5882.pdf PDF
Attachment 7 Hazard General List.pdf PDF
Solicitation W912PF24Q0087.pdf PDF
Attachment 5 Enclosure 4 Drawings PV system of bldg. 919.pdf PDF
Attachment 3 Enclosure 2 Drawings PV systems of bldg. 5138.pdf PDF
Attachment 4 Enclosure 3 Drawings PV systems of bldg. 5150.pdf PDF
Attachment 8 DUVRI.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .