Attachment 3 Enclosure 2 Drawings PV systems of bldg. 5138.pdf

PDF 229 KB Posted

Attached to
Maintenance and Repair of Photovoltaic Systems at DMC, Camp Darby, Italy
Solicitation number
W58D2M24Q0087
Issued by

About this file

This document appears to be Attachment 3 - Enclosure 2 Drawings of PV systems for Building 5138, relating to the federal contract opportunity for the Maintenance and Repair of Photovoltaic Systems at DMC, USAG Italy.

The key details are:

The federal contract opportunity is a Request for Quotation (RFQ) for a Hybrid Firm-Fixed Price and Time and Material type contract to provide maintenance and repair services for photovoltaic systems at Camp Darby in Tirrenia (Pisa), Italy. The performance period is one base year from September 8, 2024 to September 7, 2025, with two one-year option periods. A pre-quote conference will be held on June 18, 2025. To be awarded this contract, vendors must have a NCAGE number and be registered in the System for Award Management (SAM) website. The Department of the Army Materiel Command Army Contracting Command is the responsible federal agency.

View the file

Other files

File Type Posted
Amendment 0003.pdf PDF
Attachment 1 - Performance Work Statement Revised 15 July 2024 - OPENABLE.pdf PDF
Attachment 12 - Enclosure 1 2 5801.02.03.04.05.06.07 ADDED.pdf PDF
Attachment 11 - Questions and Answers Revised.xlsx XLSX spreadsheet
Attachment 1 - Performance Work Statement Revised 15 July 2024.pdf PDF
Amendment 0002.pdf PDF
Attachment 15 - Enclosure 4 919_ADDED.pdf PDF
Attachment 10 - Past Experience Questionnaire Rev 1.pdf PDF
Attachment 14 - Enclosure 2 25138 ADDED.pdf PDF
Attachment 13 - Enclosure 1 3 5801.02.03.04.05.06.07 ADDED.pdf PDF
W912PF24Q0087 AMD0001 MR Photovoltaic Systems Conform 20240711.pdf PDF
W912PF24Q0087 AMD0001 MR Photovoltaic Systems Amd 20240711.pdf PDF
Attachment 6 Standard Operating Procedures.pdf PDF
Attachment 10 Past Experience Questionnaire.pdf PDF
Attachment 1 Performance Work Statement.pdf PDF
Attachment 9 Self Certification for Antimafia Communication.pdf PDF
Attachment 2 Enclosure 1 Drawings PV systems of bldgs. 5801 02 03 04 05 06 08 and 5882.pdf PDF
Attachment 7 Hazard General List.pdf PDF
Solicitation W912PF24Q0087.pdf PDF
Attachment 5 Enclosure 4 Drawings PV system of bldg. 919.pdf PDF
Attachment 4 Enclosure 3 Drawings PV systems of bldg. 5150.pdf PDF
Attachment 8 DUVRI.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .