The file's text, extracted by GovTribe without its formatting.
TABLE A-XXI TM REQUIREMENTS MATRIX
IETM
W56HZV-13-R-0189
Attachment 0010, Technical Publications
1. Publication Clarifications
a. All illustrations shall be line drawings unless prior approval is received from the Government for specific applications on a case-by-case basis. Illustrations in operation and maintenance procedures shall be isometric and provide a view as seen by user. Illustrations shall appear on same or facing page as applicable text; quantity and type of illustration shall allow user to locate items and operate and maintain equipment in an accurate and efficient manner.
b. Incorporate appropriate lubrication instructions into the Operator and Field-Level Preventive Maintenance Checks and Services (PMCS) at the applicable hard-time intervals IAW MIL-STD-40051. Include Army Oil Analysis Program (AOAP) instructions, if applicable, and any initial, onetime, or warranty related requirements.
c. Develop and update a Maintenance Allocation Chart (MAC) per MIL-STD-40051. The MAC shall be in assembly and subassembly sequence. Contractor shall update the MAC throughout the performance period of the contract, including results of your analysis, vehicle testing, validation, verification and review manuals. Contractor shall perform an analysis to identify the extent of repair for each potentially repairable item and recommend the maintenance level to perform the work within the Army Maintenance System (AR 750-1). Variables such as item price, parts prices, failure rates of the repairable item, and piece parts, labor costs, and the cost of special tools and equipment shall be considered.
d. Prepare Components of End Item (COEI) lists, Basic Issue Items (BII) lists, Additional Authorization Lists (AAL) and References lists in accordance with MIL-STD-40051.
2. Additional Publication Quality Assurance
a. Verification is a process in which Government reserves the right to perform reviews and testing for accuracy and usability at Government discretion prior to acceptance of the final deliveries. Verification is the Government’s hands-on performance check of tasks and deliveries to check the adequacy of Contractor’s preparation and Validation efforts. Verification will be held after the Contractor delivers the Draft Equipment Publication (DEP) Electronic Technical Manuals (ETM) and Interactive Electronic Technical Manuals (IETM). The Government reserves the right to combine its Verification with the Contractor’s Validation. The Government’s Verification will include a review of the ETM and IETM.
b. Government will evaluate the ETM and IETM for compliance with contract requirements to determine acceptance of the deliveries. All information in the ETM and IETM must be presented in such a way that it can be easily identified and found, read and understood, and includes illustration support where the Government deems necessary. If Government finds errors or deficiencies in the Contractor’s deliveries during Government reviews or testing, Contractor shall correct them at no additional cost to the Government.
3. Government Furnished Information (GFI)
a. Government will provide the following: ETM and IETM numbers, NMWR numbers, end item National Stock Numbers (if available), official nomenclatures, and distribution statements.
b. Government will furnish updated Army regulations and Technical Manual numbers and titles to be included in the References portion of the ETM and IETM.
23&P 24&P
MILSTD40051-2
Reference Element Name
| FRONT MATTER |
| R |
| R |
| R |
| 5.2.1 |
| <paper.frnt> |
| Front cover |
| R |
| R |
| R |
| 5.2.1.1 |
| <frntcover> |
(MC) Promulgation letter
Warning summary
Change transmittal page
List of effective pages / work packages (Excluding pocket TMs and publications with less than eight pages)
| Title block page |
| R |
| R |
| R |
| 5.2.1.6 |
| <titleblk> |
| Table of contents |
| R |
| R |
| R |
| 5.2.1.8 |
| <contents> |
| How to use this manual |
| R |
| R |
| R |
| 5.2.1.9 |
| <howtouse> |
CHAPTER 1.
GENERAL INFORMATION, Equipment DESCRIPTION AND THEORY OF OPERATION
| GENERAL INFORMATION WORK PACKAGE |
| R |
| R |
| R |
| B.5.2 |
| <ginfowp> |
| Scope |
| R |
| R |
| R |
| B.5.2.3 |
| <scope> |
| Maintenance forms, records, and reports |
| R |
| R |
| R |
| B.5.2.4 |
| <mfrr> |
| Reporting equipment improvement recommendations (EIR) |
| R |
| R |
| R |
| B.5.2.5 |
| <eir> |
| Hand receipt (HR) manuals |
| R |
| R |
| R |
| B.5.2.6 |
| <handreceipt> |
| Corrosion prevention and control (CPC) |
| R |
| R |
| R |
| B.5.2.7 |
| <cpcdata> |
| Ozone depleting substances (ODS) |
| R |
| R |
| R |
| B.5.2.8 |
| <odsdata> |
| Destruction of Army materiel to prevent enemy use |
| R |
| R |
| R |
| B.5.2.8 |
| <destructmat> |
| Preparation for storage or shipment |
| R |
| R |
| R |
| B.5.2.10 |
| <pssref> |
Warranty information
Nomenclature cross-reference list
| List of abbreviations/acronyms |
| R |
| R |
| R |
| B.5.2.13 |
| <loa> |
Safety, care, and handling
| Nuclear hardness |
| R |
| R |
| R |
| B.5.2.17 |
| <hcp> |
| Calibration |
| R |
| R |
| R |
| B.5.2.18 |
| <calref> |
| Supporting information for repair parts, special tools, TMDE, and support equipment |
| P |
| R |
| R |
| B.5.2.25 |
| <supdata> |
Copyright credit line
| EQUIPMENT DESCRIPTION AND DATA WORK PACKAGE |
| R |
| R |
| R |
| B.5.3 |
| <descwp> |
| Equipment characteristics, capabilities, and features |
| R |
| R |
| R |
| B.5.3.3 |
| <eqpinfo> |
| Location and description of major components |
| R |
| R |
| R |
| B.5.3.4 |
| <locdesc> |
Differences between models
| Equipment data |
| R |
| R |
| R |
| B.5.3.6 |
| <eqpdata> |
| THEORY OF OPERATION WORK PACKAGE |
| R |
| R |
| R |
| B.5.4 |
| <thrywp> |
CHAPTER X.
OPERATOR INSTRUCTIONS
R
| DESCRIPTION AND USE OF OPERATOR CONTROLS AND INDICATORS WORK PACKAGE |
| R |
| OPERATION UNDER USUAL CONDITIONS WORK PACKAGE |
| R |
Security measures for electronic data
Siting requirements
Shelter requirements
Assembly and preparation for use
Initial adjustments, before use and selftest
Decals and instruction plates
| C.5.2.4.8.2 |
| <instructplt> |
Operating auxiliary equipment
Preparation for movement
| OPERATION UNDER UNUSUAL CONDITIONS WORK PACKAGE |
| R |
Security measures for electronic data
| Unusual environment / weather |
| R |
Fording and swimming
Interim nuclear, biological, and chemical (NBC) decontamination procedures
Jamming and electronic countermeasures (ECM) procedures
Degraded operation procedures
| STOWAGE AND DECAL / DATA PLATE GUIDE WORK PACKAGE |
| R |
| ONVEHICLE EQUIPMENT LOADING PLAN WORK PACKAGE |
| R |
CHAPTER X.
TROUBLESHOOTING
MASTER INDEX
D.5.4.2 <tim> <masterindexcategory>
| TROUBLESHOOTING INDEX WORK PACKAGE |
| R |
| R |
| R |
| D.5.4.4 |
| <tsindxwp> |
CHAPTER X.
TROUBLESHOOTING PROCEDURES
NOTE
The notation (*) indicates that, if required, at least one of the these content items shall be included
D.5.4.2 <tim> <troublecategory>
| TROUBLESHOOTING INDEX WORK PACKAGE |
| R |
| R |
| R |
| D.5.5.5 |
| <tsindxwp> |
*OPERATIONAL CHECKOUT WORK PACKAGES
*TROUBLESHOOTING PROCEDURES WORK PACKAGES
*COMBINED OPERATIONAL CHECKOUT AND TROUBLESHOOTING PROCEDURES WORK PACKAGES
CHAPTER X.
PMCS
MAINTENANCE INSTRUCTIONS
NOTE
PMCS is required as a minimum in one maintenance chapter
E.5.2.1 <mim> <pmcscategory>
| PMCS INTRODUCTION WORK PACKAGE |
| R |
| R |
| R |
| E.5.3.4.1 |
| <pmcsintrowp> |
| PMCS, INCLUDING LUBRICATION INSTRUCTIONS, WORK PACKAGE |
| R |
| R |
| R |
| E.5.3.4.2 |
| <pmcswp> |
CHAPTER X.
MAINTENANCE INSTRUCTIONS
NOTE
PMCS is required as a minimum in one maintenance chapter
E.5.2.2 E.5.2.3 <mim> <maintenancepmcscategory> <maintenancecategory>
| SERVICE UPON RECEIPT WORK PACKAGE |
| R |
| R |
| R |
| E.5.3.2 |
| <surwp> |
| Service upon receipt of materiel |
| R |
| R |
| R |
| E.5.3.2.3.3 |
| <surmat> |
| Installation instructions |
| R |
| R |
| R |
| E.5.3.2.3.4 |
| <install> |
| Preliminary servicing of equipment |
| R |
| Preliminary checks and adjustment of equipment |
| R |
| Preliminary calibration of equipment |
| R |
| E.5.3.2.3.9.1 |
| <ammo.markings> |
| Classification of defects |
| R |
| E.5.3.2.3.9.2 |
| <ammo.defect> |
| E.5.3.2.3.9.3 |
| <ammo.handling> |
| Procedures to activate ammunition |
| R |
| Other service upon receipt task |
| R |
| E.5.3.2.3.10 |
| <other.surtsk> |
| E.5.3.2.3.11 |
| <followon.maintsk> |
| EQUIPMENT / USER FITTING INSTRUCTIONS WORK PACKAGE (personal use equipment) |
| P |
| PMCS INTRODUCTION WORK PACKAGE |
| R |
| R |
| R |
| E.5.3.4.1 |
| <pmcsintrowp> |
| PMCS, INCLUDING LUBRICATION INSTRUCTIONS, WORK PACKAGE |
| R |
| R |
| R |
| E.5.3.4.2 |
| <pmcswp> |
MAINTENANCE WORK PACKAGES
NOTE
As applicable, the following maintenance tasks shall be presented in the general order listed below:
Servicing
Ground handling
Inspection of installed items
| E.5.3.5.3.5 |
| <inspinstitm> |
Removal
Disassembly
Cleaning
Inspectionacceptance and rejection criteria
| E.5.3.5.3.9 |
| <acptrejinsp> |
Nondestructive testing inspection (NDTI)
Repair or replacement
| E.5.3.5.3.11 |
| <repairrplc> |
Alignment
Painting
Lubrication
Assembly
Test and inspection
| E.5.3.5.3.16 |
| <testinspect> |
Installation
Adjustment
Calibration
| E.5.3.5.3.19 |
| <calibration> |
Radio interference suppression
Placing in service
Testing
Preparation for storage or shipment
Classification of defects
| E.5.3.5.3.26 |
| <ammo.defect> |
Handling ammunition
| E.5.3.5.3.27 |
| <ammo.handling> |
Ammunition markings
| E.5.3.5.3.28 |
| <ammo.markings> |
Procedures for ammunition activation
Additional maintenance task
| E.5.3.5.3.30 |
| <other.maintsk> |
Follow-on maintenance
| E.5.3.5.3.31 |
| <followon.maintsk> |
| GENERAL MAINTENANCE WORK PACKAGE |
| R |
| R |
| R |
| E.5.3.6 |
| <maintwp> |
| LUBRICATION INSTRUCTIONS WORK PACKAGE |
| R |
| R |
| R |
| E.5.3.7 |
| <lubewp> |
| ILLUSTRATED LIST OF MANUFACTURED ITEMS WORK PACKAGE |
| P |
| R |
| R |
| Error! Reference source not found. |
| <manuwp> |
| TORQUE LIMITS WORK PACKAGE |
| P |
| R |
| R |
| E.5.3.10 |
| <torquewp> |
| WIRING DIAGRAMS WORK PACKAGE |
| P |
| R |
| R |
| E.5.3.11 |
| <wiringwp> |
CHAPTER X.
AUXILIARY EQUIPMENT
MAINTENANCE INSTRUCTIONS
E.5.2.6 <mim> <auxiliarycategory>
| AUXILIARY EQUIPMENT MAINTENANCE WORK PACKAGE |
| R |
| R |
| R |
| E.5.3.13 |
| <auxeqpwp> |
| ILLUSTRATED LIST OF MANUFACTURED ITEMS WORK PACKAGE |
| P |
| R |
| R |
| Error! Reference source not found. |
| <manuwp> |
| TORQUE LIMITS WORK PACKAGE |
| P |
| R |
| R |
| E.5.3.10 |
| <torquewp> |
| WIRING DIAGRAMS WORK PACKAGE |
| P |
| R |
| R |
| E.5.3.11 |
| <wiringwp> |
CHAPTER X.
AMMUNITION
MAINTENANCE INSTRUCTIONS
E.5.2 E.5.2.7 <mim> <ammunitioncategory>
AMMUNITION MAINTENANCE WORK PACKAGE
AMMUNITION MARKING INFORMATION WORK PACKAGE
| E.5.3.14.2 |
| <ammo.markingwp> |
FOREIGN AMMUNITION (NATO) WORK PACKAGE
CHAPTER X.
PARTS information (-10, -23, -24) (-23&P, -24&p)
P
R
R
| Introduction work package |
| P |
| R |
| R |
| F.5.3.5 |
| <introwp> |
| Repair parts list work package |
| P |
| R |
| R |
| F.5.3.6 |
| <plwp> |
| Repair parts for special tools work package |
| P |
| R |
| R |
| F.5.3.7 |
| <stl_partswp> |
| Kit parts list work package |
| P |
| R |
| R |
| F.5.3.8 |
| <kitswp> |
| bulk Item Work Package |
| P |
| R |
| R |
| F.5.3.9 |
| <bulk_itemswp> |
| Special tools list work package |
| P |
| R |
| R |
| F.5.3.10 |
| <stlwp> |
| NSN index work package |
| P |
| R |
| R |
| F.5.3.11.1 |
| <nsnindxwp> |
| P/N index work package |
| P |
| R |
| R |
| F.5.3.11.2 |
| <pnindxwp> |
| Reference designator index work package |
| P |
| F.5.3.11.3 |
| <refdesindxwp> |
CHAPTER X.
DESTRUCTION OF EQUIPMENT TO PREVENT ENEMY USE
<destruct-ginfowp> <destruct-materialwp>
| GENERAL INFORMATION WORK PACKAGE |
| R |
| R |
| R |
| H.5.1 |
| <destruct-ginfowp> |
| DESTRUCTION OF EQUIPMENT TO PREVENT ENEMY USE WORK PACKAGE |
| R |
| R |
| R |
| H.5.2 |
| <destruct-materialwp> |
| battle damage assessment and repair (bdar) information |
| R |
| R |
| R |
| Appendix I |
| general information work package |
| R |
| R |
| R |
| I.5.2.1 |
| <bdar-geninfo> |
| battle damage ASSESSMENT work packageS |
| R |
| R |
| R |
| I.5.2.2 |
| <damage-assesswp> |
| repair work packages |
| R |
| R |
| R |
| I.5.2.3 |
| <genrepairwp> |
| special/fabricated tools work package |
| R |
| R |
| R |
| I.5.2.5 |
| <bdartoolswp> |
| substitute matrials/parts work package |
| R |
| R |
| R |
| I.5.2.7 |
| <substitute-matwp> |
CHAPTER X.
SUPPORTING INFORMATION
NOTE
Applicable supporting information work packages shall be arranged in the order in which they are presented here and numbered accordingly.
| REFERENCES WORK PACKAGE |
| R |
| R |
| R |
| G.5.2 |
| <refwp> |
| INTRODUCTION FOR STANDARD TWO-LEVEL OR AVIATION Two-level maintenance mac WORK PACKAGE |
| P |
| R |
| R |
| G.5.3.13 |
G.5.3.3A <macintrowp>
| MAC WORK PACKAGE (STANDARD TWO-LEVEL OR AVIATION Two-level) |
| P |
| R |
| R |
| G.5.3.4 |
| <macwp> |
| COMPONENTS OF END ITEM (COEI) AND BASIC ISSUE ITEMS (BII) LISTS WORK PACKAGE |
| R |
| R |
| R |
| G.5.4 |
| <coeibiiwp> |
ADDITIONAL AUTHORIZATION LIST (AAL) WORK PACKAGE
| EXPENDABLE AND DURABLE ITEMS LIST WORK PACKAGE |
| R |
| R |
| R |
| G.5.6 |
| <explistwp> |
| TOOL IDENTIFICATION LIST WORK PACKAGE |
| P |
| R |
| R |
| G.5.7 |
| <toolidwp> |
| MANDATORY REPLACEMENT PARTS WORK PACKAGE |
| P |
| R |
| R |
| G.5.8 |
| <mrplwp> |
CRITICAL SAFETY ITEMS AND FLIGHT SAFETY CRITICAL AIRCRAFT PARTS WORK PACKAGE
| SUPPORT ITEMS WORK PACKAGE |
| R |
| R |
| R |
| G.5.10 |
| <supitemwp> |
| ADDITIONAL SUPPORTING WORK PACKAGES |
| R |
| R |
| R |
| G.5.11 |
| <genwp> |
| REAR MATTER |
| R |
| R |
| R |
| 5.2.2 |
| <rear> |
Glossary
| Alphabetical index |
| R |
| R |
| R |
| 5.2.2.2 |
| <aindx> |
| DA Form 2028 |
| R |
| R |
| R |
| 5.2.2.3 |
| <da2028> |
| Authentication page |
| R |
| R |
| R |
| 5.2.2.4 |
| <authent> |
| Foldout pages |
| P |
| R |
| R |
| 5.2.2.5 |
| <foldsect> |
| Back cover |
| R |
| R |
| R |
| 5.2.2.7 |
| <back> |
Legend
| R | Required |
| P | Prohibited |
| Shaded | As Required |
TABLE A-II TM REQUIREMENTS MATRIX
Page-Based ETM
MIL-STD-40051-2 TM Requirements Matrix – Table A-II 8
TABLE A-XVII. Functionality Matrix
| Complexity Factor |
| Category |
| Functionality |
| Reqmt |
| Paragraph Reference |
| 1 |
| 1 |
| Ac |
| Suspend and Restart |
| R |
| A.5.2.3.1.1 |
| 3 |
| 3 |
| Ac |
| Login |
| R |
| A.5.2.3.1.2 |
| 2 |
| 2 |
| An |
| Global Data Annotation |
| R |
| A.5.2.3.2.1 |
| 2 |
| 2 |
| An |
| Local Data Annotation |
| R |
| A.5.2.3.2.2 |
| 1 |
| 1 |
| An |
| Personal Annotation |
| O |
| A.5.2.3.2.3 |
| 3 |
| 3 |
| An |
| Redlining Graphics |
A.5.2.3.2.4
A.5.2.3.2.5
| 1 |
| 1 |
| DD |
| CD-ROM |
| R |
| A.5.2.3.3.1 |
| 2 |
| 2 |
| DD |
| Network Distribution |
| R |
| A.5.2.3.3.3 |
| 1 |
| 1 |
| DP |
| Diagnostics - User Determined Entry to IETM |
| R |
| A.5.2.3.4.1 |
| 2 |
| 2 |
| DP |
| Diagnostics - Software Driven Entry to IETM |
| R |
| A.5.2.3.4.2 |
| NA |
| 5 |
| DP |
| Dynamic Diagnostics |
| R |
| A.5.2.3.4.3 |
| NA |
| 5 |
| DP |
| Prognostics |
| R |
| A.5.2.3.4.4 |
A.5.2.3.4.5
| 4 |
| 4 |
| DP |
| Wire/Fluid System Tracing |
| R |
| A.5.2.3.4.6 |
| 3 |
| 3 |
| E |
| Deficiency Report |
| R |
| A.5.2.3.5.1 |
| NA |
| 5 |
| E |
| Knowledge Management |
| R |
| A.5.2.3.5.2 |
| 3 |
| 3 |
| E |
| Maintenance Data Collection |
| R |
| A.5.2.3.5.3 |
| 3 |
| 3 |
| E |
| Operator Debriefing |
A.5.2.3.5.4
| 3 |
| 3 |
| E |
| Parts Ordering |
| R |
| A.5.2.3.5.5 |
| 3 |
| 3 |
| E |
| Resource Scheduling |
A.5.2.3.5.6
| 2 |
| 2 |
| E |
| Supporting Technical Data |
| R |
| A.5.2.3.5.7 |
A.5.2.3.6.1
| 2 |
| 2 |
| G |
| Assembly/Disassembly |
| R |
| A.5.2.3.6.2 |
| 1 |
| 1 |
| G |
| Locator Graphics |
| O |
| A.5.2.3.6.3 |
| 1 |
| 1 |
| G |
| Pan, Zoom, Expand, Magnify |
| R |
| A.5.2.3.6.4 |
| 2 |
| 2 |
| L |
| Hot Reference |
| R |
| A.5.2.3.7.1 |
| 3 |
| 3 |
| L |
| Hotspotting |
| R |
| A.5.2.3.7.2 |
| 1 |
| 1 |
| L |
| Internal References |
| R |
| A.5.2.3.7.3 |
| 2 |
| 2 |
| L |
| Link To Separate Parts Data |
| R |
| A.5.2.3.7.4 |
| 1 |
| 1 |
| L |
| Table of Contents |
| R |
| A.5.2.3.7.5 |
A.5.2.3.8.1
| 3 |
| 3 |
| N |
| Dialog-driven interaction |
A.5.2.3.8.2
| 2 |
| 1 |
| N |
| Filter by Configuration |
| O |
| A.5.2.3.8.4 |
| 2 |
| 1 |
| N |
| Filter by Model Series |
| R |
| A.5.2.3.8.5 |
| 2 |
| 1 |
| N |
| Filter by Modification |
| O |
| A.5.2.3.8.6 |
| 2 |
| 1 |
| N |
| Filter by Skill/Maintenance Level |
| R |
| A.5.2.3.8.7 |
| 2 |
| 1 |
| N |
| Filter by Unique Identification Code |
| O |
| A.5.2.3.8.8 |
| 2 |
| 2 |
| N |
| Graphical Navigation |
| R |
| A.5.2.3.8.9 |
| 1 |
| 1 |
| N |
| History of Traversed Links |
| R |
| A.5.2.3.8.10 |
| 1 |
| 1 |
| N |
| Next and Previous |
| R |
| A.5.2.3.8.11 |
| 1 |
| 1 |
| N |
| Forward and Back |
| R |
| A.5.2.3.8.12 |
| 2 |
| 2 |
| N |
| Search - Context |
| R |
| A.5.2.3.8.13 |
| 1 |
| 1 |
| N |
| Search - Full Text |
| R |
| A.5.2.3.8.13.2 |
| 1 |
| 1 |
| N |
| Search - User Defined Boolean |
| R |
| A.5.2.3.8.13.3 |
| 4 |
| 3 |
| N |
| Search - Across Multiple Databases/Files |
| R |
| A.5.2.3.8.13.4 |
| 2 |
| 2 |
| N |
| Search - Key Word |
| R |
| A.5.2.3.8.13.5 |
| 2 |
| 2 |
| N |
| Simultaneous display of multiple content elements |
| O |
| A.5.2.3.8.14 |
| 1 |
| 1 |
| N |
| System/Subsystem Navigation |
| R |
| A.5.2.3.8.15 |
| 2 |
| 2 |
| N |
| Tear off Window Capability |
A.5.2.3.8.16
| 1 |
| 1 |
| N |
| User Creation of Bookmarks |
| R |
| A.5.2.3.8.17 |
| 3 |
| 3 |
| N |
| Voice-Activated Commands |
| O |
| A.5.2.3.8.18 |
| 1 |
| 2 |
| P |
| Work Package Specific Printing |
| R |
| A.5.2.3.9.1 |
| 4 |
| 5 |
| P |
| Fully Formatted/Book Version |
| R |
| A.5.2.3.9.2 |
| 2 |
| 2 |
| P |
| Print Linked Data |
| O |
| A.5.2.3.9.3 |
| 1 |
| 1 |
| P |
| Print Screen |
| R |
| A.5.2.3.9.4 |
| 1 |
| 1 |
| P |
| Print Frame |
| R |
| A.5.2.3.9.5 |
| 1 |
| 1 |
| S |
| Alerts |
| R |
| A.5.2.3.10.1 |
| 4 |
| 4 |
| S |
| Animation |
| R |
| A.5.2.3.10.2 |
| 2 |
| 2 |
| S |
| Audio |
| R |
| A.5.2.3.10.3 |
| 1 |
| 1 |
| S |
| Content Sensitive Help (Technical Data Help) |
| R |
| A.5.2.3.10.4 |
| 2 |
| 2 |
| S |
| Context Sensitive Help (Viewer Help) |
| R |
| A.5.2.3.10.4.2 |
| 3 |
| 3 |
| S |
| Motion Video |
| R |
| A.5.2.3.10.5 |
| 1 |
| 1 |
| S |
| Digital Photos |
| R |
| A.5.2.3.10.6 |
| 3 |
| 3 |
| S |
| User Training |
| R |
| A.5.2.3.10.7 |
| 1 |
| 2 |
| S |
| Browsing |
| R |
| A.5.2.3.10.8 |
| 1 |
| 1 |
| S |
| Selectable Text |
| O |
| A.5.2.3.10.9 |
| 2 |
| 3 |
| S |
| Selectable Graphics |
| O |
| A.5.2.3.10.10 |
NOTE
When specified by the acquiring activity, the following guide post requirements are required.
| 1 |
| 2 |
| S |
| Reset User Interface To Standard Default |
| R |
| A.5.2.3.10.11a |
| 1 |
| 2 |
| S |
| Minimize IETM |
| O |
| A.5.2.3.10.11b |
| 1 |
| 1 |
| S |
| Print Frame |
| O |
| A.5.2.3.10.11c |
| 4 |
| 5 |
| S |
| Change To Page View |
| O |
| A.5.2.3.10.11d |
| 1 |
| 3 |
| S |
| Open New IETM |
| O |
| A.5.2.3.10.11e |
| 1 |
| 1 |
| S |
| Suspend |
| O |
| A.5.2.3.10.11f |
| 1 |
| 1 |
| S |
| Restart |
| O |
| A.5.2.3.10.11g |
| 2 |
| 2 |
| S |
| View Revision Summary |
| R |
| A.5.2.3.10.11h |
| 1 |
| 1 |
| S |
| Back |
| O |
| A.5.2.3.10.11i |
| 1 |
| 1 |
| S |
| Forward |
| O |
| A.5.2.3.10.11j |
| 1 |
| 2 |
| S |
| Abort Browse Mode |
| O |
| A.5.2.3.10.11k |
| 2 |
| 2 |
| S |
| Toggle Screen Panels/Bars On and Off |
| O |
| A.5.2.3.10.11l |
| 2 |
| 2 |
| S |
| Drill Up/Drill Down |
| R |
| A.5.2.3.10.11m |
| 1 |
| 1 |
| S |
| Other Custom Functions |
| O |
| A.5.2.3.10.11n |
| 1 |
| 1 |
| S |
| Exit Guide Post |
| R |
| A.5.2.3.10.11o |
| 2 |
| 2 |
| U |
| Active Change Indications and markings |
| R |
| A.5.2.3.11.1 |
| 2 |
| 2 |
| U |
| Block Cycle with /Urgent Changes |
| R |
| A.5.2.3.11.2 |
| 1 |
| 1 |
| U |
| Full Revision |
| R |
| A.5.2.3.11.3 |
| 2 |
| 2 |
| U |
| Near Real Time Updates |
| R |
| A.5.2.3.11.4 |
| 2 |
| 2 |
| Uo |
| Network Connectivity |
A.5.2.3.12.1
| 2 |
| 2 |
| Uo |
| Network Connectivity - Context Filtering |
A.5.2.3.12.1.1
| 2 |
| 2 |
| Uo |
| Network Connectivity - Update Capability (Full Revision) |
A.5.2.3.12.1.2
| 4 |
| 4 |
| Uo |
| Network Connectivity - Update Capability (Partial) |
A.5.2.3.12.1.3
| 1 |
| 1 |
| Uo |
| Stand Alone Mode |
| R |
| A.5.2.3.12.2 |
| 3 |
| 3 |
| Uo |
| Stand Alone Mode -Context Filtering |
| R |
| A.5.2.3.12.2.1 |
| 1 |
| 1 |
| Uo |
| Stand Alone Mode - Update Capability (Full Revision) |
| R |
| A.5.2.3.12.2.2 |
| 4 |
| 4 |
| Uo |
| Stand Alone Mode - Update Capability (Partial) |
| R |
| A.5.2.3.12.2.3 |
| 2 |
| 3 |
| Uo |
| Web Browser Viewable |
| O |
| A.5.2.3.12.3 |
| R | Required |
| P | Prohibited |
| O | Optional |
TABLE A-XVII TM REQUIREMENTS MATRIX
IETM
MIL-STD-40051-1 TM Requirements Matrix – Table A-XVII 11
| TM Content |
| 23&P |
| 24&P |
| 40&P |
| MIL-STD- 40051-1 Reference |
| Element Name |
| INTRODUCTORY MATTER |
| R |
| R |
| R |
| 5.2.1 |
| <framed.frnt> |
| IETM Installation data |
| R |
| R |
| R |
| 5.2.1.1 |
| CD content frame |
| R |
| R |
| R |
| 5.2.1.2 |
(MC) Promulgation letter
Warning summary
Revision summary frame
| 5.2.1.5 |
| <revisionsummary> |
| Identification information |
| R |
| R |
| R |
| 5.2.1.6 |
| <frntcover> |
| Table of contents |
| R |
| R |
| R |
| 5.2.1.7 |
| <contents> |
| How to use this IETM |
| R |
| R |
| R |
| 5.2.1.8 |
| <howtouse> |
| GENERAL INFORMATION, EQUIPMENT DESCRIPTION AND THEORY OF OPERATION |
| R |
| R |
| R |
| B.5.1 |
| <gim> |
| GENERAL INFORMATION WORK PACKAGE |
| R |
| R |
| R |
| B.5.2 |
| <ginfowp> |
| Scope |
| R |
| R |
| R |
| B.5.2.3 |
| <scope> |
| Maintenance forms, records, and reports |
| R |
| R |
| R |
| B.5.2.4 |
| <mfrr> |
| Reporting equipment improvement recommendations (EIR) |
| R |
| R |
| R |
| B.5.2.5 |
| <eir> |
| Hand receipt (HR) information |
| R |
| R |
| R |
| B.5.2.6 |
| <handreceipt> |
| Corrosion prevention and control (CPC) |
| R |
| R |
| R |
| B.5.2.7 |
| <cpcdata> |
| Ozone depleting substances (ODS) |
| R |
| R |
| R |
| B.5.2.8 |
| <odsdata> |
| Destruction of Army materiel to prevent enemy use |
| R |
| R |
| R |
| B.5.2.9 |
| <destructmat> |
| Preparation for storage or shipment |
| R |
| R |
| R |
| B.5.2.10 |
| <pssref> |
Warranty information
| Nomenclature cross-reference list |
| R |
| R |
| R |
| B.5.2.12 |
| <nomenreflist> |
| List of abbreviations/acronyms |
| R |
| R |
| R |
| B.5.2.13 |
| <loa> |
| Quality assurance (QA) |
| Aviation |
Non-aviation
Quality of material
| Safety, care, and handling |
| R |
| R |
| R |
| B.5.2.16 |
| <sftyinfo> |
| Nuclear hardness |
| R |
| R |
| R |
| B.5.2.17 |
| <hcp> |
| Calibration |
| R |
| R |
| R |
| B.5.2.18 |
| <calref> |
| Flight safety critical aircraft part |
| Aviation |
Non-aviation
| Supporting information for repair parts, special tools, TMDE, and support equipment |
| R |
| R |
| R |
| B.5.2.25 |
| <supdata> |
Copyright credit line
| EQUIPMENT DESCRIPTION AND DATA WORK PACKAGE |
| R |
| R |
| R |
| B.5.3 |
| <descwp> |
| Equipment characteristics, capabilities, and features |
| R |
| R |
| R |
| B.5.3.3 |
| <eqpinfo> |
Location and description of major components (Not required for Conventional and Chemical Ammunition IETMs)
| Differences between models |
| R |
| R |
| R |
| B.5.3.5 |
| <eqpdiff> |
| Equipment data |
| R |
| R |
| R |
| B.5.3.6 |
| <eqpdata> |
| THEORY OF OPERATION WORK PACKAGE |
| R |
| R |
| R |
| B.5.4 |
| <thrywp> |
TROUBLESHOOTING PROCEDURES
NOTE
The notation (*) indicates that, if required, at least one of the these content items shall be included
| INTRODUCTION WORK PACKAGE |
| R |
| R |
| R |
| D.5.5.3 |
| <tsintrowp> |
| TECHINICAL DESCRIPTION WORK PACKAGE |
| R |
| R |
| R |
| D.5.5.4 |
| <techdescwp> |
| Equipment description and data |
| R |
| R |
| R |
| D.5.5.4.3 |
| <descproc> |
| Controls and indicators |
| R |
| R |
| R |
| D.5.5.4.4 |
| <ctrlindproc> |
| Theory of Operation |
| R |
| R |
| R |
| D.5.5.4.5 |
| <thryproc> |
| TROUBLESHOOTING INDEX WORK PACKAGE |
| R |
| R |
| R |
| D.5.5.5 |
| <tsindxwp> |
*OPERATIONAL CHECKOUT WORK PACKAGE
*TROUBLESHOOTING PROCEDURES WORK PACKAGE
*COMBINED OPERATIONAL CHECKOUT AND TROUBLESHOOTING PROCEDURES WORK PACKAGE
| *DIAGNOSTICS WORK PACKAGE |
| R |
| R |
| R |
| D.5.6 |
| <diagnosticswp> |
| MAINTENANCE INSTRUCTIONS |
| R |
| R |
| R |
| E.5.1 |
| <mim> |
| SERVICE UPON RECEIPT WORK PACKAGE |
| R |
| R |
| R |
| E.5.3.2 |
| <surwp> |
Siting requirements
Shelter requirements
Service upon receipt of materiel
Installation instructions
Preliminary servicing of equipment
Preliminary checks and adjustment of equipment
Preliminary calibration of equipment
Circuit alignment
Ammunition markings
| E.5.3.2.3.9.1 |
| <ammo.markings> |
Classification of defects
| E.5.3.2.3.9.2 |
| <ammo.defect> |
Ammunition handling
| E.5.3.2.3.9.3 |
| <ammo.handling> |
Procedures to activate ammunition
Additional service upon receipt task
| E.5.3.2.3.10 |
| <other.surtsk> |
Follow-on maintenance
| E.5.3.2.3.11 |
| <followon.maintsk> |
EQUIPMENT / USER FITTING INSTRUCTIONS WORK PACKAGE (PERSONAL USE EQUIPMENT)
| PMCS INTRO WORK PACKAGE |
| Aviation |
| PMCS WORK PACKAGE |
| Aviation |
| PREVENTIVE MAINTENANCE INSPECTION WORK PACKAGE |
| Aviation |
MAINTENANCE WORK PACKAGES
NOTE
As applicable, the following maintenance tasks shall be presented in the general order listed below:
| Assembly and preparation for use |
| Aviation |
Servicing
Ground handling
Inspection of installed items
| E.5.3.5.3.5 |
| <inspinstitm> |
Removal
Disassembly
Cleaning
Inspection - acceptance and rejection criteria
| E.5.3.5.3.9 |
| <acptrejinsp> |
Nondestructive testing inspection (NDTI)
Repair or replacement
| E.5.3.5.3.11 |
| <repair-rplc> |
Alignment
Painting
Lubrication
Assembly
Test and inspection
| E.5.3.5.3.16 |
| <test-inspect> |
Installation
Adjustment
Calibration
| E.5.3.5.3.19 |
| <calibration> |
Radio interference suppression
Placing in service
Testing
| Overhaul and retirement schedule |
| Aviation |
Non-Aviation
Preparation for storage or shipment
Classification of defects
| E.5.3.5.3.26 |
| <ammo.defect> |
Handling ammunition
| E.5.3.5.3.27 |
| <ammo.handling> |
Ammunition markings
| E.5.3.5.3.28 |
| <ammo.markings> |
Procedures for ammunition activation
Additional maintenance task
| E.5.3.5.3.30 |
| <other.maintsk> |
Follow-on maintenance
| E.5.3.5.3.31 |
| <followon.maintsk> |
| GENERAL MAINTENANCE WORK PACKAGE |
| R |
| R |
| R |
| E.5.3.6 |
| <maintwp> |
| LUBRICATION INSTRUCTION WORK PACKAGE |
| R |
| R |
| R |
| E.5.3.7 |
| <lubewp> |
| ILLUSTRATED LIST OF MANUFACTURED ITEMS WORK PACKAGE |
| R |
| R |
| R |
| E.5.3.9 |
| <manuwp> |
| Introduction work package |
| R |
| R |
| R |
| E.5.3.9.1 |
| <intro> |
| Manufacturing procedures work package |
| R |
| R |
| R |
| E.5.3.9.2 |
| <manfcprocwp> |
| TORQUE LIMITS WORK PACKAGE |
| R |
| R |
| R |
| E.5.3.10 |
| <torquewp> |
| AIRCRAFT INVENTORY MASTER GUIDE WORK PACKAGE |
| Aviation |
Non-Aviation
| STORAGE OF AIRCRAFT WORK PACKAGE |
| Aviation |
Non-Aviation
| WEIGHING AND LOADING WORK PACKAGE |
| Aviation |
Non-Aviation
| WIRING DIAGRAMS WORK PACKAGE |
| R |
| R |
| R |
| E.5.3.11 |
| <wiringwp> |
| AUXILIARY EQUIPMENT MAINTENANCE INSTRUCTIONS |
| R |
| R |
| R |
| E.5.1 |
E.5.2.6 <mim> <auxiliarycategory>
| AUXILIARY EQUIPMENT MAINTENANCE WORK PACKAGE |
| R |
| R |
| R |
| E.5.3.13 |
| <auxeqpwp> |
| ILLUSTRATED LIST OF MANUFACTURED ITEMS WORK PACKAGE |
| R |
| R |
| R |
| E.5.3.9 |
| <manuwp> |
| Introduction work package |
| R |
| R |
| R |
| E.5.3.9.1 |
| <intro> |
| Manufacturing procedures work package |
| R |
| R |
| R |
| E.5.3.9.2 |
| <manfcprocwp> |
| TORQUE LIMITS WORK PACKAGE |
| R |
| R |
| R |
| E.5.3.10 |
| <torquewp> |
| WIRING DIAGRAMS WORK PACKAGE |
| R |
| R |
| R |
| E.5.3.11 |
| <wiringwp> |
AMMUNITION MAINTENANCE INSTRUCTIONS
E.5.1 E.5.2.7 <mim> <ammunitioncategory>
AMMUNITION MAINTENANCE WORK PACKAGE
AMMUNITION MARKING INFORMATION WORK PACKAGE
| E.5.3.14.2 |
| <ammo.markingwp > |
FOREIGN AMMUNITION (NATO) WORK PACKAGE
AIRCRAFT PMS/PMD
<pmscategory>
GENERAL INFORMATION WORK PACKAGE
PMS/PMD INSPECTION WORK PACKAGE
AIRCRAFT PHASED MAINTEANCE
<checklistcategory>
GENERAL INFORMATION WORK PACKAGE
PM INSPECTION WORK PACKAGE
General inspection
Aircraft area inspection
Aircraft power on checks
| E.5.3.16.4 |
| <pwron-inspec> |
Aircraft final inspection
| PARTS INFORMATION |
| R |
| R |
| R |
| F.5.3.1 |
| <pim> |
| INTRODUCTION WORK PACKAGE |
| R |
| R |
| R |
| F.5.3.3 |
| <introwp> |
| REPAIR PARTS LIST WORK PACKAGE |
| R |
| R |
| R |
| F.5.3.4.4 |
| <plwp> |
| REPAIR PARTS FOR SPECIAL TOOLS WORK PACKAGE |
| R |
| R |
| R |
| F.5.3.6 |
| <stl_partswp> |
| KIT PARTS LIST WORK PACKAGE |
| R |
| R |
| R |
| F.5.3.6.3.1 |
| <kitswp> |
| BULK ITEMS WORK PACKAGE |
| R |
| R |
| R |
| F.5.3.8 |
| <bulk_itemswp> |
| SPECIAL TOOLS LIST WORK PACKAGE |
| R |
| R |
| R |
| F.5.3.8.1 |
| <stlwp> |
| NSN INDEX WORK PACKAGE |
| R |
| R |
| R |
| F.5.3.10.1 |
| <nsnindxwp> |
| PART NUMBER INDEX WORK PACKAGE |
| R |
| R |
| R |
| F.5.3.10.1 |
| <pnindxwp> |
| REFERENCE DESIGNATOR INDEX WORK PACKAGE |
| R |
| R |
| R |
| F.5.3.10.2.1 |
| <refdesindxwp> |
SUPPORTING INFORMATION
NOTE
Applicable supporting information work packages shall be arranged in the order in which they are presented here and numbered accordingly.
| REFERENCES WORK PACKAGE |
| R |
| R |
| R |
| G.5.2 |
| <refwp> |
| INTRODUCTION FOR STANDARD TWO-LEVEL OR AVIATION TWO-LEVEL MAC WORK PACKAGE |
| R |
| R |
| G.5.3.1 (Standard) G.5.3.3 (Aviation) |
| <macintrowp> |
| MAC WORK PACKAGE (STANDARD TWO-LEVEL OR AVIATION TWO-LEVEL ONLY) |
| R |
| R |
| EXPENDABLE AND DURABLE ITEMS LIST WORK PACKAGE |
| R |
| R |
| R |
| G.5.6 |
| <explistwp> |
| TOOL IDENTIFICATION LIST WORK PACKAGE |
| R |
| R |
| R |
| G.5.7 |
| <toolidwp> |
| MANDATORY REPLACEMENT PARTS WORK PACKAGE |
| R |
| R |
| R |
| G.5.8 |
| <mrplwp> |
CRITICAL SAFETY ITEMS(CSI) AND FLIGHT SAFETY CRITICAL AIRCRAFT PARTS (FSCAP) WORK PACKAGE
| SUPPORT ITEMS WORK PACKAGE |
| R |
| R |
| R |
| G.5.10 |
| <supitemwp> |
| ADDITIONAL SUPPORTING WORK PACKAGES |
| R |
| R |
| R |
| G.5.11 |
| <genwp> |
| R | Required |
| P | Prohibited |
| Shaded | As Required |
MIL-STD-40051-1 TM Requirements Matrix – Table A-XXI 16