About this file

This document provides instructions for completing a Military Performance Specification (MIL-PRF-49506) Logistics Management Information (LMI) Data Worksheet for provisioning data related to a federal contract opportunity. Key details include:

  • The contractor must provide LMI data for all piece parts and special tools identified for equipment, as well as Repair Parts and Special Tools Lists. Data includes commercial and government entity codes, demilitarization codes, essentiality codes, figures, functional group codes, hazardous codes, indenture codes, interchangeability codes, item categories, names, numbers, maintenance replacement rates, national stock numbers, next higher assembly provisioning list item sequence numbers, overhaul replacement rates, prior item provisioning list item sequence numbers, production lead times, provisioning contract control numbers, provisioning list item sequence numbers, provisioning nomenclatures, quantities per assembly and end item, reference designators, reference numbers, reference number categories and variations, repair cycle times, replacement task distributions, serial number effectivities, shelf lives, source maintenance and recoverability codes, technical manual change numbers, technical manual indenture codes and numbers, type of change codes, unit of issues and measures, unit of issue conversion factors, and usable on codes.

  • The government will provide production lead times, provisioning contract control numbers, usable on codes, and technical manual numbers. The contractor must develop Logistics Support Analysis control numbers and assign provisioning list item sequence numbers according to specified guidelines.

  • Pre-provisioning screening of items using the Federal Logistics Information System and Web Federal Logistics Information Service is required. Tables of values are provided for maintenance task distribution, replacement task distribution, and replacement cycle time.

View the file

Other files

File Type Posted
W56HZV-21-R-0195 Amendment 0001 RFP for BFV STS.pdf PDF
BFV MLRS STS J and A.pdf PDF
Attachment 0019 -- ATPD 2232.pdf PDF
Attachment 0013 -- IUID Marking Activity Val Ver w Raw Scan.xlsx XLSX spreadsheet
Attachment 0018 -- Incoming Transaction Format.docx DOCX document
Attachment 0014 -- IUID QA Guide.docx DOCX document
Attachment 0003 -- Contract Performance Report Sample.xlsx XLSX spreadsheet
Attachment 0020 -- Preparation Instructions Shipment and Storage.docx DOCX document
Attachment 0005 -- Resource Distribution Table.xlsx XLSX spreadsheet
Attachment 0007 -- Request for Use of Prohibited Materials.docx DOCX document
Attachment 0002 -- Assertion of Restrictions.xlsx XLSX spreadsheet
Attachment 0015 -- Technical Publications.docx DOCX document
Attachment 0016 -- Copyright Release Letter Template.docx DOCX document
Attachment 0017 -- LPD Coded Data Products Packaging.docx DOCX document
Attachment 0025 -- Small Business Subcontracting Plan (Placeholder).docx DOCX document
Attachment 0012 -- TACOM-RRAD Sample Data Plate.pdf PDF
Attachment 0021 -- Revisions and Exceptions.docx DOCX document
Attachment 0008 -- Level of Repair Analysis.docx DOCX document
Attachment 0004 -- Cost and Software Data Reporting Plan.xlsx XLSX spreadsheet
Attachment 0009 -- LMI Data Worksheet Form - Provisioning Data Requirements.pdf PDF
Attachment 0022 -- NDC Personal Information Requirements.docx DOCX document
Attachment 0006 -- TDP Options Worksheet.pdf PDF
Attachment 0011 -- Provisioning Requirements Statement.docx DOCX document
Attachment 0001 -- GFP.xlsx XLSX spreadsheet
W56HZV21R0195 RFP for BFV STS Services.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. W56HZV-10-R-0018

W56HZV-13-R-0189

ATTACHMENT 0009

LMI DATA WORKSHEET – PROVISIONING DATA REQUIREMENTS

(MIL-PRF-49506)

1. DATA PRODUCT DELIVERABLE: Data product information required as stated below.

SELECTEXPLANATION
1Data required for all piece parts and special tools identified on equipment
2Data required for Repair Parts and Special Tools List (RPSTL)
ARData required for part number changes and supersessions

DED Matrix

DATA PRODUCT TITLE
SELECT
ADDITIONAL INFORMATION
COMMERCIAL GOVERNMENT ENTITY(CAGE) CODE
1
LMI 0140
CAGE CODE – ADDITIONAL REFERENCE NUMBER
1
LMI 0140
DEMILITARIZATION CODE (DMIL)
1
LMI 0230
ESSENTIALITY CODE
1
LMI 0280
FIGURE NUMBER
2
LMI 0300
FUNCTIONAL GROUP CODE see note 1 for assignment
1
LMI 0330
HAZARDOUS CODE
1
LMI 0360
INDENTURE CODE
1
LMI 0370
INTERCHANGEABILITY CODE
AR
LMI 0430
ITEM CATEGORY CODE (ICC)
1
LMI 0460
ITEM NAME
1
LMI 0480
ITEM NUMBER
1
LMI 0500
MAINTENANCE REPLACEMENT RATE I
1
LMI 0560 (“P” CODED ITEMS)
MAINTENANCE REPLACEMENT RATE II
1
LMI 0570 (“P” CODED ITEMS)
MAINTENANCE TASK DISTRIBUTION
1
LMI 0580 (SEE TABLE 1)
NATIONAL STOCK NUMBER
1
LMI 0680
NEXT HIGHER ASSY PROVISIONING LIST ITEM SEQUENCE NUMBER (NHA PLISN)
1
LMI 0690
NEXT HIGHER ASSY PROVISIONING LIST ITEM SEQUENCE NUMBER INDICATOR (NHA IND)
1
LMI 0700
OVERHAUL REPLACEMENT RATE
1
LMI 0740
PRIOR ITEM PLISN
AR
LMI 0820
PRODUCTION LEAD TIME
1
LMI 0830

PROVISIONING CONTRACT CONTROL

NUMBER (PCCN)

1
LMI 0870 (GOVT PROVIDED)

PROVISIONING LIST ITEM SEQUENCE

NUMBER (PLISN)

1
LMI 0890
PROVISIONING NOMENCLATURE
1
LMI 0900
QUANTITY PER ASSEMBLY (QPA)
1
LMI 0930
QUANTITY PER END ITEM (QPEI)
1
LMI 0950
QUANTITY PER FIGURE
2
LMI 0960
REFERENCE DESIGNATOR
1
LMI 1030
REFERENCE NUMBER (Part Number)
1
LMI 1050
REFERENCE NUMBER CATEGORY CODE (RNCC)
1
LMI 1060
REFERENCE NUMBER VARIATION CODE (RNVC)
1
LMI 1070
REPAIR CYCLE TIME
1
LMI 1080 (SEE TABLE 3)
REPLACEMENT TASK DISTRIBUTION
1
LMI 1110 (SEE TABLE 2)
SERIAL NUMBER EFFECTIVITY
AR
LMI 1170
SHELF LIFE (SL)
1
LMI 1190

SOURCE, MAINTENANCE AND

RECOVERABILITY (SMR) CODE

1
LMI 1220
TECHNICAL MANUAL CHANGE NUMBER (TM CHG)
2
LMI 1350
TECHNICAL MANUAL INDENTURE CODE (TM IND)
2
LMI 1360
TECHNICAL MANUAL NUMBER
2
LMI 1370 (GOVT PROVIDED)
TYPE OF CHANGE CODE (TOCC)
2
LMI 1460
UNIT OF ISSUE (UI)
1
LMI 1470
UNIT OF ISSUE CONVERSION FACTOR (UI CONV FACTOR)
1
LMI 1480
UNIT OF ISSUE/UNIT OF MEASURE CODE
1
LMI 1490
UNIT OF ISSUE/UNIT OF MEASURE PRICE (UI/UM PRICE)
1
LMI 1500
UNIT OF MEASURE (UM)
1
LMI 1510
USABLE ON CODE (UOC)
1
LMI 1560 (GOVT PROVIDED)

Note 1: Use Logistics Support Analysis Control Number (LCN) for this code. LCN will be assigned in end item hardware breakdown sequence. This breakdown is accomplished by sequencing all parts comprising the end item in a lateral and descending "family tree/generation breakdown." This breakdown shall consist of the end item, including all components, listing every assembly, subassembly, and parts which can be disassembled, reassembled/replaced. All parts are listed in their relation to the end item, component, assembly, or installation system in which they are contained and to their own further subassemblies and parts. This relationship is shown by means of an indenture code. See item 3.a below for detailed guidance for assignment of LCNs. FUNCTIONAL GROUP CODES PER TB 750-93-1 WILL NOT BE USED. RPSTL manuals and MAC will be organized in top-down breakdown (LCN) format.

2. GOVERNMENT SUPPLIED PROVISIONING DATA

2.1 PRODUCTION LEAD TIME (PLT) — LMI 0830

Consumable Items = 1 month Repair Parts = 3 months Long Lead Time Items or made to order = 8 months

2.2 PROVISIONING CONTRACT CONTROL NUMBER (PCCN) — LMI 0870

The PCCN is assigned by the government and will be provided at the provisioning start of work meeting.

2.3 USEABLE ON CODE (UOC) — LMI 1560

The UOC is assigned by the government and will be provided at the provisioning start of work meeting. This code is also called the Provisioning Control Code (PCC).

2.4 TECHNICAL MANUAL NUMBER – LMI 1370

The TM number is assigned by the government and will be provided at the provisioning start of work meeting.

3. SPECIFIC GUIDANCE:

3.1 LSA Control Number (LCN) Assignment. The Prime Contractor shall develop LSA control numbers in coordination with the procuring activity. Contractor proposed LSA control number assignment shall be reviewed for government approval as a part of the Start of Work meeting. The term LCN is synonymous with FGC in MIL STD 40051.

3.1.1 Hardware LCN. LSA Control Numbers shall be assigned for hardware with the following criteria:

3.1.1.1 The number of digits representing an indenture level need not remain constant. A repair part, assembly, etc., should be traceable to the next higher assembly by eliminating either the last one or two characters of the LSA control number. For example, a repair part LCN ADA/AA and reparable assembly ADAB both have the next higher assembly of ADA.

3.1.1.2 Assignment of the LCN shall be according to top-down drawing generation breakdown, not bill of materials. Lower level items tracing upward to a higher assembly should be assigned LCNs which trace to the LCN representing the higher assembly. Piece parts (non-reparable) to a reparable installation/assembly shall have a slash (/) at the end of the NHA LCN followed with two character sequencing per indenture level.

3.1.2 Peculiar and Common Support Equipment LCN. A unique LCN for the system shall be assigned for all support equipment. Lower indentured LCNs should also be assigned for Tools, support equipment, TO&E items and bulk items. Only one LCN which traces to one of the above categories should be assigned to each item falling into those categories.

3.1.3 Operational Sequence LCN. An LCN structure may be established to document operator procedures, both operational and maintenance. This sequence shall be consistent with the outline for the -10 level TMs. Crew level maintenance tasks shall be fully documented under the hardware LCN structure.

3.1.4 Troubleshooting LCN. A functional LCN structure may be established for troubleshooting development and maintenance that is consistent with the diagnostic strategy for the system. For example, if all troubleshooting were to be symptom-driven with procedures established for each symptom, an LCN structure for symptoms might be required.

3.2 PLISN assignment. Each part number submitted for initial provisioning will have a four (4) digit PLISN assigned. The contractor will leave at least three (3) spaces between each PLISN assignment.

3.3 Replaced or superseding PLISN. The contractor will establish a tracking system for part numbers that replace or supersede a part number already submitted for provisioning. This tracking will be documented for the new part number by adding an “A” in the fifth digit of the PLISN being replaced or superseded. Subsequent part number replacement/supersessions of the same part will use a B, C, etc in the fifth digit of the PLISN.

3.4 SMR Code Assignment.

3.4.1 SMR Code for shelf life (SL) items. The contractor will use a source code of “PC” for items having a shelf life. The appropriate SL code will be entered in accordance with DED 1170 in Matrix above.

3.5 EDFP Documentation.

a) Text on all illustrations shall be in English.

b) Each illustration shall have approved Vendor Commercial and Government Entity (CAGE) Code and Part Number will be typed, stamped, or written legibly with an authorized signature.

c) Substitutes for illustrations are permitted only by exception, on a case by case basis. Decisions will be made by Provisioning and Catalog Representative present at Provisioning Conference.

d) All illustrations shall include Nomenclature, a brief description, to include sizes, grade, surface finish, and coatings for common hardware.

3.6 Pre-provisioning Screening. Screening results are not a separate deliverable but must be provided for each “P” coded part submitted for provisioning at each conference.

a) FLIS. For additional information on requesting software and passwords, refer to the Provisioning Screening User Guide at www.dlis.dla.mil.

b) WEBFLIS. For additional information on WEBFLIS, go to www.dlis.dla.mil/webflis. There are two versions of WEBFLIS: Public Query and Restricted/Sign-on. Anyone with access to the Internet may access the Public Query version. The Restricted/Sign-on version requires a valid User ID/password to access the system. User IDs may be obtained by filling out a registration form. The registration forms are found on the DLIS web site. After accessing the Home Page, go into the Forms and Publications section and select the registration form for WEBFLIS. There are two forms available - one for Government workers and one for Government sponsored Contractors.

c) Batch submittals to DLIS. For additional information on how to submit batch requests to DLIS, refer to the Provisioning Screening User Guide at www.dlis.dla.mil.

3.7 Tables of Values.

a) Maintenance Task Distribution (MTD) (see Table 1)

b) Replacement Task Distribution (RTD) (see Table 2)

c) Replacement Cycle Time (RCT) (see Table 3)

TABLE 1 – MAINTENANCE TASK DISTRIBUTION (MTD) – LMI 0580

SMR CODE
01A
P
A
F
F
F
A
MAINTENANCE TASK DISTRIBUTION
01D
Field
H
DEP
CR
22
23
24
25
26
27
28
29
30
31
7
0
1
5
1
0
0
5
SMR CODE
01A
P
A
F
H
H
A
MAINTENANCE TASK DISTRIBUTION
01D
Field
H
DEP
CR
22
23
24
25
26
27
28
29
30
31
7
5
2
0
0
5
SMR CODE
01A
P
A
H
D
D
A
MAINTENANCE TASK DISTRIBUTION
01D
Field
H
DEP
CR
22
23
24
25
26
27
28
29
30
31
9
5
0
5

TABLE 2 – REPLACEMENT TASK DISTRIBUTION (RTD) – LMI 1110

SMR CODE
01A
P
A
F
F
F
A
REPLACEMENT TASK DISTRIBUTION
01J
Field
H
PCS/TS
DEP
22
23
24
25
26
27
28
29
30
31
32
33
0
0
0
0
2
5
0
0
5
SMR CODE
01A
P
A
H
H
H
A
REPLACEMENT TASK DISTRIBUTION
01J
Field
H
PCS/TS
DEP
22
23
24
25
26
27
28
29
30
31
32
33
0
9
5
0
0
5
SMR CODE
01A
P
A
D
D
D
A
REPLACEMENT TASK DISTRIBUTION
01J
Field
H
PCS/TS
DEP
22
23
24
25
26
27
28
29
30
31
32
33
1
0
0

TABLE 3 – REPLACEMENT CYCLE TIME (RCT) – LMI 1080

SMR CODE
01A
P
A
F
F
F
A
REPLACEMENT CYCLE TIME
01J
Field
H
DEP
51
52
53
54
55
56
57
58
59
60
61
62
0
4
5
0
6
0
0
9
0
SMR CODE
01A
P
A
F
H
H
A
REPLACEMENT CYCLE TIME
01J
Field
H
DEP
51
52
53
54
55
56
57
58
59
60
61
62
0
6
0
0
9
0
SMR CODE
01A
P
A
F
D
D
A
REPLACEMENT CYCLE TIME
01J
Field
H
DEP
51
52
53
54
55
56
57
58
59
60
61
62
0
9
0

4. PROVISIONING INFORMATION. Each provisioning submittal must include the following:

National Stock Number (NSN): (if assigned)

Equipment Nomenclature: {name of system}

Model Number: (if assigned)

Contract Number: {enter after award}

Provisioning Activity (address and zip code):

U.S. Army TACOM Life Cycle Management Command

ATTN: AMSTA-LCG-L

6501 E. 11 Mile Rd.

Warren, MI 48397-5000

Contractor (name, address and zip code):

{Enter after award}

MIL-PRF-49506 LMI Data Worksheet 1

MIL-PRF-49506 LMI Data Worksheet 1

File details come from the government source that posted it. Updated .