About this file

This document contains instructions for completing a Resource Distribution Table deliverable under a federal contract. The contractor must provide Systems Technical Support and Sustainment Systems Technical Support for the Bradley Fighting Vehicle System Family of Vehicles, Multiple Launch Rocket System Carrier, and their derivatives. Efforts include program management, logistics support, engineering, product assurance and field service support for the vehicle systems. The contractor must fill out the provided Excel template to detail the allocation of the total contract price among work performed internally as the prime contractor, individual subcontractors exceeding $20 million, and all other subcontractors combined. For each major subcontractor, the contractor must specify the company name, location, workshare breakdown by contract line item, and percentages of the subcontract that are commercial or competitively sourced.

View the file

Other files

File Type Posted
W56HZV-21-R-0195 Amendment 0001 RFP for BFV STS.pdf PDF
BFV MLRS STS J and A.pdf PDF
Attachment 0019 -- ATPD 2232.pdf PDF
Attachment 0013 -- IUID Marking Activity Val Ver w Raw Scan.xlsx XLSX spreadsheet
Attachment 0018 -- Incoming Transaction Format.docx DOCX document
Attachment 0014 -- IUID QA Guide.docx DOCX document
Attachment 0003 -- Contract Performance Report Sample.xlsx XLSX spreadsheet
Attachment 0020 -- Preparation Instructions Shipment and Storage.docx DOCX document
Attachment 0007 -- Request for Use of Prohibited Materials.docx DOCX document
Attachment 0010 -- LMI Data Worksheet Instructions - Provisioning Data Requirements.docx DOCX document
Attachment 0002 -- Assertion of Restrictions.xlsx XLSX spreadsheet
Attachment 0015 -- Technical Publications.docx DOCX document
Attachment 0016 -- Copyright Release Letter Template.docx DOCX document
Attachment 0017 -- LPD Coded Data Products Packaging.docx DOCX document
Attachment 0025 -- Small Business Subcontracting Plan (Placeholder).docx DOCX document
Attachment 0012 -- TACOM-RRAD Sample Data Plate.pdf PDF
Attachment 0021 -- Revisions and Exceptions.docx DOCX document
Attachment 0008 -- Level of Repair Analysis.docx DOCX document
Attachment 0004 -- Cost and Software Data Reporting Plan.xlsx XLSX spreadsheet
Attachment 0009 -- LMI Data Worksheet Form - Provisioning Data Requirements.pdf PDF
Attachment 0022 -- NDC Personal Information Requirements.docx DOCX document
Attachment 0006 -- TDP Options Worksheet.pdf PDF
Attachment 0011 -- Provisioning Requirements Statement.docx DOCX document
Attachment 0001 -- GFP.xlsx XLSX spreadsheet
W56HZV21R0195 RFP for BFV STS Services.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RDT Instructions

CUI

Metadata Reference
File Name1.aAttachment 0005 - Resource Distribution Table.xlsx
Reference Attachment2.aAttachment 0005
Contract Number2.b0
Last Updated MOD2.c0
Instructions1The contractor shall utilize the worksheets titled "Metadata" and "RDT Data" within this attachment as a template to provide the Resource Distribution Table deliverable.
2Other than cells marked, "(optional)" the contractor shall enter data in all yellow highlighted cells as indicated on each worksheet and in accordance with these instructions.
3Fill in the required data on the worksheet titled "Metadata" which provides data about the contract, the CDRL deliverable, who prepared the CDRL deliverable, and when the CDRL deliverable was prepared.
4Fill in the required data on the worksheet titled "RDT Data" as instructed below (see the NOTONAL EXAMPLE in columns E and F on "RDT Data" worksheet for two example subcontractor columns):
a)The total of the "Price" row (5.c) shall equal the contractor's total contract price when all options are exercised.
b)Total contract price (row 5.c) shall be broken down into:
i.Costs plus profit/fee incurred to preform work internally by the prime contractor, reported in "Prime Contractor" column.
ii.Costs incurred to pay subcontractors to provide hardware, software, or other services, reported in columns "All Other Subcontractors" thru "Subcontractor n".
iii.Subcontractor costs shall be provided for each subcontractor (row 5.c, columns "Subcontractor 1" thru "Subcontractor n") if the total anticipated price paid to the subcontractor is estimated to exceed $20M during the course of the contract (assuming all options are exercised). Insert and label additional columns between "Subcontractor 1" and "Subcontractor n" as required to provide data for each subcontractor.

A subcontract is any agreement, purchase order, or instrument other than a prime contract calling for work or for the material required for the performance of one or more prime contracts. It usually covers procurement of major components or subsystems that require the subcontractor to do extensive design, development, engineering, and testing to meet a prime contractor’s procurement specifications. (Via DoD Manual 5000.04 - Cost and Software Data Reporting (CSDR) Manual)

iv.Costs associated with all subcontractors not anticipated to exceed $20M may be combined and reported in the row labeled 5.c, column "All Other Subcontractors".
c)The following information is required, by subcontractor, if the total anticipated price paid to the subcontractor is estimated to exceed $20M during the course of the contract (assuming all options are exercised).
i.In the row labeled 5.a, enter the company name of the subcontractor who will be providing the part, software, or service. If the subcontractor is not yet known, enter "TBD".
ii.In the row labeled 5.b, enter the city and state (and country if not the United States) the subcontract is located in. If the subcontractor has multiple locations, enter the location the part or software is produced or the service is being completed. If the subcontractor is not yet known, enter "TBD".
iii.For each WBS identified in section 5.g and for each of the "Subcontractor 1" thru "Subcontractor n" columns, enter an "X" in the cell at the subcontractor-WBS intersection if the subcontractor identified in the column is completing work associated with the WBS identified in the row. If the subcontractor is not completing work associated with the WBS, enter "-".
iv.(Optional) In row labeled 5.d, provide what percentage of the parts, software, or services being procured from the subcontract qualifies as a commercially available item, according to the contractor's assessment (note: only the government's Procuring Contractor Officer makes all final commerciality assessments). The percentage shall be calculated as a percent of total price (the row labeled 5.c) (i.e., price of commercial items divided by price of all items) not as a function of quantity.

For more info on commerciality, see "https://www.acq.osd.mil/dpap/dars/pgi/docs/DoD_Guidebook_PartA_Commercial_Item_Determination_07_10_19.pdf"

v.(Optional) In row labeled 5.e, provide what percentage of the parts, software, or services being procured from the subcontract qualifies as a competitively sourced item. An item is considered competitively sourced if the prime contractor has received two or more quotes from independent subcontracts in order to provide the item. The percentage shall be calculated as a percent of total price (the row labeled 5.c) (i.e., price of competitively sourced items divided by price of all items) not as a function of quantity.
vi.USG USE ONLY: In row 5.f, enter the OSD(CAPE) Waiver Number associated with the subcontractor and commercial product in question if a waiver has been previously issued by OSD(CAPE).
CUI

Formatting

CUI

Metadata Reference
File Name1.aAttachment 0005 - Resource Distribution Table.xlsx
Reference Attachment2.aAttachment 0005
Contract Number2.b0
Last Updated MOD2.c0

The Contractor shall only enter values in cells that are colored light yellow (as shown here) unless otherwise noted:

Cells formatted in this color require contractor input unless otherwise noted.

CUI

Change Log

CUI

This worksheet documents changes to this attachment between contract modifications (except changes to the 'Change Log' itself, which are self-evident).

Change # Date MOD Number Range Changed Change Description

CUI

Revision Log

CUI

Metadata Reference
File Name1.aAttachment 0005 - Resource Distribution Table.xlsx
Reference Attachment2.aAttachment 0005
Contract Number2.b0
Last Updated MOD2.c0
Complete one row per submission.
Submission NumberResubmission Number
Author: If the report is a resubmission, enter the resubmission number, starting with “1” for the first resubmission, “2” for the second resubmission, and so forth. Enter “0” for original submission.DateChange Description
(1…n)(0…n)(YYYY-MM-DD)(Description of changes)
(add additional rows as necessary)
CUI

Metadata

CUI

1. Deliverable Metadata1.aFile NameAttachment 0005 - Resource Distribution Table.xlsx
1.bWorksheet TitleMetadata
1.cData TypeRDT
1.dReport As of Date(YYYY-MM-DD)
1.eReport Submission Date(YYYY-MM-DD)
1.fSubmission Number(1…n)
1.gResubmission Number
Author: If the report is a resubmission, enter the resubmission number, starting with “1” for the first resubmission, “2” for the second resubmission, and so forth. Enter “0” for original submission.(0…n)
1.hSubmission Remarks
1.iProprietary Markings and/or Disclosures
1.jDistribution Statement
1.kContains Proprietary DataYes
1.lSecurity ClassificationUnclassified
1.mData Version2021_2
2. Contract & Program Metadata2.aReference AttachmentAttachment 0005
2.bContract Number
2.cLast Updated MOD
2.dSolicitation Number<- Update Me
2.eReference SOWC.3.7.1
2.fReference CDRLA006
2.gReference DIDDI-FNCL-81565C
2.hApproved CSDR Plan NumberA-21-C-C1
2.iProgram NameBradley STS/SSTS Contract
2.jProgram PhaseO&S
2.kPrime Mission ProductSystem Technical Support (STS), Post Production System Support (PPSS), and Sustainment System Technical Support (SSTS) - Bradley Family of Vehicles (FOVs)
3. Preparation Metadata3.aReporting Organization Type

Author: - Enter "Contractor" if the reporiting entity is the prime contractor.

- Enter "Subcontractor" if the reporting entity is a subcontractor.

3.bOrganization Name
3.cOrganization Address Line 1
3.dOrganization Address Line 2 (optional)
3.eOrganization Address City
3.fOrganization Address State
3.gOrganization Address Zip
3.hDivision Name (optional)
3.iDivision Address Line 1 (optional)
3.jDivision Address Line 2 (optional)
3.kDivision Address City (optional)
3.lDivision Address State (optional)
3.mDivision Address Zip (optional)
3.nPrincipal Preparer Name
3.oPrincipal Preparer Phone
3.pPrincipal Preparer Email
4. Additional Fields4.a(Custom Field 01 (optional))
4.b(Custom Field 02 (optional))
4.c(Custom Field 03 (optional))
4.d(Custom Field 04 (optional))
4.e(Custom Field 05 (optional))
4.f(Custom Field 06 (optional))
4.g(Custom Field 07 (optional))
4.h(Custom Field 08 (optional))
4.i(Custom Field 09 (optional))
4.j(Custom Field 10 (optional))
CUI

RDT Data

CUI

Worksheet Metadata1.aFile NameAttachment 0005 - Resource Distribution Table.xlsx
2.aReference Attachment2
2.bContract Number0
2.cLast Updated MOD0
--- NOTIONAL EXAMPLE DATA ---
5. RDT DataSubcontractor 1Subcontractor 2Prime ContractorAll Other SubcontractorsSubcontractor 1Subcontractor 2…Subcontractor n
5.aSubcontractor NameVandelay IndustriesKruger Industrial SmoothingN/AVarious
5.bSubcontractor LocationNew York, NYNew York, NYN/AVarious
5.cPrice$ 21,000,000.00$ 25,000,000.00
5.dPercent Commercially Available (optional)50.0%45.0%N/A
5.ePercent Competitively Sourced (optional)90.0%40.0%N/A
5.fOSD(CAPE) Subcontractor Waiver NumberN/AN/A
5.gWBS ELEMENT CODEWBS REPORTING ELEMENTS
1.0System Technical Support, Post Production System Support, & Sustainment System Technical Support--
1.1Manufacturing--
1.2Secondary Vehicle--
1.3Systems Engineering--
1.4Program ManagementX-
1.5System Test and Evaluation--
1.5.1Development Test and Evaluation--
1.5.2Operational Test and Evaluation--
1.5.3Cybersecurity Test and Evaluation--
1.5.4Mock-ups/System Integration Labs (SILs)--
1.5.5Test and Evaluation Support--
1.5.6Test Facilities--
1.6TrainingX-
1.6.1Equipment--
1.6.1.1Operator Instructional Equipment--
1.6.1.2Maintainer Instructional Equipment--
1.6.2Services--
1.6.2.1Operator Instructional Services--
1.6.2.2Maintainer Instructional Services-X
1.6.3Facilities--
1.6.4Training Software 1...n (Specify)--
1.7Data--
1.8Peculiar Support Equipment--
1.9Common Support Equipment--
1.10Operational/Site Activation by Site 1...n (Specify)--
1.10.1System Assembly, Installation, and Checkout--
1.10.2Contractor Technical SupportX-
1.10.3Site Construction--
1.10.4Site/Ship/Vehicle Conversion--
1.10.5Interim Contractor Support--
1.11Contractor Logistics Support (CLS)--
1.12Industrial Facilities--
1.13Initial Spares and Repair Parts--

CUI