This Provisioning Requirements Statement supplements a Statement of Work for solicitation W56HZV-13-R-0189. The contractor must provide provisioning conferences at their facility, with sample components as needed. Incremental submission of provisioning technical documentation is authorized in both hard copy and electronic format. Logistics product data including special tools, repair kits, and consumable materials must be included. A provisioning preparedness review or resident team are not required.

This sole-source solicitation seeks Systems Technical Support and Sustainment Systems Technical Support from an incumbent for the Bradley Fighting Vehicle System Family of Vehicles, Multiple Launch Rocket System Carrier, and their derivatives. Efforts include program management, logistics support, engineering, product assurance and field service support for the vehicle systems. The Department of the Army Materiel Command TACOM Life Cycle Management Command is the contracting agency.

View the file

Other files

File Type Posted
W56HZV-21-R-0195 Amendment 0001 RFP for BFV STS.pdf PDF
BFV MLRS STS J and A.pdf PDF
Attachment 0019 -- ATPD 2232.pdf PDF
Attachment 0013 -- IUID Marking Activity Val Ver w Raw Scan.xlsx XLSX spreadsheet
Attachment 0018 -- Incoming Transaction Format.docx DOCX document
Attachment 0014 -- IUID QA Guide.docx DOCX document
Attachment 0003 -- Contract Performance Report Sample.xlsx XLSX spreadsheet
Attachment 0020 -- Preparation Instructions Shipment and Storage.docx DOCX document
Attachment 0005 -- Resource Distribution Table.xlsx XLSX spreadsheet
Attachment 0007 -- Request for Use of Prohibited Materials.docx DOCX document
Attachment 0010 -- LMI Data Worksheet Instructions - Provisioning Data Requirements.docx DOCX document
Attachment 0002 -- Assertion of Restrictions.xlsx XLSX spreadsheet
Attachment 0015 -- Technical Publications.docx DOCX document
Attachment 0016 -- Copyright Release Letter Template.docx DOCX document
Attachment 0017 -- LPD Coded Data Products Packaging.docx DOCX document
Attachment 0025 -- Small Business Subcontracting Plan (Placeholder).docx DOCX document
Attachment 0012 -- TACOM-RRAD Sample Data Plate.pdf PDF
Attachment 0021 -- Revisions and Exceptions.docx DOCX document
Attachment 0008 -- Level of Repair Analysis.docx DOCX document
Attachment 0004 -- Cost and Software Data Reporting Plan.xlsx XLSX spreadsheet
Attachment 0009 -- LMI Data Worksheet Form - Provisioning Data Requirements.pdf PDF
Attachment 0022 -- NDC Personal Information Requirements.docx DOCX document
Attachment 0006 -- TDP Options Worksheet.pdf PDF
Attachment 0001 -- GFP.xlsx XLSX spreadsheet
W56HZV21R0195 RFP for BFV STS Services.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT L03

PROVISIONING REQUIREMENTS STATEMENT

W56HZV-13-R-0189

ATTACHMENT 0008

PROVISIONING REQUIREMENTS STATEMENT

This Provisioning Requirements Statement (PRS) supplements and definitizes requirements in the Statement of Work (SOW).

1. Provisioning/Maintenance/Publication Guidance Conference: Is Required

a. Location:At the Contractor’s facility.
b. Date:TBD
c. Time:TBD

d. Estimated number of days: One

2. Provisioning Conferences(s): Are Required

a. Location: At the Contractor’s facility.

b. Date: As listed in Work Directive.

c. Time: TBD

d. Estimated number of days: As Required (not to exceed 5 days per conference)

e. The Contractor is required to have a sample of the component/end item at the conference.

3. The sample article will not be disassembled at the conference.

4. A Provisioning Preparedness Review Conference is not required.

5. Incremental submission of PTD (LMI Data & EDFP) is authorized.

6. Provisioning Screening is required.

7. A Resident Provisioning Team (RPT) will not be established.

8. Commercial Illustrations and LMI Illustration products media shall be:

a. Hard Copy at each conference

b. Electronic Format (See CDRL AL08)

9. LMI EDFP Support will be sequenced by:

a. PLISN order for hard copy review at conference

b. Part Number order for electronic submission

10. Special Tools and Test Equipment will be included as part of the LMI Data Products (PPL).

11. Repair Kits and Repair Part Sets will be included in the LMI Data Products (PPL).

12. Special Purpose Kits will be included in the LMI Data Products (PPL).

13. Basic Issue Items (BII) will be included in the LMI Data Products (PPL).

14. Components of End Items (COEI) will be included in the LMI Data Products (PPL).

15. Additional Authorization List (AAL) items will be included in the LMI Data Products (PPL).

16. Expendable and durable items will be included in the LMI Data Products (PPL).

17. Bulk material that is required to fabricate items that are coded “M” (make) will also be listed on the LMI Data Products (PPL).