Attachment 0011 -- Provisioning Requirements Statement.docx
DOCX document 22 KB Posted
- Solicitation number
- W56HZV21R0195
About this file
This Provisioning Requirements Statement supplements a Statement of Work for solicitation W56HZV-13-R-0189. The contractor must provide provisioning conferences at their facility, with sample components as needed. Incremental submission of provisioning technical documentation is authorized in both hard copy and electronic format. Logistics product data including special tools, repair kits, and consumable materials must be included. A provisioning preparedness review or resident team are not required.
This sole-source solicitation seeks Systems Technical Support and Sustainment Systems Technical Support from an incumbent for the Bradley Fighting Vehicle System Family of Vehicles, Multiple Launch Rocket System Carrier, and their derivatives. Efforts include program management, logistics support, engineering, product assurance and field service support for the vehicle systems. The Department of the Army Materiel Command TACOM Life Cycle Management Command is the contracting agency.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT L03
PROVISIONING REQUIREMENTS STATEMENT
W56HZV-13-R-0189
ATTACHMENT 0008
PROVISIONING REQUIREMENTS STATEMENT
This Provisioning Requirements Statement (PRS) supplements and definitizes requirements in the Statement of Work (SOW).
1. Provisioning/Maintenance/Publication Guidance Conference: Is Required
| a. Location: | At the Contractor’s facility. |
| b. Date: | TBD |
| c. Time: | TBD |
d. Estimated number of days: One
2. Provisioning Conferences(s): Are Required
a. Location: At the Contractor’s facility.
b. Date: As listed in Work Directive.
c. Time: TBD
d. Estimated number of days: As Required (not to exceed 5 days per conference)
e. The Contractor is required to have a sample of the component/end item at the conference.
3. The sample article will not be disassembled at the conference.
4. A Provisioning Preparedness Review Conference is not required.
5. Incremental submission of PTD (LMI Data & EDFP) is authorized.
6. Provisioning Screening is required.
7. A Resident Provisioning Team (RPT) will not be established.
8. Commercial Illustrations and LMI Illustration products media shall be:
a. Hard Copy at each conference
b. Electronic Format (See CDRL AL08)
9. LMI EDFP Support will be sequenced by:
a. PLISN order for hard copy review at conference
b. Part Number order for electronic submission
10. Special Tools and Test Equipment will be included as part of the LMI Data Products (PPL).
11. Repair Kits and Repair Part Sets will be included in the LMI Data Products (PPL).
12. Special Purpose Kits will be included in the LMI Data Products (PPL).
13. Basic Issue Items (BII) will be included in the LMI Data Products (PPL).
14. Components of End Items (COEI) will be included in the LMI Data Products (PPL).
15. Additional Authorization List (AAL) items will be included in the LMI Data Products (PPL).
16. Expendable and durable items will be included in the LMI Data Products (PPL).
17. Bulk material that is required to fabricate items that are coded “M” (make) will also be listed on the LMI Data Products (PPL).
File details come from the government source that posted it. Updated .