Attachment_0021_Request_for_Waiver_of_First_Article_Testing_Requirements_.docx
DOCX document 21 KB Posted
- Attached to
- Modular Fuel System Tank Rack Module
- Solicitation number
- W56HZV-18-R-0096
About this file
Request for Waiver - First Article Test
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 0021 - Request for Waiver of First Article Testing Requirements
Request for Waiver of First Article Testing Requirements Requirements for First Article Testing are specified in Section C.5 – C.5.3.11.2 of the solicitation. The offeror shall provide proposed prices for CLINs 0001, 0002, and 0003 as part of its Price Factor submission in Attachment 0017 – Pricing Spreadsheet.
PLEASE NOTE: The Government does NOT intend to require all activities under CLIN 0001, 0002, and 0003 during contract performance; only one of the FAT requirements is necessary and will be required depending upon whether offeror’s proposed solution has been previously delivered to/accepted by the Government, and (if so), how recent a previously delivered/accepted proposed system was last produced. Therefore offerors shall provide a completed Waiver of First Article Testing Requirements with its proposal which the Government will consider in the evaluation.
INSTRUCTIONS TO THE OFFEROR: It is expected for each offeror to request one of the three Waiver Request options below as part of its proposal, which will enable the Government to eliminate certain priced CLINs during the evaluation phase of the Price Factor. The offeror shall select one of the Waiver Request options based on the system being proposed, and submit this completed Request as part of its proposal. The offeror can only request waivers specific to one of the three options below. If the subject waiver is approved, all related CDRLs and resulting requirements will be removed upon award. We reserve the right to request additional information to determine whether a Government Full Material Release (FMR) has been obtained.
| CLIN |
| 0001 |
| 0002 |
| 0003 |
| SOW Reference |
| C.5.3 |
| C.5.2 |
| C.5.1 |
| Waiver Request: Select 1 from below 3 choices – X (on the right 3 columns) indicates test activity requested to be waived by Offeror. |
| Full FAT |
| PQT |
| PVT |
☐ Option 1: Offeror proposes a new system that has not been previously delivered to and accepted by the Government.
| X |
| X |
| ☐ | Option 2: Offeror proposes existing system which has NOT been produced in more than two years from RFP closing date. |
| X |
X
| ☐ | Option 3: Offeror Proposes existing system which has been produced within the last two years from RFP closing date. |
| X | |
| X |
If your company proposes Option 1 waiver, please acknowledge the following:
Our company is producing a new system not previously delivered to, and accepted by the Government, and is therefore seeking a waiver from PQT and PVT.
| Signature: _____________________ |
| Name: ________________________ |
| Title: _________________________ |
If your company proposes waiver Options 2 or 3, please complete items 1 and 2 below.
(1) Identify the location where your proposed system/NSN has been manufactured within the last two years from RFP closing date: _____________________________________________________________
(i) Confirm your proposed system was previously furnished by the same manufacturer within the past two years and accepted by the Government by providing the following information:
(a) Contract Number(s):___________________________ Date of most recent acceptance:_______________________________________ Issuing Government Agency (ies):____________________________
(b) Item previously furnished and accepted by the Government:
NSN: _____________________________________
Part number: _______________________________ Type: _____________________________________ Model Number: ______________________________
(c) Engineering control document/change number of item previously furnished:
(2) Certify to the following information:
(i) There have been no changes to manufacturing processes, tooling, or locations used to manufacture the items successfully in the past;
(ii) There have been no changes to manufacturing data (e.g., drawing revisions that change materials, dimensions, processes, inspection or testing requirements used to manufacture the items successfully in the past);
(iii) The proposed item will be the same design and manufactured by same method at same facilities as item previously accepted by the Government.
I certify the information provided in Section 2 is true and pertains to NSN _______________, and is the identical system proposed in Section 1.
| Signature: ___________________________ |
| Name: ______________________________ |
| Title:_______________________________ |
File details come from the government source that posted it.