Attachment_0019__IMI_Appendix_A.PDF
PDF 40 KB Posted
- Attached to
- Modular Fuel System Tank Rack Module
- Solicitation number
- W56HZV-18-R-0096
About this file
IMI Appendix A
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IMI Appendix A, Attachment 0019 10 MAY 18
Tank Rack Module Courseware Minimum Requirements
TANK RACK MODULE
Courseware Minutes Interactivity Level
Scenario
General Information 05 II
Equipment Description And Data 05 II
Theory Of Operation 05 II
Operator Instructions
Description And Use Of Operator Controls And Indicators
10 II
Operation Under Usual Conditions - Preparation For Use
10 II
Operation Under Usual Conditions - Ladder Emplacement And Take Down
10 II
Operation Under Usual Conditions - Fuel Loading Via Port A
10 III X
Operation Under Usual Conditions - Fuel Loading Via Ports B Or G
10 II
Operation Under Usual Conditions - Retail Gravity Operations Via Ports D Or E
10 II
Operation Under Usual Conditions - Fuel Loading Via Port F
05 II
Operation Under Usual Conditions - 4-Inch And 2-Inch Hose Evacuation
10 III X
Operation Under Usual Conditions - Internal Recirculation
10 III X
Operation Under Usual Conditions - HEMTT Interface:
Longitudinal
10 III X
Operation Under Usual Conditions – HEMTT Interface:
Transverse
10 III X
Operation Under Usual Conditions - Upload And Download MFS TRM
10 II
Operation Under Usual Conditions - Draining MFS TRM 10 II
Operation Under Usual Conditions - Draining Fuel From Filter/Separator Assembly
10 II
Operation Under Usual Conditions - Evacuating Manifold
10 II
Operation Under Usual Conditions - Shut Down 05 II
Operation Under Usual Conditions - Checking Fuel Level With Gauge Stick
10 II
Operation Under Usual Conditions - Emplacing And Stowing Roller Assemblies
10 II
Operation Under Usual Conditions - Purging 10 II
Operation Under Usual Conditions - Preparation For Air Or Rail Transport
05 II
Operation Under Unusual Conditions - Unusual Environment/Weather
05 II
Whole-Task Practice Final Practical Exercise. 10 II
Operator Troubleshooting Procedures 20 II
Operator Maintenance Procedures 20 II
Total Min’s 255
Total Hours 4.25
Glossary
Acronyms
Web Links
Digitized Manufactures Manuals and Documentation
Digitized Technical Manuals
Display of the PdM PAWS Logo
File details come from the government source that posted it.