ATTACHMENT_0021_-_Operator's_Manual_Electronic_Technical_Manual_(ETM)_Matrix.pdf

PDF 369 KB Posted

Attached to
M917A3 Heavy Dump Truck (HDT)
Solicitation number
W56HZV15R0026
Issued by

About this file

M917A3 ATTACHMENT 0021

View the file

Other files

File Type Posted
Questions_and_Answers_-_M917A3_HDT_Solicitation_W56HZV-15-R-0026,_31_August_2017.pdf PDF
Questions_and_Answers_-_M917A3_HDT_Solicitation_W56HZV-15-R-0026,_30_August_2017.pdf PDF
Solicitation_Amendment_W56HZV15R0026-0005_-_M917A3_Heavy_Dump_Truck.pdf PDF
Questions_and_Answers_-_M917A3_HDT_Solicitation_W56HZV-15-R-0026,_29_August_2017.pdf PDF
ATTACHMENT_0024_-_Pricing_Worksheet,_29_August_2017.xlsx XLSX spreadsheet
ATTACHMENT_0025_-_DD_Form_254_-_Contract_Security_Classification_Specification,_17_August_2017.pdf PDF
ATTACHMENT_0002_-_Performance_Requirement_Matrix,_15_August_2017.xlsx XLSX spreadsheet
ATTACHMENT_0024_-_Pricing_Worksheet,_23_August_2017.xlsx XLSX spreadsheet
Conformed_Solicitation_W56HZV-15-R-0026__-_M917A3_Heavy_Dump_Truck.pdf PDF
EXHIBIT_A_-_M917A3_Contract_Data_Requirements_List_(CDRL)_DD_Form_1423,_17_August_2017.pdf PDF
Solicitation_Amendment_W56HZV15R0026-0004_-_M917A3_Heavy_Dump_Truck.pdf PDF
Questions_and_Answers_-_M917A3_HDT_Solicitation_W56HZV-15-R-0026,_24_August_2017.pdf PDF
Questions_and_Answers_-_M917A3_HDT_Solicitation_W56HZV-15-R-0026,_17_August_2017.pdf PDF
Questions_and_Answers_-_M917A3_HDT_Solicitation_W56HZV-15-R-0026,_04_August_2017.pdf PDF
Questions_and_Answers_-_M917A3_HDT_Solicitation_W56HZV-15-R-0026,_01_August_2017.pdf PDF
ATTACHMENT_0002_-_Performance_Requirement_Matrix,_27_July_2017.xlsx XLSX spreadsheet
Solicitation_Amendment_W56HZV15R0026-0003_-_M917A3_Heavy_Dump_Truck.pdf PDF
Questions_and_Answers_-_M917A3_HDT_Solicitation_W56HZV-15-R-0026,_26_July_2017.pdf PDF
Questions_and_Answers_-_M917A3_Heavy_Dump_Truck_(HDT)_Solicitation_W56HZV-15-R-0026.pdf PDF
ATTACHMENT_0002_-_Performance_Requirement_Matrix,_21_July_2017.xlsx XLSX spreadsheet
Solicitation_Amendment_W56HZV15R0026-0002_-_M917A3_Heavy_Dump_Truck.pdf PDF
Solicitation_Amendment_W56HZV15R0026-0001_-_M917A3_Heavy_Dump_Truck.pdf PDF
Questions_and_Answers_-_M917A3_Heavy_Dump_Truck_(HDT)_Solicitation_W56HZV-15-R-0026.pdf PDF
Questions_and_Answers_-_M917A3_Heavy_Dump_Truck_(HDT)_Solicitation_W56HZV-15-R-0026.pdf PDF
Questions_and_Answers_-_M917A3_Heavy_Dump_Truck_(HDT)_Solicitation_W56HZV-15-R-0026.pdf PDF
M917A3_Contract_Data_Requirements_List_(CDRL)_DD_Form_1423.pdf PDF
ATTACHMENT_0024_-_Pricing_Worksheet.xlsx XLSX spreadsheet
ATTACHMENT_0019_-_National_Maintenance_Work_Requirement_(NMWR)_Matrix.pdf PDF
ATTACHMENT_0032_-_Government_Furnished_Property_(GFP).pdf PDF
ATTACHMENT_0023_-_New_Equipment_Training_(NET)_After_Action_Report_(AAR).xlsx XLSX spreadsheet
ATTACHMENT_0028_-_TRA_Guidance.pdf PDF
Attachment_0031_-_Certification_of_Small_Business_Size_&_Socioeconomic_Status_for_Subcontractors_Not_Registered_in_the_System_for_Award_Management_(SAM).docx DOCX document
ATTACHMENT_0027_-_Small_Business_Participation_Factor_Workbook_Instructions.pdf PDF
ATTACHMENT_0026_-_Small_Business_Participation_Factor_Workbook.xlsx XLSX spreadsheet
ATTACHMENT_0020_-_Interactive_Electronic_Technical_Manual_(IETM)_Matrix.pdf PDF
ATTACHMENT_0025_-_DD_Form_254_-_Contract_Security_Classification_Specification.pdf PDF
ATTACHMENT_0017_-_Failure_Definition_Scoring_Criteria_(FDSC).pdf PDF
ATTACHMENT_0022_-_Shipping_and_Storage_Guidance.pdf PDF
ATTACHMENT_0029_-_GM_Toolkit_Tool_List.xlsx XLSX spreadsheet
ATTACHMENT_0007_-Products_Provisioning_Parts_List_(PPL)_DATA_Element_Requirements.pdf PDF
ATTACHMENT_0009_-_Incoming_Transaction_Format.pdf PDF
ATTACHMENT_0005_-_Proposed_Vehicle_Specification_Sheet.pdf PDF
ATTACHMENT_0001_(ANNEX_E)_-_ATPD_2352T_Transparent_Armor.pdf PDF
ATTACHMENT_0004_-_Vehicle_Cone_Index_(VCI)_Data_Requirements_Matrix.xlsx XLSX spreadsheet
ATTACHMENT_0011_-_Equipment_Control_Record.pdf PDF
ATTACHMENT_0014_-_Data_Deliverable_Description_-_Request_for_Variance_(RFV).pdf PDF
ATTACHMENT_0001_(ANNEX_I)_-_Tow_Bar_MS500048A.pdf PDF
ATTACHMENT_0012_-_Data_Delivery_Description_-_ECP_&_VECP.pdf PDF
ATTACHMENT_0006_-_Corrosion_and_Rust_Inhibitor_-_Salt_Water_Exposure.pdf PDF
ATTACHMENT_0002_-_Performance_Requirement_Matrix.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MIL-STD-40051-2B

APPENDIX A

TABLE A-II. Operators and combined operator/maintenance requirements matrix for

TM 9-2320-XXX-10_____________.

TM Content -10 -13

-13&P -14

-14&P

MIL-STD-40051-2B

Reference Element Name FRONT MATTER R R R 5.2.1 <paper.frnt>

Front cover R R R 5.2.1.1 <frntcover>

(MC) Promulgation letter 5.2.1.3 <promulgation>

Warning summary 5.2.1.4 <warnsum>

Change transmittal page 5.2.1.5 <chgsheet>

List of effective pages/work packages

R R R 5.2.1.6 <loepwp>

Title page R R R 5.2.1.7 <titleblk>

Table of contents R R R 5.2.1.9 <contents>

How to use this manual R R R 5.2.1.10 <howtouse>

CHAPTER 1.

GENERAL INFORMATION,

EQUIPMENT DESCRIPTION,

AND THEORY OF OPERATION

R R R APPENDIX B <gim>

GENERAL INFORMATION WORK

PACKAGE

R R R B.5.2 <ginfowp>

Scope R R R B.5.2.3 <scope>

Maintenance forms, records, and reports

R R R B.5.2.4 <mfrr>

Reporting Equipment Improvement Recommendations (EIR)

R R R B.5.2.5 <eir>

Hand Receipt (HR) manuals B.5.2.6 <handreceipt>

Corrosion Prevention and Control

(CPC)

R R R B.5.2.7 <cpcdata>

Ozone Depleting Substances

(ODS)

B.5.2.8 <odsdata>

Destruction of Army materiel to prevent enemy use

R R R B.5.2.9 <destructmat>

Preparation for storage or shipment R R R B.5.2.10 <pssref>

Warranty information B.5.2.11 <wrntyref>

Nomenclature cross-reference list R R R B.5.2.12 <nomenreflist>

List of abbreviations/acronyms R R R B.5.2.13 <loa>

Quality of material P R R B.5.2.15 <qual.mat.info>

Safety, care, and handling B.5.2.16 <sftyinfo>

Nuclear hardness B.5.2.17 <hcp>

Calibration B.5.2.18 <calref>

Item unique identification (IUID) B.5.2.19 <iuid>

M917A3 ATTACHMENT 0021

TABLE A-II. Operators and combined operator/maintenance requirements matrix for

TM Content -10 -13

-13&P -14

-14&P

MIL-STD-40051-2B

Reference Element Name Supporting information for repair parts, special tools, TMDE, and support equipment

P B.5.2.26 <supdata>

Copyright credit line B.5.2.27 <copyrt>

EQUIPMENT DESCRIPTION AND

DATA WORK PACKAGE

R R R B.5.3 <descwp>

Equipment characteristics, capabilities, and features

R R R B.5.3.3 <eqpinfo>

Location and description of major components

R R R B.5.3.4 <locdesc>

Differences between models B.5.3.5 <eqpdiff>

Equipment data R R R B.5.3.6 <eqpdata>

THEORY OF OPERATION WORK

PACKAGE

R R R B.5.4 <thrywp>

CHAPTER X.

OPERATOR INSTRUCTIONS

R R R APPENDIX C <opim>

DESCRIPTION AND USE OF

OPERATOR CONTROLS AND

INDICATORS WORK PACKAGE

R R R C.5.2.2.1 <ctrlindwp>

OPERATION UNDER USUAL

CONDITIONS WORK PACKAGE

R R R C.5.2.2.2 <opusualwp>

Operation under usual conditions task

R R R C.5.2.2.2.3 <opertsk>

Security measures for electronic data

C.5.2.2.2.4 <secref>

Siting requirements C.5.2.2.2.5 <site>

Shelter requirements C.5.2.2.2.6 <shelter>

Assembly and preparation for use C.5.2.2.2.7 <prepforuse>

Initial adjustments, before use and self-test

C.5.2.2.2.8 <initial>

Operating procedures R R R C.5.2.2.2.9 <oper>

Operating auxiliary equipment C.5.2.2.2.11 <operaux>

Preparation for movement C.5.2.2.2.12 <prepmove>

Decals and instruction plates C.5.2.2.2.13 <instructplt>

OPERATION UNDER UNUSUAL

CONDITIONS WORK PACKAGE

R R R C.5.2.2.3 <opunuwp>

Security measures for electronic data

C.5.2.2.3.4 <secref>

Unusual environment/weather R R R C.5.2.2.3.5 <unusualenv>

Fording and swimming C.5.2.2.3.6 <fording>

TABLE A-II. Operators and combined operator/maintenance requirements matrix for

TM Content -10 -13

-13&P -14

-14&P

MIL-STD-40051-2B

Reference Element Name Interim Chemical, Biological, Radiological, and Nuclear (CBRN) decontamination procedures

C.5.2.2.3.7 <decon>

Jamming and Electronic Countermeasures (ECM) procedures

C.5.2.2.3.8 <ecm>

Degraded operation procedures C.5.2.2.3.9 <degraded>

Decals and instruction plates C.5.2.2.3.10 <instructplt>

EMERGENCY WORK PACKAGE C.5.2.2.4 <emergencywp>

STOWAGE AND DECAL/DATA

PLATE GUIDE WORK PACKAGE

C.5.2.2.5 <stowagewp>

ON-VEHICLE EQUIPMENT

LOADING PLAN WORK PACKAGE

C.5.2.2.6 <eqploadwp>

CHAPTER X.

TROUBLESHOOTING

MASTER INDEX

APPENDIX D

D.5.4.4

<tim> <masterindexcategory>

TROUBLESHOOTING INDEX WORK

PACKAGE

D.5.5.5 <tsindxwp>

CHAPTER X.

TROUBLESHOOTING

PROCEDURES

NOTE

The notation (*) indicates that at least one of the these content items shall be included

R R APPENDIX D

D.5.4.2

<tim> <troublecategory>

INTRODUCTION WORK PACKAGE D.5.5.3 <tsintrowp>

TROUBLESHOOTING INDEX WORK

PACKAGE

D.5.5.5 <tsindxwp>

*OPERATIONAL CHECKOUT WORK

PACKAGES

D.5.5.8.3 <opcheckwp>

*TROUBLESHOOTING WORK

PACKAGES

D.5.5.8.4 <tswp>

*COMBINED OPERATIONAL

CHECKOUT AND

TROUBLESHOOTING WORK

PACKAGES

D.5.5.8.5 <opcheck-tswp>

TABLE A-II. Operators and combined operator/maintenance requirements matrix for

TM Content -10 -13

-13&P -14

-14&P

MIL-STD-40051-2B

Reference Element Name

CHAPTER X.

PMCS

MAINTENANCE INSTRUCTIONS

NOTE

PMCS may be in its own chapter or may be combned with other maintenance work packages in a maintenance chapter but not both places.

APPENDIX E

E.5.2.1

<mim> <pmcscategory>

PMCS INTRODUCTION WORK

PACKAGE

R R R E.5.3.4.1 <pmcsintrowp>

PMCS, INCLUDING LUBRICATION

INSTRUCTIONS, WORK PACKAGE

R R R E.5.3.4.2 <pmcswp>

CHAPTER X.

MAINTENANCE INSTRUCTIONS

NOTE

PMCS is required as a minimum in one maintenance chapter. PMCS may be in its own chapter or may be combned with other maintenance work packages in a maintenance chapter but not both places.

R R R APPENDIX E

E.5.2.2 E.5.2.3

<mim> <maintenancepmcscateg ory> <maintenancecategory>

SERVICE UPON RECEIPT WORK

PACKAGE (MAINTAINER LEVEL

ONLY)

P R R E.5.3.2 <surwp>

Service upon receipt tasks P R R E.5.3.2.3 <surtsk>

Siting P E.5.3.2.3.1 <siting>

Shelter requirements P E.5.3.2.3.2 <shltr>

Service upon receipt of materiel P R R E.5.3.2.3.3 <surmat>

Installation instructions P R R E.5.3.2.3.4 <install>

Preliminary servicing of equipment P E.5.3.2.3.5 <preserv>

Preliminary checks and adjustment of equipment

P E.5.3.2.3.6 <prechkadj>

Preliminary calibration of equipment

P E.5.3.2.3.7 <precal>

Circuit alignment P E.5.3.2.3.8 <calign>

Ammunition markings P E.5.3.2.3.9.1 <mark>

Classification of defects P E.5.3.2.3.9.2 <ammo.defect>

Ammunition handling P E.5.3.2.3.9.3 <ammo.handling>

Procedures to activate ammunition P E.5.3.2.3.9.4 <arm>

Additional maintenance task P E.5.3.2.3.10 <other.surtsk>

Follow-on maintenance P E.5.3.2.3.11 <followon.maintsk>

TABLE A-II. Operators and combined operator/maintenance requirements matrix for

TM Content -10 -13

-13&P -14

-14&P

MIL-STD-40051-2B

Reference Element Name

EQUIPMENT/USER FITTING

INSTRUCTIONS WORK PACKAGE

E.5.3.3 <perseqpwp>

PMCS INTRODUCTION WORK

PACKAGE

R E.5.3.4.1 <pmcsintrowp>

PMCS WORK PACKAGE R E.5.3.4.2 <pmcswp>

MAINTENANCE WORK PACKAGES R R E.5.3.5 <maintwp>

Maintenance tasks R R E.5.3.5.3 <maintsk> Inspect E.5.3.5.3.2 <inspect> Test E.5.3.5.3.3 <test> Service E.5.3.5.3.4 <service> Adjust E.5.3.5.3.5 <adjust> Align E.5.3.5.3.6 <align> Calibrate E.5.3.5.3.7 <calibration> Remove E.5.3.5.3.8 <remove> Install E.5.3.5.3.9 <install> Replace E.5.3.5.3.10 <replace> Repair E.5.3.5.3.11 <repair> Paint E.5.3.5.3.12 <paint> Overhaul P E.5.3.5.3.13 <overhaul> Rebuild P E.5.3.5.3.14 <rebuild> Lubricate E.5.3.5.3.15 <lube> Mark E.5.3.5.3.16 <mark> Pack E.5.3.5.3.17 <pack> Unpack E.5.3.5.3.18 <unpack> Preserve E.5.3.5.3.19 <preserv> Prepare for use E.5.3.5.3.20 <prepforuse> Assemble E.5.3.5.3.21 <assem> Disassemble E.5.3.5.3.22 <disassem> Clean E.5.3.5.3.23 <clean> Nondestructive inspection E.5.3.5.3.24 <ndi> Radio interference suppression E.5.3.5.3.25 <ris> Place in service E.5.3.5.3.26 <pis> Towing E.5.3.5.3.27 <tow> Jacking E.5.3.5.3.28 <jack> Parking E.5.3.5.3.29 <park> Mooring E.5.3.5.3.30 <moor> Covering E.5.3.5.3.31 <cover> Hoisting E.5.3.5.3.32 <hoist> Sling loading E.5.3.5.3.33 <sling> External power E.5.3.5.3.34 <extpwr> Preparation for shipment and storage

E.5.3.5.3.35 <pss>

Arm E.5.3.5.3.36 <arm> Load E.5.3.5.3.37 <load> Unload E.5.3.5.3.38 <unload> Software maintenance E.5.3.5.3.39 <softwaremaint>

TABLE A-II. Operators and combined operator/maintenance requirements matrix for

TM Content -10 -13

-13&P -14

-14&P

MIL-STD-40051-2B

Reference Element Name Additional maintenance task E.5.3.5.3.40 <other.maintsk>

Follow-on maintenance E.5.3.5.3.41 <followon.maintsk>

GENERAL MAINTENANCE WORK

PACKAGE

E.5.3.7 <gen.maintwp>

LUBRICATION INSTRUCTIONS

WORK PACKAGE

E.5.3.8 <lubewp>

ILLUSTRATED LIST OF

MANUFACTURED ITEMS WORK

PACKAGE (MAINTAINER LEVEL

AND ABOVE)

P

E.5.3.10

Illustrated list of manufactured items introduction work package

P R R E.5.3.10.1 <manu_items_introwp>

Manufacturing procedures work package

P R R E.5.3.10.2 <manuwp>

TORQUE LIMITS WORK PACKAGE

(MAINTAINER LEVEL AND ABOVE)

P E.5.3.11 <torquewp>

WIRING DIAGRAMS WORK

PACKAGE (MAINTAINER LEVEL

AND ABOVE)

P E.5.3.12 <wiringwp>

CHAPTER X.

AUXILIARY EQUIPMENT

MAINTENANCE INSTRUCTIONS

APPENDIX E

E.5.2.6

<mim> <auxiliarycategory>

AUXILIARY EQUIPMENT

MAINTENANCE WORK PACKAGE

E.5.3.14 <auxeqpwp>

ILLUSTRATED LIST OF

MANUFACTURED ITEMS WORK

PACKAGE (MAINTAINER LEVEL

AND ABOVE)

P E.5.3.10

Illustrated list of manufactured items introduction work package

P R R E.5.3.10.1 <manu_items_introwp>

Manufacturing procedures work package

P R R E.5.3.10.2 <manuwp>

TORQUE LIMITS WORK PACKAGE

(MAINTAINER LEVEL AND ABOVE)

P E.5.3.11 <torquewp>

WIRING DIAGRAMS WORK

PACKAGE (MAINTAINER LEVEL

AND ABOVE)

P E.5.3.12 <wiringwp>

CHAPTER X.

AMMUNITION

MAINTENANCE INSTRUCTIONS

APPENDIX E

E.5.2.7

<mim> <ammunitioncategory>

AMMUNITION MAINTENANCE

WORK PACKAGE

E.5.3.15.1 <ammowp>

TABLE A-II. Operators and combined operator/maintenance requirements matrix for

TM Content -10 -13

-13&P -14

-14&P

MIL-STD-40051-2B

Reference Element Name

AMMUNITION MARKING

INFORMATION WORK PACKAGE

E.5.3.15.2 <ammo.markingwp>

FOREIGN AMMUNITION (NATO)

WORK PACKAGE

E.5.3.15.3 <natowp>

CHAPTER X.

PARTS INFORMATION

(-10, -13, -14) (-13&P, -14&P)

R

R

APPENDIX F <pim>

INTRODUCTION WORK PACKAGE P R R F.5.3.5 <introwp>

REPAIR PARTS LIST WORK

PACKAGE

P R R F.5.3.6 <plwp>

REPAIR PARTS FOR SPECIAL

TOOLS WORK PACKAGE

P F.5.3.7 <stl_partswp>

KIT PARTS LIST WORK PACKAGE P F.5.3.8 <kitswp>

BULK ITEM WORK PACKAGE P F.5.3.9 <bulk_itemswp>

SPECIAL TOOLS LIST WORK

PACKAGE

P F.5.3.10 <stlwp>

NSN INDEX WORK PACKAGE P R R F.5.3.11.1 <nsnindxwp>

P/N INDEX WORK PACKAGE P R R F.5.3.11.2 <pnindxwp>

REFERENCE DESIGNATOR INDEX

WORK PACKAGE

P F.5.3.11.3 <refdesindxwp>

CHAPTER X.

DESTRUCTION OF EQUIPMENT

TO PREVENT ENEMY USE

NOTE

If a separate destruction of material manual is not developed for this equipment, then the destruction chapter must be included.

APPENDIX H <dim>

DESTRUCTION OF EQUIPMENT TO

PREVENT ENEMY USE

INTRODUCTION WORK PACKAGE

R R R H.5.3 <destruct-introwp>

Authority to destroy R R R H.5.3.3 <authorize_to_destroy

Reporting destruction R R R H.5.3.4 <report_destruct>

General destruction information R R R H.5.3.5 <general_destruct_inf o>

Degree of destruction R R R H.5.3.6

Essential components and spare parts

H.5.3.7 <component_spares>

TABLE A-II. Operators and combined operator/maintenance requirements matrix for

TM Content -10 -13

-13&P -14

-14&P

MIL-STD-40051-2B

Reference Element Name

DESTRUCTION OF EQUIPMENT TO

PREVENT ENEMY USE

PROCEDURES WORK PACKAGE

R R R H.5.4 <destruct-materialwp>

Parts list H.5.4.3 <essential_spares>

Specific destruction procedures R R R H.5.4.4 <proc>

CHAPTER X.

SUPPORTING INFORMATION

NOTE

Applicable supporting information work packages shall be arranged in the order in which they are presented here and numbered accordingly.

R R R APPENDIX G <sim>

REFERENCES WORK PACKAGE R R R G.5.2 <refwp>

INTRODUCTION FOR NON-

AVIATION TWO-LEVEL

MAINTENANCE MAC WORK

PACKAGE

P R R G.5.3.1 <macintrowp>

MAC WORK PACKAGE (NON-

AVIATION TWO-LEVEL)

P R R G.5.3.3 <macwp>

COMPONENTS OF END ITEM

(COEI) AND BASIC ISSUE ITEMS

(BII) LISTS WORK PACKAGE

R R R G.5.4 <coeibiiwp>

ADDITIONAL AUTHORIZATION

LIST (AAL) WORK PACKAGE

G.5.5 <aalwp>

EXPENDABLE AND DURABLE

ITEMS LIST WORK PACKAGE

R R R G.5.6 <explistwp>

TOOL IDENTIFICATION LIST WORK

PACKAGE

G.5.7 <toolidwp>

MANDATORY REPLACEMENT

PARTS WORK PACKAGE

G.5.8 <mrplwp>

CRITICAL SAFETY ITEMS WORK

PACKAGE

G.5.9 <csi.wp>

SUPPORT ITEMS WORK PACKAGE G.5.10 <supitemwp>

ADDITIONAL SUPPORTING WORK

PACKAGES

G.5.11 <genwp>

REAR MATTER R R R 5.2.3 <rear>

Glossary 5.2.3.1 <glossary>

Alphabetical index 5.2.3.2 <aindx>

DA Form 2028 R R R 5.2.3.3 <da2028>

Authentication page R R R 5.2.3.4 <authent>

TABLE A-II. Operators and combined operator/maintenance requirements matrix for

TM Content -10 -13

-13&P -14

-14&P

MIL-STD-40051-2B

Reference Element Name Foldout pages 5.2.3.5 <foldsect>

Back cover R R R 5.2.3.6 <back>

Legend R - Required P - Prohibited Shaded - As Required

File details come from the government source that posted it. Updated .