IMG_0057.jpg

JPG image 107 KB Posted

Attached to
Flush Sprinkler Systems Building 212
Solicitation number
W52P1J20R5006
Issued by

About this file

This document provides details of a pre-solicitation notice for solicitation number W52P1J20R5006 from the Department of the Army Materiel Command Joint Munitions Command. The pre-solicitation is for a construction project to investigate and flush up to 11 sprinkler systems and 1 cross tie system for possible obstructions in Building 212 on the Rock Arsenal Rock Island IL. The total estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00. The solicitation is expected to be posted on or around April 11, 2020 and will be a full and open competition under NAICS code 238220. Performance and Payment Bonds are required.

View the file

Other files

File Type Posted
E01 W52P1J20C5008 AWARD.pdf PDF
IMG_0053.jpg JPG image
IMG_0055.jpg JPG image
IMG_0050.jpg JPG image
IMG_0054.jpg JPG image
IMG_0051.jpg JPG image
B08 Amendment 00001.pdf PDF
IMG_0046.jpg JPG image
IMG_0048.jpg JPG image
B08 Corrected Amendment 00001.pdf PDF
IMG_0043.jpg JPG image
IMG_0049.jpg JPG image
IMG_0044.jpg JPG image
IMG_0041.jpg JPG image
IMG_0052.jpg JPG image
IMG_0047.jpg JPG image
IMG_0056.jpg JPG image
IMG_0045.jpg JPG image
B08 ATTACHMENT 00001 SOW - PR 2020-875 Flush Building 212 Sprinkler Systems - 16 April 2020....pdf PDF
B08 W52P1J20R5006.pdf PDF
B08 ATTACHMENT 0009 Appendix H - Sprinkler System 5.pdf PDF
B08 ATTACHMENT 0021 Davis Bacon Wage Determination.pdf PDF
B08 ATTACHMENT 0011 Appendix J - Sprinkler System 7.pdf PDF
B08 ATTACHMENT 0007 Appendix F - Sprinkler System 3.pdf PDF
B08 ATTACHMENT 0014 Appendix M - Sprinkler System 10.pdf PDF
B08 ATTACHMENT 0018 Appendix Q - NHC and Demolition Debris Submittal Form - 13Jun16.pdf PDF
B08 ATTACHMENT 0002 Appendix A-Loss-Prevention-Data-Sheet-2-0.pdf PDF
B08 ATTACHMENT 0006 Appendix E - Sprinkler System 2.pdf PDF
B08 ATTACHMENT 0001 SOW - PR 2020-875 Flush Building 212 Sprinkler Systems - 16 April 2020....pdf PDF
B08 ATTACHMENT 0020 Access Control Record Check Request Form.pdf PDF
B08 ATTACHMENT 0016 Appendix O - Cross Tie System.pdf PDF
B08 ATTACHMENT 0010 Appendix I - Sprinkler System 6.pdf PDF
B08 ATTACHMENT 0017 Appendix P - Engineering Graphics Standard - 13Jun16.pdf PDF
B08 ATTACHMENT 0005 Appendix D - Sprinkler System 1.pdf PDF
B08 ATTACHMENT 0013 Appendix L - Sprinkler System 9.pdf PDF
B08 ATTACHMENT 0008 Appendix G - Sprinkler System 4.pdf PDF
B08 ATTACHMENT 0003 Appendix B-Lps Corrosion-Automatic-Sprinkler-Systems.pdf PDF
B08 ATTACHMENT 0004 Appendix C-LPS-Fire-Protection Inspection-Testing-Maint.pdf PDF
B08 ATTACHMENT 0019 Appendix R - REC 2020-0875.pdf PDF
B08 ATTACHMENT 0012 Appendix K - Sprinkler System 8.pdf PDF
B08 ATTACHMENT 0022 Site Visit Meeting Location.pdf PDF
B08 ATTACHMENT 0015 Appendix N - Sprinkler System 11.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .