E01 W52P1J20C5008 AWARD.pdf

PDF 912 KB Posted

Attached to
Flush Sprinkler Systems Building 212 Federal contract opportunity
Solicitation number
W52P1J20R5006
Issued by
Department of the Army Materiel Command Joint Munitions Command

About this file

This document is a federal contract award for flushing sprinkler systems in Building 212 at the Rock Island Arsenal in Rock Island, Illinois. Tri-State Automatic Sprinkler, Inc. was awarded a firm fixed price contract totaling $941,397 to flush up to 11 sprinkler systems and 1 cross tie system. The contractor must begin work within 15 days of receiving the notice to proceed and complete all work within 333 calendar days. The contract incorporates the scope of work and Davis Bacon wage determination. The Army Contracting Command at Rock Island will administer the contract, with work inspected and accepted by the Joint Munitions Command at Rock Island. The contractor must furnish performance and payment bonds and comply with standard federal acquisition clauses and regulations.

View the file

Other files for this federal contract opportunity

Other files attached to Flush Sprinkler Systems Building 212, newest first.
File Type Posted
B08 Corrected Amendment 00001.pdf PDF
IMG_0043.jpg JPG image
IMG_0048.jpg JPG image
IMG_0057.jpg JPG image
IMG_0051.jpg JPG image
IMG_0055.jpg JPG image
IMG_0046.jpg JPG image
IMG_0049.jpg JPG image
B08 Amendment 00001.pdf PDF
IMG_0054.jpg JPG image
IMG_0050.jpg JPG image
IMG_0044.jpg JPG image
IMG_0047.jpg JPG image
IMG_0041.jpg JPG image
IMG_0052.jpg JPG image
IMG_0045.jpg JPG image
IMG_0056.jpg JPG image
IMG_0053.jpg JPG image
B08 W52P1J20R5006.pdf PDF
B08 ATTACHMENT 00001 SOW - PR 2020-875 Flush Building 212 Sprinkler Systems - 16 April 2020....pdf PDF
B08 ATTACHMENT 0001 SOW - PR 2020-875 Flush Building 212 Sprinkler Systems - 16 April 2020....pdf PDF
B08 ATTACHMENT 0017 Appendix P - Engineering Graphics Standard - 13Jun16.pdf PDF
B08 ATTACHMENT 0016 Appendix O - Cross Tie System.pdf PDF
B08 ATTACHMENT 0011 Appendix J - Sprinkler System 7.pdf PDF
B08 ATTACHMENT 0005 Appendix D - Sprinkler System 1.pdf PDF
B08 ATTACHMENT 0003 Appendix B-Lps Corrosion-Automatic-Sprinkler-Systems.pdf PDF
B08 ATTACHMENT 0006 Appendix E - Sprinkler System 2.pdf PDF
B08 ATTACHMENT 0004 Appendix C-LPS-Fire-Protection Inspection-Testing-Maint.pdf PDF
B08 ATTACHMENT 0009 Appendix H - Sprinkler System 5.pdf PDF
B08 ATTACHMENT 0010 Appendix I - Sprinkler System 6.pdf PDF
B08 ATTACHMENT 0021 Davis Bacon Wage Determination.pdf PDF
B08 ATTACHMENT 0007 Appendix F - Sprinkler System 3.pdf PDF
B08 ATTACHMENT 0013 Appendix L - Sprinkler System 9.pdf PDF
B08 ATTACHMENT 0018 Appendix Q - NHC and Demolition Debris Submittal Form - 13Jun16.pdf PDF
B08 ATTACHMENT 0008 Appendix G - Sprinkler System 4.pdf PDF
B08 ATTACHMENT 0014 Appendix M - Sprinkler System 10.pdf PDF
B08 ATTACHMENT 0002 Appendix A-Loss-Prevention-Data-Sheet-2-0.pdf PDF
B08 ATTACHMENT 0020 Access Control Record Check Request Form.pdf PDF
B08 ATTACHMENT 0022 Site Visit Meeting Location.pdf PDF
B08 ATTACHMENT 0012 Appendix K - Sprinkler System 8.pdf PDF
B08 ATTACHMENT 0015 Appendix N - Sprinkler System 11.pdf PDF
B08 ATTACHMENT 0019 Appendix R - REC 2020-0875.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011472532-0002

The United States Army Contracting Command - Rock Island Contracting Center requests a proposal to f lush the sprinkler sytems in Buiding 212 on the Rock Island Arsenal, Rock Island IL. All w ork is to be done in accordance w ith the Scope of Work (SOW) 2020-875.

This Request for Proposal is issued as full and open competition.

In accordance w ith FAR 36.206, Disclosure of Magnitude of Construction Projects, the magnitude for this project, including all bid options is betw een $500,000.00 and $1,000,000.00

A pre-construction site visit is scheduled for 10:00 am CST on April 24th, 2020, at the turn-style in the parking lot behind Building 212. See Attachment 0022 for map. RESERVATIONS FOR THIS SITE VISIT ARE MANDATORY NO LATER THAN 72 HOURS PRIOR TO DATE OF SITE VISIT. See FAR Clause 52.236-27 for registration instructions.

JULIE CULLITON 309-782-5354

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

30-Jun-2020

(RFP)

(IFB)

X

CALL:

Bulding 212 Sprinklers

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________333 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________18 May 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

W52P1J20C5008

7. ISSUED BY CODE

ARMY CONTRACTING COMMAND - ROCK ISLAND

3055 RODMAN AVENUE

ROCK ISLAND IL 61299-8000

W52P1J

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

03:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

2020-875

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W52P1J20R50060001 23

See Item 7

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE

8BU56

FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

SEE SCHEDULE

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

$941,397.00 See Schedule

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE HQ049027. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

DEFENSE FINANCE AND ACCOUNTING SERVICE

DFAS-INDY VP GFEBS

8899 E 56TH STREET

INDIANAPOLIS IN 46249-3800

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR

TRI STATE AUTOMATIC SPRINKLER, INC.

5570 CAREY AVE

DAVENPORT IA 52807-2637

15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.)1 Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract. REF: Proposal dated 15 Jun 2020

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print) Molly J. Lewis / Contract Specialist

TEL: 309-782-1837 EMAIL: molly.j.lewis4.civ@mail.mil

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY 30-Jun-2020

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENTX

(M ust be fully completed by offeror)OFFER

W52P1J20C5008

Section SF 30 - Block 14 Continuation Page (SF 30)

AWARD NARRATIVE

1. This Firm Fixed Price contract W52P1J-20-C-5008, is issued to Tri-State Automatic Sprinkler, Inc, in support of the Flush Building 212 Sprinklers project on the Rock Island Arsenal, Rock Island IL. This work will be completed in accordance with the Scope of Work (SOW) PR 2020-875, dated 28 May 2020 and all appedices attached to the solicitation and this resulting contract.

2. A Notice to Proceed will be provided at the pre-construction conference to be scheduled at a later date.

Work is not to begin until the Notice to Proceed has been issued. The period of performance will begin upon receipt of the Notice to Proceed and the project must be completed within 333 days.

3. A certification of insurance, as set forth in the contract, is required before work commences.

4. Please display all hot line posters at your work site per the safety requirements.

5. Tri-State Automatic Sprinkler, Inc. proposal dated 15 June 2020 is hereby incorporated into this contract.

6. The prevailing Davis Bacon Wage determination is incorporated and will be in effect the entire performance period. The most recent wage determination, provided as Attachment 0021 can also be found online at https://www.wdol.gov/dba.aspx.

7. All other terms and conditions of solicitation W52P1J-20-R-5006 and all of its amendments and attachments are herby incorporated into this contract.

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job $165,188.00 $165,188.00 Base Bid

FFP

Perform the flushing of the sprinkler systems and inspection of the sprinkler heards in accordance with the Scope of Work.

FOB: Destination

PURCHASE REQUEST NUMBER: 0011472532-0002

PSC CD: Z1QA

NET AMT $165,188.00

ACRN AA

CIN: GFEBS001147253200001

$165,188.00

0003 1 Job $126,046.00 $126,046.00

EXERCISED

OPTION

Bid Option 2

FFP

Perform full system flushing and sprinkler head replacement for Sprinkler System 2 in accordance with the Scope of Work.

FOB: Destination

NET AMT $126,046.00

CIN: GFEBS001147253200002

$126,046.00

0004 1 Job $163,413.00 $163,413.00

EXERCISED

OPTION

Bid Option 3

FFP

Perform full system flushing and sprinkler head replacement for Sprinkler System 3 in accordance with the Scope of Work.

FOB: Destination

NET AMT $163,413.00

CIN: GFEBS001147253200003

$163,413.00

0005 1 Job $20,406.00 $20,406.00

EXERCISED

OPTION

Bid Option 4

FFP

Perform full system flushing and sprinkler head replacement for Sprinkler System 4 in accordance with the Scope of Work.

FOB: Destination

NET AMT $20,406.00

CIN: GFEBS001147253200004

$20,406.00

0006 1 Job $122,527.00 $122,527.00

EXERCISED

OPTION

Bid Option 5

FFP

Perform full system flushing and sprinkler head replacement for Sprinkler System 5 in accordance with the Scope of Work.

FOB: Destination

NET AMT $122,527.00

CIN: GFEBS001147253200005

$122,527.00

0007 1 Job $14,802.00 $14,802.00

EXERCISED

OPTION

Bid Option 6

FFP

Perform full system flushing and sprinkler head replacement for Sprinkler System 6 in accordance with the Scope of Work.

FOB: Destination

NET AMT $14,802.00

CIN: GFEBS001147253200006

$14,802.00

0008 1 Job $122,190.00 $122,190.00

EXERCISED

OPTION

Bid Option 7

FFP

Perform full system flushing and sprinkler head replacement for Sprinkler System 7 in accordance with the Scope of Work.

FOB: Destination

NET AMT $122,190.00

CIN: GFEBS001147253200007

$122,190.00

0009 1 Job $14,735.00 $14,735.00

EXERCISED

OPTION

Bid Option 8

FFP

Perform full system flushing and sprinkler head replacement for Sprinkler System 8 in accordance with the Scope of Work.

FOB: Destination

NET AMT $14,735.00

CIN: GFEBS001147253200008

$14,735.00

0010 1 Job $122,364.00 $122,364.00

EXERCISED

OPTION

Bid Option 9

FFP

Perform full system flushing and sprinkler head replacement for Sprinkler System 9 in accordance with the Scope of Work.

FOB: Destination

NET AMT $122,364.00

CIN: GFEBS001147253200009

$122,364.00

0011 1 Job $69,726.00 $69,726.00

EXERCISED

OPTION

Bid Option 10

FFP

Perform full system flushing and sprinkler head replacement for Sprinkler System 10 in accordance with the Scope of Work.

FOB: Destination

NET AMT $69,726.00

CIN: GFEBS001147253200010

$69,726.00

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 27-JUL-2020 TO

25-JUN-2021

N/A JOE GUMPERT

RODELL REED

BLDG 102, 1ST FLR, SW

ROCK ISLAND, IL IL 61299-5000

FOB: Destination

W91QFD

0003 POP 27-JUL-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

0004 POP 27-JUL-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

0005 POP 27-JUL-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

0006 POP 27-JUL-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

0007 POP 27-JUL-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

0008 POP 27-JUL-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

0009 POP 27-JUL-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

0010 POP 27-JUL-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

0011 POP 27-JUL-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

ACCOUNTING AND APPROPRIATION DATA

AA: 0212020202020200000113132254 M.0092760.1 6100.9000021001

COST CODE: A60SG

AMOUNT: $941,397.00

ACRN CLIN/SLIN CIN AMOUNT

AA 0001 GFEBS001147253200001 $165,188.00

0003 GFEBS001147253200002 $126,046.00

0004 GFEBS001147253200003 $163,413.00

0005 GFEBS001147253200004 $20,406.00

0006 GFEBS001147253200005 $122,527.00

0007 GFEBS001147253200006 $14,802.00

0008 GFEBS001147253200007 $122,190.00

0009 GFEBS001147253200008 $14,735.00

0010 GFEBS001147253200009 $122,364.00

0011 GFEBS001147253200010 $69,726.00

Section 00 21 00 - Instructions

CLAUSES INCORPORATED BY REFERENCE

52.228-15 Performance and Payment Bonds--Construction OCT 2010

CLAUSES INCORPORATED BY FULL TEXT

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be twenty (20) percent of the bid price or $3,000,000.00, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

52.232-18 AVAILABILITY OF FUNDS (APR 1984)

Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.

(End of clause)

Section 00 45 00 - Representations and Certifications

52.204-13 System for Award Management Maintenance OCT 2018 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism

MAY 2019

52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. As used in this clause--

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is--

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4) such as agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.

Materials purchased directly by the Government are supplies, not construction material.

Cost of components means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means--

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if--

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

Foreign construction material means a construction material other than a domestic construction material.

United States means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison Construction material description Unit of measure Quantity Price (dollars) \1\ Item 1 Foreign construction material.... ........... ___ ........ ....... ………. ___ ................ ........ ___ Domestic construction material... ........ ___ ............... .............. ___ .................. ...... ___ Item 2 Foreign construction material.... ......... ___ ............. ........ ……. ___ ............... ......... ___ Domestic construction material... ....... ___ .................. ............. ___ ................. ....... ___ Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil

Section 00 70 00 - Conditions of the Contract

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government 0010 Destination Government Destination Government 0011 Destination Government Destination Government

52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.204-2 Alt II Security Requirements (Aug 1996) - Alternate II APR 1984 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber

Content Paper

MAY 2011

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

OCT 2018

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

OCT 2018

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.215-2 Audit and Records--Negotiation OCT 2010 52.219-4 Notice of Price Evaluation Preference for HUBZone Small

Business Concerns

OCT 2014

52.219-8 Utilization of Small Business Concerns OCT 2018 52.219-14 Limitations On Subcontracting JAN 2017 52.222-3 Convict Labor JUN 2003

52.222-4 Contract Work Hours and Safety Standards - Overtime Compensation

MAY 2018

52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records AUG 2018 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for

Construction

APR 2015

52.222-35 Equal Opportunity for Veterans OCT 2015 52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-37 Employment Reports on Veterans FEB 2016 52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-50 Combating Trafficking in Persons JAN 2019 52.222-54 Employment Eligibility Verification OCT 2015 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-15 Energy Efficiency in Energy-Consuming Products DEC 2007 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

AUG 2018

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

AUG 2011

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.227-1 Authorization and Consent DEC 2007 52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

DEC 2007

52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 Pledges Of Assets AUG 2018 52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014 52.228-14 Irrevocable Letter of Credit NOV 2014 52.228-15 Performance and Payment Bonds--Construction OCT 2010 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-17 Interest MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

OCT 2018

52.232-40 Providing Accelerated Payments to Small Business Subcontractors

DEC 2013

52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004

52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-4 Physical Data APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-16 Quantity Surveys APR 1984 52.236-17 Layout of Work APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.242-5 Payments to Small Business Subcontractors JAN 2017 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.244-6 Subcontracts for Commercial Items AUG 2019 52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.248-3 Value Engineering-Construction OCT 2015 52.249-2 Alt I Termination for Convenience of the Government (Fixed-

Price) (Apr 2012) - Alternate I

SEP 1996

52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Antiterrorism Awareness Training for Contractors. FEB 2019 252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting

DEC 2019

252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials

SEP 2014

252.225-7001 Buy American And Balance Of Payments Program-- Basic DEC 2017 252.225-7012 Preference For Certain Domestic Commodities DEC 2017 252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7008 Contract Prices-Bidding Schedules DEC 1991 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.247-7023 Transportation of Supplies by Sea FEB 2019

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 14 days calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work in the base bid ready for use not later than 60 days after the notice to proceed. The time stated for completion shall include final cleanup of the premises.

The Bid Options shall add the following calendars to the length of the contract. If multiple Bid options are selected, the total number of calendar days added is cumulative.

Option 1 - 28 calendar days Option 2 - 42 calendar days Option 3 - 63 calendar days Option 4 - 7 calendar days Option 5 - 42 calendar days Option 6 - 7 calendar days Option 7 - 42 calendar days Option 8 - 7 calendar days Option 9 - 42 calendar days Option 10 -21 calendar days Option 11- 42 calendar days

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JULY 2013)

(a) Definitions. As used in this clause--

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is ``not dominant in its field of operation'' when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.

(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts--

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/content/table-small-business-size-standards.

(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.

(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.

(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.

(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

The Contractor represents that it ( ) is, ( ) is not a small business concern under NAICS Code 238220 - assigned to contract number resultant from this solicitation.

(Contractor to sign and date and insert authorized signer's name and title).

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC HQ0490

Issue By DoDAAC W52P1J

Admin DoDAAC** W52P1J

Inspect By DoDAAC W91QFD

Ship To Code W92QFD

Ship From Code N/A

Mark For Code N/A

Service Approver (DoDAAC) W91QFD

Service Acceptor (DoDAAC) W91QFD

Accept at Other DoDAAC N/A

LPO DoDAAC N/A

DCAA Auditor DoDAAC N/A

Other DoDAAC(s) N/A

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

Rodell.l.reed.civ@mail.mil

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

See List of Attachments

ATTACHMENTS

List of Attachments:

Attachment 0001 – Scope of Work Attachment 0002 – Appendix A – Loss Prevention Data Sheet 2.0 Attachment 0003 – Appendix B – Loss Prevention Data Sheet 2-1, Corrosion in Automatic Sprinkler Systems Attachment 0004 – Appendix C – Loss Prevention Data Sheet 2-81, Fire Protection Inspection, Testing, Maintenance Attachment 0005 – Appendix D – Sprinkler System 1 Attachment 0006 – Appendix E – Sprinkler System 2 Attachment 0007 – Appendix F – Sprinkler System 3 Attachment 0008 – Appendix G – Sprinkler System 4 Attachment 0009 – Appendix H – Sprinkler System 5 Attachment 0010 – Appendix I - Sprinkler System 6 Attachment 0011 – Appendix J – Sprinkler System 7

Attachment 0012 – Appendix K – Sprinkler System 8 Attachment 0013 – Appendix L – Sprinkler System 9 Attachment 0014 – Appendix M – Sprinkler System 10 Attachment 0015 – Appendix N – Sprinkler System 11 Attachment 0016 – Appendix O – Cross Tie System Attachment 0017 – Appendix P – Engineering Graphics Standard Attachment 0018 – Appendix Q – Non-Hazardous Construction and Demolition Submittal Form Attachment 0019 – Appendix R – Record of Environmental Consideration Attachment 0020 – Access Control Check Request Attachment 0021 – Davis Bacon Wage Determination Attachment 0022 – Site Visit Meeting Location

File details come from the government source that posted it. Updated .