B08 ATTACHMENT 0019 Appendix R - REC 2020-0875.pdf

PDF 215 KB Posted

Attached to
Flush Sprinkler Systems Building 212 Federal contract opportunity
Solicitation number
W52P1J20R5006
Issued by
Department of the Army Materiel Command Joint Munitions Command

About this file

This Record of Environmental Consideration (REC) documents the scope of work for a construction project to flush sprinkler systems in Building 212 at Rock Island Arsenal in Illinois. The project will investigate and flush up to 11 sprinkler systems and 1 cross tie system for possible obstructions over approximately 120 days. Routine repair and maintenance of facilities is categorically excluded from further environmental review. Contractors will be responsible for proper disposal of any solid or hazardous waste generated by the project. Asbestos-containing materials, lead-based paint, and non-stormwater discharges from flushing will not impact the work. The REC was approved in December 2019 by the installation's cultural resource manager, chief of environmental division, and NEPA program manager.

View the file

Other files for this federal contract opportunity

Other files attached to Flush Sprinkler Systems Building 212, newest first.
File Type Posted
E01 W52P1J20C5008 AWARD.pdf PDF
B08 Corrected Amendment 00001.pdf PDF
IMG_0043.jpg JPG image
IMG_0048.jpg JPG image
IMG_0057.jpg JPG image
IMG_0051.jpg JPG image
IMG_0055.jpg JPG image
IMG_0046.jpg JPG image
IMG_0049.jpg JPG image
B08 Amendment 00001.pdf PDF
IMG_0044.jpg JPG image
IMG_0047.jpg JPG image
IMG_0041.jpg JPG image
IMG_0052.jpg JPG image
IMG_0045.jpg JPG image
IMG_0056.jpg JPG image
IMG_0053.jpg JPG image
IMG_0054.jpg JPG image
IMG_0050.jpg JPG image
B08 W52P1J20R5006.pdf PDF
B08 ATTACHMENT 00001 SOW - PR 2020-875 Flush Building 212 Sprinkler Systems - 16 April 2020....pdf PDF
B08 ATTACHMENT 0001 SOW - PR 2020-875 Flush Building 212 Sprinkler Systems - 16 April 2020....pdf PDF
B08 ATTACHMENT 0017 Appendix P - Engineering Graphics Standard - 13Jun16.pdf PDF
B08 ATTACHMENT 0016 Appendix O - Cross Tie System.pdf PDF
B08 ATTACHMENT 0011 Appendix J - Sprinkler System 7.pdf PDF
B08 ATTACHMENT 0005 Appendix D - Sprinkler System 1.pdf PDF
B08 ATTACHMENT 0003 Appendix B-Lps Corrosion-Automatic-Sprinkler-Systems.pdf PDF
B08 ATTACHMENT 0006 Appendix E - Sprinkler System 2.pdf PDF
B08 ATTACHMENT 0004 Appendix C-LPS-Fire-Protection Inspection-Testing-Maint.pdf PDF
B08 ATTACHMENT 0009 Appendix H - Sprinkler System 5.pdf PDF
B08 ATTACHMENT 0010 Appendix I - Sprinkler System 6.pdf PDF
B08 ATTACHMENT 0021 Davis Bacon Wage Determination.pdf PDF
B08 ATTACHMENT 0007 Appendix F - Sprinkler System 3.pdf PDF
B08 ATTACHMENT 0022 Site Visit Meeting Location.pdf PDF
B08 ATTACHMENT 0012 Appendix K - Sprinkler System 8.pdf PDF
B08 ATTACHMENT 0015 Appendix N - Sprinkler System 11.pdf PDF
B08 ATTACHMENT 0013 Appendix L - Sprinkler System 9.pdf PDF
B08 ATTACHMENT 0018 Appendix Q - NHC and Demolition Debris Submittal Form - 13Jun16.pdf PDF
B08 ATTACHMENT 0008 Appendix G - Sprinkler System 4.pdf PDF
B08 ATTACHMENT 0014 Appendix M - Sprinkler System 10.pdf PDF
B08 ATTACHMENT 0002 Appendix A-Loss-Prevention-Data-Sheet-2-0.pdf PDF
B08 ATTACHMENT 0020 Access Control Record Check Request Form.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Record of Environmental Consideration (REC)

Project Title: Flush Sprinkler Systems, Building 212

Project # 2020-0875

Anticipated date and/or duration of proposed action: 120 days

Brief Description of the Project: The scope of this project consists of furnishing labor, equipment and material to flush the sprinkler systems in Building 212. If the results of the initial flushing and investigation indicate that the sprinkler system is obstructed, then a full system flush shall be performed.

This Project is Categorically Excluded Under:

a. Per 32 CFR Part 651.29 (a) (1, 2, and 3): The action has not been segmented, no exceptional circumstances exist (b) (1-14), and one or more of the Categorical Exclusions (CX’s) encompass the proposed action.

b. Per 32 CFR Part 651, Appendix B, Section II, the following CX applies which states: (g) Repair and maintenance activities: (1) Routine repair and maintenance of buildings, airfields, grounds, equipment, and other facilities. Examples include, but are not limited to: Removal and disposal of asbestos containing material (for example, roof material and floor tile) or lead-based paint in accordance with applicable regulations; removal of dead, diseased, or damaged trees; and repair of roofs, doors, windows, or fixtures or work on historic structures.

Environmental Considerations

*Contractor is responsible for proper collection/disposal of any solid/hazardous waste generated.

**This action results in a "no potential to cause effects" determination in accordance with 36 CFR Part 800.

*ACM and LBP shall not have an impact on this project.

*Fire sprinkler line flushing is an allowable non-storm water discharge to the storm water system. The flushed water can be directed to a storm drain. This is state in our Industrial Stormwater Permit ILR00-1154.

Record of Environmental Consideration (REC)

George J. Schaub _________________________ Cultural Resource Manager

Reita A. Kuster _________________________ Chief, Environmental Division Installation Environmental Coordinator

Robin Gaines _________________________ NEPA Program Manager

2019-12-03T11:26:55-0600
SCHAUB.GEORGE.JOHN.1268938474
2019-12-04T10:18:59-0600
KUSTER.REITA.A.1230448511
2019-12-04T10:31:51-0600
GAINES.ROBIN.ANNE.1139344029

File details come from the government source that posted it. Updated .