This document contains a construction and demolition debris submittal form and information about an upcoming federal contract opportunity for flushing sprinkler systems. The submittal form requires contractors to estimate the weight and percentage of various construction materials from a project that will be landfilled, recycled, or diverted. It also includes spaces to track actual weights and receiving vendors.

The pre-solicitation notice announces a forthcoming solicitation around April 11, 2020 for a construction project to investigate and flush up to twelve sprinkler and cross-tie systems in a building on Rock Island Arsenal, Illinois. The work is to be completed as a full and open competition under NAICS code 238220 with an estimated value between $1,000,000 and $5,000,000. Performance and payment bonds are required from the successful offeror. The contracting agency is the Department of the Army Materiel Command Joint Munitions Command.

View the file

Other files

File Type Posted
E01 W52P1J20C5008 AWARD.pdf PDF
IMG_0053.jpg JPG image
IMG_0055.jpg JPG image
IMG_0050.jpg JPG image
IMG_0054.jpg JPG image
IMG_0051.jpg JPG image
IMG_0057.jpg JPG image
B08 Amendment 00001.pdf PDF
IMG_0046.jpg JPG image
IMG_0048.jpg JPG image
B08 Corrected Amendment 00001.pdf PDF
IMG_0043.jpg JPG image
IMG_0049.jpg JPG image
IMG_0044.jpg JPG image
IMG_0041.jpg JPG image
IMG_0052.jpg JPG image
IMG_0047.jpg JPG image
IMG_0056.jpg JPG image
IMG_0045.jpg JPG image
B08 ATTACHMENT 00001 SOW - PR 2020-875 Flush Building 212 Sprinkler Systems - 16 April 2020....pdf PDF
B08 W52P1J20R5006.pdf PDF
B08 ATTACHMENT 0009 Appendix H - Sprinkler System 5.pdf PDF
B08 ATTACHMENT 0021 Davis Bacon Wage Determination.pdf PDF
B08 ATTACHMENT 0011 Appendix J - Sprinkler System 7.pdf PDF
B08 ATTACHMENT 0007 Appendix F - Sprinkler System 3.pdf PDF
B08 ATTACHMENT 0014 Appendix M - Sprinkler System 10.pdf PDF
B08 ATTACHMENT 0002 Appendix A-Loss-Prevention-Data-Sheet-2-0.pdf PDF
B08 ATTACHMENT 0006 Appendix E - Sprinkler System 2.pdf PDF
B08 ATTACHMENT 0001 SOW - PR 2020-875 Flush Building 212 Sprinkler Systems - 16 April 2020....pdf PDF
B08 ATTACHMENT 0020 Access Control Record Check Request Form.pdf PDF
B08 ATTACHMENT 0016 Appendix O - Cross Tie System.pdf PDF
B08 ATTACHMENT 0010 Appendix I - Sprinkler System 6.pdf PDF
B08 ATTACHMENT 0017 Appendix P - Engineering Graphics Standard - 13Jun16.pdf PDF
B08 ATTACHMENT 0005 Appendix D - Sprinkler System 1.pdf PDF
B08 ATTACHMENT 0013 Appendix L - Sprinkler System 9.pdf PDF
B08 ATTACHMENT 0008 Appendix G - Sprinkler System 4.pdf PDF
B08 ATTACHMENT 0003 Appendix B-Lps Corrosion-Automatic-Sprinkler-Systems.pdf PDF
B08 ATTACHMENT 0004 Appendix C-LPS-Fire-Protection Inspection-Testing-Maint.pdf PDF
B08 ATTACHMENT 0019 Appendix R - REC 2020-0875.pdf PDF
B08 ATTACHMENT 0012 Appendix K - Sprinkler System 8.pdf PDF
B08 ATTACHMENT 0022 Site Visit Meeting Location.pdf PDF
B08 ATTACHMENT 0015 Appendix N - Sprinkler System 11.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Estimated Weight Estimated Percent to be Landfilled

Estimated Percent to be Recycled

Estimated Percent to be Diverted TOTAL Weight Weight landfilled Landfill Weight recycled Recycler Weight

Diverted Diversion Weight tickets received

(pounds) (%) (%) (%) (pounds) (pounds) (vendor/ company name) (pounds) (vendor/ company name) (pounds) (vendor/ company name) Y or N

CIVIL

Asphalt Concrete Gravel Soil Structural Steel Structural Wood Other Wood Other Steel/Metal Top Soil Sub Soil Trees Crushed Stone/Base

ARCHITECTURAL

Aluminum Brick Carpet Ceiling Tile

CMU

Copper Doors Drywall Glass Insulation Materials Iron Metal Studs Misc Metal Paper Plastic Roofing Materials Sheet Metal Stone Vinyl Base Vinyl Flooring Windows Wood Studs

ELECTRICAL

Ballasts Light Fixtures Transformers Wire Conduit

MECHANICAL

Cast Iron Pipe Copper Pipe Steel Pipe HVAC Equipment White Goods Plumbing Fixtures

RPZ/DCD

Insulation

PHASE II:C&D Report Data

Material

Non-Hazardous Construction and Demolition Debris Submittal Project Title:

Project Number:

Contractor Name:

Contracting Officer's Representative:

PHASE I:C&D Plan Data

File details come from the government source that posted it. Updated .