This file is a Questions and Answers document addressing clarifications for RFQ W51AA1-27-Q-A004 concerning preventative maintenance, diagnostic inspections, and repairs of approximately 39 400 Hz cycle converters at Tobyhanna Army Depot, Pennsylvania. The document clarifies equipment scope, compliance requirements, and evaluation criteria. The converter inventory consists of 14 Tier 1 units, 13 Tier 2 units, and 12 Tier 3 units, with two units currently out of service (to be classified as Tier 3 if repaired) and one spare Hobart unit in storage. Replacement parts will be supplied at direct cost with no markup under Stage 2 emergency repairs, with hourly labor rates submitted in the pricing worksheet serving as binding maximums. The prime contractor must hold CMMC Level 2 (Self) status at time of award, with the requirement flowing down to subcontractors handling Controlled Unclassified Information (CUI), which includes service reports and unit location lists containing building numbers. The NAICS code 811210 must be active in the prime contractor's SAM registration by award, and the contractor must meet the small business size standard of $34.0 million in average annual receipts.
The evaluation will assess only the prime contractor's past performance and resumes of key personnel (from either prime or subcontractor) under FAR 52.212-2 best-value criteria, without requiring a formal subcontractor commitment letter. Offerors should reference solicitation number W51AA1-27-Q-A004 in email subject lines, and site visit attendance on December 7, 2026, is recommended but not mandatory; Form 648-C is required only for attendees without existing depot-issued contractor badges. The wage determination (SCA WD No. 2015-5797, Rev. 33) specifies labor categories: Lead Field Service Technician as electronics mechanic (journeyman/senior) WG-2604-10 or WL-10 leader, and field technicians as electronics mechanic (intermediate) WG-2604-08. Emergency repair authorization is available through five unpriced CLINs (0005, 1005, 2005, 3005, 4004) with funding and execution authority to be provided via subsequent contract modifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| W51AA1-27-Q-A004 | |
| QUESTIONS AND ANSWERS 2 | |
| 24-NOVEMBER 2026 | |
| 6. | CMMC Level 2 (Self) — timing. DFARS 252.204-7021(d)(1)(i) requires the contractor to hold a current CMMC status at Level 2 (Self) or higher, and the pricing worksheet asks for a CMMC UID with the quote. Is a CMMC Level 2 (Self) status (with SPRS affirmation and UID) required at the time of quote submission, or is it required by the time of award / during performance? If a subcontractor holds the required CMMC status, can that satisfy the requirement for the subcontractor's systems, or must the prime contractor itself hold Level 2 (Self)? |
| CMMC status at Level 2 (Self) or higher is required by the prime contractor at time of award. A subcontractor’s CMMC Status does not satisfy the CMMC requirement. The prime contractor must flow down the CMMC Level 2 (Self) requirement to all subcontracts when the subcontractor will handle CUI. | |
| 7. | Submission subject line. RFQ Section 12 instructs offerors to reference solicitation "W51AA1-27-Q-A007" in the email subject line. Please confirm the correct subject-line reference is W51AA127QA004. |
| Correct email subject reference and RFQ identifier is W51AA1-27-Q-A004. The addendum has been corrected. | |
| 8. | NAICS 811210 in SAM. Is NAICS code 811210 required to be active on the offeror's SAM registration at the time of quote submission, or is an active SAM registration with no exclusions sufficient, with the NAICS added before award? Our firm is small under the $34.0M size standard. |
| A small size standard for NAICS 811210 is required at time of award. | |
| 9. | Converter count. The PWS states 39 converters, but Attachment IV lists 43 line items (sequence numbers 1–41 with gaps, plus X2, P1, and P2). Please confirm the total number of converters covered and whether items X2, P1, and P2 are included. |
| The 2 units missing tiers (#5 and #21) have issues and are still in place but currently not in service. They were left on the list as we may receive funding to repair them if there is a workload requirement and they need to be maintained. They will both be Tier 3 if they are returned to service. The Hobart unit serial #305PS09347 is a spare unit in storage and not hooked to power. Attachment IV lists 39 units for maintenance (pending repair of the two not in service) and the spare Hobart in storage. | |
| 10. | Un-tiered units. Six units in Attachment IV have no tier assigned (Sequence 5, 6, 8, 21, 25, and 33). Which PM tier and schedule applies to each of these units? |
| Leaving out the spare Hobart unit there are 14ea Tier 1, 13ea Tier 2, and 12ea Tier 3. If the spare Hobart ever replaces one of the 39 units, it will assume the Tier of the unit it replaces. | |
| 11. | Site visit. Please confirm attendance at the December 7, 2026 site visit is not mandatory for quote submission, and that Form 648-C is required only for attendees who do not already hold a depot-issued Contractor badge. |
| Attendance at the site visit is recommended, but not mandatory, for quote submission. Form 648-C is only required for attendees who do not have a depot-issued contractor badge. | |
| 12. | Parts — Nonmanufacturer Rule and OEM access. FAR 52.219-33 (Nonmanufacturer Rule) is listed in the RFQ. Does it apply to replacement parts furnished under this services contract? May the prime satisfy OEM-parts requirements through its subcontractor's authorized OEM distribution channels, including for makes the subcontractor does not manufacture (e.g., Hobart, Pillar, Unitron)? |
| FAR 52.219-33 (Nonmanufacturer Rule) has been removed since applies strictly to acquisitions where the principal purpose is the procurement of manufactured supplies. The primary purpose of this acquisition is for services. | |
| 13. | Wage Determination. The RFQ cites SCA Wage Determination No. 2015-5797, Rev. 33, dated 08/17/2026. Please confirm where offerors may obtain the full WD, and which labor categories apply to the Lead Field Service Technician and field technicians. |
| Offerors may obtain the full WD on https://sam.gov/. The labor category for lead field service technician is electronics mechanic (journeyman / senior) WG-2604-10 (or WL-10 leader) and the labor category for field technicians is electronics mechanic (intermediate) WG-2604-08. | |
| 14. | Past performance and subcontractor experience. Under the best-value evaluation (FAR 52.212-2), may a subcontractor's past performance and the resumes of subcontractor key personnel (Contract Manager, Lead Field Service Technician) be submitted to satisfy the Volume II technical requirements? Is a subcontractor commitment letter required with the quote? |
| Only the Prime’s past performance will be evaluated and resumes of key personnel, from the prime or the subcontractor, should be submitted. See FAR 52.212-2, Evaluation - Commercial Products and Commercial Services for award evaluation and basis for award. A signed commitment letter from the subcontractor is not required. | |
| 15. | CLIN reference. PWS Paragraph 4.3 refers to emergency-repair materials under "CLIN 0003," while Attachment III prices Stage 2 approved emergency repairs under CLIN 0005 (and Stage 1 call-outs under CLIN 0004). Please confirm the correct CLIN references. |
| Performance Work Statement, paragraph 4.3 has been edited to reference CLIN 0005. | |
| 16. | Stage 2 repair pricing. Please confirm that Stage 2 repair quotes are priced at direct cost for parts with no markup (PWS 5.2.3), and that the Stage 2 hourly labor rate entered in Attachment III is the binding maximum rate for repair labor. |
| Any Stage 2 repair action must be proposed using your direct (at-cost) material expenses and a labor charge that does not exceed the hourly rate submitted in your Attachment III pricing worksheet. | |
| QUESTIONS AND ANSWERS 1 | |
| 19-NOVEMBER 2026 | |
| 1. | Can you confirm the final equipment count and maintenance tiers? The PWS specifies 39 converters, while Attachment IV contains blank entries and unassigned tiers. |
| The 2 units missing tiers (#5 and #21) have issues and are still in place but currently not in service. They remain on the list as we may receive funding to repair them if there is a workload requirement and they need to be maintained. They will both be Tier 3 if they are returned to service. The Hobart unit serial #305PS09347 is a spare unit in storage and not hooked to power. Attachment IV lists the 39 units for maintenance (pending repair of the two not in service) and the spare Hobart in storage. Leaving out the spare Hobart unit, there are 14ea Tier 1, 13ea Tier 2, and 12ea Tier 3. If the spare Hobart is ever needed to replace one of the 39 units, it will assume the Tier of the unit it replaces so they remain the same. | |
| 2. | Will relevant subcontractor experience and past performance be considered during technical and past-performance evaluation? |
| UPDATE: The government is evaluating the past performance and experience of the prime offeror for this requirement. resumes of key personnel, from the prime or the subcontractor, should be submitted. See FAR 52.212-2, Evaluation - Commercial Products and Commercial Services for award evaluation and basis for award. | |
| 3. | Regarding CMMC Level 2 (Self), can you clarify which contractor information systems are expected to process, store, or transmit FCI or CUI under this requirement? |
| Post-award, the contractor will be receiving the list of locations for the units. According to our OPSEC program building and bay numbers are considered critical information and therefore any lists of units or service reports with building numbers is considered CUI. | |
| 4. | Can you confirm the correct CLIN designation for separately authorized emergency repairs? |
| CLINs 0005, 1005, 2005, 3005, 4004 are established as Unpriced Line Items in accordance with RFO 12.201-1(e)(2) for approved Stage 2 Emergency Repairs. Funding and execution authority will be provided via subsequent bilateral contract modifications establishing priced Sub-Line Items (SLINs). | |
| 5. | Can you confirm the correct solicitation number to reference in our proposal submission email, as the documents contain different numbers? |
| Correct email subject reference and RFQ identifier is W51AA1-27-Q-A004. The addendum has been corrected. |