Attachment I Performance Work Statement.pdf
PDF 369 KB Posted
- Solicitation number
- W51AA127QA004
- Issued by
-
Department of the Army
About this file
This is a Performance Work Statement (PWS) for preventative maintenance, diagnostic inspections, and repairs on 39 400 Hz cycle converters located at Tobyhanna Army Depot (TYAD) in Tobyhanna, Pennsylvania, effective November 18, 2026.
The contract is non-personal services with the objective of maintaining all designated 400 Hz cycle converters in fully operational condition under load while minimizing system downtime and resolving emergency breakdowns rapidly. The Contractor must provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and travel/lodging necessary for performance. Work must comply with manufacturers' service and technical manuals, with emergency repairs requiring formal written bilateral contract modification approval from the Contracting Officer. The contract establishes three preventative maintenance tiers: Tier I quarterly (four visits annually per unit), Tier II semi-annual (two visits annually per unit), and Tier III annual (one visit annually per idle/storage units). Each PM visit includes load verification using Contractor-furnished load banks (not Government assets), complete internal inspection, filter replacement, cleaning, voltage verification, and written inspection reports delivered within 15 calendar days. Emergency support comprises two sequential stages: Stage 1 provides all-inclusive firm-fixed-price (FFP) emergency call-out and diagnostics with 48-hour on-site response (excluding Federal Holidays and weekends), with diagnostic report and itemized repair quote due within 15 calendar days; Stage 2 covers approved emergency repairs via bilateral contract modification at direct cost only, with no markup permitted on parts/materials, initiated within five business days of modification receipt. The Contractor must develop and maintain a Quality Control Plan addressing organizational structure, performance monitoring, compliance verification, corrective action procedures, and document retention for contract life plus five years. Additional requirements include comprehensive security protocols, ALERT! MWNS enrollment for assignments exceeding seven days, mandatory AT Level I and iWATCH training completion within specified timeframes, OPSEC compliance with Level I Initial and Continual training, CUI handling per DoD standards, full compliance with OSHA 29 CFR 1910/1926 and TYAD Safety Regulation 385-1, and environmental standards under TYAD Regulation 200-5 (ISO 14001). Contract Manager and Lead Field Service Technician positions are designated as Key Personnel with minimum five and eight years of relevant experience, respectively. The Government provides on-site facility access, electricity, water, manufacturers' technical manuals, and on-site training (iWATCH, OPSEC Level I Initial, UXO recognition); the Contractor furnishes all diagnostic/load-testing equipment, spare parts meeting OEM specifications, and vehicles prominently marked with company name.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment V 648C Request for Access to TYAD.pdf | ||
| Attachment II Quality Assurance Surveillance Plan.pdf | ||
| Attachment III Proposed Pricing Worksheet.xlsx | XLSX spreadsheet | |
| RFQ W51AA127QA004 - 400Hz Coverters.pdf | ||
| Attachment IV 400 Hz Converters List.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
PERFORMANCE WORK STATEMENT (PWS)
400 Hz CYCLE CONVERTERS
PREVENTATIVE MAINTENANCE, DIAGNOSTIC INSPECTIONS, AND REPAIRS
TOBYHANNA ARMY DEPOT (TYAD)
November 18, 2026
PART 1 - GENERAL INFORMATION
1.1 Description of Services / Introduction
This is a non-personal service(s) contract to provide preventative maintenance, diagnostic inspections, and repairs on thirty-nine (39) 400 Hz cycle converters located throughout Tobyhanna Army Depot (TYAD). The Contractor shall inspect, test, maintain, and perform repairs on these systems to ensure they remain fully operational under load.
1.2 Background
Tobyhanna Army Depot requires regular preventative maintenance, rapid diagnostic inspections, and emergency repairs for its fleet of thirty-nine (39) 400 Hz cycle converters. These converters support critical depot-wide communications, electronics, and electronics maintenance missions.
Constant readiness of these systems is essential to safeguard uninterrupted support for military operations.
1.3 Scope
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, travel, lodging, and other items necessary to perform services as described in this Performance Work Statement (PWS) and associated contract documents, except for those items specified in Part 3 (Government Property and Services).
The Contractor shall inspect, test, and perform repairs (as approved by the Contracting Officer [KO] or Contracting Officer's Representative [COR]) to the designated 400 Hz cycle converters in accordance with manufacturer’s service and technical manuals. Before performing any emergency repairs, formal written approval must be obtained via bilateral contract modification from the Contracting Officer. The Contractor shall perform to the standards and acceptable quality levels identified in this PWS.
1.4 Objectives
The objective of this contract is to maintain all designated 400 Hz cycle converters in a fully operational condition under load, minimizing system downtime, preventing electrical or mechanical failures, and resolving emergency breakdowns rapidly to ensure continuous depot mission readiness.
1.5 General Information
1.5.1 Quality Control Plan (QCP)
The Contractor shall develop and maintain a Quality Control Plan (QCP) to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s Proposed QCP shall be submitted to the COR for review within ten (10) calendar days after the date of contract award.
The Government will review and either notify the Contractor in writing of acceptance of the plan or return comments within ten (10) calendar days. If the Government has provided comments, the Contractor shall have five (5) calendar days to submit a Final QCP. Any proposed changes to the accepted QCP must be resubmitted for written acceptance by the Contracting Officer no later than thirty (30) calendar days prior to the anticipated change and before implementation. At a minimum, the QCP must address the following:
(a) An organizational chart showing lines of authority, and the names, qualifications, duties, and responsibilities of each Quality Control Team member.
(b) Monitoring procedures to ensure performance complies with all deliverables, timelines, deadlines, and goals.
(c) Monitoring procedures to ensure compliance with all technical specifications, contract clauses, and manufacturer guidelines.
(d) Verification processes to ensure staff qualifications and safety certifications remain current and valid throughout performance.
(e) Controls to ensure all keys and key cards issued remain controlled items.
(f) Inventory controls to track maintenance of any Government-provided materials or manuals.
(g) Corrective action procedures to identify, investigate, and correct non-conforming performance and prevent recurrence.
(h) Document retention procedures to file and save all Quality Control related documents for the life of the contract plus five (5) years.
1.5.1.1 Quality Control Analysis
An Analysis of Quality Control and Timeliness of Submittals (deliverables) shall be provided to the COR within thirty (30) calendar days upon completion of each option period.
1.5.1.2 Issue Reporting
The Contractor shall inform the COR of issues or potential issues that might affect contract performance within two (2) hours of identifying those issues. Verbal reports shall be followed up with written reports within five (5) calendar days.
1.5.2 Quality Assurance
The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).
1.5.3 Recognized Holidays
Work shall not be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a holiday occurs on a Saturday or a Sunday, it is observed on the preceding Friday or following Monday, respectively.
New Year's Day (January 1st) M. L. King Jr.'s Birthday (3rd Monday in January) Presidents Day (3rd Monday in February) Memorial Day (Last Monday in May) Juneteenth (June 19th) Independence Day (July 4th) Labor Day (1st Monday in September) Columbus Day (2nd Monday in October) Veteran's Day (November 11th) Thanksgiving Day (4th Thursday in November) Christmas Day (December 25th)
1.5.4 Operating Hours
1.5.4.1 Government Facility Office Hours
The Government facility office hours are 0700 to 1630 Monday through Thursday, and 0700 to 1530 on Fridays, following TYAD's Regular Day Off (RDO) schedule, except when closed due to federal holidays, local or national emergencies, administrative closings, or similar Government-directed closings.
1.5.4.2 Government Facility Operating Hours
The Government facility operating hours are established around the RDO schedule. The facility may close due to local or national emergencies, administrative closings, or similar Government-directed closings, which will be communicated by the Contracting Officer or COR.
1.5.4.3 Contractor Support Hours
The Contractor shall provide support during normal business operating hours (0700-1630 Monday through Thursday, and 0700-1530 on Fridays, following the TYAD RDO schedule). The Contractor shall maintain an adequate workforce at all times for the uninterrupted performance of all tasks defined within this PWS.
1.5.4.3.1 Contractor Work Plan
The Contractor shall prepare and maintain a Work Plan. The plan shall identify regularly scheduled maintenance (including location, work to be completed, and timeline) and how the Contractor intends to address emergency calls. The Contractor’s proposed Work Plan shall be submitted to the COR for review within ten (10) calendar days after the date of contract award.
The Government will review and accept or return comments within ten (10) calendar days. The Contractor shall then have three (3) calendar days to submit a Final Work Plan. Any proposed change to the accepted Final Work Plan must be resubmitted to the COR for review at least thirty (30) calendar days prior to implementation.
1.5.5 Training Holidays
RESERVED
1.5.6 Place of Performance
The work to be performed under this contract will be performed on-site at Tobyhanna Army Depot, Tobyhanna, PA 18466, and remotely through web/telephone technical support as required.
1.6 Security Requirements
The Contractor shall comply with the TYAD mandatory security requirements incorporated later in this PWS. Those requirements govern contractor access, personnel security, OPSEC, CUI, physical security, and related matters.
Force Protection Condition (FPCON). Should the Force Protection Condition (FPCON) at the installation change, the Government may require changes in contractor security matters and/or processes. If based on the requirements of this contract, contractor employees may be designated as mission essential. Mission-essential contractor employees are required to report for duty and remain on duty during declared emergencies and/or elevated FPCON levels unless otherwise directed by the Contracting Officer (KO) via the appropriate Contracting Officer's Representative
(COR).
Unscheduled gate closures by Law Enforcement may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays.
Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations.
Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
The contractor’s employees shall become familiar with and obey the regulations of the installation, including law enforcement, fire, traffic, safety and security (protecting National security) regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall always carry proper identification with them. The contractor shall ensure compliance with all regulations and orders of the installation which may affect performance. The contractor, if required, shall provide support during contingencies, exercises, heightened operations, and adverse weather or security closures in the accomplishment of performance requirements. From time to time, the Base Commander may decide to close all or part of a base in response to an unforeseen emergency or similar occurrence.
Such emergencies include adverse weather such as snow, or ice, "an act of God,” such as a tornado or an earthquake, or a base disaster such as a gas leak or fire.
Emergency Communications and Services. If assigned to TYAD for (7) seven days or longer, contractors and subcontractor employees will enroll in the ALERT! Mass Warning Notification System (MWNS). Common Access Card (CAC) is required to register for ALERT!. If a CAC has not been deemed necessary for the contractor or subcontractor, the COR will provide the necessary information to TYADs Antiterrorism Officer or TYADs Emergency Manager in the Security Operations Branch for manual input into the ALERT! System.
ALERT! MWNS is NOT optional - it is a Headquarters Department of the Army (HQDA) requirement to be a registered user.
Due to the life-safety implications of the information being relayed and the requirement to provide immediate alerts and warnings, personnel assigned to TYAD must ensure that their personal contact information, including after-duty hours contact information, as appropriate (e.g., personal cellular phone numbers or landline phone numbers), e-mail addresses, home address, etc., are entered into the system and regularly updated or verified every 90 days to remain current and accurate.
In the event of a life-threatening emergency or natural disaster, COR will account for assigned contractors. COR will send personnel accountability report to Emergency Operations Center (EOC).
Base closure announcements will be disseminated via ALERT! MWNS.
Antiterrorism (AT) Level I Training. In accordance with AR 525-13, all contractor and subcontractor employees requiring access to Army installations, facilities, or controlled access areas shall complete AT Level I awareness training annually. This training must be completed prior to being granted installation access and beginning work. The contractor is responsible for ensuring this requirement is met and for providing certificates of completion for each employee to the COR upon request. The web-based training is available at https://jko.jten.mil (Course: JS-US007).
AT Level I and iWATCH training is not required to be in person. While in-person training is an option, the most common and widely accepted method is web-based. Army regulations explicitly provide multiple ways to meet the training requirement to ensure flexibility for all personnel, regardless of their location or access to a classroom setting.
iWATCH Army Training. This training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award. Contractors and all associated sub-contractors will be briefed by the TYAD Antiterrorism/Force Protection officer. It is recommended this training be conducted as part of an initial entry briefing or unit/organization newcomer’s briefings. Send training requests to TYADs Antiterrorism Officer. Contractor employee training will be documented on a local form.
Access and General Protection/Security Policy and Procedures. Contractor and all associated sub-contractor employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by TYAD Law Enforcement. Contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, and/or local policy.
Contractor and all associated sub-contractor employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC- III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by the government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
A background check and approval from TYAD Law Enforcement is required for all contractor and subcontractor personnel prior to on-site access at TYAD. All persons seeking entrance to TYAD shall submit to and comply with all security standards and requirements in force at the time such persons are seeking entry. All contractors, regardless of resident status or citizenship, will be subject to vehicle search and intense in-processing by TYAD security personnel prior to being granted access to TYAD. This requirement is inclusive of on-site supervisory or managerial personnel and sub-contractor personnel that the contractor anticipates will be performing work or visiting on-site. This security screening process may be time consuming, and access may be delayed or denied. COR will provide specifics to the contractor after award and at least ten days prior to the expected visit date for completion. This security screening does not relieve the contractor of any responsibilities to conduct thorough pre-employment background checks and drug screening. Contractor workers will not be granted access to the work site until security screening is completed and access is approved. Any contractor personnel on-site who fail screening will not be permitted further access to TYAD. Ensure undocumented workers are not included in contracted work related to Army missions.
The company will ensure that its employees entering Army-controlled installations or facilities have obtained access badges and passes in accordance with facility regulations and that these badges and passes are obtained in advance so as not to delay the accomplishment of contracted services.
Pre-Bid Site Visit Controls. Any pre-bid site visits held before the contract award will be conducted under strict security controls. These protocols—including mandatory pre-registration for baseline vetting and constant escorting—apply to all potential bidders, regardless of any previous work history with TYAD or current installation access. During this public solicitation phase, a contractor's prior access or familiarity with the installation does not grant them a "need-to-know" for a new requirement. All bidders will be treated as external entities, and the site visit is strictly for a visual inspection of physical conditions only.
Post-Award Information Release. Conversely, all project specifics—including exact locations, detailed plans, and mission context—can and must be provided to the contractor only after the contract is awarded and their personnel have completed all mandatory security training (AT, OPSEC, CUI). At this stage, the contractor has an established "lawful government purpose," and the controlled release of detailed information is appropriate and necessary for the performance of the contract.
Common Access Card (CAC). [If applicable.] Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.
Contractors shall be identified with Government issued identification card (e.g., Common Access Card (CAC) or unit specified identification card). When required, contractor personnel shall comply with local security policies to wear their identification card in a standardized manner, clearly visible attached to the torso of the exterior garment above the belt and below the shoulders except when in use (i.e., inserted in a computer CAC reader) or when in controlled areas requiring other credentials as the primary method of identification. To access any Government base and certain facilities, the contractor shall present required identification card upon demand. Upon exit from Government facilities, the contractor shall conceal their credentials (CAC or other credentials) from plain view.
The contractor and Contractor Security Manager/Officer shall coordinate with the COR for Government credential issues.
For contractors that do not require CAC, but require access to a DoD facility or installation:
Contractor and all associated subcontractor employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC- III) and Terrorist Screening Database (Army Directive 2014-05/AR 190-13); applicable installation, facility and area commander installation and facility access and local security policies and procedures (provided by Government representative); or, at OCONUS locations, in accordance with status-of-forces agreements and other theater regulations.
Collection of Badges. The Contractor shall account for all forms of Government-provided identification (even visitor badges) issued to the Contractor employees in connection with performance under this contract. The Contractor shall return such identification to the issuing agency at the earliest of any of the following, unless otherwise determined by the Government:
1. When no longer needed for contract performance
2. Upon completion of the Contractor employee’s employment
3. Upon contract completion or termination
The Contracting Officer may delay final payment under a contract if the Contractor fails to comply with these requirements. The Contractor shall insert the substance of this clause, including this paragraph, in all subcontracts when the subcontractor’s employees are required to have routine physical access to a federally controlled facility and/or routine access to a federally controlled information system. It shall be the responsibility of the prime Contractor to return such identification to the issuing agency in accordance with the terms set forth in of this section, unless otherwise approved in writing by the Contracting Officer. The company will return all issued U.S. Government Common Access Cards, installation badges, and/or access passes to the COR when the contract is completed or when a contractor employee no longer requires access to the installation or facility.
Contractor personnel will obtain a vehicle pass for access to the military installation and Common Access Cards for computer access, if applicable.
Threat Awareness and Reporting Program (TARP). [If applicable.] For all contractors with security clearances, per AR 381-12, TARP contractor employees must receive initial and annual TARP training by a CI Agent or other trainer as specified.
Insider Threat Program. [If applicable.] The contractor will establish and maintain an insider threat program to gather, integrate, and report relevant and available information indicative of a potential or actual insider threat, consistent with E.O. 13587 and Presidential Memorandum “National Insider Threat Policy and Minimum Standards for Executive Branch Insider Threat Programs.”
Security (OPSEC). OPSEC is mandatory for all and is not a one-time checklist, it is a dynamic, ongoing process embedded in every phase of planning, execution, and daily operations. It requires continuous critical thinking and vigilance from everyone who interacts with government information or operates on a government installation. This includes military personnel, Department of Defense civilians, contractors, subcontractors, and family members. OPSEC is not just a policy, it’s a mindset. Its success depends on consistent awareness and execution by every member of the TYAD community.
At TYAD, all observations, communications, and experiences must be protected and must not be shared with anyone lacking a lawful government purpose or a validated business need-to-know.
This disciplined approach ensures that emerging threats, evolving vulnerabilities, and shifting mission parameters are constantly reassessed and addressed to safeguard critical information.
OPSEC applies across the full spectrum of DoD missions, functions, programs, and activities under this contract. Practicing OPSEC daily is a requirement that is essential to mission success and the protection of national security assets.
Failure to properly safeguard sensitive or classified information—whether through negligence, willful misconduct, or ignorance—may result in administrative, disciplinary, contractual, or criminal consequences.
Applicability and Management of the Contractor OPSEC Plan. The requirement for an Operations Security (OPSEC) Plan or an OPSEC Standing Operating Procedure (SOP) is based on the contractor's access to and handling of Critical Information and/or Controlled Unclassified Information (CUI), regardless of where that information resides. It is essential to distinguish between Information Security (INFOSEC), which protects data "at rest" within a system, and OPSEC, which protects data "in use" by governing the procedures and actions of personnel.
When contractor personnel generate, access or handle CUI—such as building floor plans, maps, technical manuals, operational schedules, or documents that contain information that falls within a CUI category www.dodcui.mil—they are required to have an approved OPSEC Plan/SOP. Contact the COR for more information on an OPSEC Plan/SOP. This plan is a formal, documented agreement that outlines how the contractor will protect the government's sensitive information. Even when CUI is handled exclusively on Government Furnished Equipment (GFE), the contractor remains responsible for the "human factor." The OPSEC Plan transfers the responsibility for protecting this information from the Government to the contractor by legally obligating them to establish internal procedures for everything from secure physical storage and controlled discussions to the proper destruction of materials. Without this plan, the Government retains all risk for how a contractor safeguards its data.
The management and approval of the contractor's OPSEC Plan is a shared responsibility, with defined roles at each stage. Per government acquisition and security policy, it is the Contracting Officer's Representative (COR) who is ultimately responsible for the initial identification and final enforcement of this requirement. The process is as follows:
The COR (designated technical representative) identifies the need for an OPSEC Plan based on the work described and writes the requirement into the Statement of Work (SOW)/checks this off on the Security Review Cover Sheet. After contract award, the COR enforces this by ensuring the contractor submits the plan on time.
The Contracting Officer (KO) ensures the requirement is legally binding in the final contract and is the sole authority to take contractual action for non-compliance. Finally, the Government OPSEC Officer, as the technical expert, is responsible for reviewing the submitted plan against AR 530-1 and providing formal approval or rejection back to the COR.
Annual OPSEC Training Requirements In accordance with AR 530-1, paragraph 4-2(a), all contractors and subcontractors requiring access to TYAD information, systems, or facilities must complete OPSEC Level I Initial and OPSEC Level I Continual training within 30 calendar days of assignment to TYAD and annually thereafter. Personnel may begin work immediately; however, there is no grace period or minimum on-site duration that postpones the training requirement.
Completion and documentation are required no later than 30 calendar days after assignment.
OPSEC Level I training consists of the following:
OPSEC Level I Initial Training. This training provides information specific to the TYAD OPSEC program. Contractors and subcontractors shall coordinate with the TYAD OPSEC Officer, or designated alternate, to schedule and complete the training. The COR will provide the appropriate point of contact. Training may be conducted in person or through Microsoft Teams and is documented by the TYAD OPSEC Officer using the local training form.
OPSEC Level I Continual Training. Commonly referred to as annual OPSEC training, this course provides general OPSEC awareness and reinforces sound OPSEC practices throughout contract performance. Personnel shall complete the online course titled “OPSEC Awareness for Military Members, DoD Employees and Contractors” at:
https://securityawareness.dcsa.mil/opsec/index.htm
The COR serves as the oversight authority for OPSEC training compliance. Contractors and subcontractors shall provide OPSEC Level I Continual training completion certificates to the COR.
The COR will collect and review required documentation to verify compliance with contract requirements.
OPSEC Measures to Protect Critical Information. All personnel are required to protect critical information at all times and in all forms. This section is critical because it moves beyond a simple, vague requirement to “practice OPSEC” and provides the contractor with specific, actionable, and enforceable rules of behavior.
All contractors and subcontractors shall implement the following mandatory OPSEC measures during the entire period of performance to protect critical and sensitive unclassified information:
1. Training and Compliance: Complete all mandatory OPSEC training as specified in this contract and actively apply all TYAD OPSEC measures in daily, contract-related operations.
2. Secure Communications: Avoid discussing government operations in public spaces or over-protected communications (e.g., personal cell phones). Transmit Controlled Unclassified Information (CUI) only through authorized, encrypted channels as directed in the SOW/PWS or use DoD Safe Access File. All contractor personnel handling CUI shall complete mandatory DoD CUI training initially and annually. If contractors do not have the capability to use encrypted emails, they should use DoD SAFE which is the accredited method for sending files that contain CUI, Personally Identifiable Information (PII), or other sensitive data.
3. Public Release and Social Media Prohibition: Do not disclose or post any images, data, or operational details (e.g., maps, pictures, schedules, equipment, tactics) to any unofficial media, including personal or corporate social media platforms. All information or materials intended for public release require a documented OPSEC review by a TYAD certified OPSEC Level II reviewer.
Coordinate all press releases through the COR and TYADs Public Affairs Office.
4. Reporting Requirements: Immediately report any attempts by unauthorized third parties to solicit sensitive information to the TYAD Security Operations Branch, the contract POC, and the contractor's Facility Security Officer (FSO).
5. Credential Control: Conceal or remove all government-issued badges and identification when off the installation. Do not duplicate, loan, or leave credentials unattended (CACs, badges, and/or parking passes or placards). Report any lost or stolen passes/badges/credentials to TYAD Law Enforcement Branch. The COR will provide all POC contact information.
6. Protection of Sensitive Data: Mark and protect internal company data related to this contract (e.g., schedules, deliverables, vulnerability reports) as CUI. All government-provided information, such as drawings and technical data, must be protected in accordance with DoD, Army guidance and guidance within contract package documents.
7. Information Disposal: At contract completion or upon Government request, return all government information to the COR or destroy it in accordance with approved TYAD procedures for handling CUI.
Photography or Videography. Contractors and subcontractors who take photos or video at TYAD must notify their COR at least fourteen business (14) days in advance and complete OPSEC Level I Initial training. The COR will provide the contractor with the security branch’s points of contact after the contract is awarded. All individuals must follow TYAD policy regarding photography/videography and the use of personal electronic devices.
All photos and videos must undergo an OPSEC Review—per AR 530-1 Chapter 4—to evaluate them against TYAD’s Critical Information List and identify any vulnerabilities. That review must be fully documented and signed off by a TYAD employee who holds OPSEC Level II certification before being disseminated.
COMMUNICATIONS SECURITY (COMSEC). (If applicable) All telephonic and electronic communications with DoD organizations are subject to Communications Security (COMSEC) review and monitoring. The contractor is advised that any calls placed to or received from a DoD organization may be subject to monitoring and recording. The contractor shall ensure frequent dissemination of this notice to all employees who communicate with DoD personnel.
Information Security (INFOSEC). The contractor shall comply with all applicable regulations for the protection of government information. Information handled under this contract is categorized as either Controlled Unclassified Information (CUI) or Classified National Security Information (CNSI).
Controlled Unclassified Information (CUI). The handling, marking, safeguarding, and destruction of all CUI shall be in strict accordance with DoD Instruction 5200.48, Controlled Unclassified Information (CUI). Specific contractor responsibilities are detailed in the "Safeguarding CUI" section of this document.
CUI Training Requirement. Any contractor or subcontractor personnel who will generate, receive, maintain, or otherwise access Controlled Unclassified Information (CUI) in performance of this contract must complete mandatory CUI training before accessing CUI. The “DoD Mandatory Controlled Unclassified Information (CUI) Training” course, available through the DCSA CDSE Security Awareness Hub, satisfies this requirement:
https://securityawareness.dcsa.mil/cui/
Contractors and subcontractors are responsible for protecting CUI created, collected, received, or maintained in performance of a Government contract, including contractor-generated information requiring safeguarding, such as personally identifiable information, when applicable. The contractor shall comply with applicable CUI requirements, including Executive Order 13556 and 32 CFR Part 2002. Contractor responsibilities include, but are not limited to:
Marking: Apply required CUI markings to CUI data and contract deliverables.
Access Controls: Restrict CUI access to personnel with a lawful Government purpose and validated need-to-know.
Flow Down: Ensure applicable CUI protection requirements are included in all subcontracts.
Physical and Electronic Safeguarding: Implement appropriate protections for CUI in hard-copy and electronic form, including locked storage and controlled-access areas, as applicable.
Incident Reporting: Immediately report any actual or suspected loss, unauthorized disclosure, or compromise of CUI to the Contracting Officer’s Representative (COR).
Disposition: Return CUI to Tobyhanna Army Depot (TYAD) control or destroy it in accordance with applicable DoD and Army requirements upon contract completion.
CUI training completion certificates shall be provided to the COR upon request. Additional CUI guidance is available at:
www.dodcui.mil
Classified National Security Information (CNSI). (If applicable) If this contract requires access to CNSI, all such information shall be handled, stored, and protected in strict accordance with AR 380- 5, Army Information Security Program, the National Industrial Security Program Operating Manual (NISPOM), and the security classification guidance provided in the DD Form 254 issued for this contract.
SECURITY CLEARANCES AND ACCESS TO CLASSIFIED INFORMATION. (If applicable) Performance of this contract requires contractor access to Classified National Security Information.
The definitive guidance for classification requirements is provided in DD Form 254, Contract Security Classification Specification, which is attached to and made a part of this contract. The contractor shall comply with FAR 52.204-2, Security Requirements, the Security Agreement (DD Form 441), and the National Industrial Security Program Operating Manual (NISPOM). The contractor is responsible for ensuring all personnel who require access to classified information possess the appropriate security clearance and need-to-know before access is granted.
Physical Security. Safeguarding of Government Property. The Contractor shall be responsible for safeguarding all government equipment, information, and property provided for Contractor use.
At the close of each work period, government facilities, equipment, and materials shall be secured.
Key Control. The Contractor shall establish and implement methods of making sure all keys and key cards issued to the Contractor by the Government are not lost, misplaced, or used by unauthorized personnel.
• No keys issued by the Government shall be duplicated.
• The Contractor shall develop a key control procedure, to be included in their Quality Control Plan, which includes procedures for the turn-in of keys by personnel who no longer require access.
• The Contractor shall immediately report any lost or duplicated keys to the Contracting Officer (KO). In the event a key is lost or duplicated, the Government may, at its option, re-key or replace the affected locks, and the total cost shall be deducted from the monthly payment due to the Contractor.
Lock Combinations. The Contractor shall establish and implement methods to ensure that lock combinations are not revealed to unauthorized personnel when applicable. The Contractor shall ensure combinations are changed when personnel with knowledge of the combination no longer have a need-to-know.
1.7 Post Award Conference/Periodic Progress Meetings
The Contractor shall attend a Pre-Work/Post-Award Conference convened by the COR at a time and location established after contract award. The Contracting Officer, COR, and other Government personnel will meet periodically with the Contractor to assess performance. These meetings shall be at no additional cost to the Government. The Contract Manager or designated representative shall attend all scheduled and unscheduled meetings as requested by the Government.
1.8 Contracting Officer’s Representative (COR)
The COR monitors all technical aspects of the contract and assists in contract administration IAW DFARS 202.101 and DoDI 5000.72. The COR is appointed in writing to assure the Contractor performs technical requirements, performs inspections, maintains communication, and monitors performance. The COR is not authorized to change any terms, conditions, cost, or delivery dates, or to request new work that is outside the scope of the contract.
1.9 Key Personnel & Technical Staffing
The Contractor shall provide an adequate and fully qualified workforce to ensure the continuous, uninterrupted performance of all preventative maintenance, diagnostic troubleshooting, and repair requirements described in this Performance Work Statement (PWS). Certain administrative and technical leadership positions are vital to mission success and are designated by the Government as Key Personnel.
The following positions are designated as Key Personnel:
(a) Contract Manager (CM)
(b) Alternate Contract Manager (ACM)
(c) Lead Field Service Technician (LFST)
1.9.1 Contract Manager (CM) and Alternate (ACM)
1. Duties & Authority: The CM (and ACM when acting) serves as the primary point of contact for the Contracting Officer (KO) and Contracting Officer's Representative (COR). The CM shall have full authority to act on all daily operational, scheduling, quality, and contractual matters.
2. Qualifications:
o A minimum of five (5) years of experience within the past ten (10) years managing industrial equipment maintenance, electrical systems, or similar facility support contracts.
o Documented completion of an OSHA 30-Hour safety course (Construction or General Industry).
3. Dual-Hat Option: The Contractor may designate the Lead Field Service Technician as the Alternate Contract Manager, provided that doing so does not compromise on-site technical supervision or safety compliance.
1.9.2 Lead Field Service Technician (LFST)
1. Duties: The LFST directly leads and oversees all on-site preventative maintenance (Tiers I, II, III), Stage 1 emergency diagnostics under load, and Stage 2 repairs across all 39 converters.
2. Qualifications:
o A minimum of five (5) years of hands-on experience within the past eight (8) years troubleshooting, maintaining, and repairing 400 Hz frequency converters or equivalent industrial power systems from multiple manufacturers.
1.9.3 Non-Key Technicians
All non-key technicians assisting on-site must have at least two (2) years of industrial electrical maintenance experience, baseline safety awareness, and work under the direct supervision of the LFST.
1.9 Identification of Contractor Employees
All Contractor personnel must always identify themselves as such, including proper marking of email signature blocks, answering telephones, and wearing visible identification badges.
Contractor employees shall wear their Government-issued badges (or CAC) visibly always attached to the torso of their exterior garment above the belt and below their shoulders, except when safety dictates otherwise.
1.10 Contractor Workspace and Badges
Contractor workspaces (on-site staging, desks, offices) shall contain a sign signifying the space is occupied by Contractor employees. Visible badges containing the employee’s name, company name, photo, and assignment area shall be worn on site. Badges must be returned to the COR immediately upon employee termination or contract completion.
1.11 Contractor Travel
The Contractor shall provide all labor, supervision, tools, equipment, travel, and lodging required to successfully complete all scheduled maintenance and approved repairs on-site at TYAD.
Travel, lodging, and mobilization expenses are not separately reimbursable under this contract and must be incorporated into the Contractor's fully loaded firm-fixed-price rates.
1.12 Other Direct Costs (ODCs)
RESERVED
1.13 Data Rights
The Government has unlimited, exclusive rights to all documents, inspection sheets, engineering reviews, and materials produced under this contract. All such materials are Government-owned and may not be used, disclosed, or sold by the Contractor without written permission from the Contracting Officer.
1.14 Non-Disclosure Requirements
Contractor personnel shall not use, disclose, reproduce, or release any proprietary or Controlled Unclassified Information (CUI) developed or obtained under this contract, except to authorized Government personnel with a strict "Need-to-Know." All sensitive information shall be handled, marked, and protected in accordance with NIST SP 800-53 (for systems operated on behalf of the agency) or NIST SP 800-171 (for internal systems).
1.15 Protection of Government and Contract Information
The Contractor shall not cite or display any contract information, pictures, names, or locations obtained through this contract on any digital or hard copy marketing tools, including company websites, social media, or brochures, IAW the Defense Imagery Management Operations Center (DIMOC) limitations.
1.16 Non-Disclosure Statements
The Contractor shall provide signed individual non-disclosure agreements for all personnel to the Government no later than five (5) calendar days prior to the commencement of on-site work.
1.17 Organizational Conflict of Interest (OCI)
If the Contractor becomes aware of any actual or potential OCI (as defined in FAR Subpart 9.5), the Contractor shall notify the Contracting Officer immediately and submit an OCI Mitigation Plan.
1.18 Phase In / Phase Out Period
RESERVED
1.19 Safety
1.19.1 Safety Laws, Regulations, and TYAD Standards
The Contractor is always solely responsible and liable for job-site safety. Review of plans by Government personnel does not shift this liability. The Contractor shall comply with all OSHA (29 CFR 1910 and 1926), USACE EM 385-1-1, and TYAD Safety Regulation 385-1 (ISO 45001 certified site) safety standards.
1.19.1.1 OSHA 30-Hour Certificates
Contract Manager and direct on-site supervisor(s) (including subcontractor supervisors) will have completed an OSHA 30-hour safety course prior to performing any on-site work. Valid OSHA 30-hour certificates for these personnel must be submitted with proposals.
1.19.1.2 Activity Hazard Analysis (AHA)
Before starting any new phase of work, the Contractor shall prepare, whenever work conditions change, or when a repair introduces new hazards a detailed Job Hazard Analysis (JHA) or Activity Hazard Analysis (AHA) listing the work steps, associated hazards, and risk-mitigation controls IAW EM 385-1-1 shall be submitted.
1.19.1.3 Site-Specific Safety / Accident Prevention Plan
The Contractor shall submit a written Site-Specific Safety & Accident Prevention Plan to the Safety Office and COR before initiating any on-site activities.
1.19.1.4 Red Card Program
TYAD utilizes a "Red Card" program where any depot employee can halt unsafe actions. If a TYAD employee presents a Red Card, the Contractor shall immediately stop working. Work shall not resume until the COR and TYAD Safety Office evaluate the situation and authorize resumption.
1.19.1.5 Fossil Fuel Restrictions
TYAD restricts the use of fossil fuels inside buildings. Only electric or alternatively fueled material-movement equipment is permitted. Any proposed use of fossil-fueled vehicles inside must be documented with engineering justifications and scrubbers/ventilation plans and approved by the Safety Office prior to use.
1.19.1.6 Confined Space Permits
All confined spaces at TYAD are considered permit required. The Contractor must submit a Confined Space Entry Permit and checklist to the Safety Office and Fire Department through the COR and obtain a signed permit prior to entry.
1.19.1.7 Lockout/Tagout (LOTO)
Contractors must perform LOTO in strict accordance with 29 CFR 1910.147 (Control of Hazardous Energy) and coordinate all energy isolation events with the COR.
1.19.1.8 Crane Lift Operations
For any crane or hoist operations, a detailed Lift Plan must be submitted to the Safety Office through the COR at least fourteen (14) days prior to the lift.
1.19.1.9 Crystalline Silica Control
Contractors must establish a written Silica Exposure Control Plan matching OSHA 29 CFR
1926.1153 prior to any grinding, drilling, or concrete cutting.
1.19.1.10 Incident and Accident Reporting
All accidents resulting in injury of any type, near misses, or property damage must be reported to the COR immediately.
Within eight (8) hours: Report any fatality, in-patient hospitalization, amputation, or eye loss.
Within twenty-four (24) hours: Report all other accidents or near misses.
Within five (5) working days: Submit a formal written OSHA 301 Accident/Injury Report to the COR and KO.
1.20 Environmental Standards and Programs
The Contractor shall perform all operations in strict conformance with TYAD Regulation 200-5 (Environmental Management System - EMS under ISO 14001) and NEPA guidelines (32 CFR 651).
1.22.1.1 Air Pollution and Odor Controls
The Contractor shall control fugitive dust and emissions. Any application of paint, epoxy, adhesive, or odor-producing materials must be coordinated with the COR prior to execution.
Work should be planned for off-hours to avoid disrupting depot operations.
1.22.1.2 Hazardous Materials and Safety Data Sheets (SDSs)
The Contractor must submit current SDSs for all hazardous materials (paints, solvents, adhesives, cleaners) proposed for use to the Environmental Branch through the COR at least five (5) working days prior to the materials being brought on post. Legacy Material Safety Data Sheets (MSDS) are not accepted.
1.22.1.3 Hazardous Waste and Disposal
The Contractor shall safely store and label all hazardous waste generated at designated locations. If the TYAD EPA ID is used for shipping, only the Environmental Branch is authorized to sign the manifest. The Contractor must remove all unused hazardous materials upon job completion.
1.22.1.4 Refuse and C&D Debris Recycling
The Contractor shall recycle metals, cardboard, plastics, and wood IAW the depot's general recycling program. A minimum of sixty (60) percent of all non-hazardous construction and demolition (C&D) debris must be diverted from landfills. The Contractor shall submit landfill weight slips or recycling certificates to the COR quarterly.
1.22.1.5 Asbestos and Lead Restrictions
The Contractor must ensure all new materials used are asbestos-free. If ACM or lead paint is suspected or encountered, work must cease immediately and the Environmental Branch contacted at 570-615-7098.
1.21 Required Training
1.21.1 Anti-Terrorism (AT) Level I Training
All Contractor and subcontractor employees requiring access to TYAD shall complete AT Level I awareness training prior to the contract start date or within ten (10) days of hiring new personnel. Training is available on Joint Knowledge Online (JKO) course # JS-US007.
Certificates of completion shall be submitted to the COR within ten (10) calendar days after completion. Refresher training is required every twelve (12) months.
1.21.2 OPSEC Training
All Contractor and subcontractor employees must receive OPSEC Level I Initial training from the TYAD OPSEC officer within thirty (30) days of arrival on post. The Contractor must schedule this training (in-person or via Teams) with the OPSEC branch. For annual refreshers, personnel may take continuous online training and submit certificates of completion to the COR within ten (10) calendar days of completion.
1.21.3 iWATCH Training
All Contractor and subcontractor employees shall be briefed on the local iWATCH program. This training informs employees of suspicious behaviors to watch for and how to report them. The training must be completed within thirty (30) calendar days of contract award (or hire) and results/briefing logs reported to the COR NLT sixty (60) calendar days after contract award.
1.21.4 Information Assurance (IA) Training
All Contractor employees requiring access to Government information systems shall complete the DoD IA Cyber Awareness Training prior to system access. Certificates of completion must be submitted to the COR within thirty (30) days of award/hire and updated every twelve (12) months.
1.21.5 Personally Identifiable Information (PII) Training
Contractor employees requiring access to PII shall complete the "Identifying and Safeguarding PII" training within thirty (30) calendar days of employment and submit certificates to the COR within five (5) days of completion.
1.22 Authorization to Perform Services in Germany
1.23 Notice to Proceed
The effective date of the contract will constitute the date of notice to proceed. A notice to proceed letter will be issued. The date of the letter transmitting the contract will constitute the date of the notice to proceed.
1.24 Electromagnetic Compatibility Directive
RESERVED
1.25 Government Property and Services
For all issued Government Property (such as manuals, technical guidelines, or keys), the Contractor shall submit a Property Management Plan to the KO and Property Administrator via the COR within fifteen (15) calendar days after contract award.
1.26 Conventional Forces Europe (CFE) Treaty Verification Inspection
PART 2 - DEFINITIONS & ACRONYMS
2.1 Definitions
Contracting Officer (KO): A person with the authority to enter, administer, and/or terminate contracts and make related determinations and findings on behalf of the Government.