This file is a Questions and Answers document addressing clarifications for Solicitation W51AA1-27-Q-A004, a Request for Quote for maintenance, inspections, and repairs of approximately 39 400 Hz cycle converters at Tobyhanna Army Depot in Pennsylvania. The document clarifies that the final equipment count comprises 14 Tier 1 units, 13 Tier 2 units, and 12 Tier 3 units for maintenance, with two additional units (#5 and #21) classified as Tier 3 pending potential repair funding and one spare Hobart unit held in storage. The government confirmed that only the prime contractor's past performance and technical experience will be evaluated; subcontractor experience will not be considered during the award process. Regarding cybersecurity requirements, the government clarified that building and bay numbers are classified as Controlled Unclassified Information (CUI) and must be protected by contractors implementing CMMC Level 2 self-assessment controls.
The document also addresses contracting procedures, confirming that CLINs 0005, 1005, 2005, 3005, and 4004 are established as Unpriced Line Items for approved Stage 2 Emergency Repairs, with funding and execution authority to be provided through subsequent contract modifications establishing priced sub-line items. Contractors were directed to reference the solicitation number on page 1, box 5 of the solicitation document when submitting proposals. This is a 100% small business set-aside under NAICS 811210 and PSC J059, with a site visit scheduled for December 7, 2026, at 10:00 a.m. at Tobyhanna Army Depot.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| W51AA1-27-Q-A004 | |
| QUESTIONS AND ANSWERS 1 - 19-NOVEMBER 2026 | |
| 1. | Can you confirm the final equipment count and maintenance tiers? The PWS specifies 39 converters, while Attachment IV contains blank entries and unassigned tiers. |
| The 2 units missing tiers (#5 and #21) have issues and are still in place but currently not in service. They remain on the list as we may receive funding to repair them if there is a workload requirement and they need to be maintained. They will both be Tier 3 if they are returned to service. The Hobart unit serial #305PS09347 is a spare unit in storage and not hooked to power. Attachment IV lists the 39 units for maintenance (pending repair of the two not in service) and the spare Hobart in storage. Leaving out the spare Hobart unit, there are 14ea Tier 1, 13ea Tier 2, and 12ea Tier 3. If the spare Hobart is ever needed to replace one of the 39 units, it will assume the Tier of the unit it replaces so they remain the same. | |
| 2. | Will relevant subcontractor experience and past performance be considered during technical and past-performance evaluation? |
| The government is only evaluating the past performance and experience of the prime offeror for this requirement. Subcontractor past performance and technical experience will not be considered during the evaluation process. See FAR 52.212-2, Evaluation - Commercial Products and Commercial Services for award evaluation and basis for award. | |
| 3. | Regarding CMMC Level 2 (Self), can you clarify which contractor information systems are expected to process, store, or transmit FCI or CUI under this requirement? |
| Post-award, the contractor will be receiving the list of locations for the units. According to our OPSEC program building and bay numbers are considered critical information and therefore any lists of units or service reports with building numbers is considered CUI. | |
| 4. | Can you confirm the correct CLIN designation for separately authorized emergency repairs? |
| CLINs 0005, 1005, 2005, 3005, 4004 are established as Unpriced Line Items in accordance with RFO 12.201-1(e)(2) for approved Stage 2 Emergency Repairs. Funding and execution authority will be provided via subsequent bilateral contract modifications establishing priced Sub-Line Items (SLINs). | |
| 5. | Can you confirm the correct solicitation number to reference in our proposal submission email, as the documents contain different numbers? |
| See page 1, box 5 of the solicitation for the solicitation number to reference in your proposal submission email. |