Attachment III Proposed Pricing Worksheet.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- W51AA127QA004
- Issued by
-
Department of the Army
About this file
This is a Proposed Pricing Worksheet for the preventative maintenance, diagnostic inspections, and repairs of approximately 39 400 Hz cycle converters located at Tobyhanna Army Depot in Tobyhanna, Pennsylvania. Offerors must complete all green-shaded cells and submit the completed worksheet as part of their proposal, with pricing also populated on the signed SF 1449.
The pricing structure consists of firm fixed price (FFP) line items across a base year and four option years, with CLINs organized by maintenance tier and emergency repair services. Base year CLINs include Tier I quarterly preventative maintenance (4 lots), Tier II semi-annual preventative maintenance (2 lots), Tier III annual preventative maintenance (1 lot), and Stage 1 emergency call-out and diagnostics with 48-hour response (4 lots). Each maintenance tier covers all labor, travel, and routine consumables. Stage 2 approved emergency repairs are priced as a fully burdened hourly labor rate and are not evaluated for low-bid determination but will be analyzed for reasonableness; proposed rates are contractually binding and represent maximum authorized charges. Identical CLINs repeat for Option Years 1 through 4. CLIN 5001 is a non-priced informational line item tracking all data deliverables and reports referenced in the Performance Work Statement. CLIN 6001 provides a 6-month option to extend services, calculated at 50% of Option Year 4 total for evaluation purposes, with no obligation for the Government to exercise this option. The Total Evaluated Price combines the base year, all four option years, and the 6-month extension and is used for evaluation only. All funding for repairs requires Contracting Officer Representative approval prior to work commencement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Attachment III - Proposed Pricing Worksheet (16-NOV-26) |
| 400Hz Cycle Converters |
| Preventative Maintenance, Diagnostic Inspections, and Repairs |
| INSTRUCTIONS |
***This attachment shall be completed and submitted as part of the offeror's proposal.*** Entries are required in the green shaed cells ONLY. The pricing shall also be populated on the signed and submitted SF1449.
| FULL COMPANY NAME: | |||||||||
| CAGE CODE: | |||||||||
| UEI: | |||||||||
| CMMC Unique Identifier (UID): | |||||||||
| CLINs | Period | Type | Description | Brief Description / PWS Reference | Quantity | Unit | Unit Price | Total Price | Instructions |
| 0001 | Base Year | FFP | TIER I PM (Quarterly) | All labor, travel, and routine consumables for quarterly preventative maintenance and inspections. (Ref: PWS 5.2.1.1). | 4 | LOT | $0.00 | Enter Firm Fixed Price per Lot for all labor, travel, and routine consumables for PM. (Ref: PWS 5.2.1). | |
| 0002 | Base Year | FFP | TIER II PM (Semi-Annual) | All labor, travel, and routine consumables for semi-annual preventative maintenance and inspections. (Ref: PWS 5.2.1.2). | 2 | LOT | $0.00 | Enter Firm Fixed Price per Lot for all labor, travel, and routine consumables for PM. (Ref: PWS 5.2.1). | |
| 0003 | Base Year | FFP | TIER III PM (Annual) | All labor, travel, and routine consumables for annual preventative maintenance and inspections. (Ref: PWS 5.2.1.3) | 1 | LOT | $0.00 | Enter Firm Fixed Price per Lot for all labor, travel, and routine consumables for PM. (Ref: PWS 5.2.1). | |
| 0004 | Base Year | FFP | Stage 1: Emergency Call-Out & Diagnostics | 48-hr response, troubleshooting under load, diagnostic visit, and quote. (Ref: PWS 5.2.2.1) | 4 | LOT | $0.00 | Enter Firm Fixed Price per call-out. | |
| 0005 | Base Year | FFP | Stage 2: Approved Emergency Repairs | Execution of repairs based on a firm fixed price quote approved by the COR prior to any work being completed. (Ref: PWS 5.2.2.3) | 1 | HOUR | 0 | Enter the fully burdened hourly labor rate to perform repairs under this CLIN. This CLIN is not evaluated for the low-bid determination. However, proposed rates will be analyzed for reasonableness.Offerors may be deemed ineligible for award if proposed rates are unbalanced or reflect a significant variance from customary market rates. Proposed rates will be contractually binding and represent the maximum rates authorized to be charged under this CLIN. | |
| BASE YEAR TOTAL >>> | $0.00 |
| 1001 | Option Year 1 | FFP | TIER I PM (Quarterly) | All labor, travel, and routine consumables for quarterly preventative maintenance and inspections. (Ref: PWS 5.2.1.1). | 4 | LOT | $0.00 | Enter Firm Fixed Price per Lot for all labor, travel, and routine consumables for PM. (Ref: PWS 5.2.1). |
| 1002 | Option Year 1 | FFP | TIER II PM (Semi-Annual) | All labor, travel, and routine consumables for semi-annual preventative maintenance and inspections. (Ref: PWS 5.2.1.2). | 2 | LOT | $0.00 | Enter Firm Fixed Price per Lot for all labor, travel, and routine consumables for PM. (Ref: PWS 5.2.1). |
| 1003 | Option Year 1 | FFP | TIER III PM (Annual) | All labor, travel, and routine consumables for annual preventative maintenance and inspections. (Ref: PWS 5.2.1.3) | 1 | LOT | $0.00 | Enter Firm Fixed Price per Lot for all labor, travel, and routine consumables for PM. (Ref: PWS 5.2.1). |
| 1004 | Option Year 1 | FFP | Stage 1: Emergency Call-Out & Diagnostics | 48-hr response, troubleshooting under load, diagnostic visit, and quote. (Ref: PWS 5.2.2.1) | 4 | LOT | $0.00 | Enter Firm Fixed Price per call-out. |
| 1005 | Option Year 1 | FFP | Stage 2: Approved Emergency Repairs | Execution of repairs based on a firm fixed price quote approved by the COR prior to any work being completed. (Ref: PWS 5.2.2.3) | 1 | HOUR | 0 | Enter the fully burdened hourly labor rate to perform repairs under this CLIN. This CLIN is not evaluated for the low-bid determination. However, proposed rates will be analyzed for reasonableness.Offerors may be deemed ineligible for award if proposed rates are unbalanced or reflect a significant variance from customary market rates. Proposed rates will be contractually binding and represent the maximum rates authorized to be charged under this CLIN. |
| OPTION YEAR 1 TOTAL >>> | $0.00 |
| 2001 | Option Year 2 | FFP | TIER I PM (Quarterly) | All labor, travel, and routine consumables for quarterly preventative maintenance and inspections. (Ref: PWS 5.2.1.1). | 4 | LOT | $0.00 | Enter Firm Fixed Price per Lot for all labor, travel, and routine consumables for PM. (Ref: PWS 5.2.1). |
| 2002 | Option Year 2 | FFP | TIER II PM (Semi-Annual) | All labor, travel, and routine consumables for semi-annual preventative maintenance and inspections. (Ref: PWS 5.2.1.2). | 2 | LOT | $0.00 | Enter Firm Fixed Price per Lot for all labor, travel, and routine consumables for PM. (Ref: PWS 5.2.1). |
| 2003 | Option Year 2 | FFP | TIER III PM (Annual) | All labor, travel, and routine consumables for annual preventative maintenance and inspections. (Ref: PWS 5.2.1.3) | 1 | LOT | $0.00 | Enter Firm Fixed Price per Lot for all labor, travel, and routine consumables for PM. (Ref: PWS 5.2.1). |
| 2004 | Option Year 2 | FFP | Stage 1: Emergency Call-Out & Diagnostics | 48-hr response, troubleshooting under load, diagnostic visit, and quote. (Ref: PWS 5.2.2.1) | 4 | LOT | $0.00 | Enter Firm Fixed Price per call-out. |
| 2005 | Option Year 2 | FFP | Stage 2: Approved Emergency Repairs | Execution of repairs based on a firm fixed price quote approved by the COR prior to any work being completed. (Ref: PWS 5.2.2.3) | 1 | HOUR | 0 | Enter the fully burdened hourly labor rate to perform repairs under this CLIN. This CLIN is not evaluated for the low-bid determination. However, proposed rates will be analyzed for reasonableness.Offerors may be deemed ineligible for award if proposed rates are unbalanced or reflect a significant variance from customary market rates. Proposed rates will be contractually binding and represent the maximum rates authorized to be charged under this CLIN. |
| OPTION YEAR 2 TOTAL >>> | $0.00 |
| 3001 | Option Year 3 | FFP | TIER I PM (Quarterly) | All labor, travel, and routine consumables for quarterly preventative maintenance and inspections. (Ref: PWS 5.2.1.1). | 4 | LOT | $0.00 | Enter Firm Fixed Price per Lot for all labor, travel, and routine consumables for PM. (Ref: PWS 5.2.1). |
| 3002 | Option Year 3 | FFP | TIER II PM (Semi-Annual) | All labor, travel, and routine consumables for semi-annual preventative maintenance and inspections. (Ref: PWS 5.2.1.2). | 2 | LOT | $0.00 | Enter Firm Fixed Price per Lot for all labor, travel, and routine consumables for PM. (Ref: PWS 5.2.1). |
| 3003 | Option Year 3 | FFP | TIER III PM (Annual) | All labor, travel, and routine consumables for annual preventative maintenance and inspections. (Ref: PWS 5.2.1.3) | 1 | LOT | $0.00 | Enter Firm Fixed Price per Lot for all labor, travel, and routine consumables for PM. (Ref: PWS 5.2.1). |
| 3004 | Option Year 3 | FFP | Stage 1: Emergency Call-Out & Diagnostics | 48-hr response, troubleshooting under load, diagnostic visit, and quote. (Ref: PWS 5.2.2.1) | 4 | LOT | $0.00 | Enter Firm Fixed Price per call-out. |
| 3005 | Option Year 3 | FFP | Stage 2: Approved Emergency Repairs | Execution of repairs based on a firm fixed price quote approved by the COR prior to any work being completed. (Ref: PWS 5.2.2.3) | 1 | HOUR | 0 | Enter the fully burdened hourly labor rate to perform repairs under this CLIN. This CLIN is not evaluated for the low-bid determination. However, proposed rates will be analyzed for reasonableness.Offerors may be deemed ineligible for award if proposed rates are unbalanced or reflect a significant variance from customary market rates. Proposed rates will be contractually binding and represent the maximum rates authorized to be charged under this CLIN. |
| OPTION YEAR 3 TOTAL >>> | $0.00 |
| 4001 | Option Year 4 | FFP | TIER I PM (Quarterly) | All labor, travel, and routine consumables for quarterly preventative maintenance and inspections. (Ref: PWS 5.2.1.1). | 4 | LOT | $0.00 | Enter Firm Fixed Price per Lot for all labor, travel, and routine consumables for PM. (Ref: PWS 5.2.1). |
| 4002 | Option Year 4 | FFP | TIER II PM (Semi-Annual) | All labor, travel, and routine consumables for semi-annual preventative maintenance and inspections. (Ref: PWS 5.2.1.2). | 2 | LOT | $0.00 | Enter Firm Fixed Price per Lot for all labor, travel, and routine consumables for PM. (Ref: PWS 5.2.1). |
| 4003 | Option Year 4 | FFP | TIER III PM (Annual) | All labor, travel, and routine consumables for annual preventative maintenance and inspections. (Ref: PWS 5.2.1.3) | 1 | LOT | $0.00 | Enter Firm Fixed Price per Lot for all labor, travel, and routine consumables for PM. (Ref: PWS 5.2.1). |
| 4004 | Option Year 4 | FFP | Stage 1: Emergency Call-Out & Diagnostics | 48-hr response, troubleshooting under load, diagnostic visit, and quote. (Ref: PWS 5.2.2.1) | 4 | LOT | $0.00 | Enter Firm Fixed Price per call-out. |
| 4005 | Option Year 4 | FFP | Stage 2: Approved Emergency Repairs | Execution of repairs based on a firm fixed price quote approved by the COR prior to any work being completed. (Ref: PWS 5.2.2.3) | 1 | HOUR | 0 | Enter the fully burdened hourly labor rate to perform repairs under this CLIN. This CLIN is not evaluated for the low-bid determination. However, proposed rates will be analyzed for reasonableness.Offerors may be deemed ineligible for award if proposed rates are unbalanced or reflect a significant variance from customary market rates. Proposed rates will be contractually binding and represent the maximum rates authorized to be charged under this CLIN. |
| OPTION YEAR 4 TOTAL >>> | $0.00 |
5001 All Years NSP Data Deliverables / Reports Contract Data Requirements List (CDRLs) - This non-priced, informational CLIN is used to contractually list and track all data deliverables (A.001 through A.009). (Ref: PWS 7.2 Tech Exhibit B) The cost for producing these items is included in the priced CLINs. See Exhibits A-J for more information. Not separately priced.
| 6001 | Option to Extend Services | FFP | 6-Month Option to Extend Services | Extension of services. (Ref: FAR 52.217-8) | 1 | LOT | $0.00 | The six (6) month option to extend services does not require pricing. Calculated as 50% of Option Year 4 total for evaluation purposes. The Government is under no obligation to exercise this option. |
| TOTAL EVALUATED PRICE >>> | $0.00 | Sum of Base, Option Years, and 6-Month Extension. This price will be used for "EVALUATION PURPOSES ONLY." All funding for repairs shall be approved by the Contracting Officer Representative (COR) prior to commencement of any work. |
File details come from the government source that posted it. Updated .