Attachment 0005 - 2025-0083 Appendix D - Non-Hazardous Construction and Demolition DS Form (7-16-25).xls
XLS spreadsheet 54 KB Posted
- Solicitation number
- W519TC-25-R-A015
About this file
The file is an Appendix D Non-Hazardous Construction and Demolition Debris Submittal form for the Repair Roof Building 222 - Annex Project (Project Number 2025-0083) at Rock Island Arsenal. The document provides a comprehensive tracking template for construction and demolition materials, categorizing potential waste streams across multiple sectors including Civil (e.g., asphalt, concrete, structural steel), Architectural (e.g., aluminum, brick, drywall), Electrical (e.g., ballasts, light fixtures), and Mechanical (e.g., pipes, HVAC equipment) components. The form is designed to estimate material weights, calculate landfill versus recycling percentages, and track diversion efforts, suggesting a strong emphasis on sustainable waste management practices during the roof repair project.
The associated federal contract opportunity, solicitation number W519TC-25-R-A015, is issued by the Army Contracting Command - Rock Island (ACC-RI) and seeks proposals for repairing the roof of Building 222 Annex located at Rock Island Arsenal in Rock Island, IL. The solicitation was recently updated on 7/16/25 with Amendment 1, which specifically references the updated Attachment 0005 Non-Hazardous Construction & Demolition form, indicating an ongoing refinement of project specifications and environmental considerations for the roof repair project.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1
| Non-Hazardous Construction and Demolition Debris Submittal | ||||||||||||
| Project Title: Repair Roof Building 222 - Annex | ||||||||||||
| Project Number: 2025-0083 | ||||||||||||
| Contractor Name: | ||||||||||||
| Contracting Officer's Representative: | ||||||||||||
| PHASE I:C&D Plan Data | PHASE II:C&D Report Data | |||||||||||
| Material | Estimated Weight | Estimated Percent to be Landfilled | Estimated Percent to be Recycled | Estimated Percent to be Diverted | TOTAL Weight | Weight landfilled | Landfill | Weight recycled | Recycler | Weight Diverted | Diversion | Weight tickets received |
| (pounds) | (%) | (%) | (%) | (pounds) | (pounds) | (vendor/ company name) | (pounds) | (vendor/ company name) | (pounds) | (vendor/ company name) | Y or N | |
| CIVIL | ||||||||||||
| Asphalt | ||||||||||||
| Concrete | ||||||||||||
| Gravel | ||||||||||||
| Soil | ||||||||||||
| Structural Steel | ||||||||||||
| Structural Wood | ||||||||||||
| Other Wood | ||||||||||||
| Other Steel/Metal | ||||||||||||
| Top Soil | ||||||||||||
| Sub Soil | ||||||||||||
| Trees | ||||||||||||
| Crushed Stone/Base | ||||||||||||
| ARCHITECTURAL | ||||||||||||
| Aluminum | ||||||||||||
| Brick | ||||||||||||
| Carpet | ||||||||||||
| Ceiling Tile | ||||||||||||
| CMU | ||||||||||||
| Copper | ||||||||||||
| Doors | ||||||||||||
| Drywall | ||||||||||||
| Glass | ||||||||||||
| Insulation Materials | ||||||||||||
| Iron | ||||||||||||
| Metal Studs | ||||||||||||
| Misc Metal | ||||||||||||
| Paper | ||||||||||||
| Plastic | ||||||||||||
| Roofing Materials | ||||||||||||
| Sheet Metal | ||||||||||||
| Stone | ||||||||||||
| Vinyl Base | ||||||||||||
| Vinyl Flooring | ||||||||||||
| Windows | ||||||||||||
| Wood Studs | ||||||||||||
| ELECTRICAL | ||||||||||||
| Ballasts | ||||||||||||
| Light Fixtures | ||||||||||||
| Transformers | ||||||||||||
| Wire | ||||||||||||
| Conduit | ||||||||||||
| MECHANICAL | ||||||||||||
| Cast Iron Pipe | ||||||||||||
| Copper Pipe | ||||||||||||
| Steel Pipe | ||||||||||||
| HVAC Equipment | ||||||||||||
| White Goods | ||||||||||||
| Plumbing Fixtures | ||||||||||||
| RPZ/DCD | ||||||||||||
| Insulation |
File details come from the government source that posted it. Updated .