Attachment 0005 - 2025-0083 Appendix D - Non-Hazardous Construction and Demolition DS Form (7-16-25).xls

XLS spreadsheet 54 KB Posted

Attached to
Repair Roof Building 222 Annex – Rock Island Arsenal
Solicitation number
W519TC-25-R-A015
Issued by

About this file

The file is an Appendix D Non-Hazardous Construction and Demolition Debris Submittal form for the Repair Roof Building 222 - Annex Project (Project Number 2025-0083) at Rock Island Arsenal. The document provides a comprehensive tracking template for construction and demolition materials, categorizing potential waste streams across multiple sectors including Civil (e.g., asphalt, concrete, structural steel), Architectural (e.g., aluminum, brick, drywall), Electrical (e.g., ballasts, light fixtures), and Mechanical (e.g., pipes, HVAC equipment) components. The form is designed to estimate material weights, calculate landfill versus recycling percentages, and track diversion efforts, suggesting a strong emphasis on sustainable waste management practices during the roof repair project.

The associated federal contract opportunity, solicitation number W519TC-25-R-A015, is issued by the Army Contracting Command - Rock Island (ACC-RI) and seeks proposals for repairing the roof of Building 222 Annex located at Rock Island Arsenal in Rock Island, IL. The solicitation was recently updated on 7/16/25 with Amendment 1, which specifically references the updated Attachment 0005 Non-Hazardous Construction & Demolition form, indicating an ongoing refinement of project specifications and environmental considerations for the roof repair project.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet 1

Non-Hazardous Construction and Demolition Debris Submittal
Project Title: Repair Roof Building 222 - Annex
Project Number: 2025-0083
Contractor Name:
Contracting Officer's Representative:
PHASE I:C&D Plan DataPHASE II:C&D Report Data
MaterialEstimated WeightEstimated Percent to be LandfilledEstimated Percent to be RecycledEstimated Percent to be DivertedTOTAL WeightWeight landfilledLandfillWeight recycledRecyclerWeight DivertedDiversionWeight tickets received
(pounds)(%)(%)(%)(pounds)(pounds)(vendor/ company name)(pounds)(vendor/ company name)(pounds)(vendor/ company name)Y or N
CIVIL
Asphalt
Concrete
Gravel
Soil
Structural Steel
Structural Wood
Other Wood
Other Steel/Metal
Top Soil
Sub Soil
Trees
Crushed Stone/Base
ARCHITECTURAL
Aluminum
Brick
Carpet
Ceiling Tile
CMU
Copper
Doors
Drywall
Glass
Insulation Materials
Iron
Metal Studs
Misc Metal
Paper
Plastic
Roofing Materials
Sheet Metal
Stone
Vinyl Base
Vinyl Flooring
Windows
Wood Studs
ELECTRICAL
Ballasts
Light Fixtures
Transformers
Wire
Conduit
MECHANICAL
Cast Iron Pipe
Copper Pipe
Steel Pipe
HVAC Equipment
White Goods
Plumbing Fixtures
RPZ/DCD
Insulation

File details come from the government source that posted it. Updated .